Loading...
HomeMy WebLinkAbout116-96 Renewal Coulbourn, EdwinPermit Class 2nd RENEWAL Permit Number 116-96 ����� STATE OF NORTH CAROLINA ment of Environment and Natural Resources and FEB 0 5 2002 Coastal Resources Commission ®N OF COASTAL MANAGEMENT�ri� RALEIGH V for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound. south end of Ferry Dock Rd.. Manns Harbor —,as requested in the permittee's application dated letter dated 12/28/01, This permit, issued on Tanun y72, 2002 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ne suciect to rmes, 1mpRs0111ne111, OF G1V11 aUllVlh Vr 111ay UdUSU ule peII1111 10 oe null an11 V01t1. 1) This renewal must be attached to the original of Permit #116-96, which was transferred to the current permittee on 8/28/00, and all documents must be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: Effective 8/1/00, the Coastal Shoreline AEC category was amended to include the Public Trust Shoreline AEC. The permittee is advised that any future development within 30 feet of the mean high water line may require additional permit authorization from the Division. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2003 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal 'Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. v � /✓ donna D. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class tad RENEWAL Permit Number 116-96 RECELVECYTATE OF NORTH CAROLINA - partment of Environment and Natural Resources F ^ S 2002 and Coastal Resources Commission QN OF GC nALLIGHNAGE icNTPermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Edwin T. Coulbourn, P.O. Box 2450, Manteo, NC 27954 Authorizing development in Dare County at Croatan Sound, south end of Ferry Dock Rd.. Matins Harbor —,as requested in the permittee's application dated letter dated 12/28/Ol. This permit, issued on Innyinry. 22, 2002 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suo]ecE to lines, lnrprrsornrrent or CIV11 acuon; or may cause me permit to ce null ana voia. 1) This renewal must be attached to the original of Permit #116-96, which was transferred to the current permittee on 8/28/00, and all documents must be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: Effective 8/1/00, the Coastal Shoreline AEC category was amended to include the Public Trust Shoreline AEC. The permittee is advised that any future development within 30 feet of the mean high water line may require additional permit authorization from the Division. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2003 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. vy 9 /✓gonna D. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. C-Signature of Permittee North Carolina Michael F. Easley, Governor Edwin T. Coulbourn P O Box 2450 Marten, NC 27954 Dear Sir: NCDENR Department of Environment and Natural Resources Division of Coastal Management Donna D. Moffitt, Director William G. Ross Jr., secretary January 30, 2002 The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113- 229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. DH/csp Enclosure Very sincerely, Douglas V. Huggett Major Permits/Consistency Manager 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-22931 FAX: 919-733-14951 Internet: hfp://dcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper JAN 1 U 7007 AihOW. of COASTAL �, AMMEN7 NCDENR Vi North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna b. Moffitt, Director William G. Ross Jr., Secretary MEMORANDUM: CO f r TO: Doug Huggett, Major Permits Coordinator, DCM N 6 1- THROUGH: Ted Sampson, District Manger, DCM FROM: Frank A. Jennings, III, Coastal Management Representative, DCM -51 AP SUBJECT: CAMA Major Permit #116-96, Edwin T. Coulbourn, Jr. Renewal Request DATE: January 2, 2001 CAMA Major Permit 4116-96 was transferred to the applicant on August 28, 2000 with a December 31, 2001 expiration date. The permit authorized the construction of a bulkhead, pier and boatlift on a lot located at the south end of Ferry Dock Road (SR 1110) Manns Harbor in Dare County and adjacent to the Croatan Sound. To date, the applicant has constructed the bulkhead; however, neither the pier nor the boatlift have been constructed. The applicant has submitted a renewal request as well as check #002174 for $100.00 for the renewal fee. It is recommended that the permit be renewed with no change in the conditions. g,I klw.A dan+ H/h I<s% z re 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-372311nternet: hfp:lldcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post consumer Paper The Big Beaver Wood Company P. O. Box 2450 Manteo, NC 27954 252-473-2254 December 28, 2001 Mr. Frank Jennings Division of Coastal Management 1367 Hwy 17 S. Elizabeth City, NC 27909 Re: Permit Number 116-96 Edwin T,Coulbourn, Jr. Dear Mr. Jennings: 'F CEIVE® DEC 3 1 COASTAL MANAGEMENT ELIZABETH CITY Park of the work on the above referenced permit has been performed in the past two years. The bulkheading was started and has been completed. I am requesting that a two year extension be granted to complete the pier/platform/boatlift portion of the origional permit. A check in the amount of U00.06is enclosed. Thank you for your assistance in this procedure. Sincerely C.�'C���jFc1�i2✓. Edwin T. Coulbourn, Jr.