Loading...
HomeMy WebLinkAboutScraping SitePlan.26.10.2022CD CD CD COnstructiw Baseline (2022 4 14 A Proposed Work Area (See Sheet 02) At l a n t i c 0 c e a 4, I MA:l Buxton IS % 12 7�. CD CD C) 0') 00 J M.Mm, I 'SCALE: ASSHOWN DATE: 25 Oct 2022 DRAWN BY: TH 01 APPROVED BY: PB [PROJECT # 2403M Buxton Survey Datum: Horizontal: SPCS NAD'83 (Feet) NC Zone 3200 Vertical: NAVD '88 (Feet) Notes: Data collected by Coastal Science & Engineering, Inc via RTK GPS: Aerial Image: Post Nourishment (19 August 2022) CD CD CD Q cc 22 Construction Baseline (2022) • ,1 • 0 40 Scale (Feet) 0 <� O O Q N I Note: Note: Harvest Area (H1-H3) Harvest area H1 will be used to fill areas F1 and F2. The dune crest will be at +13 ft NAVD and the typical Harvest areas H2 & H3 will be used to fill area F2. width of the dune crest will be 20 ft. The seaward Fill Area (F1-F3) Harvest and fill areas may vary slightly due to site slope of the dune will be at 1 on 3. conditions at time of construction. Applicant Dare County 954 Marshall Collins Dr. Manteo, NC 27954 Project: Beach Renourishment To Protect NC Highway 12 At Buxton Dare County, NC DRAWING TITLE: Post IAN Storm Damage Repair Work Area Map SCALE: AS SHOWN DATE: 25 Oct 2022 DRAWN BY: TH O� APPROVED BY: PB PROJECT#: 2403M