HomeMy WebLinkAbout41-96 Oversized Plans Town of Southern ShoresC r 4 GENERAL NOTES: 1. CONTRACTOR SHALL LOCATE AND PROTECT EXISTING UTILITIES FROM DAMAGE. CONTRACTOR SHALL NOTIFY "ULOCO" AND THE DARE COUNTY WATER DEPARTMENT NOT LESS THAN 72 HOURS PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITIES. ONLY THE WATER MAIN IS SHOWN ON THE DRAWINGS, BUT OTHER UTILITIES ARE ASSUMED TO BE PRESENT. 2. CONTRACTOR SHALL COORDINATE WITH UTILITIES PROVIDERS TO AVOID EXTRA WORK AND DELAY. 3. THE CONTRACTOR IS RESPONSIBLE TO RELOCATE THE WATER MAIN. OTHER UTILITIES PROVIDERS ARE RESPONSIBLE TO RELOCATE THEIR RESPECTIVE FACILITIES. 4. CONTRACTOR SHALL MAINTAIN A SAFE AND PASSABLE ROADWAY TRAVEL SURFACE AT ALL TIMES THAT THE ROADWAY IS OPEN FOR TRAFFIC. CLOSURE OF THE ROADWAY SHALL BE FOR THE MINIMUM REASONABLE TIME, AND SHALL BE ONLY AS APPROVED BY THE TOWN. THE CONTRACTOR SHALL INSTALL AND MAINTAIN SUFFICIENT TRAFFIC CONTROLS (INCLUDING STREET CLOSURE SIGNS) FOR THE CONDITIONS WHICH OCCUR DURING THE CONSTRUCTION PERIOD. 5. CONTRACTOR SHALL MAINTAIN THE JOBSITE NEAT AND CLEAN. CONTRACTOR SHALL PROPERLY DISPOSE OF DEBRIS, WASTE, EXCESS MATERIAL AND TRASH. THE SITE SHALL BE LEFT NEAT, CLEAN AND ORDERLY. 6, CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDUCT AND SUPERVISION OF ALL WORK ASSOCIATED WITH THIS PROJECT. 7. CONTRACTOR SHALL COMPLY WITH ALL LAWS AND REGULATIONS APPLICABLE TO GENERAL CONTRACTING IN THE STATE OF NORTH CAROLINA. S. "NOISE" HOURS ARE 7:00 AM TO 8:00 PM WEEKDAYS AND SATURDAYS. NO WORK SHALL BE PERFORMED DURING OTHER HOURS EXCEPT WITH THE PRIOR APPROVAL OF THE TOWN. STABILIZATION: 1. FINE GRADE. 2. SEED, FERTILIZE AND APPLY MULCH OR EROSION CONTROL BLANKETS IN ACCORDANCE WITH THE SEEDING SCHEDULE. 3. REPAIR EROSION DAMAGE NOT CAUSED BY A 10-YEAR OR GREATER STORM DURING THE FIRST YEAR AFTER ACCEPTANCE OF THE COMPLETED PROJECT BY THE TOWN. 4. APPLY EXCELSIOR BALNKETS WHERE THE SLOPE EXCEEDS 1:2 (V:H), OR WHERE CONCENTRATED FLOWS OCCUR. SEEDING SCHEDULE: APRIL 1 - JULY 15; PERMANENT SEEDING: K-31 FESCUE 3 LB/ 1000 SQ FT COMMON BERMUDAGRASS 1 LB/1000 SQ FT GERMAN MILLET 3 LB/1000 SQ FT NOTE: DELETE GERMAN MILLET IF OVERSEEDING AN ESTABLISHED TEMPORARY SEEDING AUGUST 15 - APRIL 1; TEMPORARY SEEDING: K-31 FESCUE WINTER RYE GRAIN 3 LB/1000 SQ FT 5 LB/ 1000 SQ FT SEEDING OR SODDING SHALL BE ACCOMPANIED BY 25 LB OF 10-10-10 FERTILIZER PER 1000 SQ FT OR ACCORDING TO SOIL TEST. ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW AND DISKED AT THE RATE OF 100 LB PER 1000 SQ FT OR SHALL BE HYDRO -SEEDED AND MULCHED AT A RATE SUFFICIENT TO ACCOMPLISH THE SEEDING SCHEDULE AND TO CONTROL WIND AND WATER BORNE EROSION. EXCELSIOR OR EQUIVALENT BLANKETS SHALL BE INSTALLED AND STAPLED IN PLACE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS FOR SEEDED AREAS WITH SLOPES STEEPER THAN 1:3 (V:H). OVERSEEDING OF ESTABLISHED TEMPORARY SEEDING SHALL BE MULCHED AS REQUIRED TO PROTECT AND HOLD THE SEED. SOD SHALL BE LIVE, HEALTHY BERMUDA GRASS. REPAIR AND/OR REPLACEMENT OF THE SEEDING OR SODDING INSTALLATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN THE EVENT OF PARTIAL OR COMPLETE FAILURE OF THE SEEDING TO GERMINATE AND/OR THE SEEDING OR SODDING TO BECOME ESTABLISHED. ALL SEEDED AREAS SHALL RECIEVE AN APPLICATION OF FERTILIZER AT THE INITIAL RATE AT THE BEGINNING OF THE SECOND GROWING SEASON. IF PERMANENT SEEDING OR SODDING CANNOT BE PERFORMED UPON COMPLETION OF LAND DISTURBING ACTIVITIES, TEMPORARY SEEDING SHALL BE INSTALLED AND MAINTAINED UNTIL PERMANENT SEEDING CAN BE INSTALLED. ESTABLISHMENT OF PERMANENT STABILIZATION IS THE RESPONSIBILITY OF THE CONTRACTOR. SOIL EROSION AND SEDIMENTATION: 1. CONSTRUCTION ACTIVITIES SHALL BE UNDERTAKEN AND CONTROLLED IN SUCH A MANNER AS TO MINIMIZE SOIL DISTURBANCE AND EROSION. 2. SILT FENCES SHALL BE INSTALLED IN THE LAGOON ADJACENT TO THE PROJECT WORK AREA. 3. SILT FENCES SHALL BE INSTALLED WHERE NECESSARY TO PREVENT EROSION OF DISTURBED BANKS INTO THE LAGOON. 4. TEMPORARY EROSION CONTROL FEATURES SHALL BE MAINTAINED UNTIL PERMANENT FEATURES ARE ESTABLISHED, EXCEPT THAT SILT FENCES IN THE LAGOON SHALL BE REMOVED UPON COMPLETION OF THE CULVERT INSTALLATION AND STABILIZATION OF THE LAGOON BANKS. (NOTE: DISTURBED AREAS SHALL BE SEEDED OR SODDED WITHIN 30 DAYS OF CESSATION OF LAND DISTURBING ACTIVITIES) � W MATERIAL SPECIFICATION: CONCRETE: 3,000 PSI MINIMUM. ADMIXTURES MAY BE EMPLOYED ONLY WITH PRIOR APPROVAL OF THE TOWN. Y ' 4 L, ALL MATERIALS SHALL BE NEW AND IN AS -NEW CONDITION, +'•�+��,'``` BACKFILL: CLEAN SAND OR NATIVE SOIL FREE OF ORGANICS, CLAY, SILT AND TRASH OR DEBRIS. 111111 1177 ALUIYIa/UMa AASIJ7'G Al-Zlq f A.57At .�- ZO9 2 0 CI A R GENERAL PROJECT SEQUENCE: 1, INSTALL SOIL EROSION AND SEDIMENTATION CONTROL FEATURES AND TEMPORARY TOILET. 2. PROTECT UTILITIES. 3. DEMOLISH AND REMOVE EXISTING FACILITIES AND DEBRIS. 4. INSTALL NEW CULVERT SYSTEM. 5. BACKFILL AND COMPACT. 6. CONSTRUCT ROADWAY. 7. STABILIZE. � O Q: Q. W i- J 5 Q o CL cn = a 0 j 2 Q. W 1-. L� 0. Q LJ �u--44-Lu Q:I—to W Lt. C) Z U z Q 2 z°.qa41 3Q UQ. Lu � _ _j� Lu JQ. QU ►x-occq 6u-_j Q c� 10 z "® W Q n uj -_.1 2 o ca er Q 4 ,, `+) tL N W ch � Y Z W W uj 0 W r J Q J W W. i°'- W ®D W H 0a� Z 0 0 0 3: � cc W CD LL O 0 W cl cc 0 W sue' Z .J U DESIGNED R.D.C. DRAWN R.D.G. SCALE AS NOTED DATE —5/1 / 95 _- CHECKED r c ---x CURRENT REVISION --- SHEET NO. C .4 OF SHEETS PROJECT NO. 90033