Loading...
HomeMy WebLinkAboutBuxton P03 Project PlanRev30July2021X C_D n N 12 7- Q l 0Z Buxton 20 Zw Lighthouse Rd Old Cape 01d `tghthouse Rd Hatteras o Light Site > CD cli Dune - (3,500 If) I _ STA 1880+50 to 1915+00 I —South Underwater Pipeline Reach 1 - Buxton (4,500 If) I Cooridor STA 1880+50 to 1925+50 675,000 cy (150 cy/ft) Note Fill design is based on the beach condition in August 2020. The actual limit of fill will be the +7 ft NAVD contour at the time of construction. The final configuration and limits of beach construction will be determined based on conditions at the time of construction and the aggregate total fill volume that can be accomplished within the available budget for the project. The indicated quantities are maximum amounts to be permitted. �To co �o �� zw Survey Datum: Horizontal: SPCS NAD'83 (Feet) NC Zone 3200 Vertical: NAVD'88 (Feet) Notes: Data collected by Coastal Science & Engineering, Inc via RTK GPS: Data collected: August 2020 J J e 0 O O 12 A t l a n t i c O c e a n Note The project will not fill or cover any emergency shore protection structures such as sandbags. Buffers (no work areas) alongshore will be maintained around areas of active bird nesting at the time of construction in consultation with NPS biologists. To extent practicable, the construction berm will shift seaward of Mean Low Water at sites of nests then reenter the existing beach outside of the buffer zone. MHW (+1.05 ft NAVD) MLW (-1.94 ft NAVD) Applicant: Dare County 954 Marshall Collins Dr. Manteo, NC 27954 i� U') N co CO �() CO Z W P a m l i c o S o u n d Cape Hatteras National Seashore O O O p no" p + O V N O + CD �12� o Reach 2 - National Seashore (11,500 If) STA 1770+50 to 1880+50 525,000 cy (46 cy/ft) (No dune to be constructed) Note: A minimum of two underwater pipeline corridors will be used for transport of the sand slurry. From those points, land based pipes will run along the constructed berm. The order of beach filling alongshore will be determined in consultation with the National Park Service (NPS) biologists so as to avoid areas of active nesting by colonial water birds to the extent practicable. Project: Beach Renourishment To Protect NC Highway 12 At Buxton Dare County, NC —North Underwater Pipeline Cooridor �o U-)co zw LEGEND , Approximate limits of dune fill Approximate limits of dry sand beach at placement Sloping beach fill to existing grade DRAWING TITLE: OVERALL PROJECT PLAN 0 1,000 Scale (Feet) t" �`NCAR ", eo SCALE: AS SHOWN DATE: 30 July 2021 DRAWN BY: JJH e E7722HBBL11 _ ''�'./D�NF'�;GIN EEP.•Oy��c-� uillini��� � 03 APPROVED BY: HLK PROJECT#: 2403M