HomeMy WebLinkAbout91-96 Renewal 2018 Bald Head Island Limited LLCPermit Class Permit Number
RENEWAL 91-96
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
RECEIVED
Permit DEC 0.7 2018
for DCM-
X Major Development in an Area of Environmental Concern MHD CITY
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head !eland Limited LLC PO Boa 3069 Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540,
as requested in the permittee's application dated letter 10/03/18.
This permit, issued on December C 2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may
)e subject to fines, imprisonment or civil action; or may cause the permit to be null and vow.
1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96,
as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all
documents shall be readily available on site when a Division representative inspects the project for
compliance.
2) All conditions and stipulations of the active permit remain in force under this Renewal.
NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2.
NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management program.
Signed by the authority of the Secretary or VhQ and me
Chairman of the Coastal Resources Commission.
'R�� Y 67�
fliR, Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Permit Class Permit Number
RENEWAL 91-96
STATE OF NORTH CAROLINA
Department of Environmental Quality
and RECEIVED
Coastal Resources Commission
Jorrmit DEC 0.7 2018
for DCM-
X Major Development in an Area of Environmental Concern MHD CITY
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bald Head Island Limited LLC PO Box 3069 Bald Head Island, NC 29461
Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540,
as requested in the permittee's application dates letter 10/03/18.
This permit, issued on December 6.2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
)e suolect to noes, rmpnsonment or crvu acaon; yr may causo mo permu w w uwi auu ♦wu.
1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96,
as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all
documents shall be readily available on site when a Division representative inspects the project for
compliance.
2) All conditions and stipulations of the active permit remain in force under this Renewal.
NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2.
NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
'R�� Y
it , Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Permit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
V erm tt
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
91-96
Issued to Bald Head Island Limited LLC PO Box 3069 Bald Head Island, NC 28461
Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540,
as requested in the permittee's application dated letter 10/03/18.
This permit, issued on December 6, 2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96,
as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all
documents shall be readily available on site when a Division representative inspects the project for
compliance.
2) All conditions and stipulations of the active permit remain in force under this Renewal.
NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2.
NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
'R:V- 6-�
6)iz Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
_ •Y
ROy COOPER
Dovemor
MICHAELS.REGAN`
secretary
BRAXTON C: DAVIS
Director
Bald Head island Limited; LCC
c/gBruceNtaiek'.
P.0 Box3065, ,
Bald Read Island, kNC 461 '
'Dear Mr, Mareki
, NORTH-CAROWNN
&1ronmentar,Quarity
.December.6, 2018
The enclosed,renewedpermit constitutes auth.odzation under the Coastal Area Management Act, and.
whereapplicable, the State Dredg6.anc1Filhaw;for you to proceed with your project.proposaL The original ;(buff -
colored form) is retained;by you and;it musf.be available on5ite•when the project is inspected for compliance;:
`Please sign b6th4he gold original and the.white copy and retum,the white copy to this office inithe enclosed
lenvelope: Signing the permit and proceeding' means you'Ihavemaived your"iight of appeal described below.
Ifyou object to the permit`orany,ofthe'eonditions,you may,request a.heating pursuant to NCGS,113A-
or 113-229. Your -petition for a,hearing must be,filed,in accordance'.with NCGS Chapter 1508 with the.Offlce
nmistrative Hearings,'6714 Mail Service Center, ftalelgh;,NC 27,611, 6714, (919) 733-2698'within twenty [20j
if thl`sA qe Ipwon your permlt.Xo0hould:`als6 be awat6thaf another qualified party may SU6rriitan
carried out,in accofddgce`with yourapi
additional approval. Please read your,p
approved, if you plan to have.tle work
und'erstands all permit requirements,
permit form: Otherwise, all'work must be,
isions, and future maintenance requires
irk and review all project plans, as
to your benefit,to-besure'that he fully
From timeto time; Departrnent.personnel will vNif the project site. To facilitate this=review;.we request
that you complete and mail the yellow Notice Card justphor to;work initiation. Howeverif questlons arise
concerning -"permit conditions; environmental safeguards, or problem areas, you may.contact Department
personnel at anytime for assistance; By,warking{ih accordance with the permit, You will 6e helping;to protect out
vitally important coastal resources.
Sincerely,
479,
Douglas,% Haggett
Ma]or-Permlts: and: Consisten cy' Ma nager
N.C..Division ofCoastal Management.
Enclosure: wIRO
-� DFQ
.
North,Carollna Department ofETWronrrlen[al Quality FDhislon of Coastal Management
Wllmington,office. l 127 Cardinf Drive Wenslon_ i�wlimingtun. North Carolina 2a,105'
,910.796.72t5
ROY COOPER
Governor
MICHAEL S. REGAN
Secretory
BRAXTON C. DAVIS
Director
MEMORANDUM
NORTH CAROLINA
Environmenta/Quality
TO: Courtney Spears
Assistant Major Permits Coordinator, WiRO
FROM: Shaun Simpson �Q¢�
DCM Permit Support, WiRO
THRU: Debra Wilson �61
DCM, District Manager, WiRO
DATE: October 5, 2018
SUBJECT: Major Permit Renewal Request: State Permit No. 91-96
Bald Head Island, Ltd, (Deep Point Manna) Brunswick County
Mr. Bruce Marek, acting as agent for Bald Head Island Limitett LLC is requesting the renewal of State
Permit No. 91-96. This permit was originally issued on June 3, 1996, and has had several renewals,
minor modifications, and Letters of Refinement since its original issue date. Most recently a renewal was
issued on February 1, 2017 that is due to expire on December 31, 2018. Mr. Marek states that ongoing
dredging and marina maintenance, as well as yet to be constructed projects (hotel and restaurant)
approved under State Permit No. 91-96 will require ongoing renewal requests.
This Office has no objection to the renewal of State Permit No. 91-96. Mr. Marek has submitted a check
(no. 1650) in the fee amount of $100.
Enclosures
cc: MHC files
Liz Hair, USACE
Chad Cobum, DWR
RECENED
OCT 2 3 2018
�.H,
D_E Q HD CITY
U-nrNM4iw�l OV,� .
North Carolina Department of Environmental Quality I Division of Coastal Management
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington North Ca Hna 2a405
910.796,7215
Bruce Marek, P.E.
5489 Eastwind Rd
Wilmington, NC 28403
October 3, 2018
Ms. Courtney Spears, Assistant Major Permits Coordinator
Ms. Tara MacPherson, CAMA Brunswick County Feld Agent
NCDENR Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Renewal for CAMA #91-96 Bald Head Island Limited, LLC Deep Point Marina
Dear Ms. MacPherson & Ms. Spears,
This letter is submitted on behalf of Bald Head Island Limited, LLC for renewal of CAMA Permit #91-
96 Deep Point Marina Included is my Check #1650, dated 10-3-18, for the $100 renewal fee. The
current permit expires on December 31.2018.
Deep Point Marina, 1301 Ferry Road, Southport, NC is the home of the mainland side Ferry Terminal
for the Bald Head Island Ferry. It is still an active permit, as we will always have ongoing periodic
dredge projects, marina maintenance, parking lot resurfacing, etc., and we have not yet completed all of
the development that we are permitted for, i.e. the future restaurant and hotel.
As always, thanks for your attention to this matter. Your efforts are appreciated.
Bruce Marek, P.E.
For Bald Head Island Limited, LLC Planning Dept.
Cell & Texts: 910-228-2484 e-mail: marekyd@ec.r•.com
CC: William Mack & Jamillah Bailey, Bald Head Island Limited, LLC Planning Dept
RECEIVED
OCT 2 3 2018
DCM-MHD CITY
RECEIVED
OCT 0 3 2018
DCM WILMINGTON, NC
MOQON6000oN6}:SO4TbOP00O0%4NOOOPPPtA 1
prrriif Class
Permit Number
ENEWAL
91-96
STATE OF NORTH CAROLHIA
Department of Environmental (Nality
and
Coastal Resources Commission
RECEIVED
OCT 232018
for
X Major Development in an Area of Environmental Conc PM-MHD CITY
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
sued to Bald Head Island Limited LLC, PO Box 3069, Bald Head. NC 28461
uthorizing development in Brunswick County at Cape Fear River, at Southport of SR 1540
is requested in the nermittee's application dated letter dated 12/9/15.
ems permit, rssuea on February 1, 2017 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
)e subject to fines, imprisonment or civil action; or may cause the permit to benull and void.
1) This renewal shall be attached to Permit No. 91-96, which was issued to .the permittee on 6/3/96, as
well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the perninee or Signed by the authority of the Secretary of DEQ and the
her qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission
This permit must be accessible on -site to Department
iersonnel when the project is inspected for compliance.
maintenance work or project modification not covered
ier requires further Division approval.
work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees
Scat your project is consistent with the North Carolina Coastal
v
Braxton C. Aaiis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
O MWILMING ON,NC
RECEIVED
FE.5 0 OCT 0 5 2018
Signature of Permittee
C^1 WIIMINGTON, NC
DEEP POINT MARIN „u DPM-3 DWG 7- -07
75' MARINA AEC S' MAROJA AEC
sansm
NB'
30' MARINA ZGN
mO Om m0 ®mom �; s• �roa.�.EErA,..Ee� y"
I... TE. . NIE ...
L YWT Lg .PI+QpMInC ml
75' MARINA AEC
5. ELECTRICAL TRANSFORMERS/JUNCTION ENCLOSURES - tb
6. TELEPHONE, CABLE TV 6 DSL - tW
7. WATERMAIN, LATERALS, AND/OR STANDPIPE SYSTEM - tbd
B. SIDE RAMPS, (7) 2 IN D-DOCK, 2 ON E-DOCK, 3 ON F-DOCK
9. STRAIGHT RAMPS (6) A, B, C, D & H-DOCK 6 FINGER ! G2/G3
10. RAMP LAND -SIDE LANDINGS <13k 2! 0x16', 6@ l2'x20', t! 16'x16', 42 20'x28' li
11. HARBORMASTER STORAGE SHEDS, (4) 12'x12' ROOF AREA
12. SITE LIGHTING - tbd
13. FSH CLEANING STATIONS (1)
14. GRILL PADS (4) 90 SF PAVERS
13. PERGOLAS/GAZEBOS (3) SIM TO BHI, 22.5'x26' ROOFED
16. HOLDING TANK PUMP OUT STATIONS (2)
17. FUEL DOCK DISPENSERS (3), HOSE REELS, FUEL PIPING
18. JETTY WALK, 6' VIDE WOOD BOARDWALK, 2%' ON JETTY, 235'./- ON LAND
19. 404 PROTECTIVE BENCH, FENCE DR RETAINING WALL
20. CROFTER, (2) 22'K24' ROOF AREA, 6 WOOD STAIRS/DECK, OUTSIDE OF 30' ZONE
z�
w
flEreiw [MTEz
'= c
viz
.........,.. » Q C
� c g
c,AANpNunNryN+�' m � a z
�pRTHq'�, � A
' 0 Z
- n(� 11��MlR
PE M(N(D(A ME63�f�BiAnITD:S DRAWING .9-9-87: 7N107