Loading...
HomeMy WebLinkAbout91-96 Renewal 2018 Bald Head Island Limited LLCPermit Class Permit Number RENEWAL 91-96 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission RECEIVED Permit DEC 0.7 2018 for DCM- X Major Development in an Area of Environmental Concern MHD CITY pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Bald Head !eland Limited LLC PO Boa 3069 Bald Head Island, NC 28461 Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540, as requested in the permittee's application dated letter 10/03/18. This permit, issued on December C 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may )e subject to fines, imprisonment or civil action; or may cause the permit to be null and vow. 1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96, as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this Renewal. NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2. NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management program. Signed by the authority of the Secretary or VhQ and me Chairman of the Coastal Resources Commission. 'R�� Y 67� fliR, Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class Permit Number RENEWAL 91-96 STATE OF NORTH CAROLINA Department of Environmental Quality and RECEIVED Coastal Resources Commission Jorrmit DEC 0.7 2018 for DCM- X Major Development in an Area of Environmental Concern MHD CITY pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Bald Head Island Limited LLC PO Box 3069 Bald Head Island, NC 29461 Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540, as requested in the permittee's application dates letter 10/03/18. This permit, issued on December 6.2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e suolect to noes, rmpnsonment or crvu acaon; yr may causo mo permu w w uwi auu ♦wu. 1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96, as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this Renewal. NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2. NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. 'R�� Y it , Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission V erm tt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 91-96 Issued to Bald Head Island Limited LLC PO Box 3069 Bald Head Island, NC 28461 Authorizing development in Brunswick County at Cape Fear River, at Southport off SR 1540, as requested in the permittee's application dated letter 10/03/18. This permit, issued on December 6, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This Renewal shall be attached to Permit No. 91-96, which was issued to the permittee on 06/03/96, as well as all subsequent renewals, modifications, amendments, and refinements, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this Renewal. NOTE: The NC Division of Water Resources assigned the project DWR Project No. 95-1268v2. NOTE: The US Army Corps of Engineers assigned the project COE Action Id. No. 199602657. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. 'R:V- 6-� 6)iz Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee _ •Y ROy COOPER Dovemor MICHAELS.REGAN` secretary BRAXTON C: DAVIS Director Bald Head island Limited; LCC c/gBruceNtaiek'. P.0 Box3065, , Bald Read Island, kNC 461 ' 'Dear Mr, Mareki , NORTH-CAROWNN &1ronmentar,Quarity .December.6, 2018 The enclosed,renewedpermit constitutes auth.odzation under the Coastal Area Management Act, and. whereapplicable, the State Dredg6.anc1Filhaw;for you to proceed with your project.proposaL The original ;(buff - colored form) is retained;by you and;it musf.be available on5ite•when the project is inspected for compliance;: `Please sign b6th4he gold original and the.white copy and retum,the white copy to this office inithe enclosed lenvelope: Signing the permit and proceeding' means you'Ihavemaived your"iight of appeal described below. Ifyou object to the permit`orany,ofthe'eonditions,you may,request a.heating pursuant to NCGS,113A- or 113-229. Your -petition for a,hearing must be,filed,in accordance'.with NCGS Chapter 1508 with the.Offlce nmistrative Hearings,'6714 Mail Service Center, ftalelgh;,NC 27,611, 6714, (919) 733-2698'within twenty [20j if thl`sA qe Ipwon your permlt.Xo0hould:`als6 be awat6thaf another qualified party may SU6rriitan carried out,in accofddgce`with yourapi additional approval. Please read your,p approved, if you plan to have.tle work und'erstands all permit requirements, permit form: Otherwise, all'work must be, isions, and future maintenance requires irk and review all project plans, as to your benefit,to-besure'that he fully From timeto time; Departrnent.personnel will vNif the project site. To facilitate this=review;.we request that you complete and mail the yellow Notice Card justphor to;work initiation. Howeverif questlons arise concerning -"permit conditions; environmental safeguards, or problem areas, you may.contact Department personnel at anytime for assistance; By,warking{ih accordance with the permit, You will 6e helping;to protect out vitally important coastal resources. Sincerely, 479, Douglas,% Haggett Ma]or-Permlts: and: Consisten cy' Ma nager N.C..Division ofCoastal Management. Enclosure: wIRO -� DFQ . North,Carollna Department ofETWronrrlen[al Quality FDhislon of Coastal Management Wllmington,office. l 127 Cardinf Drive Wenslon_ i�wlimingtun. North Carolina 2a,105' ,910.796.72t5 ROY COOPER Governor MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA Environmenta/Quality TO: Courtney Spears Assistant Major Permits Coordinator, WiRO FROM: Shaun Simpson �Q¢� DCM Permit Support, WiRO THRU: Debra Wilson �61 DCM, District Manager, WiRO DATE: October 5, 2018 SUBJECT: Major Permit Renewal Request: State Permit No. 91-96 Bald Head Island, Ltd, (Deep Point Manna) Brunswick County Mr. Bruce Marek, acting as agent for Bald Head Island Limitett LLC is requesting the renewal of State Permit No. 91-96. This permit was originally issued on June 3, 1996, and has had several renewals, minor modifications, and Letters of Refinement since its original issue date. Most recently a renewal was issued on February 1, 2017 that is due to expire on December 31, 2018. Mr. Marek states that ongoing dredging and marina maintenance, as well as yet to be constructed projects (hotel and restaurant) approved under State Permit No. 91-96 will require ongoing renewal requests. This Office has no objection to the renewal of State Permit No. 91-96. Mr. Marek has submitted a check (no. 1650) in the fee amount of $100. Enclosures cc: MHC files Liz Hair, USACE Chad Cobum, DWR RECENED OCT 2 3 2018 �.H, D_E Q HD CITY U-nrNM4iw�l OV,� . North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington North Ca Hna 2a405 910.796,7215 Bruce Marek, P.E. 5489 Eastwind Rd Wilmington, NC 28403 October 3, 2018 Ms. Courtney Spears, Assistant Major Permits Coordinator Ms. Tara MacPherson, CAMA Brunswick County Feld Agent NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Renewal for CAMA #91-96 Bald Head Island Limited, LLC Deep Point Marina Dear Ms. MacPherson & Ms. Spears, This letter is submitted on behalf of Bald Head Island Limited, LLC for renewal of CAMA Permit #91- 96 Deep Point Marina Included is my Check #1650, dated 10-3-18, for the $100 renewal fee. The current permit expires on December 31.2018. Deep Point Marina, 1301 Ferry Road, Southport, NC is the home of the mainland side Ferry Terminal for the Bald Head Island Ferry. It is still an active permit, as we will always have ongoing periodic dredge projects, marina maintenance, parking lot resurfacing, etc., and we have not yet completed all of the development that we are permitted for, i.e. the future restaurant and hotel. As always, thanks for your attention to this matter. Your efforts are appreciated. Bruce Marek, P.E. For Bald Head Island Limited, LLC Planning Dept. Cell & Texts: 910-228-2484 e-mail: marekyd@ec.r•.com CC: William Mack & Jamillah Bailey, Bald Head Island Limited, LLC Planning Dept RECEIVED OCT 2 3 2018 DCM-MHD CITY RECEIVED OCT 0 3 2018 DCM WILMINGTON, NC MOQON6000oN6}:SO4TbOP00O0%4NOOOPPPtA 1 prrriif Class Permit Number ENEWAL 91-96 STATE OF NORTH CAROLHIA Department of Environmental (Nality and Coastal Resources Commission RECEIVED OCT 232018 for X Major Development in an Area of Environmental Conc PM-MHD CITY pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 sued to Bald Head Island Limited LLC, PO Box 3069, Bald Head. NC 28461 uthorizing development in Brunswick County at Cape Fear River, at Southport of SR 1540 is requested in the nermittee's application dated letter dated 12/9/15. ems permit, rssuea on February 1, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to fines, imprisonment or civil action; or may cause the permit to benull and void. 1) This renewal shall be attached to Permit No. 91-96, which was issued to .the permittee on 6/3/96, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the perninee or Signed by the authority of the Secretary of DEQ and the her qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission This permit must be accessible on -site to Department iersonnel when the project is inspected for compliance. maintenance work or project modification not covered ier requires further Division approval. work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees Scat your project is consistent with the North Carolina Coastal v Braxton C. Aaiis, Director Division of Coastal Management This permit and its conditions are hereby accepted. O MWILMING ON,NC RECEIVED FE.5 0 OCT 0 5 2018 Signature of Permittee C^1 WIIMINGTON, NC DEEP POINT MARIN „u DPM-3 DWG 7- -07 75' MARINA AEC S' MAROJA AEC sansm NB' 30' MARINA ZGN mO Om m0 ®mom �; s• �roa.�.EErA,..Ee� y" I... TE. . NIE ... L YWT Lg .PI+QpMInC ml 75' MARINA AEC 5. ELECTRICAL TRANSFORMERS/JUNCTION ENCLOSURES - tb 6. TELEPHONE, CABLE TV 6 DSL - tW 7. WATERMAIN, LATERALS, AND/OR STANDPIPE SYSTEM - tbd B. SIDE RAMPS, (7) 2 IN D-DOCK, 2 ON E-DOCK, 3 ON F-DOCK 9. STRAIGHT RAMPS (6) A, B, C, D & H-DOCK 6 FINGER ! G2/G3 10. RAMP LAND -SIDE LANDINGS <13k 2! 0x16', 6@ l2'x20', t! 16'x16', 42 20'x28' li 11. HARBORMASTER STORAGE SHEDS, (4) 12'x12' ROOF AREA 12. SITE LIGHTING - tbd 13. FSH CLEANING STATIONS (1) 14. GRILL PADS (4) 90 SF PAVERS 13. PERGOLAS/GAZEBOS (3) SIM TO BHI, 22.5'x26' ROOFED 16. HOLDING TANK PUMP OUT STATIONS (2) 17. FUEL DOCK DISPENSERS (3), HOSE REELS, FUEL PIPING 18. JETTY WALK, 6' VIDE WOOD BOARDWALK, 2%' ON JETTY, 235'./- ON LAND 19. 404 PROTECTIVE BENCH, FENCE DR RETAINING WALL 20. CROFTER, (2) 22'K24' ROOF AREA, 6 WOOD STAIRS/DECK, OUTSIDE OF 30' ZONE z� w flEreiw [MTEz '= c viz .........,.. » Q C � c g c,AANpNunNryN+�' m � a z �pRTHq'�, � A ' 0 Z - n(� 11��MlR PE M(N(D(A ME63�f�BiAnITD:S DRAWING .9-9-87: 7N107