Loading...
HomeMy WebLinkAboutBuxton P05 Plan Aerial PhotoRev30July2021Note Fill design is based on the beach condition in August 2020. The actual limit of fill will be the +7 ft NAVD contour at the time of construction. The final configuration and limits of beach construction will be determined based on conditions at the time of construction and the aggregate total fill e + volume that can be accomplished within the available budget for the a . '`' s project. The indicated quantities are maximum amounts to be permitted. �c The project will not fill or cover any emergency shore protection k` structures such as sandbags. Buffers (no work areas) alongshore will be 12` < Ja maintained around areas of active bird nesting at the time of construction t r^ n consultation with NPS biologists. To extent practicable, the construction berm will shift seaward of Mean Low Water at sites of nests then reenter the existing beach outside of the buffer zone. Buxton'` ., t I o y �� o 0 o r C) o Y y Ca a Hatteras +o +o".. +o p 1" c i _ ' o Ys o ~Landward Fill Limit o National Seashore a. o �� �. e Crest @ +13 ft NAVD —Landward Fill Limit —Berm Fill Limit ' @+7 ft NAVD +7 ft NAVD —Slope Toe Fill Limit Elevation Varies r Survey Datum: Horizontal: SPCS NAD'83 (Feet) NC Zone 3200 Vertical: NAVD'88 (Feet) Notes: Data collected by Coastal Science & Engineering, Inc via RTK GPS: Data collected: August 2020 Aerial Image: 07 May 2021 / Note: _ _ LEGEND Initial dunes will be built along the Village of Buxton during — MHw (+1.05 FT NGVD) renourishment construction. The dune crest will be at +13 ft — — — — — MLw (-1.94 FT NGVD) NAVD and the typical width of the dune crest will be 20 ft.FIRST LINE OF VEGETATION The seaward slope of the dune will be at 1 on 3. The DUNE FILL CREST (+13 ft NAVD) constructed dry sand berm (@+7 ft NAVD) in front of the toe Slope @ 1 on 3 of the dune will be 200-250 ft wide. BERM FILL - DRY BEACH (+7 ft NAVD) No fill is to be placed on exposed emergency sand bags, or FILL SLOPE TO TOE under exposed walkovers and houses. Note: No dune will be constructed along Reach 2 - National Seashore. 0 200 A Reach 1 - Buxton Reach 2 -National Park Service Scale (Feet) 675,000 cy 525,000 cy 4,500If-11,000if Atlantic Ocean MHW (+1.05 ft NAVD) 1 MLW (-1.94 ft NAVD) Applicant: Dare County 954 Marshall Collins Dr. Manteo, NC 27954 Project: Beach Renourishment To Protect NC Highway 12 At Buxton Dare County, NC DRAWING TITLE: PROJECT PLAN STA 1895+00 to STA 1864+00 soMM q��, `���`,•,`.�o ESA SCALE: AS SHOWN DATE: 30 July 2021 DRAWN BY: JJH E L� = • �uGL{ ��j: 'y•3O �Vl ini��� OC J APPROVED BY:HLK PROJECT* 2403M