Loading...
HomeMy WebLinkAbout43-13 Letter of RefinementNorth Carolina Pat McCrory Governor Currituck 34, LLC C/O Michael Sifen 500 Central Drive, Suite 106 Virginia Beach, VA 23454 Dear Mr. Sifen: NCDENR Department of Environment and Natural Division of Coastal Management Braxton C. Davis Director LETTER OF REFINEMENT Permit #43-13 Resources John E. Skvada, III Secretary November 14, 2013 Pt QED NOV 18 2013 1 This letter is in response to an email received on November 12, 2013, from Mike White, P.R.Y WOWYwas requested that Major Permit #43-13 be modified to include the following: Bulkhead repair (within the existing footprint) comprising of top cap board replacement along the length of the bulkhead as needed. - Replacing the decking, joists and girders on the main pier, platform and finger piers. (Main pier section measures 150'x6' w/ 16'x16' platform and three 24'x3' finger piers on south side). No expansion proposed. - Widen a 90' section of elevated walkway over USACE 404-wetlands from the permitted width of 4' to a proposed width of 6'. Major Permit #43-13 was issued to Currituck 34, LLC, on April 11, 2013. This Permit was issued for the creation of a 22 lot subdivision, the removal of all existing building structures, the construction of two roads to access the lots, the construction of a roadway to access an existing boat ramp, the creation of a stormwater fire pond, the installation of aggregate walking trails, swales for drainage and repairs to an existing dock along the boat ramp. The project is located at 172 Marsh Causeway (NC HWY 615), Knotts Island, Currituck County, adjacent to North Landing River. Your modification request as described and/or depicted in an email received November 12, 2013, is hereby authorized as a refinement to CAMA Major Permit #43-13. All existing conditions remain in effect, including the expiration date of December 31, 2016. This letter is provided to you as a record of the authorization, and should be included with the Permit file. You may need to obtain a building permit from Currituck County. If you have any questions, please contact Mr. Ron Renaldi, of this office at 252-264-3901. Sincerely, Frank Jenni gs, District Manager, Northeast District FAJ/rar cc: Doug Huggett, Major Permits Coordinator, NC Division of Coastal Management, Morehead City Lynn Mathis, District Compliance & Enforcement Representative, DCM, Elizabeth City Mike White, P.E., Agent, Virginia Beach, VA 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer N 0 V 12 Q�A NCDENK North Carolina Department of Environment and Natural Resources Division of Coastal Management Bevedy Eaves Perdue, Govemor James H, Gregson, Director Dee Freeman, Secretary Date Noj. / Zt Zoll Name of Property Owner Applying for Permit: RECEIVED NOV 18 2013 Mailing Address: 50o Cea.,tral /Ave s,, tle. 106 DCMm1DCrm YtrUA G Kejt _ VA 23`i 5Y 0 I certify that I have authorized (agent) r 11r ' k c 4 r tC P.C. to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (my property located at) _ i 72- Yh w 5 k CaCP w0.y K t-c. & 15l Kno ifs rd %un Lp 1Dt LAN 6vU4 f7 NV, +t,\ C6V0Irkk This certification is valid thru (date) �S lam. `2 i`J Property Owner signature 0 Date 6,41r eXls7�r1� vvc4MwU ay o�cF US�ic( vt�7�att�f (3) 9'q Ittte- j o Ii' -S �r'r1/>Fld � L1C t l55 Or1 ��trh e i'Q� i 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagementnet Equd 0WrtntY 1 APamaM Acdan EmpbYw- SD% Regcled i 10% Pat Caeumer Page �) sbPtLA max+ - Soct¢ rrtiw� Renaldi, Ronald From: Renew the Bay, LLC [renewthebay@cox. net) Sent: Tuesday, November 12, 2013 1:26 PM To: Renaldi, Ronald Subject: Re: CAMA Permit modification Attachments: NCDENR-Mike White Authorization. pdf Hi Ron, Pls find attached the agent authorization form ... signed by Mr. Sifen of the Currituck 34, LLC. With the submittal of the attached ... will this be sufficient to move ahead with NCDENR's authorization of the following work effort?: 1) bulkhead repair, (2) the replacement of the joists, girders and decking on the main pier and (3) the expansion of the walkway over USACE wetlands from 4' wide to 6' wide, can be done under a permit refinement Please advise. Thx, Mike From: Renaldi, Ronald Sent: Friday, November 08, 2013 11:19 AM To: Mike White Subject: RE: CAMA Permit modification Mike, RECEIVED r NOV 18 Z013 DCMMHDcITY I heard back from our Major Permits Coordinator and it was decided that the (1) bulkhead repair, (2) the replacement of the joists, girders and decking on the main pier and (3) the expansion of the walkway over USACE wetlands from 4' wide to 6' wide, can be done under a permit refinement. That is a simple letter that can be issued from our office authorizing the work. The only thing we will need for this is a statement from Currituck 34, LLC authorizing you to modify the permit on their behalf. I've attached our agent authorization form. The extension of the 50' pier next to the boat ramp will have to go through a Major Modification to MP#43-13. The reason for this is that there was no previous agency review of development within the waters of North Landing River since all proposed development was landward of normal water level. This means that the same process that was done for the original Major Permit will have to be repeated. A new application, narrative and scaled site plans will have to be submitted as well as notifying the adjacent riparian property owners of the intended pier extension. There will also be z fee of $250 and a processing time of 75-150 days for permit issuance after it is accepted as complete. I've attached all required forms as well as a checklist. I should note that this pier is close to the property line and if any portion of it comes within 15' of the property line extended into the water, then a 15' waiver from the adjacent riparian property owner will be required. If you have any questions, feel free to contact me. Once I get that Agent Authorization form, I can get the refinement issued. Thanks; Ron From: Mike White [mailto:renewthebay@cox.net] Sent: Thursday, November 07, 2013 10:43 AM To: Renaldi, Ronald Subject: Re: CAMA Permit modification Thx Mike Renew the Bay, LLC Renewthebav@cox.net (757)814-1586 . Sent from myiPhone On Nov 7, 2013, at 8:06 AM, "Renaldi, Ronald" <ronald.renaldi@ncdenr.eov> wrote: Mike, I'm still waiting to hear back from our Major permits Coordinator, my understanding is that he was out of the office the past couple of days. If it does turn out to be a Minor Modification, I will need a written request listing all the "proposed modifications to the permit in detail as well as an updated scaled site plan (can be added to the approved site plans). A minor modification also has a fee of $100 payable to NCDENR. A minor modification typically is not circulated to all reviewing agencies, but instead to ones that may have a concern; however, there is. a time period for any comments to be submitted. Thanks, Ron Ron Renaldi Field. Representative NC Division of Coastal Management Elizabeth City Office 1367 US 17 South Elizabeth City, NC 27909 Ronald.Renaldi@ncdenr.eov (252) 264-3901 ext. 232 (252)264-3723 FAX http://dcm2.enr.state.nc.us/ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed Renaldi, Ronald From: Sent: To: Subject: No Renew the Bay, LLC Renewthebav@cox.net (757)814-1586 Sent from my iPhone Mike White [renewthebay@cox.net] Tuesday, November 05, 2013 9:55 PM Renaldi, Ronald Re: CAMA Permit modification On Nov 5, 2013, at 12:41 PM, "Renaldi, Ronald" <ronald.renaldi@ncdenr.¢ov> wrote: Mike, Any proposed slips on the pier extension? Thanks, Ron Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Mike White [mailto:renewthebavCiilcox.net] Sent: Tuesday, November 05, 2013 12:09 PM To: Renaldi, Ronald Subject: Re: CAMA Permit modification Yes your assessment of the work effort is exactly what we are proposing ... Thx Renew the Bay, LLC Renewthebav@cox.net (757)814-1586 Sent from my iPhone On Nov 5, 2013, at 12:03 PM, "Renaldi, Ronald" <ronald.renaldi@ncdenr.eov> wrote: Mike, From what I can tell, it appears the proposed changes will be: " NOV 19 2013 DCM-MmCffy Bulkhead repair (within the existing footprint) comprising of top cap board replacement along the length of the bulkhead as needed. Replacing the decking, joists and girders on the main pier, platform and finger piers. (Main pier section measures 150'x6' w/ 16'x16' platform and three 24'x3' finger piers on south side). No expansion proposed. Extend the 50'x6' pier adjacent to the boat ramp an additional 50' for a total of 100'. Widen a 90' section of elevated walkway over wetlands from the permitted width of 4' to a proposed width of 6'. Is this correct? Are there any proposed slips involved with the pier extension? I have sent an email to the Major Permits Coordinator to determine if this will fall under a Minor or Major Modification. Thanks, Ron ><> ><> ><> ><> ><> ><> >b ><> Ron Renaldi Field Representative NC Division of Coastal Management Elizabeth City Office 1367 US 17 South Elizabeth City, NC 27909 Ronald.Renaldi@ncdenr.gov (252) 264-3901 ext. 232 (252)264-3723 FAX http://dcm2.enr.state.nc.us/ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Renew the Bay, LLC [mailto:renewthebayCcbcox.net] Sent: Tuesday, November 05, 2013 7:21 AM To: Renaldi, Ronald Subject: Re: CAMA Permit modification Hi Mr. Renaldi, Thanks for your e-mail response. FYI - I will be in the field all day today as well working in south Va Beach (Pungo) trying to finish up a project ... cell phone service is spotty in. this area. Yes we are talking about CAMA Major Permit #43-13 that was issued to Currituck 34, LLC. I am working with Currituck 34, LLC to obtain this permit ... either to amend / add to what was previously issued or apply for a new permit for this work effort => as directed by you. Please find attached a PDF copy of the dock work @ the East Point Estates project that we are trying to permit. FYI - Broad Bay Contracting is the sub contractor to Currituck 34, LLC that will be doing the actual work Please let me know if the attached info is adequate to meet your review needs or will you need add'I info.? Do we need to fill out an amended / new permit application and are there review fees? If there are review fees ... how much and who to we make the fees payable to? Thanks for your help! Regards, NOV 18 2013 Mike DCAf-MoCrry Mike White, P.E. N.C. Lic. No. 034032 / VA Lic. No. 036710 / FL Lic. No. 043441 Renew the Bay, LLC Cell: (757) 814-1586 FAX: (757) 965-5758 e-mail: renewthebay@cox.net From: Renaldi, Ronald Sent: Monday, November 04, 2013 2:50 PM To: renewthebay(&cox.net Subject: CAMA Permit modification Mike, Hopefully I got this email address right because the message was in and out of reception. I just want to make sure we are talking about CAMA Major Permit #43-13 issued to Currituck 34, LLC. If so, then I need to know exactly what is being proposed (dimensions, etc...). Since there is an existing Major Permit, we will need to do a modification to it, but the type of modification will depend on the proposed changes. Also, a site plan will be required. Thanks, Ron Ron Renaldi 3 Field Representative NC Division of Coastal Management Elizabeth City Office 1367 US 17 South Elizabeth City, NC 27909 Ronald.RenaIdi@ncdenr.gov (252) 264-3901 ext. 232 (252)264-3723 FAX http://dcm2.enr.state.nc.us/ ><> ><> ><> ><> ><> ><> ><> ><> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. VIr=y MAP :ram ---- VaNF'T DATA v _�. mtvcm raoearxao mmm Issa i P VAT S .SIZ mil. 49�+R_ SIT Sp. �'TL Broad Day Contracting Inc. P.O. Box 3232 Virginia Beach, VA 23454 PRE -CONSTRUCTION PLANS EAST POINT ESTATES, PHASE 2 172 MARSH CAUSEWAY (ROUTE 615) FRUITVILLE TOWNSHIP: CURRITUCK COUNTY, NORTH CAROLINA rr K _ wMm P wv_er^wnurc.w RECEIVED . 35- -�4 6 & V 18 2013 DCM•MHD C1Ty pm —a _ems _ m r rn m am 0@ 4 ux + TE s.up co z m_ t `tom b �t RBCMW NOV 18 2013 ►max J��%�� i� "��s W p�►.ur:�.i 1 �tV�k�Vl�ir� MGjo✓ �Crm.l NOV I PA, ;: II `e. PTiTC IFG•ryn Ll aYw >ao�xk£ nsrrx war t 4'(Lwxd RJR-..iP�' ��i V%YARe U�ytty`"'.,.-.,{ 'k F Y r h R r 1 N Y MAZER J rl //^t �` .f N'WA 3 lk .` iAWI r.9'ISIiIN(T ti J 19 9 19 N-..- LFI 93L 9j r Itl •` s nn u�+ � i ,.4: �crth _� � �'� ��•t - i%' S�itd''/ fRR �R�"r fl �7'� Irv...,, � 6/{'W \f— A.'ixt'�i ��� I,ts; � -s.,.r � r ' ki �"'i I'\ '. „�-rw• 4�' �9c r I {a/:r. �'�s-,"�..5-' r 1 .— i Y fy/'p Nsa�eg LW�ea'lue.TCN)cIM..0 i:'.=� f' /� kt 1'I ) k♦ w x •.... nWY r•.�•.+..wowm>�ur•i�. w... u*•.u_n_mry—`�wlu�^ mCA wpBI NIL i r�G� � �u,1,,Yw>-qYZ r ElOZ g I AON nix 10 c ..fir 4 rn ..+a.arv.�wlPl :Ll R'1F TAfti.� L'TW3no..wy.