HomeMy WebLinkAbout91-96 Renewal 2017 Bald Head Island Limited LLCPermit Class RENEWAL RECEIVED MAR 01 2017 STATE OF NORTH CAROLINA Department of Environmental Quality and Permit Number 91-96 Z for DCM- MHD CITY X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Coastal Resources Commission Permit X Excavation and/or filling pursuant to NCGS 113-229 Issued to Bald Head Island Limited LLC, PO Box 3069, Bald Head, NC 28461 Authorizing development in Brunswick County at Cape Fear River, at Southport of SR 1540 , as requested in the permittee's application dated letter dated 12/9/15. is subject to con ms and notes set diance with the a where consistent below. Any violation of these terms may De subject to rmes, mipnsonment or civil action; or may cause me permit to be null and void. 1) This renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 6/3/96, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. Praiis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee :rout Class STATE OF NORTH CAROLINA Department of Environmental Quality — - - and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 91-96 to Bald Head Island Limited LLC PO Box 3069 Bald Head NC 28461 izing development in Brunswick County at Cape Fear River, at Southport of SR 1540 uested in the permittee's application dated letter dated 12/9/15. trait, issued on February 1 2017 is subject to compliance with the application (where consistent permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ,ct to fines, imprisonment or civil action; or may cause the permit to be null and void. This renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 6/3/96, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this renewal. A permit renewal application processing fee of $100 was received by DCM for this project. permit action may be appealed by the permittee or ialified persons within twenty (20) days of the issuing permit must be accessible on -site to Department iel when the project is inspected for compliance. maintenance work or project modification not covered ier requires further Division approval. work must cease when the permit expires on ng this permit, the State of North Carolina agrees project is consistent with the North Carolina Coastal ent Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. Mavis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Per Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 Cell: 910-228-2484 RECEIVED marekvd@ec.rr.com November 1, 2016 NOV 16 2016 Ms. Tara MacPherson NCDEQ Division of Coastal Management DC M- M H D CITY 127 Cardinal Drive Extension Wilmington, NC 28405 Re: CAMA Permit #91-96: Bald Head Island Limited, LLC Deep Point Marina Permit Renewal Dear Ms. MacPherson: This letter is submitted on behalf of Bald Head Island Limited, LLC, for CAMA Major Permit 91-96 Deep Point Marina, 1301 Ferry Road, Southport, NC 28461, set to expire 12-31-16. Included is Bald Head Island Ltd Planning and Permits Check # 1543 for $100 for the renewal. Deep Point is still an important part of the Bald Head Island Limited, LLC ongoing development. As the mainland transportation terminal for the Bald Head Island Ferry, parking facility for almost 3000 vehicles, and the home to an 86 slip recreational "Clean Marina", Deep Point may seem to be pretty complete. However, we still have plans (already in the 91-96 CAMA Permit) for a future Administration Building, Restaurant, Hotel, Marina -front Shops and more parking. It will be several more years before Deep Point is "complete". Thanks for your always kind assistance in this manner. Bruce Marek, P.E. For Bald Head Island Limited, LLC Planning Dept. cc: Jamillah Bailey, BHI Planning & Development 2.aQ0 9� •.,. I l% SEAL 's 15684 { _ •.FjyGINE�a ti� ' ;9(i E J.MPP RECEIVED DCM WILMINGTON, NC NOV 0 4 2016 w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 12, 21 Mr. Bruce Marek PO Box 3069 Bald Head Island, NC 28461 Dear Mr. Marek: Donald R. van der Vaart ? Secretary RECEIVED NOV 16 2016 DCM- MHD CITY This is with reference to your request to modify State Permit #91-96, acting as agent for Bald Head Island Limited, LLC. The permit was issued on June 3, 1996 and expires on November 15, 2016. The action proposed in your submittal, as submitted in your March 2, 2015 request, is to modify the dimensions of the ferry maintenance dock. The dock was originally authorized at 95' in length by 8' in width. The modified dock would include a 16' in length by 10' in width floating ramp landing platform connecting to a 70' in length by 6.25' in width dock. Ferry access dock steps leading to a cantilevered platform would be constructed approximately midway along the dock. Twelve dolphin pilings, each consisting of 4 pilings, are also proposed along the dock. In reviewing the information provided, the Division of Coastal Management has determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. This Letter of Refinement authorizes the modification of State Permit #91-96, as described in your letter dated March 12, 2015 and plan labeled "Sheet: Deep Point Marina Floating Maintenance Dock", dated March 12, 2015. All permit conditions remain in effect. Please note this refinement does not authorize any work not expressly described above, nor does it eliminate the need to obtain any other additional state, federal or local permits, approvals or authorizations that may be required. By copy of this letter we are also notifying the U. S. Army Corps of Engineers and the NC Division of Energy, Minerals & Land Resources of our action. If you have any questions concerning the above or if I can be of any other assistance, please advise. Sincerely, Debra Wilson District Manager cc: Jonathan Howell, DCM Wayne Strickland, LPO Tyler Crumbley, COE Wilmington Files Chad Coburn, DWR 127 Cardinal Drive Ext, Wilmington, North Carolina 28405 Phone: 910-796-72151 Intemet: www.nodenr.gov An Equal Opportunity 1 Af6rmab" Action Employer— Made in part by recycled paper DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARUNGTON AVENUE WILMINGTON, NORTH CAROLINA 28403.1343 July 18, 2017 Regulatory Division Action ID No. SAW-1996-02657 and State Permit No. 91-96 General Permit No. 198000291 Bald Head Island, LLC Attn: Mr. Bruce Marek 5489 Eastwind Road Wilmington, North Carolina 28403 Dear Mr. Marek: Through coordination with the North Carolina Division of Coastal Management, and on behalf of the Bald Head Island, LLC, we have learned of your request to modify your permit issued on June 2, 1996, authorizing Permittee to fill gaps between vessel access stairways, install a 5-piling dolphin cluster, and 5 timber pilings on F-dock last finger pier on Bald Head Island, Brunswick County, North Carolina. Coordinates are: 33.93077 N,-77.99609 W. Your proposal continues to be consistent with the provisions and objectives of general permit No. 198000291 (copy enclosed). The permit is hereby modified. It is understood that all other conditions of your permit remain applicable. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2021. Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field Office, Regulatory Branch, telephone 910-251-4170. Sincer Tyler Crum ley Regulatory Project Manager Enclosures: CAMA permit GP 291 conditions -2- Copies Furnished (without enclosures): Dr. Ken Riley National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Dr. Pace Wilber National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Mr, Chad Coburn Division of Water Resources North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Ms. Karen Higgins Division of Water Resources North Carolina Department of Environmental Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 -3- Mr. Todd Allen Bowers US EPA Region 4 Life Scientist Water Protection Division 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 BOSN3/Mr. ScottMcAloon United States Coast Guard Sector North Carolina Waterways Management 2301 E. Fort Macon Road Atlantic Beach, North Carolina 28512 Ms. Heather Coats North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Current zomrg � 1 7—gHiiridustdal whichAr Area; :ration asttuff.'�` o m v SIZE i xoua .�Ms -rota ran' SNART, SF.- FMDAEE R t sr tir. c 9TM r o B 4W F S St VICINITY MAP structure,2 ,gAAAw.-eooa. Service Entry mid Exit, FanpPt�oyee:and Conhmctor Park Exil ordy. Proposed 6ktention Basin Mr'. Skannwater�(�Mnegedtent� � / 2 dcry buffer ctiskigv.vcgeratlon ks Utilize buffer - to i s ,,3f. Tl laa ®� •Y,-: ml~a�rl e�� i- �s'1✓ O tl 1 t 4 V 9►"� } 'vvv-p 4Y •�.r. �nas' Land Use Tabulations - Pfizer Tract MEone any--�Ea�o®.�*-�-,��*, —=© ter*--,_�����r_.>•a�.��Cra�� �.>•� =iC'�aII�1��."L3�nr, �. ��f�7i�'Mlr�!♦ N.C. STATE HIGHWAY COMMISSION FERRY SUP P a Y riammea.ma�mw...u.m .. wt��oerol��4 3 D acres Laisting S1wil Basin Area Structure. 3 Mirirc MuNemmee000a, irinrige Maintenance S acre Contractor waiting and loading - - - Structure 4 large land! and Ste . aria z c ti Ey- 1-•LH W Cd N a co W rag gRS Bluse Landing PLANNING -Concrete bulkhead w�TT Acres Channel ro Marina 15O' wide allows ® 0 2n� 'Bx botFi pessengerferry boetaendbarge Structure 6 aw.l.m renew wun�g.n. raPaan �^ q� -S MsW rmnaW q Bmmwct Suw.riM tan V® O O O �Q Q DEPARTMENT / .Ilffi PLANNING DEPT' P. 0. BOX 'Sons DAM HPAD ISLAND, NC 2Bdf.!' (HIH) 450-5000 ITE PLAN Scala: Drawn Data By: 13 067 95 October / 95 LAND IUS9E PLAN P'F I Z.E R TRACT S> SOUrNP0l& }, NORTMCAROMINA gepm=d yi), $ald Read Island Plamn Department . I CEIVED RECEIVED MAY 2 5 2017 DCM- IMHD CITY G . :PITZERIRACT : SI'ff, FACAUON MAP — mIII - -_ MAY UM __ U Z } ;Z a '� Q Z W > N U N Le w� W o V 0 0 -1 LO EXMTI G 'F I Li 0 2016 GGog le Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY May 18, 2017 ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director RE�.` IV EU Charles A. Paul, III, CEO MAY 2 4 2017 Bald Head Island Limited, LLC PO Box 3069 Bald Head Island, NC 28461 DCM- MHD CITY Subject: State Stormwater Management Permit No. SW8 951012 Modification Deep Point Marina High Density Wet Pond / Infiltration Project Brunswick County The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Deep Point Manna on May 17, 2017. Staff review of the plans and specifications has determined that the modified project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding modified Permit No. SW8 951012 dated May 18, 2017, for the construction, operation and maintenance of the SCM's and built - upon areas associated with the subject project. This permit shall be effective from the date of issuance until February 15. 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. The following modifications are included and covered by this permit: 1. Added 2 new parking areas. 2. Added 2 new infiltration basins 1 and 1 B under 2017 MDC. There are now 26 infiltration basins, 6 infiltration trenches and 2 wet detention ponds under this permit. 3. Modified existing infiltration basins, ]A, 2, 3, 9A, 10 , 11 and 12 to meet 2017 MDC. 4. The supplement forms and O&M documents for the basins added/modified by this version of the permit were submitted using Supplement EZ and O&M EZ. The existing supplements and O&M documents for the existing basins, trenches and ponds that were not modified are included and covered by this permit. 5. The approved plan set includes the plans previously approved on December 17, 2008, as modified on April 7, 2015, and the plans for Basins 1, 1B, 1A and 9A. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State or North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional office ( 127 Cardinal Drive Extension I Wilmington, NC 28405 9l0 796 7215 State Stormwater Permit No. SW8 951012 Page 2 of 2 If you have any questions, or need additional information concerning this matter, please contact Linda Lewis in the Wilmington Regional Office, at (910) 796-7215. Sincerely, 3r Tracy Davis, E., Director Division of Energy, Mineral and Land Resources GDS/ arl: \\\Stormwater\Permits & Projects\1995\951012 HD\2017 05 permit 951012 cc: Liane Morgan, P.E., S&ME, Inc. (9751 Southern Pine Boulevard, Charlotte, NC 28273) Brunswick County Building Inspections Division of Coastal Management Wilmington Regional Office Stormwater File REceJ%j J�® MAY 2 4 2017 DCM- MHp CITY State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1127Cardlnal Drive Extension I Wilmington,NC 28405 910 796 7215 State Stormwater Management Permit No. SW8 951012 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bald Head Island Limited, LLC RECEIVED Deep Point Marina 1301 Old Ferry Road, Southport, Brunswick County MAY 2 4 2017 FOR THE DC M-HD CITY construction, operation and maintenance of two (2) wet detention ponds, tw n -six infiltration basins and six (6) infiltration trenches. Nine (9) of the infiltration basins are permitted under the provisions of 15A NCAC 2H .1000, effective January 1, 2017. The remaining Stormwater Control Measures (SCM's) remain permitted under the provisions of 15A NCAC 02H.1000 effective September 1, 1995 (hereafter referred to as the "stormwater rules'). The approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter, the Division or DEMLR) are considered an enforceable part of this permit. This permit shall be effective from the date of issuance until February 15, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 (26 infiltration basins), Section 1.8 (6 infiltration trenches) and Section 1.9 (2 wet detention ponds) of this permit. The total BUA for this project is 1,208,772 square feet. 3. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. There is no allotment for future built -upon area. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 9 State Stormwater Management Permit No. S W 8 951012 This project proposes that some of the basins will be interconnected and work together to provide the required minimum storage volumes. The storage volume provided is based on a controlling elevation which is the highest common elevation shared by the basins in that system prior to overflow. No storage credit is given for volume stored in the parking lot. 7. The following design criteria have been provided in the infiltration basins and must be maintained at design conditions: Infiltration Basins Combined Storage in Basins 1,1A, 113, 2, 3, 9A, 10,11 812 Units Basin 1 Basin 1A Basin 18 Basin 2 Basin 3 Basin 9A n 11 Basin 12 a Draina e Area Acres 0.82 1.13 0.95 1.51 1.38 1 53 0 2 75 Onsite ft2 35760 49094 41324 65943 90115 49339 84 119797 Offsile ft2 0 0 0 0 0 0 0 b.Total BUA f12 23156 38607 28633 53014 47047 40921 76 W61476 76041c. Desi n Storm In 1.5 15 1.5 15 15 15 5 1.5d. Basin Depth Fl 3.0 2.0 30 20 20 2.0 0 1.0e Bottom Elevation FMSL 150 16.0 15.0 16.0 16.0 160 6 17.0f. Bottom Surface Area ftz 2091 131 523 449 35 126306 7908 B ass WeirElev. FMSL 18.0 18.0 1 18.0 18.0 180 18.0 18.0 18,0 18.0 h. Permitted Stor. Vol ft3 10107 3093 6186 8086 2270 5706 8927 1 10112 1 18118 L T of Soil N/A Wando Fine Sand Infiltration Rate in/hr 18 11 3.8 20 20 5 20 20 20 k. SHWT FMSL 7.0 1 9.0 8.0 12.0 1 13.0 1 7.0 I 12.0 14.0 13.0 I Draw Down Time Hrs 40 1 26 34 1 4 1 28 1 4 14 3 m.RecStream/RiverBasin NIA Southport Restricted Area / CPF17 n. Stream Index No, N/A 18-88-3.5 o. Classification N/A Sc Infiltration Basins Units Basin 1S Basin Basin 17 Basin Basin 18 Basin 19 Basin 20 Basin2l Basin 74A 17A Drainage Area Acres;26185 0.60 .43 1.89 .21 2.20 4.39 1.84 0.10 0.52 Onsite ft2 18471 82125 9335 95968 191261 80021 4351 19945 Offsile ftz 0 0 0 0 0 0 0 0 0 q.Total BUA ft2 18867 3479 60487 7146 55114 107449 44619 1127 5817 Design Storm In 3.0 3.0 3.0 3.0 3.0 30 3.0 30 3.0 s. Basin Depth Ft 3.94 1.0 2.0 3.5 5.3 4.0 3.5 1.0 0.8 t Bottom Elevation FMSL 13.0 6.0 100 9.5 4.0 7.0 5.0 18.0 17.0 u. Botom Surface Area ft2 459 591 5197 514.5 883 5896 1219 195 1326 v. B ass Weir Elev FMSL 16 94 7.0 12,0 13.0 9.3 11.0 8.5 19.0 17.8 w Permitfed Slor.VOL fl3 7800 2751 15081 1801 15956 32522 11460 398 1585 x. T of Soil N/A Wando Fine Sand . InfiltrationRate in/hr 200 z. SHWT FMSL 11.0 12.0 6.0 6.0 2.0 5.0 2.0 15.0 14.0 aa. Draw Down Time Hrs 12 0 2 0 3.5 4 21 5.4 11.0 2.0 2.0 bb.RecStream/RiverBasin N/A Southport Restricted Area / CPF17 oc. Stream Index No. N/A 18-88-3.5 dd. Classification N/A Sc RECEIVED MAY 2 4 2017 Page 2 of 9 DCM- MHD CITY State Stormwater Management Permit No. SW8 951012 Infiltration Basins Units Basin 24 Basin 25-1 Basin 25-2 Basin 25.3 Basin 25.4 Basin3l Basin 4 Basin 7 ee.Drainage Area Acres 0.57 0.41 0.62 13 0.40 0.53 1.34 .45 Onsile ftz 24641 61339 26915 5580 17553 23,211 58301 19697 Offsite ftz 0 0 0 0 0 0 0 0 ff. Total BUA ftz 19472 39537 14619 2356 12f; 11,609 40382 9008 99 Design Storm In 3.0 3 0 3.0 30 3.0 30 3.0 3.0 hh. Basin Depth Ft 2.0 2.0 2.5 1.0 2.0 4.8 1.8 1.5 b. Bottom Elevation I FMSL 7.0 1 7.0 18.5 15.0 7.0 4.0 18.0 16.0 It. Bottom Surface Area ftz 2239 4077 6 22 440 990 11 2808 955 kk. B pass Weir Elev. FMSL 9.0 9.0 21.0 16.0 9.0 8.8 19.8 17.5 II. Permitted Slor Vol. ft3 5727 10902 3723 689 3057 2,970 14582 2447 mm. Type of Soil N/A Wando Fine Sand nn. Infiltration Rate In/hr 20.0 oo. SHWT FMSL 5.0 4.0 16.5 2.0 2.0 2.0 1 14.0 13.0 Draw Down Time His 2.6 M 7.2 1 2.0 3.8 1 66.0 1 4.0 30 RecSlream/RiverBasin N/A Southport Restricted Area / CPF17 rr. Stream Index No. WA 18-88-3.5 ss. Stream Classification N/A SC The following design criteria have been provided in the infiltration trenches and must be maintained at design conditions: Infiltration Trenches Units Trench 5 Trench 14 Trench 15 Trench 16 Trench 27 Trench 30 a. Drainage Area: Acres 1.075 0.57 0.62 0.59 0.507 0.45 Onsite: ftz 46,807 24,928 27,065 25,804 22,091 19,669 Offsite ftz 0 0 0 0 0 0 b. Total Impervious Surfaces ftz 34,173 20,859 16,410 24,914 5,968 4,964 Onsite. ftz 34,173 20,859 16,410 24,914 5,968 4,964 Offsite* ftz 0 0 1 0 1 0 0 0 c. Design Storm: Inches 30 d Trench Dimensions I I Length Feet 125 146 88 130 132 ill Width Feet 60.8 38 27 27 11.25 11.25 Height Feet 1.92 1.67 2,67 2.67 1.92 192 e. I Perforated Pipe Diameter. Inches 15" 12' 24" 24" 15" 15" Length Feet 3,497 2,850 846 1,224 682 577 f. Bottom Elevation: FMSL 17.09 14.07 13.26 13.07 10.0 11.0 g. Storage Elevation: FMSL 19.01 15.74 15.93 15.74 11,92 12.92 h. Permitted Storage Volume. ft3 8,470 1 5,072 4,199 1 6,123 1,654 1,395 i. Type of Soil: Wando Fine Sand j. Expected Infiltration Rate In/hr 20 k. SHWT: FMSL 15 12 11 11 8 9 I. Time to Draw Down: Days 1.3 1.1 2 m. Receiving Stream/ River Basin: Southport Restricted Area ! CPF17 n. Stream Index Number: 18-88-3.2 o. Stream Classification "Sc., RECEIVED MAY 2 4 2017 DCM- MHD CITY Page 3 of 9 State Stormwater Management Permit No. SW8 951012 9. The following design criteria have been provided in the two wet detention ponds and must be maintained at design conditions - Design Criteria Pond #1 Pond #2 a. Drainage Area, acres Onsite,ft2 Offsite, ft2 5.67 7,29 246,835 317,484 None b. Total Impervious Surfaces, ft2 103,916 1 185,606 c Design Storm, inches 1.0 d. Pond Design Depth, ft 30 3.5 e. TSS removal efficiency, % 85 85 f. Permanent Pool Elev., FMSL 8.0 4.5 g. Perm- Pool Surface Area, f12 9,104 21,484 h. Permitted Storage Volume, ft3 12,892 25,495 i Temporary Storage Elev., FMSL 9.0 55 . Controlling Orifice, "0 pipe 1 5 2.5 k Permitted Forebay Volume, ft3 N/A 11493 I. Receiving Stream/River Basin Southport Restricted Area / CPF17 m.Stream Index Number 18-88-3.5 n. Classification of Water Body "SC" o. Max horsepower for a fountain N/A_ 1 1/6 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. Decorative spray fountains will be allowed in the wet detention ponds, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in Ponds #1 and #2 is 118 and 116 horsepower, respectively. 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and�t �qQ� f. Debris removal and unclogging of outlet structure, orifice device, fIAT, lZtibY, E D catch basins and piping. g. Access to the outlet structure must be available at all times. MAY 2 4 2017 Page 4 of 9 DCM- MHD CITY State Stormwater Management Permit No. SW8 951012 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The facilities shall be constructed, operated and maintained in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. c. Further subdivision, acquisition, lease or sale of all or part of the project area as reported on the application documents. d. Filling in, altering, removing, redirecting, relocating or resizing of any runoff conveyance measure (catch basin, flume, sheet flow, pipe or swale) shown on the approved plan. e. The construction of any permeable pavement or areas of #57 stone for BUA credit. f. Other revisions as determined by the Director. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that tq ED have been made. K III. GENERAL CONDITIONS MAY 2 4 2017 Any individual or entity found to be in noncompliance with the provif{D CITY stormwater management permit or the requirements of the stormwala es is subject to enforcement procedures as set forth in NCGS 143 Article 21. Page 5 of 9 State Stormwater Management Permit No. S W 8 951012 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07, f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 3. The issuance of this permit does not preclude the Permittee from complying with all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater control measures. A permit will be required prior to the construction of additional SCM's. The permittee grants DEQ / DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater control measures and built -upon areas. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control measures must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall submit a permit renewal application and fee to the Division at least 180 days prior to the expiration date of this permit. Permit modified and reissued this the 18th day of May, 2017 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION RECEIVED �WTegcy Duk, P.E., Director Division of Energy, Mineral and Land Resources NAY By Authority of the Environmental Management Commission 2 4 2017 Permit Number SW8 951012 DCM_ MHD CITY Page 6 of 9 State Stormwater Management Permit No. SW8 951012 Deep Point Marina Stormwater Permit No. SW8 951012 Page 1 of 3 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on pages 2 and 3 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL REcEIVEp MAY 2 4 2017 DCM, A48D C►rY Page 7 of 9 State Stormwater Management Permit No. SW8 951012 Page 2 of 3 Certification Requirements, Wet Detention Ponds: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Regional Office Town of Southport Building Inspections Brunswick County Engineering RECEIVED MAY 2 4 2017 DCM- MHD CITY Page 8 of 9 State Stormwater Management Permit No SW8 951012 Page 3 of 3 Certification Requirements, Infiltration Basins & Trenches: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system 6. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Regional Office Town of Southport Building Inspections Brunswick County Engineering ReCE1V ED MNy 24 JW DCM" MHp CJ-N Page 9 of 9