HomeMy WebLinkAbout4-13 Renewal 2017 Clark, GeorgeClass
Permit Number
4-13
STATE OF NORTH CAROLINA
- - - ----- - De artment of EnvironmentalQuality-----
and
Coastal Resources Commission
Vertnit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to George C. Clark, 341 Vernon White Road, Winterville, NC 28590
development in Beaufort County at canal off Pungo Creek at 22 Ravenwood
as requested in the permittee's application dated letter dated
This permit, issued on February 9, 2017 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
'be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 4-13, which was issued to the permittee on 1/8/13, and
both documents shall be readily available on site when a Division representative inspects the project
for compliance.
2) All conditions and stipulations of the active pemiit remain in force under this renewal.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project
s permit action may be appealed by the permittee or
qualified persons within twenty (20) days of the issuing
permit must be accessible on -site to Department
el when the project is inspected for compliance.
Any maintenance work or project modification not covered
"-hereunder requires further Division approval.
All work must cease when the permit expires on
-issuing this permit, the State of North Carolina agrees
your project is consistent with the North Carolina Coastal
agement Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
e, Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Coastal Management
ENVIRONMENTAL QUALITY
To:
From:
Through:
Date:
Subject:
Doug Huggett
Steve Trowell
Jonathan Howell
28 December 2016
Renewal Major CAMA/Dredge and Fill Permit No. 04-13
PAT MCCRORY
DONALD R. VAN DER VAART
RECEIVED
JAN 0 3 2017
DCM- MHD CITY
Enclosed is the first renewal request for Major CAMA/Dredge and Fill Permit No. 04-13
issued to Mr. George Clark on 8 January 2013 for excavation of a boat basin, construction of a
bulkhead, boathouse and boat ramp onsite the applicant's property located off SR 1769 at 22
Ravenwood Lane adjacent the Smith Shore canal off Pungo Creek near Belhaven in Beaufort
County, North. The applicant has completed excavation of the boat basin, the bulkhead around
the basin and the boathouse over the basin. The remaining work includes replacement of the
bulkhead along the canal shoreline and the proposed boat ramp. I have had recent phone
conversations with the applicant's bulkhead contractor concerning the bulkhead alignment.
Per NCAC 7J.0404(b) staff recommends renewal of the permit. The check covering the cost
of the renewal has been deposited. If you have any questions regarding this renewal let me
know.
�Nothinq Compares_
Sete of V a& Cali. I Fo�i.mA Qoahty' CmR11,hmg.t
943W.hirgm S9oxe\h1I Riahi.1m,SC:7839
15: 946 6431
� 'w 7;
`�.
341 Vernon White Road
Winterville, INC 28590
December 8, 2016
Steve Trowell
Coastal Management Representative
Division of Coastal Management
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
RE: Permit# 4-13
RECEIVED
JAN 0 3 2017
DCM- MHD CITY
In reference to CAMA's Development Period Extension, I am requesting an extension
(for no more than 2 years) based on the following:
1-My contractor plans to start the work in early to mid 2017 and hopes to be completed
by Fall of 2017.
2-Project has not yet been completed because the contractor was unable to begin
because of other obligations causing a delay in his schedule
3-The only possible change in the project would be to eliminate the boat ramp which
reduces the scope of the project
4-There is no change of ownership of the property to be developed
5-The project remains in compliance with all conditions of the current permit.
Please contact me with any further questions or concerns. I await your reply.
Sincerely,
Ge age C. Clark, Jr.
DCM Coordinator: ?oDJA�_
MAILING DISTRIBUTION SHEET
Permit # 0 fl— is n
I II
DCM Field Offices
Elizabeth City (with revised work plan drawings)
Morehead City
Washington
Wilmington
US ACOE Offices:
Washington: Raleigh Bland
Josh Pelletier
William Westcott (NC DOT)
Bill Biddlecome (NC DOT)
Wilmington: Tyler Crumbley
Liz Hair
Cultural Resources: Renee Gledhill -Early or (environmental.review@ncdcr.gov)
Public Water Supply: Heidi Cox (WIRO)
Joey White (WARO)
Marine Fisheries: Shane Staples
NC DOT: Ben Hughes
Shellfish Sanitation: Shannon Jenkins
State Property: Tim Walton
Water Quality:
Karen Higgins (Raleigh)
John Hennessy (NC DOT)
Washington:
Anthony Scarbraugh — 401
Wilmington:
Robb Mairs — 401
Chad Coburn - 401
DEMLR:
Washington:
Scott Vinson - Stormwater
Wilmington:
Georgette Scott - Stormwater
Wildlife Resources: Maria Dunn
LPO:
Fax Distribution: Permitee
Agent #:_
Coastal Management
ENVIRONMENTAL QUALITY
February 13, 2017
George C. Clark
341 Vernon White Rd.
Winterville, N.C. 28590
Dear Sir or Madam:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
The enclosed permit constitutes authorization under the Coastal Area Management Act, and
where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The
original (buff -colored form) is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS
113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714,
(919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty (20) days.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work
must be carried out in accordance with your application. Modifications, time extensions, and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and
review all project plans, as approved. If you are having the work done by a contractor, it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions, environmental safeguards, or problem areas, you may
contact Department personnel at any time for assistance. By working in accordance with the permit, you
will be helping to protect our vitally important coastal resources.
Enclosure
Sincerely,
Car r d A
Douglas V. Hug ett
Major Permits Manager
N.C. Division of Coastal Management
State of North Carolina I Environmental Quality I Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808