Loading...
HomeMy WebLinkAbout91-96 Minor Mod 2000 Bald Head Island LimitedPermit Class Permit Number MODIFICATION/MINOR STATE OF NORTH CAROLINA 91-96 Department of Environment and Natural Resources and Coastal Resources Commission RECEIVED JUN 01 2000 for X Major Development in an Area of Environmental Concern COASTAL MANAGEMENT pursuant to CGS 113A-118 X Exca o and/or filling.pursuant to NCGS 113-229 Issued to Bald Hend Islam dL authorizing development in o Cane Fe r River a Southport off of SR 1540 ,a requeste e pp w4plication dstvd letter dated 2/22/00 includingthe he This permit, issued on S-_-Z — with the permit), all applicable regulations, special conditi be subject to a fine, imprisonment or civil action; or may c tcompflance with the application (where consistent set forth below. Any violation of these terms may permit to be null and void. 1) This minor modification authorizes the the expansion of the marina basin by 23.25 ft. along the western end of the basin in accordance with the attached workplan drawing dated revised 2/25/00. 2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and all documents must be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this modification unless altered herein. 3) This minor modification does not authorize any increase in the number of permitted boat slips. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. onna D.Moffitt Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Bald Head Island, Limited 4) Prior to the start of construction, conference with DCM staff. Permit #91-96 Page 2 of 2 and coordinate a pre -construction NOTE: This permit does not eliminate the to ob additional permits, approvals or authorizations that may be required. AN11W NC®ENFZ JAMES B. HUNT JR. L GOVERNOR Bald Head Island, Limited P. O. Box 3069 Bald Head Island, NC 28461 BILL HOLMAN SECRETARY Dear Sir: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT May 22, 2000 fir: Theenclosed permit constitutes authorization underihe Coastal Area ManagementAct, and where applicable, a1 the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is DONNA D MOFFITT, retained by you and it must be available on site when the project is inspected for compliance. Please sign both the DIRECTOR.: -'a- v oriainalandthecopyandreturnthecopytothisofficeintheenclosedenvelope.Signingthepermitandproceeding _ :` : K" means you have waived your right of appeal described below. Ifyou object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 `< or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance ofthis permit within twenty (20) days, the matter must be resolved priorto work initiation. TheCoastal Resources Commission makes the final decision on any appeal. Theprojectplan is subjectto those conditions appearing on the permit form. Otherwise, all workinustbe carried out in accordance with your application. Modifications, time extensions, and future maintenance require n�.. additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request .. . ` that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, orproblem areas, you may contact Departmentpersonnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally _ ' important coastal resources. - Very sincerely, Douglas Huggett Major Permits/Consistency Manager - DH/amw £, Enclosure T �n MAILING: 1636 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1638 - - - PHYSICAL: 2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE: 919-733-2293 FAX:919-733-149S AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST -CONSUMER PAPER r • _ti -fir`= DENR TOLL FREE HOTLINE: 1-877-623-6748 Permit Class Permit Number MODIFICATION/MINOR STATE OF NORTFI CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission hermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling.putsuant w NCGS 113-229 91-96 Iss ued to Raid Head Wand, Urnited, P-0- Rn3r 30699 Raid Hend Iqland, NC 29461 authorizing development in Brun-mrick' --Countyat Cape Fear River at Southport off of SR 1540 as requested in the petmittee's application-daled letter dated 2/22/00. including' the attached workplan . . , - . - i - . 1 1 This permit, issued on -J - 07.2— c)—j , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This minor modification authorizes the the expansion of the marina basin by 23.25 ft. along the western end of the basin in accordance with the attached workplan drawing dated revised 2/25/00. 2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and all documents must be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this modification unless altered herein. 3) This minor modification does not authorize any increase in the number of permitted boat slips. (See attached sheet for Additional Conditions) This permit action may be appealed by the pemuttee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires furtherDepartmental approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. onna D.Moffitt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Bald Head Island, Limited Permit #91-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction conference with DCM staff. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that maybe required. ooxoxoxv o�o I J Permit Class Permit Number MODIFICATION/NIINOR STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vrrmit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling.pursuant to NCGS 113-229 91-96 authorizing development in Rnmswick County at Cape Fear River at Southport off of SR 1540 , as requested in the permittee's applicationAv*d letter dated 2/22/00. including the attached workman drawing (1) dated revised 2/25/00. This permit, issued on - --,?-z— c' , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This minor modification authorizes the the expansion of the marina basin by 23.25 ft. along the western end of the basin in accordance with the attached workplan drawing dated revised 2/25/00. 2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and all documents must be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this modification unless altered herein. 3) This minor modification does not authorize any increase in the number of permitted boat slips. (See attached sheet for Additional Conditions) This permit -action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. 4/Donna D.Moffitt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee r" Bald Head Island, Limited Permit #91-96- Page 2 of 2 ADDITIONAL CONDITIONS 4) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction conference with DCM staff. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. Permit Class Permit Number MODIFICATION/NIINOR STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling.pursuant to NCGS 113-229 91-96 authorizing•pu BnmmArick County• . h••r off of SR 1540 as requested in the permittee's application4imed letter dated 2/22/00- including the • . • . r • . r • •iy1►%11 This permit, issued on J - 2—cry is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void, 1) This minor modification authorizes the the expansion of the marina basin by 23.25 ft. along the western end of the basin in accordance with the attached workplan drawing dated revised 2/25/00. 2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and all documents must be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this modification unless altered herein. 3) This minor modification does not authorize any increase in the number of permitted boat slips. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This, permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunderrequires funlierDepartmental approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. 7 onna D.Moffrtt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Bald Head Island, Limited Permit #91-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction conference with DCM staff. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 23403 August 10, 2000 Regulatory Division Action ED No. 199602657 and State Permit No. 91-96 Bald Head Island, Limited Post Office Box 3069 Southport, North Carolina 28461-7000 Dear Sir: Through coordination with the North Carolina Division of Coastal Management, we have learned of your request for modification of your permit to expand the marina basin by 23.25 feet along the western end of the basin. The Department of the Army permit issued on July 2, 1996 authorized dredging of vegetated and non -vegetated wetlands and shallow bottom in the Cape Fear River, adjacent to the Prices Creek Southport/Fort Fisher ferry on NC 210, east of Southport in Brunswick County, North Carolina. Your proposal continues to be consistent with the provisions and objectives of general permii No. 198000291. The permit is hereby modified to include the proposed work. It is understood that all other conditions of your permit remain applicable and that the expiration date is April 3, 2003. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403 August 16, 2000 Regulatory Division Action ID No. 199900249 and State Permit No. 110-99 BG Partnership 6314a Oleander Drive Wilmington, North Carolina 28403-3575 Dear Sir: Through coordination with the North Carolina Division of Coastal Management, we have learned of your request for modification of your permit to construct a 10-foot extension to the previously authorized community docking facility. The facility should not extend closer.than 140 feet from the near shore edge of the federally maintained Atlantic Intracoastal Waterway channel. The Department of the Army (DA) permit issued on November 15, 1.999 authorized construction of a 26-slip community marina for Register Place Estates subdivision including piers, finger piers and a gazebo adjacent to Middle Sound near Wilmington, New Hanover County, North Carolina. Your proposal continues to be consistent with the provisions and objectives of general permit No. 198000291. The permit is hereby modified to include the requested work. It is understood that all other conditions of your permit remain applicable and that the expiration date is December 31, 2002. Please be advised that, pursuant to recent Wilmington District Corps of Engineers policy, the following is a condition of your modified DA permit: The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. Questions or comments may be addressed to Jeffrey H. Richter, available at telephone (910) 251-4636. Sincerely, G. Wayne Wright, Chief Regulatory Division Copies Furnished: Chief, Source Data Unit NOAA/ National Ocean Survey Attention: Sharon Tear N/CS261 1315 East-West Hwy, Rm. 7316 Silver Spring, Maryland 20910-3282 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 1638 Mail Service Center Raleigh, North Carolina 27611 Mr. C. Robert Stroud, Jr., District Manager Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Questions or comments may be addressed to Jeff Richter, available at telephone (910) 251-4636. Sincerely, G. Wayne Wright, Chief Regulatory Division Copies Furnished: Chief, Source Data Unit NOAA/ National Ocean Survey Attention: Sharon Tear N/CS261 1315 East-West Hwy, Rm. 7316 Silver Spring, Maryland 20910-3282 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 1638 Mail Service Center Raleigh, North Carolina 27611 Mr. C. Robert Stroud, Jr., District Manager Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Permit Class Permit Number MODIFICATION/MINOR STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling.pursuant to NCGS 113-229 91-96 authorizing development in 11ninswick County at Crane Fear River at Southport off of. R 1540 as requested in the permittee's application -fated letter dated 2/22/00 including the attached worknlan drawing (1) dated revised 2/25/00. This permit, issued on .S- _2— c' , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This minor modification authorizes the the expansion of the marina basin by 23.25 ft. along the western end of the basin in accordance with the attached workplan drawing dated revised 2/25/00. 2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on 6/3/96, as well as all subsequent modifications, refinements and renewals, and all documents must be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force under this modification unless altered herein. 3) This minor modification does not authorize any increase in the number of permitted boat slips. (See attached sheet for Additional Conditions) This permit -action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. onna D.Moffitt Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pemtittee �'%C/bv>L /n,'-w `" il-jP6 Division of Coastal Management Application Processing Notes Applicant:i1�1 Deadline: Date/Time: Message: SXf/%ts State of North Carolina R,epartment of Environment and Natural Resources r Wilmington Regional Office Division of Coastal Management James B. Hunt, Jr., Governor Bill Holman, Secretary Donna Moffitt, Director TO: Doug Huggett Permits Section, DCM FROM: E. F. Brooks Field Representative; DCM THRU: C. Robert Stroud, Jr.G�6 District Manager, Wilmington, DCM DATE: 4/25/00 1t 0 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RECEIVED MAY 0 2'2000 COASTALMANAGEMENT SUBJECT: Request for modification of State Permit #91-96 (Deep Point Marina) Bald Head Island Management, Inc. The applicant has submitted the enclosed plans for the expansion of the marina basin at the Deep Point Marina project. The request is to accommodate the turning radius of the passenger ferry. The proposed expansion calls for an increase in basin length from 721.75 feet to 745 feet. The expansion would be at the west end of the basin. I have no objection to the proposed modification and recommend a minor modification be issued to authorize the change, provided their are no required changes to the approved stormwater plan. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer February 22, 2000 Mr. Ed Brooks Senior Coastal Management Field Representative Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 Dear Ed: �C� i MAR 0 1 I'll D OF COASTAL ]MAONAGGEMENT Enclosed are five (5) copies of a new plat layout for our new mainland base in Southport (Deep Point Marina). We are requesting a minor modification to permit # 91-96 to expand the size of the marina basin approximately 23' to the west. The size increase is necessary to allow adequate operating room for the passenger ferry. The comparison dimensions are shown in the upper right hand corner of the drawing. The increase in basin size will not result in an increase in the number of boat slips. A check for $50.00 is enclosed as permit processing fee. Call me at 457-7326 if you need additional information. Yours truly, Ken Stewart Enclosures cc: Ken Kirkman Planning Department BHI Construction BALD HEAD ISLAND Post Office Box 3069 • Bald Head Island, North Carolina 28461 • (910) 457-5000 • (800) 234-1666 w .baldheadisland.com