Loading...
HomeMy WebLinkAbout116-96 TX Coulbourn, EdwinPermit Class TRANSFER STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 116-96 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound, south end of Ferry Dock Rd:, Manns Harbor as requested in the permittee's application dated 5/28/96, including 5 dated 5/29/96 and is permit, issued on . Auwst 28, 2000 , is subject to compliance with the application (where consistent :h the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Pier/Platform/Boatlift 1) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 2) The alignment of the proposed pier must -be approved by a representative of the Division of Coastal Management prior to the start of construction. 3) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department -rsonnel when the project is inspected for compliance. Any maintenance work or project modification not covered �reunder requires further Division approval. All work must cease when the permit expires on December 31, 2001 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. t/ U- DoTina D. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Edwin T. Coulbourn Permit #116-96 Page 2 of 3 ADDITIONAL CONDITIONS NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Bulkhead NOTE: An adjacent property owner has given notice of a disputed property boundary claim relative to your property. The Division of Coastal Management does not adjudicate property disputes. Therefore, the permittee is advised that if it is determined in the future that a portion of the permitted bulkhead encroaches on the adjacent property, the permittee may be required to remove, at his own expense, the offending portion of the bulkhead. 4) The bulkhead shall not extend waterward more that 29 feet from the normal water level at any point along its alignment at the time of construction. 5) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. '6) The bulkhead must be constructed prior to any backfilling activities. 7) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 8) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 9) All back fill material will be obtained from a high ground source and confined behind the permitted bulkhead. 10) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 11) No excavated or fill material shall be placed at any time, in any surrounding waters, outside of the alignment of the fill area indicated on the workplans. 12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. Edwin T. Coulbourn ADDITIONAL CONDITIONS Sedimentation and Erosion Control Permit #116-96 Page 3 of 3 13) All disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. General NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3025 (DWQ Project No. 960653), which was issued on 7/22/96. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 199604687. NOTE: This permit does not eliminate the need to obtain- any additional permits, approvals or authorizations that may be required. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. Permit Number 116-96 Permit Class TRANSFER STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound, south end of Ferry Dock Rd., Manns Harbor , as requested in the permittee's application dated 5/28/96, including 6/13/96. This permit, issued on August 28, 2000 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Pier/Platform/Boatlift 1) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 2) The alignment of the proposed pier must be approved by a representative of the Division of Coastal Management prior to the start of construction. 3) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department �rsonnel when the project is inspected for compliance. Any maintenance work or project modification not covered �reunder requires further Division approval. All work must cease when the permit expires on December 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. y� D a D. Moffitt, Director O Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Edwin T. Coulbourn Permit #116-96 Page 2 of 3 ADDITIONAL CONDITIONS NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Bulkhead NOTE: An adjacent property owner has given notice of a disputed property boundary claim relative to your property. The Division of Coastal Management does not adjudicate property disputes. Therefore, the permittee is advised that if it is determined in the future that a portion of the permitted bulkhead encroaches on the adjacent property, the permittee may be required to remove, at his own expense, the offending portion of the bulkhead. The bulkhead shall not extend waterward more that 29 feet from the normal water level at any point along its alignment at the time of construction. 5) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 6) The bulkhead must be constructed prior to any backfilling activities. 7) The bulkhead must be structurally tight so as to prevent seepage of backftll materials through the structure. 8) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. All back fill material will be obtained from a high ground source and confined behind the permitted bulkhead. 10) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 11) No excavated or fill material shall be placed at any time, in any surrounding waters, outside of the alignment of the fill area indicated on the workplans. 12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. Edwin T. Coulbourn ADDITIONAL CONDITIONS Sedimentation and Erosion Control Permit #116-96 Page 3 of 3 13) All disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. General NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3025 (DWQ Project No. 960653), which was issued on 7/22/96. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 199604687. This permit does not eliminate the need to obtain- any additional permits, approvals or authorizations that may be required. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. �� WDENR JAMES B. HUNT JR. GOVERNOR 3. BILL HOLMAN I .SECRETARY DONNA D. Morrm NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT MEMORANDUM JUL 2 5 2000 CCASTq(A"Ar,? � TO: Doug Huggett, DCM Major Permits Processing Coordinator THROUGH: Ted Sampson, District Manager FROM: Frank A. Jennings, III, Coastal Management RepresentativeF SUBJECT: CAMA Major Permit #116-99 DATE: July 20, 2000 On August 1, 1996, CAMA Major Permit #116-96 was issued to Richard J. Spicer for construction of a bulkhead, pier and boatlift on a lot located at the south end of Ferry Dock Road, Manns Harbor in Dare County. On February 21, 2000 it was transferred to Gaylord and Deborah Perry and renewed with an expiration date of December 31, 2001. In accordance with NCAC T15A: 07J.0406, Mr. Edwin T. Coulbourn, P. O. Box 2450, Manteo, NC 27954 has submitted a request to have permit #116-96 transferred to his name. The applicant has indicated that there are no substantial changes or modifications to the development project as permitted or changes in conditions, circumstances or facts affecting the project. The applicant has submitted $50.00 for the permit transfer fee and a copy of his deed for the property. It is recommended that the transfer request be approved with all existing conditions to remain in effect. AN EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION EMPLOYER ELIZABETH CITY REGIONAL OFFICE 1367 US 17 SOUTH, ELIZABETH CITY, NC 27909 PHONE: 252-264-3901 FAX: 252-264-3723 - 509E RECYCLED / 10% POST -CONSUMER PAPER DENR TOLL FREE HOTLINE: 1-877-623-6748 JUL-ZI-Z000 IHU UJ;ZZ M UVI-UI'It C,JxUtIY MA NU. Z5Z Z44 J(ZJ r, u t AIL B: HUNT JN_. 'A tidy^ ,. TO !�y.ISCCJIETARY r f Doug Huggett, DCM Major Permits Processing Coordinator THROUGH: Ted Sampson, District Manager FROM: Frank A. Jennings, III, Coastal Management Representative 4 i SUBJECT: CAMAMajor Permit -in 16-99 DATE: July 20, 2000 OF DES TENT On August 1, 1996, CAMA Major Permit 9116-96 was issued to Richard J. Spicer for construction of a bulkhead, pier and boailift on a lot located at the south end of Ferry Dock Read Manns Harbor in Dare County. On February 21, 2000 it was transferred to Gaylord and Deborah Perry and renewed with an expiration date of December 31, 2001 _ In accordance with NCAC T15A: 071.0406, W. I dwirn T. Coulbourn, P. O. Box 2450, Manteo, NC 27954 has submitted a request to have permit 4116-96 transferred to his name, The applicant has indicated that there are no substantial changes or modifications to the development project as permitted or changes in conditions, circumstances or facts affecting the project, The applicant has submitted $50.00 for the permit transfer fee and a copy of his deed for the property. It is recommended that the transfer request be approved with all existing conditions to remain in effect. FLIZANKTN CITY NmaromAL OFYIOL 1387 U3 17 NOUTN, ELI7AALTM CITY, N❑ 27909 PMON[:2Ra.al4.3901 MX:252•1G4.3733 AN EQUAL OPFOwTUNITY / AFFIRMATIVII ACTION EMFLOYRR • 50% ALGTGLFO / 107E FOFT.00NFUM[R FN[A DENN TOLL FR[[ MOYLIYfr LwY9.wf •.n Y.. • m;:,CMsyay..,..«-r.-u�uN�r'IRL+vmti JUL-2 (-Z000 1 HU UJ I zJ Nil UU11-0H, U 1 1 Y rhR INU, eDe Cog J ICJ r, UJ Edwin T. Coulboum P,Q,Nox 2450 Manteo, NC 27954 Director of Coastal Management 1367 US Hwy 17 S Elizabeth City, NC 27909 Re: Gaylord Perry - Bulkhead permit Manns Harbor, NC 1 June 23, 2000 Cientlemen: We are requesting the above referenced permit he transferred from Mr. Perry to Fdwin 'r. Coulbourn, the new owner of the property. Enclosed is a copy of the deed and a check for $50.00. If you need additional information, please give me a call at 252-473-2254. JUL-�(-0000 IHU U3:�J M UUM-UMt. 011Y Edwin T. Coulbourn P.O. Box 2450 Manteo, NC 27954 Director of Coastal Management 1367 US Hwy 17S Elizabeth City, NC 27909 Re: Gaylord Perry - Bulkhead permit Mons Harbor, NC MA NU. CbC Lb4 J ICJ V. U4 MIMI) JUL 05noo June 30, 2000 0entlemen: We are requesting the above referenced permit be transferred fiom Mr. Perry to Edwin T. Coulbourn, the new owner ofthe property. The permit is to be used for the piupose for which it was issued and there is no substantial change in conditions, circumstances, or facts affecting the project. There is no substantial change or modification of the project as proposed in the original application. A copy of the new deed and a check for $50.00 have already been mailed to you. JUL—Ct-000u Ihu udi ZJ PI'I ull'runr 11. 011l' rHA nC. cUc c04 J(ej r. u0 Furs look: 1Dra pep: r9 010 Id: 91V1a D111112ar9 11 ISAR ReaalAt 1; seta Dee coda; DEED NO Enalas Tea Pd: 1240.0D 9PRPARP h DRAY, RE9I97EA OF 9901 DARE CO. NC IIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIilllllllllllll B9A b2'eaa 11 WAN �acx� Dd, Hans TA. $ 240,00 REAL EWATE TftANK9WtA2— ,:i)UNTY 9ooa and Tax Lot No. . ..... . ... ... .. .. . .... ......... . ....... Parcel Identifier No• 017595,000 Verified by ......:.. ............ .... .....,. C04at5 os the ...,.._. . day of . by......... .. ...... ......:............... Mail after recording to�d,[��BS Scewcll & FelU;ouscn, NUS Nnrzh Mabs liwy, Manteo, NC 27954 8 ... ..... .... ... This inbtrme unt was prepared by Aldrsd Scnwcll&1 Iehoosen, 805 Ntrd,Mainllwy, Manleo, NC 27954 Brief description for the Index Par el Ils Ma Har NORTH CAROLINA Gi NERAL WARRANTY DEED THIS DEED made this .., l7rh Avil .... day of .............. , .).. _..... . ........ ... ,2000........ . ... by and between GRANTOR GRANTEE, Gaylord J, Purry, Sr, and wife Deborah W. Pe:ry P. O. Box 489 Spmcc Pine, NC 27877 Bdwin "C. Coulhonns, Jr. and wife, Elizabeth COulboura 112 Soundsidt Iane Manleo, NC 27954 Enter Is APPmptlatc blora #or each Parir: ... eddr,Y. and, It A➢➢Topriely ehararler At ,it, r.C. uorperoeion Pr yarintrehlp The designation Grantor And Grantee as used herein shall include said parties, their heira, succeyaors, And assigns, and shall include singular, plural, maoculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable cunaideratian paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grunt, bargain, sell And convey unto the Grantee in fee simple. All that certain lot or parcel of ]and situated in the City of ,. Moans iiorbor Croann - lTownship, neic ••• • _ Caunty, North CaroliaA And more See }Nhibit "A„ pntliailnrlY described as follows: I Nx. am Lux. earn rye. yl 0 UA. Resins loll. NCNA 001 �0{�j�lll dui-of-cuuu Inu uaica rn vial-uur L. 1,111 rnn nu, coclI cuy aids F. uu IIIIIIIIIIIIIIIIIII IIIIIII�llllli l�II�IIII II�II IIII III e0e'i Pe?000 it a6an The property herelnabove described was segulred by Granter by instrument recorded in B!?"k,1059,. Page 85/ 17a1q County Rcgnlry. .. ...............-...... ............................... ................., A map showing the above described property Ia recorded In Plat Book ............ �_............... page.,,.. ,,_ To HApN AND TO HOLD the aforenajd In, er. perca! J: jaad end Ali privilege, And appurtbnaneus thereto belonging to the Grantee In fee simple, And the Grantor covenants with the Grantee, that Grantor I, seized of the premises In fee Simple, had the right to convey the name in fee simple, that title Id marketable And free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persona whomsoever except for the ex[eptiona hereinafter stated. T[tie to the pea erty heres,Above described le subject to the following cxcoptions: Nennidtions and Losernonis of Record p Inrerrds waeaaod, me cnnml M. a.reanl. ut at, hand and eaq, .e if aarveot u . h mnrum.n to e'ahme M lu e.rF..4 aw[ .Y 14 delY .YWeNue elflC[n and I4 uY U I. amunre I I aY [mn IY el p ue al IrvU4, N[ d.> nd Yen I{nl .p.a...u4a. ......._ %/' - auL) [Ca rporJe N.m[1 �K� 3i i.P c, r. •• •• �:n �•rr...._.... Jay; ..................... ............................. .....1 ISer�ardnw:pary..lJ..?IA. ATTdM Gi • •Ae......................................................------ (eaAL) 94 i:............ ar[[[ Ia"(C..DygU It") y � J.r,''%ii i' ........................................................... .. ueAil {/Jhr_. 13wa;.i[vlde�,�•, f�<.i' NutlTN cAa-Unix................ .................. Ovueb. -" v--: a': A i e Neury T=egc of the II and state I,.rnald, euufr that Gaylord J: Perry, Sr. and wide i7eporTh t4. ..0 12 a:.: s,•A Verry a ..... ., t :•. a r7' `f �L n.:.....................................------------------------- OrumA T,r p' .j; L' D[Meeµll .YDuud b.r.n ma out d.Y and RIy9.Ldu all ...M. 1 Is.f.br.M[ Iwl.e.L WIRm mr .:. �:t .✓...}, per teal. IbI. .x '. .. „' ,' 1�+•y: p sup .nd olfk4i stem ........ __ .. .�_.___ { zoOO-- el .......... NY t pm:..1.`J.K.OM aawL•aTAMf NngTtl CA+OLINA....................... .........County. 1, . Nally T.auc of rb Co." wa su" u.tea.ld, udwl that ...... .. ... . , el 11uu111 a.m. delete nit Mh day it uIha.IIdud wad _... b. Ir........................... seoUWy N ,n .... ......... .. Nato, 6..U., I.".ratwa, t.d dial eY aItuie'll, duly I"" .ad ea 18e sat ut Ian aurpontlun, UI fargatad I J..Id U It[ nem. IY 14--------------- Pndd.nl..14ld eaIW to ..eperW .14 ... aVatlq pY--......... u IU ........................ wlptu eY I+ud and oln.l.l imp ur uJ, Nlr .......day er ....................................... myIpl.nilawan .spit..:...................................................................... W.'r faille The J.te..I., c.rD . 05cn................................ ............... ...l�cJre .0.............. ..-....... ---..............-- .........................-........•..............•----------......--...........-------------------.............•••............ 4/w 1.1u44 M be a r.a ni, Mftram,mt .ad Ml. enpR..0 m dely rcc4tv.d .1 the date and unit and 1. M. tie% and ride Me.. on IAa Ioal pq. dvu1, r . _ .....TCa or pxaba roc ...... l_ at -it .................... couh7Y .......__ _ _.. BY .t�J .. iAA.iJf., l.. .M. ............ .. p.pYlY/AMIMvt'I4rLMI N Dead, N. C. ear suns. V-1-he. L-J 01916. Nnhut 0191J NCSA 001 JUL-u-0000 inu Ua-ca ni UUu vui rrI iill ++ ((„ „— ` IIII�II �IIII IIIIII IIIII I�IIIIII IIIIII I�I IIIII Ii III ee°iuseee ir:eapn P:x t?i bit "A" k? BEGINNING at an existing concrete manunent at the Northwest corner of Lot 2, David 'rhi.libotte Subdivision; the existing concrete monument also being located in the East margin right -of - Way of U.S. Highway 64-2C4 which contains a 100' right-of-way, said existing COneretemonument also being located North 1'1 deg, 23 min. 39 sec. West 15.01, to an existing iron pipe located iri the Northwest corner of Lot 1, David Di. and Janice A. Philibotte Subdivision as retarded in the office of the Register of Deeds in Plat Cabinet S, Slide 12CE; thence along the. East margin right- cf-way U.S. Ilighway 64-264 North 17 deg. 22 min. 1S sec. West 30.01, to an existing iron pipe; thence continuing alapg the East margin or sight-af,4ay of U.S. Highr;ay 64-264 Norch i7 deg. 22 min, 18 sec. West 21.56' to a Pk nail in an asphalt road; running thence North 36 deg. 47 min. 29 sec. East 130.22' to an existing .iron pipe; said existing iron pipe being located in the oroperty now or formerly owned by Edrtard W. Wise; running thence North 87 deg, 32 min, 26 sec. east 37.07' to an existing concrete monument; continuing thence North 67 deg, 32 min. 26 sec. East 94.00' to an existing iron pipe; continuing thence North 67 deg, 32 min, 26 sec, East 192.061 to a CALCULATED POINT,, continuing thence 07 deg. 32 min. 26 sec'.. East 24' more or less to the shoreline of the croatan Sound; thence along the shoreline of the Croatan Sound in a general Southerly direction to a wooden bulkhead located on the shoreline of the Croatan Sound; thence from that point south 74 deg. 42 min. 36 sec, West 12, more or I ess to an existing concrete monument; the existing concrete monument being located South 03 deg. 17 min. 02 sec. East 61,14, from the CALCULATED POINT referred to hereinabove; continuing thence South 74 deg. 42 min. 36 sec. West 110.43' to an iron'rod set; continuing thence South 74 peg, 42 min. 36 sec. West 101.72' to an iron rod set; continuing th(-cce South 74 deg, 42 min. 36 sec. West 191,0'a' Co the point and plane o; beginning. The above described property being the same as described on map or plat entitled "fin+-vey for Gay1cfd jr. psrry and wire, Dchorah W. Perry", Manns Harbor, Croatan Township, Dare County, North Carolina, dated May 20, 1996, by Manson Ray Msakins, Registered Land Surveyor, No, L-2592, which is incorporated herein by reference. Permit Class TRANSFER STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission erM t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 116-96 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound, south end of Ferry Dock , as requested in the permittee's application dated 5/28/96, including attached workplan drawings (6), 5 dated 5129/96 and 1 dated received 6/13/96. This permit, issued on August 28, 2000 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Pier/Platform/Boatlift 1) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 2) The alignment of the proposed pier must be approved by a representative of the Division of Coastal Management prior to the start of construction. 3) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department !rsonnel when the project is inspected for compliance. Any maintenance work or project modification not covered reunder requires further Division approval. All work must cease when the permit expires on December 31, 2001 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. r/ l/ I Ddfta D. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Edwin T. Coulbourn Permit ##116-96 Page 2 of 3 ADDITIONAL CONDITIONS NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Bulkhead NOTE: An adjacent property owner has given notice of a disputed property boundary claim relative to your property. The Division of Coastal Management does not adjudicate property disputes. Therefore, the permittee is advised that if it is determined in the future that a portion of the permitted bulkhead encroaches on the adjacent property, the permittee may be required to remove, at his own expense, the offending portion of the bulkhead. The bulkhead shall not extend waterward more that 29 feet from the normal water level at any point along its alignment at the time of construction. The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 6) The bulkhead must be constructed prior to any backfilling activities. 7) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 8) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. All back fill material will be obtained from a high ground source and confined behind the permitted bulkhead. 10) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 11) No excavated or fill material shall be placed at any time, in any surrounding waters, outside of the alignment of the fill area indicated on the workplans. 12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. Edwin T. Coulbourn ADDITIONAL CONDITIONS Permit #116-96 Page 3 of 3 Sedimentation and Erosion Control 13) All disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. General NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3025 (DWQ Project No. 960653), which was issued on 7/22/96. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 199604687. NOTE: This permit does not eliminate the need to obtain- any additional permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. Form DCM-MP-1 APPLICATION 1. APPLICANT a. Landowner: Name RTCHARD J. SPICER Address PO BOX 2020 City, MANTEO Zip 27954 Fax 473-1928 b. Authorized Agent: (To be completed by all applicants) State N C Day Phone 473-2020 Name GAYLORD PERRY Address 104 PINECONE TRAIL City KILL DEVIL HILLS State NC Zip 27948 Day Phone 480-1980 Fax 480-1864 c. Project name (if any) N0M Perndf will be issued in mme of londo erft), and/or project mme. 2. LOCATION OF PROPOSED PROJECT a. County DARE RECErAlph MAY 2 9 1r,,• b. City, town, community or landmark MANNS HARBOR c. Street address or secondary road number _ 6035 HWY 64 MANNS HARBOR COUNTY d. Is proposed work within ftibrIM or planning jurisdiction? _X Yes No DARE COUNTY e. Name of body of water nearest project (e.g. river, creek, sound, bay) CROATAN SOUND 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. BULKHEAD DOCK - BOATLIFT b. Is the proposed activity maintenance of an existing project, new work, or both? NEW WORK c. Will the project be for public, private or commercial use? PRIVATE d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. PRTVATE USE RECLAIM ERODED SHORELINE AND TO STABILIZE AREA. Revised 03/95 Form DCM-MP-1 4. LAND AND RATER CHARACTERISTICS a. Size of entire tract 1 .2 ACRES b. Size of individual lot(s)l LOT c. Approximate elevation of tract above MHW or NWL 6 5 d. Soil type(s) and texture(s) of tract SANDY e. Vegetation on tract PINES, SWEETGDM, CEDE$P P AOAN WARMYRTLE f. Man-made features now on tract TWO STORY HOUSE & SHED g. What is the CAMA Land Use Plan land classification of the site? (Consuk the local lane ase plan.) Rl-7 VIED MAY 2 9 1996 m. Describe existing wastewater treatment facilities. SEPTIC n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, 'wash down' and residential discharges.) NO RUN OFF o. Describe existing drinking water supply source. WELL 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: % Conservation Transitional Developed Community A copy of the deed (with state application only) or Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then RRATDFNTTAi forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? % Yes No (Anaa, zoning mnplionn "Mfiowr, fappua,tt<) • An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1/2" by 11" white paper. (Refer to done for the tract? Yes % No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes % No 1. Are there wetlands on the site? _ Yes % No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach documen=don, iif avmfable) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name EDWARD WISE Address 5513 OLD FERRY DOCK ROAD Phone MANNS HARBOR NO 27953 Name MANNS CUSTOM BOATS Address603 W. LANDING DRIVE Phone KILL DEVIL HILLS NO 27948 473-1 116 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 012y1996 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 28 day of MAY , 1996 CH RIARD J. SPICER/ GAYLORD PERRY Print Name -- - -- _ - LT� n 1 S.n tvk-evi' jne Signature Uyc�t�n,�V Downer or Authorized Agent Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts _ DCM MP-6 Marina Development NOTE: Please sign and date each attachment, in the space provided at the bottom of each form. Revised 03195 Form DCM-MP-2 RIKEuWr) EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilisation) N/A Length Width Average Final Eristing Project Depth Depth MAY 2 9 1996 1. EXCAVATION A//A a. Amount of material to be excavated from below MHW or NWL in cubic yards b. Type of material to be excavated c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? _ Yes _ No d. Highground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL N I A a. Location of disposal area b. Dimensions of disposal area c. Do you claim title to disposal area? Yes _ No If no, attach a letter granting permission from the owner. Q Will a disposal area maintenance? _ Yes If yes, where? be available for future No Revised 03195 Form DCM-MP-2 > e. Does the disposal area include any coastal wetlands MAY 2 9 Ifoyes, (marsh), SAVs or other wetlands? ( ) Yes. No (2) f. Does the disposal include any area in the water? Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization X Bulkhead Riprap b. Length c. Average distance waterward of MHW or NWL 21 ft. d. Maximum distance waterward of MHW or NWL 29 ft e. Shoreline erosion during preceding 12 months APPROXTMATELY 6 FT (Saurcc of infoc zion) A FALLFN TREE ON PROPERTY LINE f. Type of bulkhead or riprap material WOODEN Amount of material to be placed in the water Dimensions of fill area (3) Purpose of fill ._ b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? yes _ —No g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill _LE ROX 1 20 CII. YARDS It. Type of fill material SAND i. Source of fill material BROUGHT IN 4. OTHER FILL ACTIVITIES IJ (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dBAggC If H 0 E c. Will wetlands be cr,ssed in transporting equipment to project site? _ Yes X No If yes, explain steps that will be taken to lessen environmental impacts. RICHARD J. SPICER/GAYLORD PERRY Applicant /ar Project Name v"c_ Imo' �z< LLeI.�:. W �c,.p �.• signature Date Revised 03195 Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas). MAY 2 9 1996 Attach this form to Joint Application for CAMA Major e. Mooring buoys Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial _Community other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy (Color, inscription, size, anchor, a. Dock(s) and/or Pier(s) (1) _ Commercial _Community X Private (2) Number 1 (3) Length 100 f t . (4) Width 5 ft. (5) Finger Piers _ Yes y_ No (i) Number (ii) Length (iii) Width (6) Platform(s) I IM (7) (8) (9) (10) Yes (i) Number 1 (ii) Length , f (iii) Width a f Number of slips proposed _ Proximity of structure to property lines . Width of water body Water depth at waterward MLW or NWL Boathouse (including covered (1) Commercial (2) 'Length (3) Width No adjacent riparian lifts) c. Groin (e.g. wood, sheetpile, etc.) (1) Number (2) Length(s) end of pier at Private d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Private etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Mooring structu (boatlift mooring pilings, etc.) (1) _ Comme i _Community x Private (2) Number 1 (3) Length 12 f t . (4) Width , n f+ g. Other (Give compiere descripdon) RICHARD J. SPICER/GAYLORD PERRY Applicant P1r-o''ecptpN•ame N`X�CCiS-kin (,�w`�\r✓)+C.. 1'Jv OCs��!�ZN�U: Sigi{ature Date Revised 03/95 RCECEIVED MAY 2 9 1996 C Manns 64610 Harbor' "W �a �' N �. E /Post 0111ce e MAP 4Bn9 S F /. CROATAN SOUND ��r �11LKH)AD I I.il• L ni N of C+I li.. l9�i S� "I K I F 1 O _ H I •� •u1 ^nI ��N I OR FORMERLY �f ;OELLNER W I �n�l1v ®I _ =I FENCE POST 10.11, SOUTH OF LINE I I I' I FIRM& POST 0.85' NORTH O►LING i.i7' 1 I ki SEPTIC TANK Z\ _ J�. 1 "a f . \ \ V •I.O�+•+� y �.rp V RECEIVED MAY 2 9 1996 0 4 t�1t1Y 2 9 1996 111, to, N 9 5, 11c ` b� 0 �I 1c p 1 1. NORTHEASTERN MARINE CONSTRUCTION CO., INC. P.O. Box 42 — _.-- ---K4 ty Hawk -NE 27949- — .4 Pew►L ��teA 148'•st�6GsRio c W ouv -nc xoo QF r1EQS a•.6. 6.�loa to"— j� p'4' f•'ILIN4 'III Ali{�'llllf T �11 �p•i (D f M.TEA 6iF&M-L 1. 6"x6" PILING 2. 46x6" 'FOP NAILER 2. 4"x6" BOTTOM WHILE@ 4. DOUBLE LAYER 1"x88 5. 5/80 0 x 10' OALV. TIE R")D 6. 600' AMCNOR PILE 7. OG i)a.QWS 1Q 8-. FILTER CLOTH n- w ' ©A'.a' L441LLR a "foP ' O,-C." 0-JIL44 67 r&T-100 va-- Billjones, President (919) 261-3682- RIMMED MAY 2 9 1996 (b NORTHEASTERN MARINE CONSTRUCTION CO., INC P.O. Box 42 Kitty Hawk, NC 27949 Petimwmq oe" 14 of (or arfiraicR L.. Z" X (o" ucwE i oG 2"x E° �Oi-t' Bill Jones, President (919)161-3681 RECEIVED MAY 2 9-1996 IbL;. t .Z,.f V c,'pyS-bfnc1,4G h1l.Av, 4 iGH VJXERLUIE 1 � +l- Piling Spacing for all Systems & Cradle Diagram of 20,000 - 25,000 lb. Systems 8,000-16,000 lb. Systems* Fig. 4 20,000 - 25,000 Ib. Systems* Fig. 5 k y t I { x O O �. x O k x • Note: Diagional sparing must be equal tional) REMVED MAY ',.! M 4no4 6 ay'0Z't. i0 N Q 1q 9t O 0 N17023'39'W • ~ 15.01' W r•> 94 E ';P/SE- �l a � rHlS LIrYE E � 3 F R F�C'C, SCIaE q9B 34>.IS• f p iy T}fS9.s8• lvsgc2S.2s•`' _ C 1 ti J4 L . O 7 S03o vl / 61.14•!7.O2.,E �) LINE OF TREES >1E L/W � I 12 �, AND SHRUBS 101.72, 110.43' 1 574042'36"W 415.21'- I i s Permit Class TRANSFER STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission V e r M t t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 116-96 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound, south end of Ferry Dock , as requested in the permittee's application dated 5128/96, including 5 dated 5/29/96 and 1 dated received 6/13/96. is permit, issued on August 28, 2000 , is subject to compliance with the application (where consistent It the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Pier/Platform/Boatlift 1) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 2) The alignment of the proposed pier must be approved by a representative of the Division of Coastal Management prior to the start of construction. 3) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department rsonnel when the project is inspected for compliance. Any maintenance work or project modification not covered reunder requires further Division approval. All work must cease when the permit expires on December 31, 2001 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. DdYma D. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Edwin T. Coulbourn Permit #116-96 Page 2 of.3 ADDITIONAL CONDITIONS NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Rnikhaarl NOTE: An adjacent property owner has given notice of a disputed property boundary claim relative to your property. The Division of Coastal Management does not adjudicate property disputes. Therefore, the permittee is advised that if it is determined in the future that a portion of the permitted bulkhead encroaches on the adjacent property, the permittee may be required to remove, at his own expense, the offending portion of the bulkhead. The bulkhead shall not extend waterward more that 29 feet from the normal water level at any point along its alignment at the time of construction. 5) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 6) The bulkhead must be constructed prior to any backfilling activities. 7) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 8) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 9) All back fill material will be obtained from a high ground source and confined behind the permitted bulkhead. 10) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 11) No excavated or fill material shall be placed at any time, in any surrounding waters, outside of the alignment of the fill area indicated on the workplans. 12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. Edwin T. Coulbourn Permit #116-96 Page 3 of 3 ADDITIONAL CONDITIONS Sedimentation and Erosion Control 13) All disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. General NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3025 (DWQ Project No. 960653), which was issued on 7/22/96. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 199604687. This permit does not eliminate the need to obtain- any additional permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. Form DCM-MP-1 APPLICATION �Ecenlc� MAY 2 9 ,r . (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT MANNS HARBOR a. Landowner: Name RICHARD J. SPICER Address PO BOX 2020 City MANTEO State N C Zip 27954 Day Phone 473-2020 b. Authorized Agent: Name GAYLORD PERRY Address 104 PINECONE TRAIL City KILL DEVIL HILLS State NC Zip 27948 Fax 480-1864 Day Phone 480-1980 c. Project name (if any) NOTE. Perndt will be issued in Mme of la downer(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County DARE c. Street address or secondary road number 6035 Hwy 64 MANNS HARBOR COUNTY d. Is proposed work within xijyfzft or planning jurisdiction? _X Yes No DARE COUNTY e. Name of body of water nearest project (e.g. river, creek, sound, bay) CROATAN SOUND 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. BULKHEAD DOCK — BOATLIFT b. Is the proposed activity maintenance of an existing project, new work, or both? NEW WORK c. Will the project be for public, private or commercial use? PRIVATE d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. PRIVATE USE RECLAIM ERODED SHORELINE AND TO STABILIZE AREA. Revised 03/95 Form DCM-MP-1 P-Mr- /ED CHARACTERISTICS a. Size of entire tract 1 -2 ACRES b. Size of individual lot(s)l LOT c. Approximate elevation of tract above MHW or NWL 6 z 5 MAY 2 9 1996 in. Describe existing wastewater treatment facilities. SEPTIC n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) NO RUN OFF d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. SANDY WELL e. Vegetation on tract PINES, SWEETGUM, CFTIFR, PFACAN WAXMYRTL.E f. Man-made features now on tract TWO STORY HOUSE & SHED 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Canmlt the local land=e plarL) following items must be submitted: X Conservation Transitional A copy of the deed (with state application only) or Developed Community Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then R S T D NTT A L forward a copy of the deed or other instrument under which the owner claims title, plus written permission L Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? X Yes _ No Toning ronpliance cerifcare, if applicable) • An accurate, dated work plat (including plan view _(Anach and cross -sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1/2" by 11" white paper. (Refer to done for the tract? Yes ' X No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? _ Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach docamauadon, if available) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03195 Form DCM-M1P-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name EDWARD WISE Address 5513 OLD FERRY DOCK ROAD Phone MANNS HARBOR NO 27953 Name MANNS CUSTOM BOATS Address603 W. LANDING DRIVE Phone KILL DEVIL HILLS NO 27948 473-1716 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. RE•� �F�uFn 01 2 y 1996 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 28 day of MAY 1996 CH RIARD J. SPICER/ Print Name GAYLORD PERRY -. CN M S n to � Signature ; �i,�u1 , L o Downer or Authorized Agent J Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts _ DCM W-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03195 Form DCM-MP-2 r� n P-,_-CiW EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shon:line stabilization) N/ Average Final I Erictiug Project Leneth Width Depth Deoth MAY 2 9 1996 1. EXCAVATION ///A a. Amount of material to be excavated from below MHW or NWL in cubic yards b. Type of material to be excavated c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? _ Yes _ No d. Highground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL N / A a. Location of disposal area b. Dimensions of disposal area c. Do you claim title to disposal area? Yes _ No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? —Yes —No If yes, where? Revised 03/95 Form DCM-MP-2 � 1 �tEC�1VEb e. Does the disposal area include any coastal wetlands MAY 2 9 IfP) ' Amount of material to be placed in the (marsh), SAVs or other wetlands? ( yes No water (2) Dimensions of fill area f. Does the disposal include any area in the water? (3) purpose of fill Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization X Bulkhead Riprap b. Length 54 f t c. Average distance waterward of MHW or NWL 24 £t. d. Maximum distance waterward of MHW or NWL 29 ft e. Shoreline erosion during preceding 12 months APPROXIMATELY 6 FT (Source finf,,wrion) A FALLEN TREE ON PROPERTY LINE f. TWDODENlkhead or riprap material b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? yes _ —No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? 1� g. Amount of fill in cubic yards to be placed below water level (1) Riprap _ (2) Bulkhead backfill APPROX-. 120 CU.YARDS c. h. Type of fill material SAND i. Source of fill material BROUGHT IN 4. OTHER FILL ACTIVITIES N (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No No m What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? BAC HOE Will wetlands be cr3ssed in transporting equipment to project site? _ Yes X No If yes, explain steps that will be taken to lessen environmental impacts. RICHARD J. SPICER/GAYLORD PERRY Applicant ar Project Name VNYr hcr*+-en nr<— iy� P i,tC�._Ja, W 'N Signature Date Revised 03195 Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas), Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _ Commercial _Community X Private (2) Number 1 (3) Length 100 f t . (4) Width 5 f t . (5) Finger Piers _ Yes y_ No (i) Number (ii) Length (iii) Width (6) Platform(s) X Yes —No (i) Number 1 (ii) Length 12 F t (iii) Width R F+ _ (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines (9) Width of water body (10) Water depth at waterward end of pier at MLW or NWL b. Boathouse (including covered lifts) (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands RECENED MAY 2 9 1996 e. Mooring buoys (1) (2) (3) _ Commercial _Community _ Private Number Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Mooring structu (boatlift mooring pilings, etc.) (1) _ Comme i _Community x Private (2) Number 1 (3) Length 12 f t . (4) Width in v+ _ g. Other (Give wnple/e descripfim) RICHARD J. SPICER/GAYLORD PERRY Applicant AProject Name PoeM'—MS4r�e` bu'. Aw=AL= W c Sigi(ature K-.;kR-�� Date Revised 03/95 RECEIVED MAY 2 9 1996 C r Mann s T �, Harbor �' N C o W E MAP 4B 9t Office �A F" s F �.L CROATAN 5QUNU r �yLKH[AD l l.il� NORTH Of ` IINI ' w r I I � I o I H I ^ r• OR FORMERLY h \L ;OELLNER W n FENCE POST IO.II' SOUTH OF LINE s3v I I l I p{(4cS POST 0.69' NORTH OP LIN® I L.St SEPTIC TANK RECEIVED MAY 2 9 1996 0 SC)u�G M 0 1,1AY 2 9 1996 NORTHEASTERN MARINE CONSTRUCTION CO., INC P.O. Box 42 — . .---�Fitty Hawk, 27949- •{ Pab►s. �atisR 140••sT�6GtRio � fi'•a• o•wlaa rtui— iI l I ►I11 .. I �IIII T�•� .i ® Faw" 1. 6"x6" PILING 2. 4"x6" TOP NAILER 3. 44x8" BOTTOM VAILXR ®. DOUBLE LAYER 1"x8" S. 5/80 0 x 10' GALV. TIE V)D 6. 68x6" ANCHOR PILE 7. 06 iJame s iQ 8. FILTER CLOTH /il_ OF O&IEQS O1' &'',4' f ILIN4 WAlLGR 0 To P O.4:a" LJyLa4 r•O T•t"v�� KI , k vm__ Bill Jones, President (919) 261-3682- PECENEn MAY 2 9 1996 (E) I NORTHEASTERN MARLNE CONSTRUCTION CO., INC. P.O. Box 42 Kitty Hawk, NC 27949 Z' X (o" GEGKt �x- 2'�i �� COI;: T• N �I •I' II ,� 91�i BipJones. President (919) 261-3682 RECEIVED MAY 2 9 1996 ��y J0� 6liWAir>•ceD $bLTS .r, V Cross-tf4c..+G .qN +i1fiN+YIMEKLI►�E l , *1- r (y•�it�NGS F�OnCe11TE IPiling Spacing for all Systems & Cradle Diagram of 20,000 - 25,000 Ib. Systems 8,000-16,000 lb. Systems* Fig. 4 20,000 - 25,000 Ib. Systems' Fig. 5 1E y t I T X O O1 X O O x X, • Note: Diagional spacing must be equal tiona0 RECPVED MAY '.I M tor, F h rri iYir ED �/p THIS lrnVE PER C'C, sLraF e WOOD HB)n32, 49 34T.15 6..E O N Sg' 1 - i CALC. i < AT. 24.pq t &JOREL 8.00,E s o n S0301T. ` P1 / 61.14. 102"E rle U� 1 12.00, 1 ; r NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT August29, 2000 Mr. Edwin T. Coulbourn P. O. Box 2450 Manteo, NC 27954 Dear Sir The enclosed permit constitutes authorization underthe Coastal Area ManagementAct, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Ifyou object to the permit or any ofthe conditions, you may request ahearing pursuantto NCGS 113A-121.1 or 113-229. Your petition for a hearing mustbe filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance ofthis permit within twenty (20) days, the matter mustbe resolved priorto work initiation. The Coastal Resources Commission makes the final decision on any appeal. The projectplan is subject to those conditions appearing on the permit form. Otherwise, all work mustbe carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concemingpermit conditions, environmental safeguards, orproblem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, J Vg Doug gett Major Permits/Consistency Manager DH/amw Enclosure MAILING: 1638 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1638 PHYSICAL: 2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE: 919-733-2293 FAX:919-733-149S AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST -CONSUMER PAPER DENR TOLL FREE HOTLINE: 1-877-623-6748