Loading...
HomeMy WebLinkAbout126-17 Renewal 2023 Machon, BenjaminPermit Class RENEWAL Permit Number 126-17. STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission V erm t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Benjamin D. Machon 933 Alba Rose Avenue Wake Forest NC 27587 Authorizing development in Hyde County at adi. to the Pungo River, off SR 1710 on Lot 13 of the Dowry Creek S/D. near Belhaven as requested in the permittee's application dated letter dated 12/19/2022. This permit, issued on January 12, 2023 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to tines, imprisonment or ctvu action; or may cause me permn to oe nuu anu vuiu. 1) This renewal shall be attached to Permit No.126-17, which was transferred to the permittee on 7/22/21, as well as all subsequent renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2017-0796. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2017-02059. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permit Permit Class RENEWAL Permit Number 126-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Begiamin D. Machon, 933 Alba Rose Avenue, Wake Forest, NC 27587 Authorizing development in Hyde County at adi. to the Pungo River, off SR 1710 on Lot 13 of the Dowry Creek S/D, near Belhaven as requested in the permittee's application dated letter dated 12/19/2022. This permit, issued on January 12, 2023 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No.126-17, which was transferred to the permittee on 7/22/21, as well as all subsequent renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2017-0796. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2017-02059. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. llflff ' For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permit Permit Class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Beniamin D. Machon. 933 Alba Rose Avenue, Wake Forest. NC 27587 Permit Number 126-17 Authorizing development in Carteret County at adi. to the Pungo River, off SR 1710 on Lot 13 of the Dowry Creek S/D, near Belhaven as requested in the permittee's application dates# letter dated 12/19/2022. This permit, issued on January 12, 2023 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may De sunlect to nnes, imprisonment or ctvu action; or may cause rite permit to oe nuu ana vote. 1) This renewal shall be attached to Permit No.126-17, which was transferred to the permittee on 7/22/21, as well as all subsequent renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project D WR Project No. 2017-0796. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2017-02059. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permit NC Division of Coastal Management CAMA Major Permit Renewal Request District: WaRO Major Permit Staff: Gregg Bodnar Applicant Name: Machon Benjamin Request Date:01.03-2022 Carl First Project Address: Pungo River SR 1710 Dowry Creek Belhaven 27810 Street Address ci y ZIP Code CAMA Permit Permit Expiration Payment No.: 126-17 Date: 12/31/2022 $ 100.00 5809 Agent's Name: District Manager/Field Rep Approve? (Initial YES NO Appropriate Box) Q - ❑ Other Information DWR USACE Action Project No: 2017.0796 ID No.: SAW-2017-0259 If Yes, Has substantial YES Explain development occurred? Q,- NO❑: SEG YES NO Recommend to Renew? E ❑ If Not Approved, provide Justification: 3 December 19, 2022 RECEIVED JAN 0 3 2023 Kelly Spivey L7GMdWAR0 District Manager Division of Coastal Management North Carolina Department of Environmental Quality Dear Mr. Spivey, Thank you for your email response to our inquiry about extending CAMA Permit 126-17 to fill our lot in the Dowry Creek subdivision in Belhaven, NC. The permit is set to expire on December 31, 2022. Our contractor will not be able to complete the work by that date and we would like to extend it to accommodate the contractor's schedule. I have enclosed a check made out to NC DEQ for $100.00. Please do not hesitate to contact me if you need additional information. Best regards, �' Benjamin D. Machon bmachon@vahoo.com 443-625-8119 January 3, 2023 RECEIVED JAN 0 3 2023 ®CM -WARD Kelly Spivey District Manager Division of Coastal Management North Carolina Department of Environmental Quality Dear Mr. Spivey, Thank you for your email response to our inquiry about extending CAMA Permit 126.17 to fill our lot in the Dowry Creek subdivision in Belhaven, NC. The permit is set to expire on December 31, 2022. Our contractor will not be able to complete the work by that date and we would like to extend It to accommodate the contractor's schedule. Per the link you provided today, I am furnishing the following information: (1) Statement of Completed and Remaining Work: As of today's date we have: a. Completed survey work b. Marked the lot for fill in accordance with the permit c. Engaged NC DOT to install a culvert to allow access to the property. (Completed on December 1, 2022) d. Engaged the contractor (Armstrong Construction, Inc., Belhaven, NC) to provide fill and grading services as defined in Permit 126-17. The contractor has been delayed due to weather and staffing challenges. (2) Change of Plans: No change of plans has been made since the Issuance of the original permit. (3) Change of Ownership: No change of ownership of the property has occurred since we obtained the property In May of 2021. We received a transfer of Permit Number 126-17 on July 22, 2021. (4) Project Compliance: The project is in compliance with all conditions of the current permit. We appreciate your assistance with this extension. If you have any questions, please do not hesitate to contact me. Best regards, /3- Benjamin D. Machon bmachon@vahoo.com 443-625.9129 Permit Class TRANSFER STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermft for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 126-17 Issued to Beniamin D. Machon, 933 Alba Rose Avenue, Wake Forest, NC 27587 Authorizing development in Beaufort County at ad*. to Pungo River. off SR 1710 on lot 13 of the Dowry Creek S/D, near Belhaven , as requested in the permittee's application dated 9/5/17, including attached workplan drawings (5), Figures 2-4 dated 8/16/17, Figure 5 dated 8/30/17 and Figure 6 dated 9/14/17. This permit, issued on July 22, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Upland Development 1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the homesite, driveway, cart path, culvert and other associated infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. 2) No vegetated wetlands shall be excavated or filled, even temporarily, outside the approved alignment, as depicted in the attached permit application, project narrative, and workplan drawings. 3) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. (See attached sheets for Additional Conditions) This permit action maybe appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the qualified persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. This permit must be accessible on -site to Department personnel when the project is inspected for rompliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Benjamin D. Machon Permit No.126-17 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-02059). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4097 and assigned the project DWR Project No. 2017-0796. NOTE: Future development of the'permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations in place at the time of such development. NOTE: A transfer application processing fee of $100 was received by DCM for this project. Benjamin D. Machon ADDITIONAL CONDITIONS Sedimentation and Erosion Control Permit No. 126-17 Page 2 of 3 4) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter, adjacent wetlands, watercourses or properties. Docking Facility 5) This permit authorizes only the docks, piers, 4 mooring pilings,'and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes a maximum of formalized boat slips. S) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. 9) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. General 10) If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed immediately upon completion of construction. 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 12) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation.