HomeMy WebLinkAboutScraping SitePlan.26.10.2022CD
CD
CD
COnstructiw Baseline (2022 4
14
A
Proposed Work Area
(See Sheet 02)
At l a n t i c 0 c e a
4,
I MA:l
Buxton
IS
%
12
7�.
CD
CD
C)
0')
00
J
M.Mm, I
'SCALE:
ASSHOWN
DATE:
25 Oct 2022
DRAWN BY:
TH
01
APPROVED BY:
PB
[PROJECT #
2403M
Buxton
Survey Datum:
Horizontal: SPCS NAD'83 (Feet) NC Zone 3200
Vertical: NAVD '88 (Feet)
Notes: Data collected by Coastal Science & Engineering, Inc via RTK GPS:
Aerial Image: Post Nourishment (19 August 2022)
CD
CD
CD
Q cc
22
Construction Baseline (2022)
•
,1 •
0 40
Scale (Feet)
0
<�
O
O
Q N
I
Note: Note:
Harvest Area (H1-H3) Harvest area H1 will be used to fill areas F1 and F2. The dune crest will be at +13 ft NAVD and the typical
Harvest areas H2 & H3 will be used to fill area F2. width of the dune crest will be 20 ft. The seaward
Fill Area (F1-F3) Harvest and fill areas may vary slightly due to site slope of the dune will be at 1 on 3.
conditions at time of construction.
Applicant
Dare County
954 Marshall Collins Dr.
Manteo, NC 27954
Project:
Beach Renourishment To Protect
NC Highway 12 At Buxton
Dare County, NC
DRAWING TITLE:
Post IAN
Storm Damage Repair
Work Area Map
SCALE:
AS SHOWN
DATE:
25 Oct 2022
DRAWN BY:
TH
O�
APPROVED BY:
PB
PROJECT#:
2403M