Loading...
HomeMy WebLinkAbout20-96 Renewal Cutty Sark Development Corp.Permit Class 3rd RENEWAL Permit Number 20-96 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Cutty Sark Development Corp., PO Box 220, Avon, NC 27915 Authorizing development in Dare County at adj. Mariner's Cove and Pamlico Sound, off, NC 12 in Avon as requested in the permittee's application dated letter dated 12/19/03, This permit, issued on Jarmary 23, 2004 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suoJecr ro imes, tmpnsonment or crvit acnon; or may cause the permit to oe nuu ana vota. 1) This renewal must be attached to the original of Permit No. 20-96, which was issued on 12/3/02 and renewed on 2/10/00 and 12/3/02, and all documents must be readily. available on site when Division personnel inspect the project for compliance. 2) , All conditions and stipulations of the active permit remain in force under this renewal. NOTE: Future development of the permittee's property, including dredging beyond authorized limits, may require a modification of this permit. Contact a representative of the Division. at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2005 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Charl 5 S. Jones, Acting Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class 3rd RENEWAL Permit Number 20-96 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ,Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 t Issued to Cutty Sark Development Corp., PO Box 220, Avon, NC 27915 Authorizing development in Dare County at adi. Mariner's Cove and Pamlico Sound. off NC 12 in Avon , as requested in the permittee's application dated letter dated 12/19/03, This permit, issued on January 23, 2(Itld is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) . This renewal must be attached to the original of Permit No. 20-96, which was issued on 12/3/02; and renewed on 2/10/00 and 12/3/02, and all documents must be readily available on site when Division' personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: Future development of the permittee's property, including dredging beyond authorized limits, may require a modification of this permit. Contact a representative of the Division. at (252) 264-3901 prior to thecommencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. This permit action may be annealed by the Dermittee or Sianed by the authority of the Secretary of nFNR and the other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2005 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Chairman of the Coastal Resources Commission. Charl S. Jones, Acting Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class 3rd RENEWAL Permit Number 20-96 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Cutty Sark Development Corp., PO Box 220, Avon NC 27915 Authorizing development in Dare County at adj. Mariner's Cove and Pamlico Sound. off NC 12 in Avon , as requested in the permittee's application dated letter dated 12/19/03. This permit, issued on January 23, 7604 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may w o.. Jw. w aauw, va ..avu auauaa, va aamy causc utc 1)O11Ln. LV ue HUR anu V01Q. 1) This renewal must be attached to the original of Permit No. 20-96, which was issued on 12/3/02; and renewed on 2/10/00 and 12/3/02, and all documents must be readily available on site when Division' personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force uncer this renewal. NOTE: Future development of the permittee's property, including dredging beyond authorized limits, may require a modification of this permit. Contact a representative of the Division. at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2005 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission: CharlA1S. Jones, Acting Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class 3rd RENEWAL Permit Number 20-96 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vertnft for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Cutty Sark Development Corp., PO Box 220, Avon, NC 27915 Authorizing development in Dare County at adi. Mariner's Cove and Pamlico Sound. off NC 12 in Avon , as requested in the permittee's application elated letter dated 12/19/03, This permit, issued on January 23, 1004 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to Imes, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal must be attached to the original of Permit No. 20-96, which was issued on 12/3/02; and renewed on 2/10/00 and 12/3/02, and all documents must be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: Future development of the permittee's property, including dredging beyond authorized limits, may require a modification of this permit. Contact a representative of the Division. at (252) 264-3901 prior to the commencement .of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project -is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2005 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Charl S. Jones, Acting Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Acting Director William G. Ross Jr., Secretary � TO: Doug Huggett Ccr-� THROUGH: Ted Sampson FROM: Dennis W. wthorn SUBJECT: Extension of CAMA Major Permit # 20-96, Cutty Sark Development, Wallace Beckham, Dare County DATE: January 8, 2004 On December 23, 2003, this office received a request from the permittee to extend CAMA Major Permit # 20-96. This permit was issued to Cutty Sark Development, and authorized maintenance excavation of an existing canal that connects to Mill Creek, a tributary to the Pamlico Sound in Avon, Dare County. Mr. Wallace Beckham is the owner of Cutty Sark Development. This permit expired on December 31, 2003. The permittee has submitted the $100 filing fee, check No. 1012, drawn on First United Bank, December 18, 2003. During a recent site visit with Mr. Beckham and his contactors, it was determined that the project has remained in compliance with the original permit conditions. I have been able to confirm that work has been continuing. ,,.� I believe that the permittee has provided the information as required by NCAC 07J. During my meetings with Mr. Beckham, he has stated he will abide by the conditions of the existing permit. I have no objection to the renewal of this permit, so long as the permit renewal includes the conditions of the existing permit, and the renewal includes a condition that the canal footprint shall not be modified beyond the current footprint without a modification of this permit. In addition, that no excavation is authorized in Mill Creek or the Pamlico Sound, again without the modification of this permit. A copy of the above referenced check is attached, as well as the related correspondence, and pertinent permits and plats. JAN 0 9 2004 RECEIVE C, JAN 0 ,pF �jl,pFppA4MANAGEMEN cc: Raleigh Bland, USACE, Washington, NC Charles S. Jones, DCM 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper 3 --. _,.. DEC 2 3 20P" December 19, 2003 Ted Sampson NC Division of Coastal Management 1367 US Hwy 17 South Elizabeth City, NC 27909 Dear Mr. Sampson, Cutty Sark Development is requesting the renewal/extension of CAMA Major Pam Attached is a 100.00 fee payable to NCDENR for the renewal fee. The dredging contractor (Cape Dredging, Inc.) has not been able to finish the dredging property due the backlog of work created by Hurricane Isabel. 1 still wish to proceed wi the dredging and plan to request a modification of the permit for a bulkhead in the first qua of 2004. 1 am continuing with construction of my unfinished home at the site under a CAMA and will request a modification for bulkhead work at the site. Cape Dredging is scheduled to complete the dredging by February 1, 2004_ The work will be'completed under the same plans as was originally permitted. Sincerely, Wallace Beckham Cutty Sark Development permit 1012 12/18/2005 ss100.00 DOLLARS 8 M 11'00 10 1 211' ' 1:0 5 2 L00 98 71: 0010976 1911' r Permit Extension Req:Cutty Suk:20-96 Subject: Permit Extension Req:Cutty Sark:20-96 Date: Thu, 08 Jan 200411:12:54 -0500 From: Yvonne Carver <Yvonne.Carver@ncmail.net> Organization: NC DENR DCM To: Doug Huggett <Doug.Huggett@ncmail.net>, Kristie Corson <Kristie.Corson@ncmail.net> CC: dennis hawthorn <dennyblue@earthlink.net> Mr. Sampson has requested that I forward the following memos (one below and one attached) to you regarding a permit extension for Cutty Sark #20-96. If you have problems in receiving any of this correspondence, please contact me at 252-264-3901. Thank you. MEMORANDUM TO: Doug Huggett Kristie Corson I am requesting that you take whatever steps you can to expedite the processing of this permit extension request. The request for the extension came in on 23 December 2003. Dennis Hawthorn's Memo recommending approval of the request is attached to this email. A delay in all dredging projects has been experienced in this area due to the result of Hurricane Isabel, and a long backlog of projects has also resulted. While it was not anticipated that this project would be ready to go forward quite this soon, the holders of this permit are now at the head of the list for the dredging company to tackle, and they do not want to have to wait the several months that could put them into a moratorium if they do not have the permit to allow the dredging company to proceed. I advised the applicant today that I would ask that a special effort be made to get this extension issued so that commencement of the project could proceed without delay. Since I will be out tomorrow, I would appreciate it if you could convey your decision/extension directly to Yvonne, who can then contact the applicants. Anything you can do to effect this request for expeditious processing is much appreciated. Best regards, Ted Sampson Name: BeckhamCuttySarkExt2004.doc;rec PBeckhamCuttySarkExt2004.doc;rec Type: WWWORD File (application/msword)' Encoding: base64 Download Status: Not downloaded with message I of 1 1/8/04 11:42 AM r NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Acting Director William G. Ross Jr., Secretary TO: Doug Huggett THROUGH: Ted Sampson FROM: Dennis W. Hawthorn SUBJECT: Extension of CAMA Major Permit # 20-96, Cutty Sark Development, Wallace Beckham, Dare County DATE: January 8, 2004 On December 23, 2003, this office received a request from the permittee to extend CAMA Major Permit # 20-96. This permit was issued to Cutty Sark Development, and authorized maintenance excavation of an existing canal that connects to Mill Creek, a tributary to the Pamlico Sound in Avon, Dare County. Mr. Wallace Beckham is the owner of Cutty Sark Development. This permit expired on December 31, 2003. The permittee has submitted the $100 filing fee, check No. 1012, drawn on First United Bank, December 18, 2003. During a recent site visit with Mr. Beckham and his contactors, it was determined that the project has remained in compliance with the original permit conditions. I have been able to confirm that work has been continuing. I believe that the permittee has provided the information as required by NCAC 07J. During my meetings with Mr. Beckham, he has stated he will abide by the conditions of the existing permit. I have no objection to the renewal of this permit, so long as the permit renewal includes the conditions of the existing permit, and the renewal includes a condition that the canal footprint shall not be modified beyond the current footprint without a modification of this permit. In addition, that no excavation is authorized in Mill Creek or the Pamlico Sound, again without the modification of this permit. A copy of the above referenced check is attached, as well as the related correspondence, and pertinent permits and plats. cc: Raleigh Bland, USAGE, Washington, NC Charles S. Jones, DCM 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: www.nccoastaimanagement.net An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper DCM Coordinator: q MAILING DISTRIBUTION: I Permitee: != . \ ` Agent: N� DCM Field Er orehead Washington Wilmington US Army Corps of Engineers (USACE): Washington: Mike Bell (NCDOT) B, me CDOT) aleigh Bland Wilmington: Dave Timpy (NCDOT) Henry Wicker Others: Cultural Resources: Renee Gledhill -Early Environmental Health: Beverly Sanders Marine Fisheries: Mike Street NCDOT: anales �S ellfish Sanitation: Patty Fowler Late ertyOffice: Joseph Henderson Water Quality: John Domey John Hennessy (NCDOT) Water Resources: John Sutherland Wildlife Resources: David McHenry Bennett Wynne David Cox (NCDOT) Travis Wilson (NCDOT) FAXING DISTRIBUTjI�ON• Permitee at + Agent at DCM Field O be or ead city ashington Wilmington US Army Corps of Engineers (USAGE Washington: Mike Bell(NCI) Bill Biddlec e (NCDOT) eigh d Wilmington: e Timpy (NCDOT) Henry Wicker NORTH CAROLINA DEPARTMENT OF ' ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT FAX TRANSMISSION Date l as I C)q To 31nd Office us CO E Fax# a5 --) 25-l12� From #Pages o1 (including cover sheet) k a, o —aCo 3rd Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-I638 Physical Address: 2728 Capital Blvd Raleigh ,NC 27604 Phone(919-733-2293)Fax733-1495 E-MailAddress: DCMFrontdes/c@ja zcmai1net Web Address: dcmZenr.state.naus NORTH CAROLINA DEPARTMENT OF ' ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT FAX TRANSMISSION Date 1Iasl Dy To r7�nn�s }lawV-Inorr� Office DC M - c, Utz Fax# From �ns'Re C��Sen #Pages (including cover sheet) Comments: j 4 Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Physical Address: 2728 Capital Blvd Raleigh ,NC 27604 Phone(919-733-2293)Fax733-1495 E-MailAddress: DCMFrontdesk@ncmaiLnet Web Address: dcnzZennstate.naus