STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermit
X for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
91-96
RE�E��ED
SEP 0 3 'looq
COASTAL MANAGEMENT
Issued to Bald Head Island, Limited, P.O. Box 3069, Bald Head Island, NC 28461
authorizing development in
Brunswick
County at Cape Fear River at Southport off of SR 1540
as requested in the perminee's application debt
attached workplan drawing (1) dated 4/98 dated received 6/23/99.
letter dated 6/22/99, including the
This perrnit, issued on 9 - / q - 171 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification authorizes the placement of 30 feet of rip rap extension to the ends of the
entrance channel bulkheads on each side of the jetties in accordance with the attached workplan
drawing.
2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on
6/3/96, and all documents must be readily available on site when a Division representative inspects
the project for compliance. All conditions and stipulations of the active permit remain in force under
this modification unless altered herein.
3) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction
conference which will include DCM staff.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder reagSuires further Departmental approval.
All work December 31n 199Wrmit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
on D.MoffittDirector
D v io f oastal Management
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program. Signature of Permittee
Permit Class
MODIFICATION/MINOR
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
r
Vermtt -
X for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or fdling.pursuant to NCGS 113-229
Issued to Bald Head Island, Limited, P.O. Box 3069, Bald Head Island, NC 28461
authorizing development in
Brunswick
Permit Number
91-96
County at Cape Fear River at Southport off of SR 1540
as requested in the permittee's application doted letter dated 6/22/99, including the
attached workplan drawing (1) dated 4/98 dated received 6/23/99.
This permit, issued on A- - R 9 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be. null and void.
1) This minor modification authorizes the placement of 30 feet of rip rap extension to the ends of the
entrance channel bulkheads on each side of the jetties in accordance with the attached workplan
drawing.
2) This minor modification must be attachedto the original of Permit No. 91-96, whichwas issued on
6/3/96, and all documents must be readily available on site when a Division representative inspects
the project for compliance. All conditions and stipulations of the active permit remain in force under
this modification unless altered herein.
3) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction
conference which will include DCM staff.
(See attached sheet for Additional Conditions)
This permiLaction may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the errriit expires on
December 3I.199eI
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
onn D.Moffrtt,Director
D v io f oastal Management
This permit and its conditions are hereby accepted.
Signature of Peimittee
Permit Class
MODIFICATION/MINOR
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Permit
X for
Major Development in an Area of Environmental Concern
pursuant toNCGS 113A-118
X Excavation and/or fiMng.pursuant to NCGS 113-229
Issued to Bald Head Island, Limited, P.O. Box 3069, Bald Head Island, NC 28461
Permit Number
91-96
authorizing development in Brunswick County at Cape Fear River at Southport off of SR 1540
as requested in the permittee's application dated
attached workplan drawing (1) dated 4/98 dated received 6/21/99.
letter dated 6/22/99, including the
This permit, issued on A- l G - q 9 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification authorizes the placement of 30 feet of rip rap extension to the ends of the
entrance channel bulkheads on each side of the jetties in accordance with the attached workplan
drawing.
2) This minor modification must be attached to the original of Permit No. 91-96, which was issued on
6/3/96, and all documents must be readily available on site when a Division representative inspects
the project for compliance. All conditions and stipulations of the active permit remain in force under
this modification unless altered herein.
3) Prior to the start of construction, the permittee shall schedule and coordinate a pre -construction
conference which will include DCM staff.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the-uermit expires on
December 31, 199eI
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
ofn D.Moffitt,Director
D v o io astal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bald Head Island, Limited Permit #91-96
Page 2 of 2
ADDITIONAL CONDITIONS
NOTE: The applicant is advised that should the proposed rip rap not resolve the erosion problem,
the applicant may be requested to prepare and submit an engineered solution to address
the erosion. The applicant is further advised that should the erosion continue, last minute
requests for additional rip rap authorization may not be available.
NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO August 11, 1999
Regulatory Division
Action ID No. 199602657 and State Permit No. 91-96
Mr. Ken Stewart
Bald Head Island, Ltd.
Post Office Box 3069
Southport, North Carolina 28461
Dear Mr. Stewart:
Through coordination with the North Carolina Division of Coastal
Management, we have learned of your request for modification of your permit to
proceed directly into the construction and excavation of Phase II of the
marina, without installing the temporary vinyl bulkhead between Phase I and
Phase II. The Department of the Army permit issued on July 2, 1996 authorized
dredging 9,000 square feet of vegetated wetlands and an additional
110,400 square feet of non -vegetated wetlands and shallow bottom, in the Cape
Fear River, adjacent to the Prices Creek Southport/Fort Fisher ferry, on
NC 210, east of Southport, in Brunswick County, North Carolina.
Your proposal continues to be consistent with the provisions and
objectives of general permit No. 198000291. The permit is hereby modified to
include the work as shown on the enclosed plan. It is understood that all
other conditions of your permit remain applicable and that the expiration date
is April 30, 2003.
Questions or comments may be addressed to Mr. Jeff Richter, available at
telephone (910) 251-4636.
Sincerely,
G. Wayne Wright
Chief, Regulatory Division
Copies Furnished:
ymr. Doug Huggett
Division of Coastal Management
North Carolina Department of
Environment and Natural Resources
1638 Mail Service Center
Raleigh, North Carolina 27699-1638
Mr. C. Robert Stroud, Jr., District Manager
Wilmington Regional Office
North Carolina Division of
Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
ORM
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
JAMES B. HUNTJR4� Tr
DIVISION OF COASTAL MANAGEMENT
August 20, 1999
Bald Head Island
P. O. Box 3069
Bald Head Island, NC 28461
Dear Sir:
The enclosed permit constitutes authorization underthe Coastal Area ManagementAct, and where applicable,
the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is
retained by you and it must be available on site when the project is inspected for compliance. Please sign both the
original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
Ifyou object to the permit or any ofthe conditions, you mayrequest a hearing pursuant to NCGS 113A-121.1
or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter I50B with the Office of
Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis
decision on your permit You should also be aware that if another qualified party submits a valid objection to the
issuance ofthis permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as
approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully
understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we request
that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise
concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at
any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally
important coastal resources.
Very sincerely,
Douglas Huggett
Major Permits/Consistency Manager
DH/amw
Enclosure
P.O. BOX 27687, RALEIGH, NC 27611-7687 /272S CAPITAL BLVD., RALEIGH, NC 27604
PHONE 919-733-2293 FAX 919-733-1495
AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLED/10% POST -CONSUMER PAPER
Division of Coastal Management
scuaGFgR
Application Processing Notes
Applicant: - n,`u aeAr> isuoNO L�• ,moo
Deadline: ',DEe9?01ur MoR Na "
Date/Time: Message:
�2/V/99 RC -JD fu Ram GN 6 ass,c,NE�
'To Sc w.a�F6S�
7 SHE RF-.G>J sr w.n] SEA -D,RfcTzy
l0 'RAr.,Q+3 Uvc,cv- ev 13P-ootZ
S L.LF' vfTCE n ,- Asc�w1G FoR +a�T
+.jPU � OIL TH +s .
l2/8199 > FAKED COPY IF R£-WaES1 I'LD ED.
E9 . NE HAS "0
D' OVA6mo a T-p-avc, C-U2 RvwiEw