HomeMy WebLinkAbout91-96 Minor Mod 2004 Bald Head Island ManagementPermit Class
MODIFICATION/NUNOR
RECEIVED
AUG 0 9 2004
DIV. OF COASTAL
RALFH
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
91-96
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cape Fear River. at Southport off of SR
1540 , as requested in the permittee's application dated letters (2) dated 6/3/04
and 6/8/04, including attached workplat drawings (3) dated revised 6/2/04 and 6/3/04
This permit, issued on hily 16y2004 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
oe suoJect to tines, unpnsonment or civn action; or may cause me perimi to oe nun ana voia.
1) This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2) The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
3) The Land Quality Section provided approval for this project under the Erosion and Sedimentation
Control Plan which was issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
CUKrfes S. Jones, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Permit Class
MODIFICATION/MINOR
Permit Number
91-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermt"t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cape Fear River. at Southport off of SR
1540 , as requested in the permittee's application dated -letters (2) dated 6/3/04
and 6/8/04, including attached workplat drawings (3) dated revised 6/2/04 and 6/3/04
This permit, issued on i»ly 16, 2604 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
re subject to Imes, imprisonment or Clvll action; or may cause me permit n) oe null anm vole.
1) This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2). The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
3) The Land Quality Section provided approval for this project under the Erosion and Sedimentation
Control Plan which was issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet for Additional Conditions)
This permit action may beappealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the projecUs inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
"iNairman of the Coastal Resources Commission.
Cl es S. Jones, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Pemrittee
Bald Head Island Management, Inc. Permit # 91-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) In order to protect water quality, runoff from construction must not visibly increase the amount of
suspended sediments in adjacent waters.
5) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence;
diversion swales or berms, sand fence, etc.).
6) This minor modification does not authorize any new land disturbing activities within 30-feet of the
normal high water level.
7) This minor modification must be attached to the original of Permit No. 91-96 which was issued on
6/3/96, as well as all subsequent amendments, modifications, renewals and letters of refinement, and all
documents must be readily available on site when Division personnel inspect the project for compliance.
8) All conditions and stipulations of the active permit remain in force under this minor modification unless
. modified herein.
Permit Class
MODIFICATION/NUNOR
Permit Number
91-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick County at -Cape Fear River, at Southport off of SR
1540 , as requested in the permittee's application dated letters (2) dated 6/3/04
and 6/8/04, including attached workplat drawings (3) dated revised 6/2/04 and 6/3/04
This permit, issued on July 16,, 2004 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2) The Division of Water Quality approval of. this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
3) The Land Quality Section provided approval for this project under the. Erosion and Sedimentation
Control Plan which was issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet for Additional Conditions)
This permit action may beappealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the projectis inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
"thairman of the Coastal Resources Commission.
Ch6rfes S. Jones, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bald Head Island Management, Inc. Permit # 91-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) In order to protect water quality, runoff from construction must not visibly increase the amount of
suspended sediments in adjacent waters.
5) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, sand fence, etc.).
6) This minor modification does. not authorize any new land disturbing activities within 30-feet of the
normal high water level.
7) This minor modification must be attached to the original of Permit No. 91-96 which was issued on
613/96, as well as all subsequent amendments, modifications, renewals and letters of refinement, and all
documents must be readily available on site when Division personnel inspect the project for compliance.-
8) All conditions and stipulations of the active permit remain in force under this minor modification unless
modified herein.
.L/
Permit Class
MODIFICATION/MINOR
Permit Number
91-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Ir
Vermtt
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cane Fear River, at Southport off of SR
1540 as requested in the permittee's application dated letters (2) dated 6/3/04
and 6/8/04 including attached workplat drawings (3) dated revised 6/2/04 and 6/3/04
This permit, issued on Jirly lei, 2004 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2) The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
3) - The Land Quality Section provided approval for this project under the Erosion and Sedimentation
Control Plan which was issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet for Additional Conditions)
This permit action may beappealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project -is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
- - - ---- ---------
Signed by the authority of the Secretary of DENR and the
`Chairman of the Coastal Resources Commission.
ChWrfes S. Jones, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bald Head Island Management, Inc. Permit # 91-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) In order to protect water quality, runoff from construction must not visibly increase the amount of
- suspended sediments in adjacent waters.
5) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, sand fence, etc.).
6) This minor modification does not authorize any new land disturbing activities within 30-feet of the
normal high water level.
7) This minor modification must be attached to the original of Permit No. 91-96 which was issued on
6/3/96, as well as all subsequent amendments, modifications, renewals and letters of refinement, and all
documents must be readily available on site when Division personnel inspect the project.for compliance.
8) All conditions and stipulations of the active permit remain in force under this minor modification unless
modified herein.
.Z
Permit Class
MODIFICATION/NIINOR
Permit Number
91-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
�ern�it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation, and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick, County at -Cape Fear River, at Southport off of SR
, as requested in the permittee's application dated letters (2) dated 6/3/04
and 6/8/04, including attached workplat•drawings (3) dated revised 6/2/04 and 6/3/04
This pennit, issued on Inly 16, 2004 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to tines, imprisonment or civit action; or -may cause me permit to oe nun ana vota.
1) This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2) The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit:
3) The Land Quality Section provided approval for this project under the Erosion and Sedimentation
Control Plan which was issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet, for Additional Conditions)
This Dermit action may be._annealed by the uermittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project.is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
"Chairman of the Coastal Resources Commission.
.N
C es S. Jones, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bald Head Island Management, Inc. Permit # 91-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) In order to protect water quality, runoff from construction must not visibly increase the amount of,
suspended sediments in adjacent waters.
5) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, sand fence, etc.).
6) This minor modification does not authorize any new land disturbing activities within 30-feet of the
normal high water level.
7) This minor modification must be attached to the original of Permit No. 91-96 which was issued on
6/3/96, as well as all subsequent amendments, modifications, renewals and letters of refinement, and all
documents must be readily available on site when Division personnel inspect the project for compliance.
8) All conditions and stipulations of the active permit remain in force under this minor modification unless
modified herein.
Permit Class
MODIFICATION/MINOR
Permit Number
91-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermt"t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Management, Inc. PO Box 3069, Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cane Fear River, at Southport off of SR
1540 , as requested in the permittee's application dated letters (2) dated 6/3/04
and 6/8/04 including attached workplat drawings (3) dated revised 6/2/04 and 6/3/04
This permit, issued on Jnly 16, 2004 , is subject to compliance with the application.(where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1), This minor modification authorizes the additional 140 parking spaces, as depicted on the approved,
attached workplan drawings.
2) The Division of Water Quality approval of this project under stormwater management rules of the
Environmental Management Commission is covered by way of modification to Stormwater Permit No.
SW8951012, which was issued on 6/15/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
3) The Land Quality Section provided approval for this project under the Erosion and Sedimentation
Control Plan which was. issued on 6/10/04. Any violation of the permit approved by the DWQ will be
considered a violation of this CAMA permit.
(See attached sheet for Additional Conditions)
This permit action may be. appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project -is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
,Signed by the authority of the Secretary of DENR and the
"thairman of the Coastal Resources Commission.
Cl es S. Jones, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bald Head Island Management, Inc. Permit # 91-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) In order to protect water quality, runoff from construction must not visibly increase the amount of
suspended sediments in adjacent waters.
5) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands; watercourses and property (e.g. silt fence,
diversion swales or berms, sand fence, etc.).
6) This minor modification does not authorize any new land disturbing activities within 30-feet of the
normal high water level.
7) This minor modification must be attached to the original of Permit No. 91-96 which was issued on
6/3/96, as well as all subsequent amendments, modifications, renewals and letters of refinement, and all
documents must be readily available on site.when Division personnel inspect the project for compliance.
8) All conditions and stipulations of the active permit remain in force under this minor modification unless
modified herein.