HomeMy WebLinkAbout41-96 Oversized Plans Town of Southern ShoresC
r
4
GENERAL NOTES:
1. CONTRACTOR SHALL LOCATE AND PROTECT EXISTING
UTILITIES FROM DAMAGE. CONTRACTOR SHALL NOTIFY
"ULOCO" AND THE DARE COUNTY WATER DEPARTMENT
NOT LESS THAN 72 HOURS PRIOR TO COMMENCEMENT
OF LAND DISTURBING ACTIVITIES. ONLY THE WATER
MAIN IS SHOWN ON THE DRAWINGS, BUT OTHER
UTILITIES ARE ASSUMED TO BE PRESENT.
2. CONTRACTOR SHALL COORDINATE WITH UTILITIES
PROVIDERS TO AVOID EXTRA WORK AND DELAY.
3. THE CONTRACTOR IS RESPONSIBLE TO RELOCATE THE
WATER MAIN. OTHER UTILITIES PROVIDERS ARE
RESPONSIBLE TO RELOCATE THEIR RESPECTIVE
FACILITIES.
4. CONTRACTOR SHALL MAINTAIN A SAFE AND PASSABLE
ROADWAY TRAVEL SURFACE AT ALL TIMES THAT THE
ROADWAY IS OPEN FOR TRAFFIC. CLOSURE OF THE
ROADWAY SHALL BE FOR THE MINIMUM REASONABLE
TIME, AND SHALL BE ONLY AS APPROVED BY THE
TOWN. THE CONTRACTOR SHALL INSTALL AND
MAINTAIN SUFFICIENT TRAFFIC CONTROLS (INCLUDING
STREET CLOSURE SIGNS) FOR THE CONDITIONS WHICH
OCCUR DURING THE CONSTRUCTION PERIOD.
5. CONTRACTOR SHALL MAINTAIN THE JOBSITE NEAT AND
CLEAN. CONTRACTOR SHALL PROPERLY DISPOSE OF
DEBRIS, WASTE, EXCESS MATERIAL AND TRASH. THE
SITE SHALL BE LEFT NEAT, CLEAN AND ORDERLY.
6, CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
CONDUCT AND SUPERVISION OF ALL WORK
ASSOCIATED WITH THIS PROJECT.
7. CONTRACTOR SHALL COMPLY WITH ALL LAWS AND
REGULATIONS APPLICABLE TO GENERAL CONTRACTING
IN THE STATE OF NORTH CAROLINA.
S. "NOISE" HOURS ARE 7:00 AM TO 8:00 PM WEEKDAYS
AND SATURDAYS. NO WORK SHALL BE PERFORMED
DURING OTHER HOURS EXCEPT WITH THE PRIOR
APPROVAL OF THE TOWN.
STABILIZATION:
1. FINE GRADE.
2. SEED, FERTILIZE AND APPLY MULCH OR EROSION
CONTROL BLANKETS IN ACCORDANCE WITH THE
SEEDING SCHEDULE.
3. REPAIR EROSION DAMAGE NOT CAUSED BY A 10-YEAR
OR GREATER STORM DURING THE FIRST YEAR AFTER
ACCEPTANCE OF THE COMPLETED PROJECT BY THE
TOWN.
4. APPLY EXCELSIOR BALNKETS WHERE THE SLOPE
EXCEEDS 1:2 (V:H), OR WHERE CONCENTRATED FLOWS
OCCUR.
SEEDING SCHEDULE:
APRIL 1 - JULY 15; PERMANENT SEEDING:
K-31 FESCUE 3 LB/ 1000 SQ FT
COMMON BERMUDAGRASS 1 LB/1000 SQ FT
GERMAN MILLET 3 LB/1000 SQ FT
NOTE: DELETE GERMAN MILLET IF OVERSEEDING
AN ESTABLISHED TEMPORARY SEEDING
AUGUST 15 - APRIL 1; TEMPORARY SEEDING:
K-31 FESCUE
WINTER RYE GRAIN
3 LB/1000 SQ FT
5 LB/ 1000 SQ FT
SEEDING OR SODDING SHALL BE ACCOMPANIED BY 25 LB OF
10-10-10 FERTILIZER PER 1000 SQ FT OR ACCORDING TO SOIL
TEST. ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW
AND DISKED AT THE RATE OF 100 LB PER 1000 SQ FT OR
SHALL BE HYDRO -SEEDED AND MULCHED AT A RATE
SUFFICIENT TO ACCOMPLISH THE SEEDING SCHEDULE AND TO
CONTROL WIND AND WATER BORNE EROSION. EXCELSIOR OR
EQUIVALENT BLANKETS SHALL BE INSTALLED AND STAPLED IN
PLACE IN ACCORDANCE WITH THE MANUFACTURERS
RECOMMENDATIONS FOR SEEDED AREAS WITH SLOPES
STEEPER THAN 1:3 (V:H). OVERSEEDING OF ESTABLISHED
TEMPORARY SEEDING SHALL BE MULCHED AS REQUIRED TO
PROTECT AND HOLD THE SEED. SOD SHALL BE LIVE,
HEALTHY BERMUDA GRASS.
REPAIR AND/OR REPLACEMENT OF THE SEEDING OR SODDING
INSTALLATION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR IN THE EVENT OF PARTIAL OR COMPLETE
FAILURE OF THE SEEDING TO GERMINATE AND/OR THE
SEEDING OR SODDING TO BECOME ESTABLISHED. ALL SEEDED
AREAS SHALL RECIEVE AN APPLICATION OF FERTILIZER AT
THE INITIAL RATE AT THE BEGINNING OF THE SECOND
GROWING SEASON.
IF PERMANENT SEEDING OR SODDING CANNOT BE PERFORMED
UPON COMPLETION OF LAND DISTURBING ACTIVITIES,
TEMPORARY SEEDING SHALL BE INSTALLED AND MAINTAINED
UNTIL PERMANENT SEEDING CAN BE INSTALLED.
ESTABLISHMENT OF PERMANENT STABILIZATION IS THE
RESPONSIBILITY OF THE CONTRACTOR.
SOIL EROSION AND SEDIMENTATION:
1. CONSTRUCTION ACTIVITIES SHALL BE UNDERTAKEN AND
CONTROLLED IN SUCH A MANNER AS TO MINIMIZE
SOIL DISTURBANCE AND EROSION.
2. SILT FENCES SHALL BE INSTALLED IN THE LAGOON
ADJACENT TO THE PROJECT WORK AREA.
3. SILT FENCES SHALL BE INSTALLED WHERE NECESSARY
TO PREVENT EROSION OF DISTURBED BANKS INTO THE
LAGOON.
4. TEMPORARY EROSION CONTROL FEATURES SHALL BE
MAINTAINED UNTIL PERMANENT FEATURES ARE
ESTABLISHED, EXCEPT THAT SILT FENCES IN THE
LAGOON SHALL BE REMOVED UPON COMPLETION OF
THE CULVERT INSTALLATION AND STABILIZATION OF
THE LAGOON BANKS.
(NOTE: DISTURBED AREAS SHALL BE SEEDED OR SODDED
WITHIN 30 DAYS OF CESSATION OF LAND DISTURBING
ACTIVITIES)
� W
MATERIAL SPECIFICATION:
CONCRETE: 3,000 PSI MINIMUM. ADMIXTURES MAY BE
EMPLOYED ONLY WITH PRIOR APPROVAL OF THE TOWN.
Y ' 4 L,
ALL MATERIALS SHALL BE NEW AND IN AS -NEW CONDITION, +'•�+��,'```
BACKFILL: CLEAN SAND OR NATIVE SOIL FREE OF ORGANICS,
CLAY, SILT AND TRASH OR DEBRIS. 111111 1177
ALUIYIa/UMa AASIJ7'G Al-Zlq f A.57At .�- ZO9
2
0
CI
A
R
GENERAL PROJECT SEQUENCE:
1, INSTALL SOIL EROSION AND SEDIMENTATION CONTROL
FEATURES AND TEMPORARY TOILET.
2. PROTECT UTILITIES.
3. DEMOLISH AND REMOVE EXISTING FACILITIES AND
DEBRIS.
4. INSTALL NEW CULVERT SYSTEM.
5. BACKFILL AND COMPACT.
6. CONSTRUCT ROADWAY.
7. STABILIZE.
� O Q: Q.
W i-
J 5 Q o CL
cn = a 0 j 2 Q.
W 1-. L� 0. Q LJ
�u--44-Lu Q:I—to W Lt.
C) Z U z Q
2 z°.qa41 3Q
UQ. Lu
� _
_j� Lu JQ.
QU ►x-occq 6u-_j
Q
c�
10
z
"®
W
Q
n
uj
-_.1
2
o
ca
er
Q
4 ,,
`+)
tL
N
W
ch
�
Y
Z
W
W
uj
0
W
r
J
Q
J
W
W.
i°'-
W
®D
W
H
0a�
Z
0
0
0
3:
�
cc
W
CD
LL
O
0
W
cl
cc
0
W
sue'
Z
.J
U
DESIGNED
R.D.C.
DRAWN
R.D.G.
SCALE
AS NOTED
DATE
—5/1 / 95 _-
CHECKED
r c
---x
CURRENT
REVISION
---
SHEET NO.
C .4
OF SHEETS
PROJECT NO.
90033