Loading...
HomeMy WebLinkAboutBuxton P12 Fill SectionsRev30July202115 10 0 5 Q 0 Z -5 0 -10 a) w -15 -20 Buxton Station 1905+00 End Dune i• t \ \ MHW \ ----MLW------- 1 Berm Elevation +7.0 ft NAVD ` Berm Width 227 ft Fill Density 180 cy/ft Typical Dune Width 20 ft — Aug 2020 Profile —Fill Vol - -25 0 200 400 600 800 1000 1201 Distance from Baseline (ft) 15 Buxton Station 1920+00 Aug 2020 Profile 10 t —Fill Vol 0 5 \ > MHW �\ Z () \ ----- MLW------- 1 � c -5 -10 . W -15 Berm Elevation +7.0 ft NAVD -20 Berm Width 132 ft ` Fill Density 75 cy/ft -25 I I — 200 400 600 800 1000 1200 Distance from Baseline (ft) Note Fill design is based on the beach condition in August 2020. The actual limit of fill will be the +7 ft NAVD contour at the time of construction. The final configuration and limits of beach construction will be determined based on conditions at the time of construction and the aggregate total fill volume that can be accomplished within the available budget for the project. The indicated quantities are maximum amounts to be permitted. The project will not fill or cover any emergency shore protection structures such as sandbags. Buffers (no work areas) alongshore will be maintained around areas of active bird nesting at the time of construction in consultation with NPS biologists. To extent practicable, the construction berm will shift seaward of Mean Low Water at sites of nests then reenter the existing beach outside of the buffer zone. r Survey Datum: MHW (+1.05 ft NAVD) Horizontal: SPCS NAD'83 (Feet) NC Zone 3200 MLW (-1.94 ft NAVD) Vertical: NAVD'88 (Feet) Vertical Exaggeration: 10:1 Notes: Data collected by Coastal Science & Engineering, Inc via RTK GPS: Data collected: August 2020 � J 15 10 0 5 > Q 0 Z 4✓ -5 0 -10 w -15 -20 Buxton Station 1910+00 — — Aug 2020 Profile \ — Fill Vol \ MHW \ \ -----MLW------- \ Berm Elevation +7.0 ft NAVD ` Berm Width 209 ft Fill Density 150 cy/ft Typical Dune Width 20 ft ` -25 0 95 10 0 > 5 Q Z 0 0 > -5 0 W -10 -15 -100 200 400 600 800 Distance from Baseline (ft) Buxton Station 1925+00 1000 1200 0 100 200 300 400 500 Distance from Baseline (ft) Note: Initial dunes will be built along the Village of Buxton during renourishment construction. The dune crest will be at +13 ft NAVD and the typical width of the dune crest will be 20 ft. The seaward slope of the dune will be at 1 on 3. The constructed dry sand beach in front of the toe of the dune will be 200-250 ft wide. No fill is to be placed on exposed emergency sand bags, or under exposed walkovers and houses. Note: No dune will be constructed along Reach 2 - National Seashore. Applicant: Dare County 954 Marshall Collins Dr. Manteo, NC 27954 Project: Beach Renourishment To Protect NC Highway 12 At Buxton Dare County, NC 30 20 0 Q 10 Z c 0 0 N W -10 20 30 1s 10 0 5 Q 0 Z 5 0 -10 w 15 -20 25 Berm Elevation +7.0 it NAVD Berm Width 250 ft Fill Density 150 cy/ft Typical Dune Width 20 ft 0 Buxton Station 1915+00 — — Aug 2020 Profile — Fill Vol - MHW -- MLW - -- 200 400 600 800 1000 120 Distance from Baseline (ft) Buxton Station 1898+00 i — Aug 2020 Profile --- -w -------------------- ----±-------------- + i Proposed Fill --- 'o Constructed berm (@ +7 ft NAVD) width _________________-_____--------- to be 220 ft in front of the toe of dune `\ Fill density to be 180 cy/ft I - - --- '---------------------'---------- ' � i ______________________+__________________}--------- __— ------ __*--------- ------ ------- _--------------- }------------------------ 0 200 400 600 800 1000 1200 Distance from Baseline (ft) DRAWING TITLE: PLAN FILL SECTIONS STA 1905+00 to 1925+00 DATE: 30 July 2021 DRAWN BY: JJH (� APPROVED BY:HLK PROJECT #: 2403M