Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
26-96 The Pelican Marina
Permit Class Permit Number STATE OFNOR' Department of Environment`;, Coastal es a Tr % Major Developinentin pursuant to NCGS 113A' „F Ql1A^A % Excavation and/or filling piih Issued to The Pelican Marina, c/o Ervin Stahel, 43 Camden authorizing development in NC 34/US 158 Camden County 26-96 Resources 12 RECE VEO N A1AR COASTAL M"AGEMENT W A Conce v, Elizabeth` City, NC 27909 ik River. adi. Camden Causewav on , as requested in the permittee's application dated 12/8/95 including attached workplan drawings, 2 dated 12/15/95, and 1 dated 12/7/95 This permit, issued on 2Z 194g5r , is subject to compliance with the application (where consistent with the permit), all applica le regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. SHORELINE STABILIZATION The riprap shall not extend waterward more than of five (5) feet from the normal water level at any point along its alignment at the time of construction. 2. The riprap must be in place prior to any backfilling activities. 3. The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. �zt �', 0' oger N. Schecter, Director D' rsion of Coastal Management This permit and its conditions are hereby accepted. O . . emu/ Signature of Permittee The Pelican Marina CONDITIONS Permit # 26-96 Page 2 of 2 4. No vegetated wetlands will be excavated pf RLANtside of the area indicated on the workplans. 5. The temporary placement or double handling-' cavated or fill materials within waters or vegetated wetlands is not authorized. The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic material or unsightly debris will not be used. A permanent ground cover sufficient to restrain erosion will be provided on all exposed areas within thirty (30) days following project completion. GENERAL. All materials resulting from the removal of the existing breakwater must be disposed of in an area above the normal water level and landward of any wetlands. NOTE: The Division of Environmental Management has authorized the proposed project under General Water Quality Certification No. 3025 (DEM Project No. 960030), which was issued on 1/30/96. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199601197. Permit Class Permit Number NEW 26-96 STATE OF-CAROLINA Department of Environut_e`nt Health& Natural Resources Major Development m anAiea.6f Environmental Concern pursuant to NCGSOL mom 113A"118 r , . Excavation and/or fillirigpnisuant to NCGS 113-229 Issued to The Pelican Marina, c/o Ervin Stahel, 43 Camden Causeway, Elizabeth City, NC 27909 authorizing development in Camden County at Pasquotank River, adj. Camden Causeway on NC 34/US 158 , as requested in the permittee's application dated 12/8/95 including attached workplan drawings, 2 dated 12/15/95, and 1 dated 12/7/95 This permit, issued on 2Z96 , is subject to compliance with the application (where consistent with the permit), all applica le regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. SHORELINE STABILIZATION The riprap shall not extend waterward more than of five (5) feet from the normal water level at any point along its alignment at the time of construction. 2. The riprap must be in place prior to any backfilling activities. The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. (See attached sheet for Additional Conditions) This permit action may be appealed by the perminee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. e' oger N. Schecter, Director D' ision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee The Pelican Marina ADDITIONAL CONDITIONS EXCAVATION AND FILL Permit # 26-96 Page 2 of 2 4. No vegetated wetlands will be excavated or filled outside of the area indicated on the workplans. 5. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 6. The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic material or unsightly debris will not be used. 7. A permanent ground cover sufficient to restrain erosion will be provided on all exposed areas within thirty (30) days following project completion. GENERAL 8. All materials resulting from the removal of the existing breakwater must be disposed of in an area above the normal water level and landward of any wetlands. NOTE: The Division of Environmental Management has authorized the proposed project under General Water Quality Certification No. 3025 (DEM Project No. 960030), which was issued on 1/30/96. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199601197. Form DCM-MP-1 APPLICATION,F-IffHIF - }. (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Camden Causeway — HWY 158 a. Landowner: Name Ervin & Donna Stahel Address 43 Camden Causeway City Elizabeth City State NC Zip 27909 Day Phone 919-335-5108' Fax b. Authorized Agent: Name Ervin & Donna Stahel Address P.O. Box 214 City Camden State NC Zip 27921 Day Phone 919-335-5108 Fax c. Project name (if any) The Pelican Marina NOTE., Permit wiU be issued in Mme of lanido er ft), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Camden c. Street address or secondary road number 43 Camden Causeway d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Pasrrnotank River 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. shoreline with clean riprap, concrete & fill sand b. Is the proposed activity maintenance of an existing project, new work, or both? New work c. Will the project be for public, private or commercial use?public & commercial d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Current shoreline is rapidly eroding wetland. Purpose is to stop erosion and stabilize shoreline. Backhoe will be utilized to distribute riprap material Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 460' X Avcinir '1a' b. Size of individual lot(s) 75 c. Approximate elevation of tract above MHW or NWL _5 to i ft. d. Soil type(s) and texture(s) of tract sandy clay & wetland e. Vegetation on tract Native lawn grass & various wetland shrubs f. Man-made features now on tract None g. What is the CAMA classifcatlor of the site? Conservation Developed Rural Land Use Plan land (Con.ruk the local land use pfmi.) Transitional Community Other h. How is the tract zoned by local government? commercial i. Is the proposed project consistent with the applicable zoning? - X Yes No (Attach zoning compliance certificate, if applicable) Has a professional done for the tract? If yes, by whom? _ archaeological assessment been Yes X No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes —No Coastal (marsh) Other_ If yes, has a delineation been conducted tJ (Attach documentation, if available) m. Describe existing wastewater treatment facilities. Cit4t � Ayp n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface rainwater runoff US 158/NC 34 o. Describe existing drinking water supply source. City water 5. ADDITIONAL INFORMATION In addition to the 'completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. City Manager Name City of -Elizabeth City Address P.O. Box 347, Eliz. City, NC Phone 919-338-3981 Clarence Munden Name Marina Restaurant Address Camden Causeway, Eliz. City Phone 919-335-7307 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. 13-82 Pelican Marina 2/3/82, 13-82 Pelican Marina 2/11/83, 13-82 Pelican Marina 5/9/84, 158-87 Ervin Stahel 8/6/87, 51-90 ThP Pelican Tnr_ 3/99 9f1 84-91 The Pelican Inc. 5/30/91 • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the k-1A day of DD-cc- Print Name 6:';l L-lw t/T9�1`L Signature cflt� Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03195 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Average Final Existing Project Length Width Depth Depth TOP 77 ,11 .. _ _ _ _ _ .. ..- -- - - ------ ---- . 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards ;, N/A b. Type of material to be excavated N/A c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? _ Yes _ No d. Highground excavation in cubic yards N/A 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area N/A b. Dimensions of disposal area c. Do you claim title to disposal area? Yes _ No If no, attach a letter granting permission from the owner. 9 Will a disposal area maintenance? _ Yes If yes, where? be available for future No Revised 03/95 Form DCM-NfP-2 ,t e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes No f. Does the disposal include any area in the water? Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization Bulkhead X Riprap b. Length /2-6 FT c. Average distance waterward of MHW or NWL CI d. Maximum distance waterward of MHW or NWL M, e. Shoreline erosion during preceding 12 months 1 ft. estimated (Source of information) f. Type of bulkhead or riprap material rock, concrete, brick g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill h. Type of fill material sand i. Source of fill material local excavation upland source 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? x Yes No If yes, (1) Amount of material to be placed in the water 0 (2) Dimensions of fill area 875 sc. ft. (3) Purposeofftll raise elevation stop flooding b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? X Yes No If yes, (1) Dimensionsoffill area 875 sc. ft. (2) Purpose of fill=raise elevation story floodinc 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? r_ inrap b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? backhoe c. Will wetlands be cussed in transporting equipment to project site? _ Yes X_ No If yes, explain steps that will be taken to lessen environmental impacts. Thp P lic-an Marina Applicant or Project Name Signature /2—d'— 9� Date n i{ �i Revised 03/95 l'o-ri a ')TIP ��f! 1�'/! !7Q N/�J�✓� F/�L I__ i JiC//,L ,� _ , f I i I , [, `�I 1• I 'i T7vr�' /!I 4U,7 n /•"� �� , .. i '�-, � I � � � I I � yi t� 1 "h i i i ' j � i I i �• � I i � ' py!� i I - i 1 ! t ('r•.J'!O Ca r.re% lir I ! , , � j � 13ttLi�%,L•�.41 �' ' ! I f I I I I I � I I I ; i j I I i I I4'U,�if�' I � � i I i t j � i i I � i� I ��/" � r I •r ' a I, I ��"rrq�' �A"fe ! i I ' i Tn IBe %PeMOVE OZ%t��l/ji I ! fF�,S� /ice i AIWL! - RIP eap ,�oj bI� f •r � ix, ce_.''d 11/0 Moke.:4 AAJ j ! a.F -,,o / its 3� 31 rg -Y,cvam y --li °. Ian B - I O r 0 n n�. HrAilrl / 4:1 tl w n G ,.nv� ndls�a-dcvradw I .1�y -1 �D 1 3Mbd Z n I ��esr Sn h d-1 nr�o� Sv9a Wd--;, �c4 r,ilP )-L� zt-rg '�,yc"rasna� r�arr+d7 fr �ttil • "-V:;W 40(t af}L s9µdls Q r>n +c3 SI,DE, VIES New grade with ,grass cover CkcSS t,) C L 14I J DS 10.25 Ib. core stcr.a base on tutor cloth — SSG i iati above MHW Proposed Rlprap 50.200 lb. stones. 1 ton per toot, placed along azlstIng bank DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF February 16, 1996 Regulatory Branch Action ID No. 199601197 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of The Pelican Marina for a Department of the Army (DA) permit to place riprap material along an eroding shoreline and place fill material in wetlands, on property located off NC 34/US 158, Camden Causeway, adjacent the Pasquotank River, Camden County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following condition(s) be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the permit plans. 2. The riprap material will not be positioned farther waterward than 5-feet from the normal water level elevation contour at any point along its alignment. 3. All backfill materials will be obtained from a highground source and confined landward of the permitted riprap alignment. 4. No vegetated wetlands will be excavated or filled outside of the authorized area. 5. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 6. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. -2- Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, Raleigh Bland Project Manager Copies Furnished: Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF March 18, 1996 Regulatory Branch Action ID No. 199601197 and State Permit No. 26-96 The Pelican Marina ATTN: Ervin and Donna Stahel 43 Camden Causeway Elizabeth City, North Carolina 27909 Dear Mr. Stahel: Reference your application for a Department of the Army (DA) permit to place riprap material along an eroding shoreline and place fill material in wetlands, on property located off NC 34/US 158, Camden Causeway, adjacent the Pasquotank River, Camden County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of General Permit No. 198000291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, Raleigh Bland Project Manager Regulatory Branch Enclosure Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 -2- v Mr. John Dorney RECEivEO Division of Environmental Management MAR Z() 1996 North Carolina Department of Environment, CUNSTAL Health and Natural Resources MARAo", 4401 Reedy Creek Road Raleigh, North Carolina 27607 Y 1c Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region iv Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street A lanta, Georgia 30365 {r. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 Form DCM-MP-1 1. APPLICANT a. Landowner: APPLICATION,,,,'0 FF P FF•• (To be completed by all applicants) : Eii<. •_ b. City, town, community or landmark Camden Causeway - HWY 158 c. Street address or secondary road number 43 Camden Causewav --Name—E-rvrn—&--Donna—Sta-hei d• Is proposed work within city limits or planning_ jurisdiction? Yes x No Address 43 Camden Causeway 0 City Elizabeth City State NC Zip 27909 Day -4hone 919-335-5108' Fax b. Authorized Agent: e. Name of body of water nearest project (e.g. river, creek, sound, bay) Pas uotank River 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Name Ervin & Donna Stahel a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Address P.O. BOX 214 QFnhilioo 1q7 linoar fp-#- shoreline with clean riprap; City_ Camden State NC concrete & fill sand Zip 27921 Day Phone 919-335-5108 b. Is the proposed activity maintenance of an existing project, new work, or both? New work Fax c. WHI the project be for public, private or commercial use? • public & commercial c. Project name (if any) The Pelican Marina d. Give a brief description of purpose, use, methods of construction and daily operations of proposed N07E. Peends will be issued in M of lmldownerfs), ondlor project. If more space is needed, please attach project mme. additional pages. Current shoreline is rapidly eroding wetland. Purpose is to stop erosion and stabilize shoreline. Backhoe will be 2. LOCATION OF PROPOSED utilized to distribute riprap PROJECT material a. County Camden - RevLmd 03195 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 460 1 )c r,uiPr �1a' b. Size of individual lot(s) 75, c. Approximate elevation of tract above MHW or NWL 5 to 1 ft. ' 9 e. f. 9- Soil type(s) and texture(s) of tract sandy clay & wetland :9 Vegetation on tract Native lawn crass & various wetla.id shrubs Man-made features now on tract None What is the CAMA Land Use Plan land classification of the site? (Cansalt the local Land we plan.) Conservation Transitional Developed Community Rural Other h. How, is the tract zoned by local government? --commercial i. " Is the proposed-pioject consisfen[ wfth the applicable zoning? X Yes No (Attach zoning compliance certificate, ifappacable) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? k. Is the project ,.lot ated iii a National Registered Historic District -or does it;involve a -National Register listed,or eligible property17 Yes ' X No' 1. Are there wetlands on the site?' X Yes _ No Coastal (marsh)'', " Other—X-'. If yes, has -a delineation been conducted? Al (Attach d6c unentarion, if available)` m. Describe existing wastewater treatment facilities. ('i tv as*rpr n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface rainwater runoff US 158/NC' 34 o. Describe existing drinking water supply source. City water 5. ADDITIONAL INFORMATION In addition -to- the -completed application form, the following hers must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims tide to-the:affected properties. If the applicant is not claiming to be the: owner of said property, then forward a copy of the deed or other instrument under which the -owner claims title, plus written permission from the owner -to carry out the project. • An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) ' Please note that original drawings are preferred and only high quality copies' will be accepted: Blue -line prints or other larger plats are acceptable only Jf an adequate number of quality copies are provided by applicant. •_.(Contact the-,U.S. Army. Corps of Engineers regarding that_ agency's use of•larger -drawings.) .A.site or location map -is a part of plat „rtzluirements and ,it mustibe sufficiently -detailed to guide agency personnel unfamiliar with the area to. the Revised 03195 Form DCM-MP-2 EXCAVATION ME _- AND FILL (Except bridges and culverts) ""• """-----"---'"---------- ` Attach this form to Joint Application for CAMA Major _ Permit, Form DCM-MP-1. Be sure to complete all 1. EXCAVATION -----ottrer-sectionsoft Joint-Application-titatzelate-to-this proposed project. a. Amount of material to be excavated from below Describe below the purpose of propped excavation or MHW or NWL in cubic yards '-'N/A fill activities. All values to be given in -feet. Average - Final Existing Project - Length .'.Width - —_.Depth . _. Depth Access channel (MLW) or (NWL) Canal Boat -basin--- Boat ramp Rock _groin- Rock breakwater Other (Excluding 9ilORtIRC stabilization) - J. s Revised 63195 -- b. Type of material to'be excavated c. Does the area- to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAW) or other wetlands? Yes No d. Highground excavation in cubic yards N/A 2. DISP_OSAL..OF_EXCAVATED MATERIAL a. Location of disposal area -- b. Dimensions of disposal area c. Do you claim title to disposal area? . - Yes —' —f--No .._. If no, attach a letter granting permission from the owner. d. Will a disposal'=area_ be available.for future maintenance?. .—Yes No ...If yes,.where?. — 15-- 9 5-- SIB VleLL) CRO-CS above MHw P.Icposgd Alprap 50 .200 It. 1,14 Canes. I lori pgr Icat. placed along exislIng bank New grade w0h .9rasa covQ1 =XI -S-r'A)3 L We_ —. 7L 14 10.25 Lb core zcc..a bass on Ilfter Clain 0 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL/PROCESSING RECORD A) APPLICANT: Ervin Stahel (The Pelican Marina) COUNTY: Camden LOCATION OF PROJECT: NC 34/US 158, Camden Causeway, Pasquotank River DATE APPLICATION RECEIVED COMPLETE BY FIELD: January 3, 1996 FIELD RECOMMENDATION: Attached - No To Be Forwarded - Yes CONSISTENCY DETERMINATION: Attached - No To Be Forwarded - Yes FIELD REPRESENTATIVE: Frank A. Jennings, III DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: B) DATE APPLICATION RECEIVED IN RALEIGH: b FEE REC'D: $ 25z PUBLIC NOTICE REC'D: ` END OF NOTICE DATE: ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: ,� _� ON: \— \ b — q b C) 75 DAY DEADLINE: 3// YAl6 150 DAY DEADLINE: MAIL OUT DATE: I — q — [O / STATE DUE DATE: 7 S� FEDERAL DUE DATE: -/ FED. COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE ✓ DENY DRAFT ON -z - r� AGENCY DATE COMMENTS OBJECTIONS NOTES RETURNED YES NO Coastal Management Dist. Office _ 1 S -y Div. of Community Assistance — Z Z — Land Quality Section u( Div. of Env. Management Cn 14 r State Property Office t-c� Div. of Archives & History Div. of Env. Health Div. of Highways 96 Wildlife Resources Commission I _ 30 ._L/( It Div. of Water Resources 7 - Z p - Div. of Marine Fisheries L_,y 2- iL Ver6'? /V0 p)r`�k. State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr„ Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM: TO: John Parker E:)EHNFR FROM: Frank A. Jennings, III 1Y SUBJECT: Ervin Stahel (The Pelican Marina) Major Permit DATE: January 18, 1996 JAMPN� EMENZ I recommend the above project be approved with the following conditions: 1) The riprap will not extend waterward more than 5 feet from the normal water level at any point along its alignment at the time of construction. 2) The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. 3) The riprap material must consist of clean rock or masonry materials such as, but not limited to, granite or broken concrete. Materials such as tires, car bodies, scrap metal, paper products, tree limbs, wood debris, organic material or similar material, are not considered riprap. 4) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 1367 U.S. 17 South. Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, WA Health and Natural Resources Aj Division of Coastal Management ;, a James B. Hunt, Jr., Governor p E H N R Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM: TO: John Parker FROM: Frank A. Jennings, III SUBJECT: Ervin Stahel (The Pelican Marina) Major Permit Consistency DATE: January 18, 1996 The applicant proposes to construct 109 feet of riprap along NWL of a 890 square foot wetland area to prevent further shoreline erosion. The applicant also proposes to fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/Estuarine Waters. This project will impact the Estuarine Shoreline, Estuarine Waters and Public Trust Waters Areas of Environmental Concern. Page 39 of the Camden County Land Use Plan 1993 states: "The County supports the guidelines of the Coastal Area Management Act and the efforts and programs of the North Carolina Department of Environment, Health, and Natural Resources, Division of Coastal Management and the Coastal Resources Commission to protect the coastal wetlands, estuarine waters, estuarine shorelines, and public trust waters of Camden County." Concerning 404 wetlands the LUP states on page 40: "The County supports the U.S. Army Corps of Engineers regulations and the applicable guidelines of the Coastal Area Management Act and the use of the local land use ordinances to regulate development in these areas." Based on the above, as long as the project is consistent with CAMA guidelines, it is consistent with the Camden County LUP. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 60%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, 17 Health and Natural Resources 4 0 o Division of Environmental Management A& �r �w 7 James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ID E H N F� A. Preston Howard, Jr., P.E., Director January 30, 1996 Camden County DEM Project # 960030 APPROVAL of 401 Water Quality Certification A** Ervin'fdtel 43 Camden Causeway Elizabeth City, NC 27909 Dear Mr. Stahel: You have our approval to place fill material in 890 square feet of wetlands or waters for the purpose of installing rip -rap at The Pelican Marina, as you described in your application dated 10 January 1996 . After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nor 3025. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you, must follow the conditions listed in the attached certification. In addition, you should get anY other federal, state or local permits before you go ahead with your project. / If you do not accept any of the conditions of this certification, you maytask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B.of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorsey at 919-733- 1786. Sincerely, Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DELI Regional Office Mr. John Domey Central Files 4ohn Parker; DCM Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary - Roger N. Schecter, Director 15 TO: FROM: SUBJECT: January 10, 1996 Mr. A. Preston Howard, Director Division of Environmental Management John R. Parker, Jr. Major Permits Processing Coordinator [DEHNFR CAMA/DREDGE & FILL Permit Application Review Applicant: Ervin Stahel (The Pelican Marina) RECEIVED W.ISHINGTON OFFICE aq 1 2 1996 ar.IL RECEIVED JAN 1 81996 ENVIRONMENTAL SCIENCES Project Location: NC 34/US 158, Camden Causeway, Pasquotank River, Camden County Proposed Project: To construct 109 feet of rip rap along NWL of a 890 square foot wetland area to prevent further shoreline erosion. Applicant also proposes to fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/Estuarine Waters. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 31, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY _� This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed (�J^^ D_�k "L-A Date I 2g l (b 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM TO: FROM: SUBJECT: January 10, 1996 Mr. Bruce L. Freeman, Director Division of Marine Fisheries John R. Parker, Jr. Major Permits Processing Coordinator AryuaellmA [DEHNFR CAMA/DREDGE & FILL Permit Application Review Applicant: Ervin Stahel (The Pelican Marina) RECEIVED FEB 011996 DEG OF MARINE FISHERIES 4 RECENO FEB 19`�996 MN DEMENT Project Location: NC 34/US 158, Camden Causeway, Pasquotank River, Camden County Proposed Project: To construct 109 feet of rip rap along NWL of a 890 square foot wetland area to prevent further shoreline erosion. Applicant also proposes to fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/Estuarine Waters. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 31, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY v This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the atta hed comments. Signs Date / - .2 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources • Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 19, 1996 MEMORANDUM �EHNF� -'qN TO: Mr. Charles R. Fullwood, Jr., Director Wildlife Resources Commission Attn: Habitat Conservation Program g Z FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC 34/US 258, Camden Causeway, Camden Co. ROPOSED PROJECT: To construct 190 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed and return this form by February 9, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the !!11nn ached comments. SigneDate - Zl c(lF May 21, 1993 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ I o% post -consumer paper FEE' ; •yG• 10:4 HH P.15 ,Mate of North Carolina Department of Environment, S , Health and Natural Resources Division of Coastal Management i James B. Hunt, Jr., Governor Jonathan B,,Uq-Wgs, fee; to Roger Nebtor: January 19, 1996 IJ^� l}i �. Vl.. Jl. ti I.IL I. L_ rL,it1U '• �( 1 _MEMORANDUM .. ar TO: Ms. Linda Sewall Director ;. Division. of Environmental Health FROM: John Parker, Jr. Major Permits Processing Coordinator S(BJ-RCT: CANIA1DREDGE & FILL Permit Application Review APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC 34/US 158, Camden Causeway, Camden Co. PROPOSED PROJECT: To construct 109 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed project and rerurn this form by February 9, 1996, If you have any questions regarding the proposed project, please contact John Parker at 733-2293. ','v'hen appropriate, in-depth comments with supportin.- data are regu_,ted. REPLY This agency has no objection to the project as proposed. XThis agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in. the attached comments. Signed /I' (J✓(� ZWO Date -� 2d.2 Telephone 919-733-2293 FAX919-733-1495 G-'• n.^i.'l ' C71- comer State of North Carolina Department of Environment, Health and Natural Resources r Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 19, 1996 MEMORANDUM TOc Ms. Renee Gledhill -Early Environmental Review Coordinator Division of Archives and History ANA- [D FE F110 FROM: John Parker, Jr. ' Major Permits Processing Coordinator R�cE��EO 6 12 FEMpNp�EM�Nt SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC 34/US 158, Camden Causeway, Camden Co. PROPOSED PROJECT: To construct 109 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 9, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. O Signe Date Z, P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 60%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources • Division of Coastal Management ya, James B. Hunt, Jr., Governor p E H N FR Jonathan B. Howes, Secretary Roger N. Schecter, Director January 10, 1996 MEMORANDUM TO: Mr. Charles Gardner, Director Division of Land Resources FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Ervin Stahel (The Pelican Marina) Project Location: NC 34/US 158, Camden Causeway, Pasquotank River, Camden County Proposed Project: To construct 109 feet of rip rap along NWL of a 890 square foot wetland area to prevent further shoreline erosion. Applicant also proposes to fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/Estuarine Waters. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 31, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date 3�- 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Acton Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 19, 1995 MEMORANDUM E) FEE HNF1 TO- Mr. Laity R. Goode, Phd., P.E. Highway Administrator Division of Highways FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC 34/US 158, Camden Causeway, Camden Co. PROPOSED PROJECT: To construct 109 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 9, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attach co a ts. Signed Date _2,Z j5Zc?19�' P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, WA Health and Natural Resources • Division of Coastal Management James B. Hunt, Jr., Governor p E H N FR Jonathan B. Howes, Secretary Roger N. Schecter, Director �O �qh.� QED to 4NICV0 14 996 January 10, 1996 NA�fblfryT MEMORANDUM -� r TO: Mr. Robert E. Chandler, Director Division of Community Assistance FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Ervin Stahel (The Pelican Marina) Project Location: NC 34/US 158, Camden Causeway, Pasquotank River, Camden County Proposed Project: To construct 109 feet of rip rap along NWL of a 890 square foot wetland area to prevent further shoreline erosion. Applicant also proposes to fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/Estuarine Waters. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 31, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY ✓ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the at hJred comments. Signed Date 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 19, 1996 MEMORANDUM 1:3EHNF=?L TO: - Mr. John Sutherland, Chief --- Water Planning Section Division of Water Resources FROM: John Parker, Jr. Major Permits Processing Coordinator 12 1 SUBJECT: CAMA/DREDGE & FILL Permit Application Review 1 REc ED APPLICANT: Ertia Stahel (The Pelican Marina) FE13 1996 � ��eEtAENT PROJECT LOCATION: NC 34/US 158, Camden Causeway, Camden C PROPOSED PROJECT: To construct 109 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 9, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. Signed This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Date 7-124st P.O. Box 27687, Rdeigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper W. State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 23, 1996 65181urce T.WID1pu1 TO: P. A. "Skq" Wojciechowski Division of Marine Fisheries T 21 �EHNR RECEIVED F0 2 21996 DM (1E MARINE FISHERIES FROM: John Parker v' Major Permits Processing Coordinator RECEIVES FEB 26 1b96 SUBJECT: CAMA/Dredge and Fill Permit Application Review � MANA6EMENTj APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC34/US158, Camden Causeway, Camden C&.=- PROPOSED PROJECT: To construct riprap along shoreline to prevent erosion. Please indicate below your agency's position or findings on the proposed project as it relates to matters of public trust. If you have any questions regarding the proposed project, contact John Parker at 733-2293 or the DCM field representative for the project. This form should be used only for tracking and intra-agency commenting. REPLY There are no known public trust conflicts with the project location or design. There appear to be public trust conflicts that require additional investigation. Approximately _ days additional review time is needed. C/It is recommended that changes be made to the project to reduce or eliminate public trust conflicts, as discussed in the attached memo. �iQd P,znTy, L/�vc1 ,�2.0 HaT ,O�'L/iv8.P7.�"a o.v TH.e 011.6 wiNc- �: iJ Tiy2 R 6ort� ova i /d6rfidGf 'To � a c.6`�iC T./// /�isoaitii /y wiTlf 7l�L,E SignedDate T2L/�1 ,fTlfc✓filp Q/Scz/Nf/o�. S466X 0— T6`.G /Z0fOav®.1�'62 /JX &,re .a/�ao/3',wG".v.Ll" PST oy P.O. Box 27687, Rdeigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper , r State of North Carolina ~ He alth and Natural Res( Division of Coastal Managem( James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM esRECFaVE� • FEB�� SaS96 �iA I=- F1 January 19, 1996 TO: Mr. Joe Henderson, Acting Director State Property Office Department of Administration FROM: rep John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ervin Stahel (The Pelican Marina) PROJECT LOCATION: NC 341US 158, Camden Causeway, Camden Co. PROPOSED PROJECT: To construct 109 feet of riprap. Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 9, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY / This agency has no objection to the project as proposed. V This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the p attached comments. Signed" U Date P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 60%recycled/ 10%post-consumer paper DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF F,NGINEEHS P.O. Box 1890 'L it ',I;NGTON, NORTH CAROLINA 28402-18g0 A EPLY TO ATTENTION OF February 16, 1996 Regulatory Branch Action ID No. 199601197 Mr. John Parker Div,�ion of Coastal Management NOr'_n C'arOlina Department of Environment, Health, and Natural Resources Post Office Box 27667 Raleigh, Borth Carclira 21611-7687 Dear Mr. Parker: R.e=erence the appli:.ation of ,::e Fe i' a for a tepartment of the. Army �DA? permit to place riprap material along an eroding shoreline place fill material in wetlands, on property 1^,ated off NC ?4 US 158, Causeway, adjacent the Pasquotank. Ri,.er, Camden Coun7y, North Carolina. The rederal agencies have compleLed review of tl.a proposal as rl:-5enta.d h; apy lication and your field invezti;;atior. report. We 'eccmmend thSt the following condi.ticn(s) be in,_luded i.-. the StKte author, z..._on: All work authorized by this permit -1,:st he performed in strict compliance with the permit plans 2. The riprap mat=rral will riot Yc farther waterward t. ha^ 5-feet from the normal water level elevation contc'.lr at any point along its alignment. 3. All backfill materials will be obtained from a highground and confined 'landward of the permitted riprap alignment. 4. No vegetated wetlands will be excavated or filled outGide of :i',_ authorized area. 5. The temporary placement or double handling of excavated or fill --.r.taric_la within waters or ve9etate9 'ePtlands is not authorized - 6. The fill material will be clean and free of any pcllutanr,s except in tra_e quanrities. N[_tal products, organic materials, or unsightly debris will - not be used. 'J'd - -. Il01nNIh5 CPi Wi; .de v �f _7- Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Copies rurnished: Sincer ely, lehBland Project Manager Mr. John Dorney Water Quality section Division of Environmental Management North Carolina Department of Environment, health, and Natural Resources 4401 Reedy Creek Road i Raleigh, North Carolina 27607 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement "y Pcst Office Box 33726 'j Raleigh, North Carolina 27636-3726 Mr, Larry Hardy National Marine Fisheries Service Rivers Island Beaufort, North Carolina. 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region iv Wetlands, oceans and Watersheds Branch V.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 F©'d LZ:gi ?66T'u]Z'Za Nfii�NIH57P� L] DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF January 19, 1996 Regulatory Branch Action ID No. 199601197 Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27611-7687 Dear Mr. Dorney: Enclosed is the application of The Pelican Marina for Department of the Army (DA) authorization and a State Water Quality Certification to place riprap material along an eroding shoreline and place fill material in wetlands, on property located off NC 34/US 158, Camden causeway, adjacent the Pasquotank River, Camden County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. According to our administrative regulations, 60 days is reasonable for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by March 18, 1996, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919)975-1616, extension 23. Enclosure Sincerely, Raleigh Bland Project Manager Regulatory Branch -2- Copies Furnished (without enclosure): Mr. John Parker Div'sion of Coastal Management rth Carolina Department of Environment, VVV Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 I 50u WILMINGTON, NORTH CAROLINA 28402-1890� REPLY TO A"ENTiONOE January 19, 1996 -- Regulatory Branch Action ID No. 199601197 The Pelican Marina c/o Ervin and Donna Stahel 43 Camden Causeway Elizabeth City, North Carolina 27909 Dear Mr. Stahel: On February 11, 1991, we renewed General Permit No. 198000291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received January 17, 1996, for Department of the Army (DA) authorization to place riprap material along an eroding shoreline and place fill material in wetlands, on property located off NC 34/US 158, Camden Causeway, adjacent the Pasquotank River, Camden County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State -Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 199601197. It will be coordinated by Mr. Raleigh Bland in the Washington Regulatory Field Office at telephone (919)975-1616, extension 23. Sincerely, Raleigh Bland Project Manager Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): *r John Parker V"Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 REPLY TO ATTENTION OF Regulatory Branch Action ID. Mr. Larry Hardy National Marine Service, NOAA Pivers Island Beaufort, North Fisheries DEPARTMENT OF THE AR WILMINGTON DISTRICT CORPS OF ENGI S CG 8� P.O. BOX 1890�A( 99B WILMINGTON, NORTH CAROLINA 29402 F41F�y1 Hu _YJ �1 Iq z t Carolina 28516 Applicant Ms. L. K. (Mike) Gantt Fish and Wildlife Enhancement U.S. Fish and Wildlife Service Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Thomas Welborn, Chief Wetlands Regulatory Section -Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, No h Car lira 27611-7687 AA Regional Office Division of C asta1 Management North Carolina Department of Environment, Health and M R ou ce ic—I'luloa C16 0C a o� tnH> Gentlemen: Pursuant to Action ID No. 198000291, the CAMA-Corps general permit/processing agreement, a State Field Investigation Report is encloged. Your comments and/or recommendations would be appreciated on or before Q- Y V Questions or co1m-rme is y be addressed to 1� Regulatory Branch, (VGA Field Office, telephone (jj ) Sincerely, Ile 4Wa Wright m Chief, Regulatory Branch Enclosure 1 Pnm W is Aecv tl Papa State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 10, 1996 43 Camden Causeway Elizabeth City, NC 27909 Dear Mr. Stahel: AFTIAMW 10 aA [DEHNR The Division of Coastal Management hereby ikknowledges receipt of your application for State approval for development of your property located NC 34/US 158, Camden Causeway, Pasquotank River, Camden County. It was received on January 3, 1996, and appears to be adequate for processing at this time. The projected deadline for making a decision is March 18, 1996. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any 1367 U.S. 17 South. Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal opportunity Affirmative Actlon Employer 50% recycled/ 10% post -consumer paper January 10, 1996 Page #2 questions and notify me in writing if ycu wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Frank A. Jennings, III Field Representative I FAJ/kh Enclosure cc: John Parker Richard L. Watts �4�. r. `zj •o ri t ,��t CAMA PERMIT APPLIED FOR PROJECT: To construct 109 feet of rip rap along NW1 of a 890 square foot wetland area to prevent further shoreline erosion. Also fill 890 square feet of freshwater wetlands and remove 55 feet of breakwater from Public Trust/ Estuarine Waters. COMMENTS ACCEPTED THROUGH February 5, 1996 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Ervin Stahel Frank A. Jennings, III 43 Camden Causeway _Y N.C. Division of Coastal Management Elizabeth City, NC 27909 1367 U.S. 17 South Fli7.nbeth City, NC 27909 e SENDER: +i t 7i'v Lr _ ? •Complete items 1 anNor2 for additional seances. I also wish to receive the N •Complete items 3, a, and 41b. following services (for an a •print your name and address an the reverse of this farm so that we can return this extra fee): card to you. -' mailpiece, •Attach this form to the front of the ece, or on the back if ace does not -'--. - - > P p 1. ❑Addressee's Address -WrtPetit: o IThe Return Receipt Regowto 'onwho the a article a asbelow delivered article number. 2. El Restricted Delivery x . - + •The Return Receipt will show to whom the article was delivered and the date delivered_ Consult postmaster for fee. v 3. Article Addressed to: 4a. Article Number c �Lj'y /�Jg4�T Ltr�Z t Ct)O 4b. Service`7 Type 0 G//Ir of � � L-�'�-f l � ❑Registered Certified r I w r7 r7n 3 1/7 ❑ Express Mail ❑ Insured ! c ❑ Return Receipt for Merchand ❑ COD C111" .A' c 7. D t z "a7nd.,�p '7 5. Received By: (Print Name) I - w 6. Signet r * A dressee ent)o PS Form 3811, December 1994__.Dorm m SENDER: v •Complete items 1 and/or 2 for additional services. I also wish to receive the .y •Complete items 3, 4a, and 4b, following services (for an m • Print your name and address on the reverse of this fort so that we can return this extra fee): card to you. j •Atach this fort to the front of the mailpiece, or on the back if space does not 1. ❑Addressee's Address m petit. o •Wdte'Refum Receipt Requested'on the mailpiece below the article number. 2. ❑ Restricted Delivery .The Return Receipt will show to whom the adide was delivered and the date c delivered. Consult postmaster for fee. J d 3. Hide Addressed to: 4a. Artrticle Number / C /ea l^Yn GC lti7Y4eh r c f'+ 4 es -#ZCj rn w f Zo � Cr:Ly 41/ o Z7yo� z GL/{/eo7./CG InuNnet/ 5. RWived BY( Print Namej I r. 1 l ,r , ¢ c g . Signature: (Addressee or Agent) a X 1 :H PS Form 3811, December 1994 ❑ Registered Certified I ❑ Express Mail ❑ Insured ❑ Return Receipt for Merchandise ❑ COD Add anOfee j5jal _ _Qc CERTIFIED MAII. RETURN RECEIPT REOUESTED: C/TV />.9.�4GEZ Dear C/7/ o . oe--I.dc (RIPARIAN.LANDOWNER'S N ) This letter is to notify you as an adjacent riparian landowner of Mr./Mrs. (r.,Z e� (YOUR NAME plans to construct 4 9/' /T yd/t e-+ /4-, cQ (YOUR CONSTRUCTION PLANS) in C A m V E Al The sketch on the reverse side accurately depicts the proposed construction. (CITY/COUNTY) Should you have no objections to this proposal, please check the statement below, sign and date the blanks below the statement and return this letter to: .ecR✓/./ J7-4 y3 Ca (YOUR NAME AND ADDRESS /✓c_ 279tas soon as possible. Should you have objections to this proposal, please send your written comments to N.C. Division of Coastal Management, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 10 days of receipt of this notice. Failure to respond in either method within 10 days will be interpreted as no objections. Sincerely, Lz�I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments. By signature below I have agreed to the encroachment of this project within my riparian corridor and have waived the minimum setback of 15 feet from my property line. (RIPARIAN LANDOWNER SIGNATURE) (DATE) CERTIFIED MAIL RETURN RECEIPT' REQUESTED: CIA reecC -+7ac�� Dear /?e 7 ., 4 4.7 — (RIPARIAN LANDOWNER'S NAME) ------------- This letter is to notify you as an adjacent riparian landowner of Mr./Mrs. "L11A1 (YOUR NAME f7-4r71=4- plans to construct /9 ilJr"?q/' BN4leyc ee t F,•// &+ p (YOUR CONSTRUCTION PLANS) in CA/-" D ,6 /Y The sketch on the reverse side accurately depicts the proposed construction. (CITY/COUNTY) Should you have no objections to this proposal, please check the statement below, sign and date the blanks below the statement and return this letter to: Fifyti✓ ,s7*A - YC"f y (YOUR NAME AND ADDRESS s&% Al 27 90P' soon as possible. Should you have objections to this proposal, please send your written comments to N.C. Division of Coastal Management, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 10 days of receipt of this notice Failure to respond in either method within 10 days will be interpreted as no objections. Sincerely, I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed 'comments. ��� -, i' / :/ (RIPARIAN LANDO R 61 ATURE) (DATE) By signature below I have agreed to the encroachment of this project within my riparian corridor and have waived the minimum setback of 15 feet from my property line. (RIPARIAN LANDOWNER SIGNATURE) (DATE) IIOI KRAFiYR BUILDING w ELIZABETH CITY. NORTH CAROLINA 27009�'''1��r��,j���jjj1 1 ILS..-f•1..�I.J._• 1 R I U x ISE TAX � I F6.Y�?.4.s'I� $5.00 !; g I NORTH CAROLINA EXCISE STAMPS ATTACHED AND CANCELLED -&0 BETTY ri. ;I qcs R I II sTME%Ig Excise Tax E'Md�pT� o�f^dlKkRISP p �O Pthecel.I..\nti �...4...I.1K_^F•".�. e.. r•� Verified by ... ... Q............MlrK .............. County on do Oof .........C.T!.....................................n1 19. `. by.... I......... 5tm.. 6D•CO ......................................................................................................... Mail after recording to Mr S Mrs. Ervin D. Stahel, P. 0. Box 214, Camden, ...................................................................................................................................... N.C. 27921 ............................................................................................................................................................................................................................ E. Ray Etheridge, Attorney Thisinstrument was prepared by............................................................................................................................................................: Brief description for the Index NORTH CAROLINA GENERAL WARRAN' 1Y DEED tk, THIS DEED made this ...�..rl......... day of ......... A.ctober.................................... 19...90...... by and � between GRANTOR GRANTEE 0.. R. GRIFFIN and wife, XERVIN D.LSTAHELy^and wife, IDEAL HELMS GRIFFIN DONNA B. STAHEL P. 0. Box 214 Camden, N.C. 27921 Enter In appropriate block for each party; name, address, and, if appropriate, character of entity, e.7• corporation or partnership.; eir - The_desi¢nation-Grant_or_and_Grnntee as used herein shnll include said parties, their heir, successot•s;•alt assigns,.�� ATTORNEY AT LAW 201 KRAMER BUILMINO 6LISABITH CITY. NORTH CAROLINA 27909 J; •'p nl� NORTH CAROLINA EXCISE STAMPS ATTACHED AND CANCELLED • b0 090 OC.T'IT--nn-1D-17•- BETTY m. o 4ES Excise Tax ne Ttmf,*Ok #page Tax Lot No........................................................................................... Parcel Ied�entifier No. � ._19.eLR.!.._C0.:7A4C ..i0 n.... Verified by ... Z.4D_-.9Q ....... .... ..pdKr.............. County on the ..... day of ........QC.T. ............................... by_ ...... r7 .. �.CO _. _ ... ........_........................................_................................................. Mall attar recording to ... .. Mr 6 Mrs. Ervin D. Stahel, P. 0. Box 214, Camden, N.C. 27921 ..a _ ..........,. ... .... ............... ....................... ............................................ ..... ..•..... ................................................ ............................................................................................................................................................................................................................. This instrument was prepared by _.. .. E. Ray Etheridge, Attorney . ................................................................ _.................................................. Brief description for the Index ' NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ..I,rl......... day of .........October ................ . _ ...., 12.90..... by and between GRANTOR 0. R. GRIFFIN and wife, IDEAL HELMS GRIFFIN GRANTEE ERVIN B�td wife, DONNA B. STAHEL P. 0. Box 214 Camden, N.C. 27921 Enter In appropriate block for each party: name, address, and, If appropriate, character of entity, e.q. corporation or partner1.ship. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors;"and assigns, shall Include singular, plural, masculine, feminine br neater as required by context. ... - WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt 6f Khtch-is�hei acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee hi lee'almple, all certain lot or parcel of land situated in the City of........................................................... Camden > •.......: .. ........ ......................... ............__. County, North Carolina and more particularly described as follows: - • .. All that certain tract or parcel of land situate in Courthouse Township, Camden County, North Carolina, on U.S. Highway No. 158 and being a part of Lot No. 12 as shown on the map made by T. J. Jessup, Registered Surveyor, dated December 20, 1948, which map is recorded with that certain division deed dated February 2, 1952, between the grand— children of C. H. Robinson and duly recorded in the Public Registry of Camden County, North Carolina, to which reference is hereby made; said parcel or tract of land being described according to said map as follows: Beginning at a point on the South side of U.S. Highway No. 158 in the East line of Lot No. 11 and running thence along the South side of said highway eastwardly 75 feet; thence due South to the edge of Pasquotank River; thence westwardly along the Pasquotan River to the East line of said Lot No. 11; thence due North to the Point of Beginning. Being the same lot of land which was conveyed to Walton C. Jennette and wife, Nell J. Jennette, from W. G. Gaither, Jr., and wife, Frances Gaither, by deed dated December 16 1960, recorded in Deed Book 40 at Page 24 in the Office of the Register of Deeds of Camden County, North Carolina. The 1990 Camden County ad valorem taxes on said property will be assumed by the Grantor. N.C. Bar Assoc. Form No. 1 D 1919. narked 1917, hW.1 M A„..1 .Uh M 1;. ,., wxm.lgl,