Loading...
HomeMy WebLinkAbout26-14 Minor Mod 2021 TA Newbold Miller LLCM Permit Class MODIFICATION/MINOR STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 26-14 Issued to T.A. Newbold Miller LLC., 270 Queens Lane, Palm Beach, FL 33480 Authorizing development in Perquimans County at adjacent to Perquimans River, at the end of Bundy's Road , as requested in the permittee's letter dated 3/4/21, including the attached workplan drawings (5) Sheets 1-5 of 5 all dated 3/2/21. This permit, issued on June 10, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe subject to nnes, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this Minor Modification authorizes the change of the 525 linear feet previously authorized rip rap to bulkhead and the repair/replacement of 150 linear feet of existing bulkhead as depicted on Sheets 1-2 of 5, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification of this permit. 2) The bulkhead alignments shall approximate the normal water level at the time of construction. 3) The piers indicated as "proposed" on the workplan drawings were previously authorized under CAMA Permit No. 26-14. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee T.A. Newbold Miller LLC. Permit No. 26-14 Page 2 of 2 ADDITIONAL CONDITIONS 4) No vegetated wetlands or open water shall be excavated or filled, even temporarily. General 5) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 6) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 7) This Minor Modification shall be attached to the original Permit No. 26-14, which was issued on 3/24/14, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 8) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2006-101716. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 05-1169 v4. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. DCM Coordinator:Permit #: MAHdNG DISTRIBUTION SHEET 4 F G 33�& Agents:�(d �r+050A DCM Field Offices r_ �/ Elizabeth i Uri Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: / Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffens (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Gledhill -Earley at Environmental. Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivailir Chris Pullinger-401 Tina Martin - 401 Clif Whitfield (WARO) Jimmy Harrison-� Roger Thorpe-Stonnwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Holley Snider — 401 (Carteret, Onslow, Pender, Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Natural Heritage Program LPO Dunn (WARO) Rodney Butler (NCDOT) Travis Wilson S.A.M.P.S.O.N. and Company ?Pti'P�>,i�•t,-. Marine Construction And Environmental Consulting Services S� ( k L i Nn.kn..Sn V+rTt..aPk'u : "...:.. -' 3-u`+tJn'�a$.'• �zF 125 Hunters Trail West, Elizabeth City, North Carolina, 27909 USA Y:`•; Tel: 252 331 2447 — Fax: 866 793 4261 permits@sampsonmarine.com www.sampsonmarine.com Ron Renaldi District Manager NC Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 Dear Mr. Renaldi: RECEIVED MAR 0 5 2021 . DCM-EC March 4, 2021 RECEIVED M AY 1 4 2021 Re: T. A. Newbold Miller, LLC.'s Shoreline Pro%b onght6 .TION H® Docking Facilities Project along the Perquimms River; Minor Modification Request to CAMA/D&F Major Permit 26-14 Please accept this letter and the enclosed documents as the required application for a minor modification to the CAMA and NC Dredge and Fill permits for the proposed development. In the original Major Permit application, the entire shoreline of the properties adjoining the Perquimans River sought shoreline protection through the construction of a bulkhead, and this shoreline protection method was authorized by original Permit Number 26-14, on 3/26/14. Subsequently, in August 2017, a Major Modification request was submitted that sought approval for the placement of 2,565-ft of riprap in lieu of the previously authorized bulkhead, and this shoreline protection method was authorized by a Modification/Major to Permit Number 26-14, on 11/13/17. At this time, approximately 525-ft of the Perquimans River shoreline remains unprotected, and in this area the residential property remains exposed to significant loss due to erosion. This lies within the 2,565- ft of riprap authorized by the 11/13/17 Major Modification to Permit Number 26-14. Because of the elevation of the adjoining uplands, and to facilitate the associated construction activity, the owners wish to revert to the protection of this remaining section of this shoreline with a bulkhead, as authorized in the original Permit. Drawings are enclosed depicting this remaining section of shoreline, along with the rest of the 2,565-ft of shoreline changed from bulkhead to riprap by the Major Modification of 11/13/17. It is proposed to locate this bulkhead along the NWL, commencing where the northwest -most riprap area has been constructed and terminating where the existing drainage ditch enters the Perquimans River near the northwest corner of Parcel ID 5-0053-0048A. The bulkhead is proposed to be located at or landward of NWL depicted on the submitted drawings. There is no desire to locate this bulkhead water -ward of NWL. It is proposed that the bulkhead would only be water -ward of NWL to facilitate construction in straight lines where minor undulations in shoreline would make construction along the actual waterline impracticable, In these cases, the bulkhead would be, on average, no farther water -ward of the NWL than 2-ft, and no farther water -ward than 5-11 in any single location. This modification request seeks no new areas of shoreline for protection. A second purpose for this permit modification request is to allow the repair/replacement of an existing section of bulkhead along the Perquimans River of a length of approximately 1504 The section of bulkhead in need of repair lies to the east of the drainage ditch that separates T. A. Newbold Miller, LLC parcels 5-0053-0048 and 5-0053-0048A. It is proposed to construct the section of replacement bulkhead tL^^,� dR. tsxe:?."✓ia x % J:.:'r `a . � ., .z:'r2."L... _�,>T2..:,.+ . in an alignment located 2-ft water -ward of the existing bulkhead, as is required for bulkheads permitted under General Permit Rules, per 15A NCAC 07H .1105(a)(3). This section of bulkhead has reacted to the effects of storms over the past years causing the bowing of the existing sheet -piles, and steadily increasing loss of soil from the uplands landward of the bulkhead. Progressing failure of this section of bulkhead would result in a significant loss of uplands from erosion. All new and replacement bulkhead sections will be constructed prior to backftlling, and will be backfilled with clean sand and/or soil from an upland source. The bulkhead sections will be constructed so as to prevent seepages of backfill material, and in accordance with the provisions of the original Permit and the most recently approved bulkhead construction detail drawing (S.A.M.P.S.O.N. and Company Drawing No. 06-042413-002, Sheet 16, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Bulkhead Details, Rev. 2 dated 11/26113). No marsh area will be excavated or filled Please find as part of this request the drawings and supporting documents (including a check for the $100.00 application fee) identified in the list of enclosures below. We respectfully request your favorable evaluation of this permit minor modification request. Sincerely, Ted Sampson P Encl: (1) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, Sheet 1, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Proposed Modified Bulkhead Alignment (2) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, Sheet 2, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Proposed Modified Bulkhead Alignment & Existing Bulkhead Repair/Replacement (3) S.A.M.P.S.O.N. and Company Drawing No, 06-042413-004, Sheet 3, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Existing Permitted Shoreline Protection (4) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, Sheet 4, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Existing Permitted Shoreline Protection (5) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, Sheet 5, titled T. A. NEWBOLD MILLER, LLC Shoreline Protection and Pier Development, Existing Permitted Shoreline Protection (6) Agency Authorization Forms, T. A. Newbold Miller, LLC to Theodore J. Sampson/S.A.M.P.S.O.N, and Company, Inc. (7) SAMPSON CONTRACTING, Inc. Check # 18035, to NC DEQ in amount of $100 for Minor Modification Fee RECE6VIED RECEIVED MAR 0 5 2021 MAY 1 4 2021 DCM-EC UP SECTION MHD ROY COOPER GDv DIONNE DELLI-GATTI searm y BRAXTON DAVIS OLeQar MEMORANDUM FROM: THROUGH: DATE: SUB3ECT: NORTH CAROLINA E7rvlronmental Quality Gregg Bodnar, Assistant Major Permits Coordinator, Division of Coastal Management, Morehead City Cynthia Rountree, Field Representative, DCM Ron Renaidl, District Manager, NE District, DCM RAA May 10, 2021 Request for Minor Modification of Major Permit #26-14 issued to: T.A. Newbold Miller, LLC REFERENCE: (a) Letter from Ted Sampson (received March 5, 2021) requesting Minor Modification to Major Permit #26-14 (b) 15A NCAC 073.0405, Permit Modification (c) DWR Project #13-1280 (d) USACOE Action #SAW-2014-00306 Minor Modification to Major Permit 1. Ted Sampson has requested a Minor Modification to Major Permit #26-14, which was issued on March 24, 2014 and expires on December 31, 2022. The original major permit authorized a docking facility and a bulkhead with a minor and major modification to add riprap and relocate the docking facility. 2. Ted Sampson has requested to modify Major Permit #26-14 to change 525 liner foot of shoreline that was issued as riprap to bulkhead and repair/replacement of another 150 foot of bulkhead. *011-TIA M AY 1 4 2021 NIP SECTION WD D_EQ NorthCarolina Departmice 194 WashImtonmental Quality I Division of Coastal Management -vw Washington Office 1943 Washington Square Mail Washington,Norih Carolina 278891252946.6481 :/ Wilmington Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 1 910.796.72t5 n evaeei¢wy� Morehead City Office 1400 Commerce Avenue I Morehead City, North Carolina 285571252.608.2808 V Elizabeth City Office 14015outh Griffin Street, Sidra 3001 Elizabeth City, North Carolina 27909 1 2SZ264.3901 Gregg Bodnar, Assistant Major Permits Coordinator May 10, 2021 Page 2 3. I conducted a site visit on April 30, 2021 to review the Minor Modification request pursuant to the provisions of reference (a) and have determined that the, request meets the requirements contained in 15A NCAC 07H .0208 USE STANDARDS. 4. The required fee of $100, paid by Check #18035, was received by the Elizabeth City District Office on March S. 2021. 5. It is recommended that the Minor Modification request be granted, provided all the Permit Conditions of the original permit issued on March 24. 2021 remain in effect along with concurrence with the State Historic Preservation Office. 6. Notification attempts have been initiated waiting confirmation of delivery to be provided upon receipt. Attachments: Copy of Minor Modification Request, including work plan drawings M AY 1 4 2021 r MP SECTION MHD ROY COOPER Governor DIONNE DELLFGATTI Secretary BRAXTON DAVIS Director May 18, 2021 TO. - FROM: SUBJECT: Applicant: Project Location: Proposed Project: NORTH CAROLINA £nvirmunental Quality A4v1. k 21tof-Of" Oviia"aw%, b6AF AC NC Department of Culture Resources A G Gregg Bodner, Major Permits Coordinator Division of Coastal Management CAMA Minor Modification Request to Major Permit #26-14 T.A. Newbold Miller, LLC Adjacent to Perquimans River at the end of Bundy's Road Change 525 liner foot of shoreline that was issued as riprap to bulkhead and repair/replacement of another 150 ft of bulkhead Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 06/04/21 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by email. If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE RIZZCCI W E® MAY 1 1, 2021 MP SrECTNC"," ",n",D North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.2643901 ROY COOPER Govemur DIONNE DELLI-GATTI Secretary BRAXTON DAMS Director May 27, 2021 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: NORTH CAROLINA Environmental Quality RECEDU D M AY 2 -7 2021 epartrnento tureResources Wk4*Ir-F--Dunn Nc-- 1J;Idt Restu2es c5toM. Gregg Bodner, Major Permits Coordinator Division of Coastal Management CAMA Minor Modification Request to Major Permit #26-14 T.A. Newbold Miller, LLC Adjacent to Perquimans River at the end of Bundy's Road Change 525 liner foot of shoreline that was issued as riprap to bulkhead and repair/replacement of another 150 ft of bulkhead Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 06/04/21 to 400 Commerce Avenue Morehead City, NC 28557 You may also send your comments by email. If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. ✓" This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED ki 4- "- ' y DATE 5 - Z--T - ';0 L( �I,I�nr7tn�1S•hJh.iof �o� Nui_ u:Yl, t,.y,til;,.,�,p ,.Zkct-..ptrJYl, -}�11. rwf rCG�LcPStPGQ ancnc,z rtp rttl LWS-kd In 9,J13 t A-PSA f Sit VI NSN -1h-I,n 8f 21,)5- (*z 4n-V 6c c- +rr r,-hc' if rbsetve.cQ —iv n ,nlrtazt < �-ws�c lr )6%c-3 North Carolina Department of Environmental Quality I Division of Coastal Management �f�)) Elizahetb City Office 1401 South Griffin Street. Suite 300 1 rJlzabeth City. North Carolina 27909 a-aGpmn, 2522643901 Bodnar, Gregg From: Pullinger, Robert C Sent: Wednesday, June 2, 2021 8:29 AM To: Bodnar, Gregg; Martin, Tina R Subject: RE: Crystal Holdings Gregg, (No worries on the RidCo/Crystal Holdings, I noticed also that it was in Carteret and also gave Holley the heads up on that one, BIMS#2008-1740 v3, DWR has no issues with the minor modification request for Heritage Point to include both mechanical/hydraulic dredging methods, and the BIMS# for that one is 2008-1283 v1. DWR has no objection/no comment on the TA Newbold Miller project. Chris Pullinger Environmental Specialist II Division of Water Resources — Water Quality Regional Operations North Carolina Department of Environmental Quality 943 Washington Square Mall Washington, NC 27889 252 948 3918 office/desk phone 252-943-1036 state cell phone chris.oullinaer(o)ncdenr.aov From: Bodnar, Gregg gregg.bodnar@ncdenr.gov Sent: Friday, May 28, 20218:19 AM To: Pullinger, Robert C chris.ouffinger(7ncdenr.gov; Martin, Tina R Tina.Martin@ncdenr.Rov Subject: Projects with a no concurrence determination Hey all, Sorry to keep bothering but I have a number of projects I need to get off my desk. My counterpart working in the southern district has taken a field rep job so I have all 20 counties for the time being and the influx of projects is significant. I have a bunch of projects that had a no concurrence determination that I was hoping to get your feedback on and see if a BIMS number is available so I can issue. Minor Mods Ridco Corp 21-16—This is just an upland reconfiguration and changing fixed platform to floating platform within the marina. Heritage Point 178-08 — Adding a previously authorized mechanical dredging onto an existing hydraulic permit. I need to get this one out by COB today. TA Newbold Miller 26-14—Going from rip rap to bulkhead. Majors Ferry View LLC—This is the three tie pilings that all I need is DWR, no concurrence determination was made. Linwood Boyd —Just need DWR, but was a split. Ellis Ross —Same as Boyd. Nutrien PCS—Same as Boyd. ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRAXTON DAVIS Director May 18, 2021 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: NORTH CAROLINA Environmental Qua/illy Received: 5/18/2021 Historic Preservation Office I416155 NC - NCH 5/24/2021 Due: 5/26/2021 NC Department of Culture Resources Gregg Bodner, Major Permits Coordinator Division of Coastal Management CAMA Minor Modification Request to Major Permit #26-14 T.A. Newbold Miller, LLC Adjacent to Perquimans River at the end of Bundy's Road Change 525 liner foot of shoreline that was issued as riprap to bulkhead and repair/replacement of another 150 ft of bulkhead Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 06/04/21 to 400 Commerce Avenue Morehead City, NC 28557. You may also send your comments by email. If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: SIGNED This agency has no objection to the project as proposed. X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE 5/25/2021 RECEIVED MAY 2 5 2021 North Carolina Department of Environmental Quality I DIWsIb0?a VITat�eTie JO N Vdd g 11) Elizabeth City Office 1 401 South Griffin Street, Suke 300 I E a Beth C oor Carolina 27909 252.2643901 ROY COOPER Gowrnar DIONNE DELU-GATTI Secretary BRAXTON DAVIS Director May 25, 2021 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: NORTH CAROLINA Environmental Quality Gregg Bodner, Major Permits Coordinator Division of Coastal Management CAMA Minor Modification Request to Major Permit #26-14 T.A. Newbold Miller, LLC Adjacent to Perquimans River at the end of Bundy's Road Change 525 liner foot of shoreline that was issued as riprap to bulkhead and repair/replacement of another 150 ft of bulkhead Please indicate below your agency's position or viewpoint on the proposed project modification and return this forth by 06/04/21 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by email. If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. As long as plans and any applicable Xrequirements in the original permit This agency has no comment on the proposed project. are adhered to, DMF has no additional comment at this time. JAH 5/25/2021 This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 25 May 2021 64 RECEIVED MAY 2 5 2021 000 D _E QV North Carolina Department of Environmental Quality I ob MPc fKm: fi net, N F A I O Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 ii�rera� 25226,43901 Permit Class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit Permit Number 26-14 DECEIVED MAR 0 8 2021 for X Major Development in an Area of Environmental ConQCM—EC pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to T.A. Newbold Miller LLC., 270 Queens Lane, Palm Beach, FL 33480 Authorizing development in Perguimans County at adjacent to Perquimans River, at the end of Bundy's Road as requested in the permittee's application dated letter dated 12/4/20. This permit, issued on December 30, 2020 is subject to compliance with the Iapplication (where consistent;' with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may me suplect to tines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 26-14, which was issued to the permittee on 3/24/14, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 13-1280 v2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2017-01996. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. this permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance, Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Z/_/0-1� Braxton C. Davis, Director Division of Coastal Management This permit and its cc ted. MAY 1 4 2021 Signature of Permittee P NC Division of Coastal Management 14 5 3 9 ®B n Cashier's Official Receipt Date: _ 1 L Z_�jy 2034_ Received From: w.DScS`n UYL�7-ec�'�_T �t.P $ b� Permit No.: Check No.: r' Br(13S Applicant's Name: I A - mr. �, w Kr 1uer County: Pe Project Address: � A Yrn'•hu •i J Pd. Pe Please retain receipt for your records as proof of payment for permit Issued. Signature of Agent or Applicant: e �Date: Y113 Signature of Field Representativo Date: y(7,3 h1 REGOVE® M AY 1 4 2021 UP SECTION WID AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: T. A. Newbold Miller, LLC Mailing Address: 231 Osceola Way Palm Beach, FL 33480 Phone Number: 561-758-3704 Email Address: catalinamiller@me.com I certify that I have authorized Theodore J. Sampson & S.A.M.P.S.O.N. & Co., Inc Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: shoreline erosion protecting bulkheads, and riprap, piers, boat slips, & all other development at my property located at _terminus of Bundy Road Including Parcel ID 5-0052-0048, PIN 7869-53-0758, and Parcel ID 5-0053-0048A, PIN 7869-42-8389 in Perguimans County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: 6Q--22m - -- t Gr Signature Catherine Miller Print or Type Name Managing Member of T.A. Newbold Miller LLC Title 111 20 12020 Date This certification is valid through 06 1 15 1 2023 RECEIVED MAR 0 5 2021 DCM-EC RECOVE D M AY 1 4 2021 W SECTION M"D Aaent Authorization Form For Permit Aoolications I, Catherine Miller, managing member for the owner (T. A. Newbold Miller, LLC) of the property located at: do hereby authorize: Theodore J. Sampson of S.A.M.P.S.O.N. and COMPANY, INC., and its agents; to act as my agent for.•the purpose of applying for and obtaining any needed environmental Permits, or associated authorizations, including NC Coastal Area Management Act permits, NC Dredge and Fill Act permits, NC DEQ permits, OS Army Corps of Engineers permits, NC DCR authorizations, and/or any local, or county building and environmental permits, that may be needed for the proposed development at my above -indicated property, which entails: the proposed development for which permits are sought) This agency authorization is limited to the specific activities described above, and unless earlier revoked, will expire on: C C j` / - D 15 June 2023 G v (date on which agency authorization expires) Mpa 0 5 202t (Property ner►nformation) I)CM EG i f 231 Osceola Way (Signature) (Mailing Address) Catherine Miller for T. A. Newbold Miller LLC (Printed Name of Owner) Managing Member (Title., officer of corp. owner or trustee) 20 November 2020 (Date) Palm Beach, FL 22027 (City, State, Zip Code) (Telephone Nu Il�V MAY 1 4 2021 M NPIP SECTION MHD rx M Rec" S.A.M.P.S.O.N. and Company glI010 Marine Construction And Environmental Consulting Services 126 Hunters Trail West, Elizabeth City, North Carolina, 27909 USA Tel: 262 331 2447 - Fax: 866 793 4261 permits@sampsonmarine.com www.sampsonmarine.com CERTIFIED MAIL -RETURN RECEIPT REQUESTED May 7, 2021 Calvin M. and Lela W. Bundy 168 Russel Drive Hertford, NC 27944 Re: T. A. Newbold Miller, LLC's waterfront development, at terminus of Bundy Road, Perquimans County, North Carolina Dear Mr. and Mrs. Bundy: Our company has been retained by T. A. Newbold Miller, LLC, riparian neighbor to the property owned by you (Parcel ID 5-0052-0046, PIN 7869-44-1158) located to the north and south of 170 Bundys Road in Perquimans County, NC. T. A. Newbold Miller, LLC seeks to undertake development on their property otherwise described as Parcel ID 5-0052-0048, PIN 7869-53-0758, which abuts the Perquimans River and Sutton's Creek. T. A. Newbold Miller, LLC has asked us to make application for the needed permits for their proposed development on their property. You have previously received two notifications of the proposed development, which are summarized as follows: • Provide shoreline erosion protection along the property fronting on the Perquimans River initially by construction of bulkhead structures (2013), and subsequently (2017) by construction of riprap structures for a significant portion of the permitted bulkhead structures; and • Provide four water access piers with boathouse, boat lift, boat slips and platforms along the Perquimans River. This notification is required because of the intent to modify the proposed development to revert to utilizing a bulkhead for a small section of the riprap shoreline stabilization, which was previously authorized for protection by the State through the construction of a riprap alignment. The NC Division of Coastal Management (NCDCM) has required that this change be addressed as a minor modification, and has indicated that a new notification of the riparian property owners is required. This modification which is being sought does not change the location of any of the previously approved and permitted shoreline protection; it seeks only the change from riprap back to a bulkhead for a limited length of shoreline. This modification also entails the repair of an existing section of bulkhead. The overall development activities are depicted on the enclosed site drawings. As an adjacent riparian neighbor to the development location, the NC Division of Coastal Management has required that we notify you by Certified Mail of these changes to the project. This provides you with the opportunity to advise the NC Division of Coastal Management of whether you have any comments relating to the �p proposed work. Landowners have 30 days from the date of notification in which to commeuc i� comments will be considered by the Department in reaching a final decision on the application. :..,..,,;_.r=v=,nr:z:f,,,nrsxrrsm>wa 4 2021 MP SECTION MVID T. A. Newbold Miller, LLC is seeking this Permit to preserve the existing shoreline of this property along the Perquimans River, and to facilitate access to and from the Perquimans River. If you have comments, you can provide those to: NC Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 If you do have comments, or any other questions, we request that you contact us, before sending your comments to the State so that we may have the opportunity to further clarify the project and/or alleviate any of your concerns. Thank you for your kind attention to this matter. Please feel free to contact me if you have any questions. Sincerely, Ted Sampson Environmental Consultant Encl: (1) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Shoreline Protection & Pier Development, Proposed Modified Bulkhead Alignment, Sheet 1 (2) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Shoreline Protection & Pier Development, Proposed Modified Bulkhead Alignment & Existing Bulkhead Repair/Replacement, Sheet 2 (3) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 3 (4) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 4 (5) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 5 P MAY 1 4 2021 PIMP SECTION MHD 1DcM Kece-,wd '5110 ZI S.A.M.P.S.O.N. and Company Marine Construction And Environmental Consulting Services 126 Hunters Trail West, Elizabeth City, North Carolina, 27909 USA Tel: 252 331 2447 - Fax: 866 793 4261 permits@sampsonmarine.com www.sampsonmarine.com CERTIFIED MAIL - RETURN RECEIPT REQUESTED C. Edward Bundy 170 Bundys Road Hertford, NC 27944 May 7, 2021 Re: T. A. Newbold Miller, LLC's waterfront development, at terminus of Bundy Road, Perquimans County, North Carolina Dear Mr. Bundy: Our company has been retained by T. A. Newbold Miller, LLC, riparian neighbor to the property owned by you (Parcel ID 5-0052-0048B, PIN 7869-32-7978) located at the southeast end of Russell Drive in Perquimans County, NC. T. A. Newbold Miller, LLC seeks to under take development on their property otherwise described as Parcel ID 5-0052-0048, PIN 7869-53-0758, which abuts the Perquimans River and Sutton's Creek. T. A. Newbold Miller, LLC has asked us to make application for the needed permits for their proposed development on their property. You have previously received two notifications of the proposed development, which are summarized as follows: • Provide shoreline erosion protection along the property fronting on the Perquimans River initially by construction of bulkhead structures (2013), and subsequently (2017) by construction of riprap structures for a significant portion of the permitted bulkhead structures; and • Provide four water access piers with boathouse, boat lift, boat slips and platforms along the Perquimans River. This notification is required because of the intent to modify the proposed development to revert to utilizing a bulkhead for a small section of the riprap shoreline stabilization, which was previously authorized for protection by the State through the construction of a riprap alignment. The NC Division of Coastal Management (NCDCM) has required that this change be addressed as a minor modification, and has indicated that a new notification of the riparian property owners is required. This modification which is being sought does not change the location of any of the previously approved and permitted shoreline protection; it seeks only the change from riprap back to a bulkhead for a limited length of shoreline. This modification also entails the repair of an existing section of bulkhead. The overall development activities are depicted on the enclosed site drawings. As an adjacent riparian neighbor to the development location, the NC Division of Coastal Management has required that we notify you by Certified Mail of these changes to the project. This provides you with the opportunity to advise the NC Division of Coastal Management of whether you have any comments relfti g tooy�-th -- proposed work. Landowners have 30 days from the date of notification in which to co e41t, ub21V O comments will be considered by the Department in reaching a final decision on the application. 4 202V Esi:EL ZECTION 1P.HD De-K Ree.e,v4c) 5)(u/zl T. A. Newbold Miller, LLC is seeking this Permit to preserve the existing shoreline of this property along the Perquimans River, and to facilitate access to and from the Perquimans River. If you have comments, you can provide those to: NC Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 If you do have comments, or any other questions, we request that you contact us, before sending your comments to the State so that we may have the opportunity to further clarify the project and/or alleviate any of your concerns. Thank you for your kind attention to this matter. Please feel free to contact me if you have any questions. Sincerely, Ted Sampson Environmental Consultant Encl: (1) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Shoreline Protection & Pier Development, Proposed Modified Bulkhead Alignment, Sheet 1 (2) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Shoreline Protection & Pier Development, Proposed Modified Bulkhead Alignment & Existing Bulkhead Repair./Replacement, Sheet 2 (3) S.A.M.P.S.O.N, and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 3 (4) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 4 (5) S.A.M.P.S.O.N. and Company Drawing No. 06-042413-004, T. A. NEWBOLD MILLER, LLC Existing Permitted Shoreline Protection, Sheet 5 RECEIVED MAY 1 4 2021 P''tlp SAC-r10N Pt1jdP—§D Va: 1/10/21I Postal Servicb;1,1 CERTIFIED MAILm Postal '.e � RECEIPT D. a m CERTIFIED MAILD RECEIPT a' n Hen � u Qp4� ti i1M4, 1 A% � .a a• n r CaN11DA anFw ' .a f3.60 s µ •. o^ comma m o i3.60 M N Faba .3 'eask^.ubaa.m(w `.".� OReunRw<WD,wvDA a_._. 3r __. 1 ORama Rsw,pl(eb 'n ru S all ua� .Rta ww ft uRnc( D OunnuwMePRmf/CNW1rRy a i�9MIn1D (�' ru ❑Ra A.Wa tv w D OR Rk (eYc.Q D 6.6()._ pm QOMm W+4n R.pyq ! '�� F• )� Han l ❑MNSDJipeRR..yah]paroR.D •------ 0 ❑Ce11tlNArvaiawaxaoaowrr D_ ` 7 7' I I �% i,� - -- G ❑�.n spweRwaea a-- 9:00-= p PODtagD . ,. f1.40 Omm� W,em.NwMcIW OMAW 1.... _ Posgeo 41.40 Ln N mOR • OS(.OI/ 1 p Ln Tompasugoa y%85 " f�.85 ru b sent ru ru-- O sYraetariOAyr'X Cal n M. 8 Lela 4 . a' o N r C%pi Sia'roC. 168Russel Drive ;77fi:: O r.. SdnivJApi,}7:;uiCUfLr'�'"170Sun aea 170 Bun Hertford, NC 27944 c K sm�:rae�................. Hert►Wd, NG� 27944 t RECEIVED M M 1 4 2021 PIP SECT6®s"I M9 ID Bodnar, Gregg From: Bodnar, Gregg Sent: Tuesday, May 18, 2021 1:00 PM To: permits@sampsonmarine.com Cc: Cynthia Rountree Subject: TA Newbold Miller Afternoon Ted, In review of the request documents the notification green cards were not available. I searching the USPS website the notifications require additional assistance. To continue processing, can you provide proof of delivery or the acceptable number of attempts? Thanks, Gregg T,DEQ hcnveirtct[ �� Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 B08 2808 ext 21S (Office) Gregg BodnarO ncdonrgov Email correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties. ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpieoe, or on the front if space oarmits. RECEIVED JUN 8 2021 N'T SECTION I~?"'. I I 0 AQW If YES, eater delivery ip "IF q E D Calvin PA. &Lela 4V. Bundy K I v t iha Russel Drive Hbnford, NC 27944 MAY 2 2 2021 Type Ee 0�Service III'I�III'lll'llll'lII1III�I I III IIIIIIIII��I 11MeenedMail Reirmted fiSgg�eneelrictedoeWery® 13 MallO 9590 9402 6000 0069 6878 22 Cl canned Mali ReWded Delivery 0 Collect on Delivery ❑ Rerum Receipt for Merclarwiise 0 CMk, nn Delivery Restricted Delivery El Signature Confirmatlon 0 Signaturetion 2450 0002 2699 6956 I Restncted Delivery ' ctdvry PS Form 3811. July 2015 PSN 7590.02-0W-OM Domestic Return Receipt ostal CERTIFIED MAILe RECEIPT E2 Mail Only�- rDomestic HIf #i SIC d, CeffiedMeu Fee rrl.l 3 cab. eatUmrtbac oaoare 'ror p aemr, R•oeq PxeacRrl s •I t4' ru N Ga,�aeR.o.igratao,w�cl . y O Gpc.e.ee.,rn.:w:rwn.mry i LPoolmerk a 2 6 ❑ O,xxasawaaenuoa s ^ :;1�`� O o pMltllb'q,Wu,e flSSPifteO nNrvR/ S ❑ Restage p Ln S f sj eetege erd a 8" i.85 its N O Sera ro ❑ m C. EDWARD BUNDY n' O $ir tmx _ ❑ t` 170 BUNDYS ROAD r` h (17 o- W, .d ,a .1t ru y N ti � �aAro as Ar ar .wax as+ee nim<nr" pnronw- +.aznr s o OIO,.usw srr cu.s.a ❑ � I?>itaer. _�_ N N �tatil4amii.aAiw. ,, . is ❑ O: o ru o ra:,_,Y C. EDWARD BUNDY rr r` 170 BUNDYS ROAD iQ4.&4 HERTFORD, NC 27944 FrurYr Hare I, SENDER: I TE THiS S-(:TION ■ Comptate hens 1, 2, and & a. spr>Stua ■. Ptint yournama w4 address on the reverse X !7 Agm so that vm can raturnthe card to you. O. A�reese3 ■ Attach th.s card to the back of the natlplece, 8. Received by (Frn:,ai Na^>e# C- !We of Dc;,e-y or on the 4ront 0 spaoa Parrrets R E C E 6 �i 1..tnroanddressedtn. 0, IsdatwryaddrM*ffrenlfrcm kin 17 ❑Yes LE enter dehery add a belwr. ❑ No C. EDWARD BUNDY 170 BUNDYS ROAD MAY Z 7� HERTFORD, NC 279" DCM—EC A. Servico ryve o nler:ry rxn Exa,aesd a (1111 lll!�(Ili! IIIIII l! i II i! II, l I I I E .d .d 9590 9402 601110 0069 6818 08 0 006aw Mae ftwowDiamy ❑ w WU 2. ArIclz NuT4w r.nster fiom scrrcee..labc* ^—cccrtetM Daa,w fwmn"co wy O aqufura Cmirmer' 10 .:'.uroe Mw J sgW..w Cmennxb, - rr Natant Mal RedW90 t7We y PA Idcfea Ddh" 4++ea P5 Form 3811, July 2D15 PSN 7530-02.000A053 DOMA&W Retun POCS01 ; �1l't YYY USPSiRACKNG C,j 11111� I11p.I ti}i}111i11ff 1f1f1II1IilI!1fIl.Itt 11fi i}11 Postage &roes Palo Ii'.11 {11 iltltlltI I11it!}4'I11It1,,j I frill Iti11 IIf1I1 p mdtNo-G-iO �1 {li lllltt�IFlllitllll it ii �Illi'!t l 959�'- 94CE.6000 -uU9 6678 08 United States' Postal Service h • Sender. Please print your name, address, and ZIP-4" in the box• S.A M,.P.S.O.N. 8 COMPANY. INC. 125 HUNTERS TRAIL WEST "tLiZgBETF CITY. NC 17SCy9 RECEIVED JUN 8 2021 MP SECTION MND Property Of.- C. Edward Bundy ft EXISTING PIER/PLATFORM & BOATHOUSE i Property Ot T. A. Newbold Miller, LLC / PARCEL ID 5-0053-0048 40 FgFC ✓ � �' 4494 sA��sT EXISTING NEW PILES -3.0 ft v PROPOSED PIER 1: 400 sf Boathouse with 2 Boat Lifts, 384 sf Platform, & 2 Piles for Mooring or Boat Lift at 3rd Boat Slip F.-\ RECEIVED MAY 1 4 2021 LAP SECTION ll HD -50, 0' 50, 100, 200' 300' SCALE: 1inch = 50 ft 1 1 PERQUIMANSRIVER EBB 1.3 MILES TO NEAREST LAND RECEIVED MAR 0 5 2021 DCM-EC • SHORELINE(NWL)G PS 03Q3R017 EXISTING BULKHEAD PREVIOUSLYPERMITTED RPRAP TO BE REPLACED BYPROPOSED BULKHEAD PROPOSEDREPLACEMENT BULKHEAD • • (7WATERWARD OF EXISTING) DISTURBANCEFOR BULKHEAD aACKFRL EXISTING RIPRAP (PREVIOUS PERMITMOD) LOT/BOUNDARYLNE — — EXISTING UNPAVED ROADWAY/DRIVEWAY ._..._...— EXISTING DRAINAGE DITCH — — — - 30'CAMA PUBLIC TRUSTSHORELNE AEC — — — 75'CAMA ESTUARIN E SHORELINE AEC — TOPOFESCARPMENT - - BOTTOMOFESCARPMENT — — .6FTNWLCONTOUR 'YC1111!1V 4D4WETLANDS APPROX. LANDWARD EDGETREELINE +12 TOPOF ESCARPMENT ELEVATION(NWU CYPRESSTREE(S) 1) Drawings derived from a survey of Josiah A. Webb, III, L-2989, signed on March 21, 2006, and from Information available from the Perquimans Canty GIS, NCDENR's NCCREWS data, and from GPS data points of the shoreline collected on 3/2312017. 2) Drawing is for permitting purposes only and not construction. 3) Copyright ® 2021 S.A.M.P.S.O.N. & Co., Inc. All rights reserved. This material is the property of S.A.M.P.S.O.N. & Co., Inc., and is protected by the copyright laws of the United States and other countries. It may not be reproduced, distributed, or aserod in any fashion by any entity, without the express written consent of S.A.M.P.S.O.N. & Co., Inc. Written consent is hereby granted to T. A Newbold Miller, LLC. Written consent is herby granted to NC DCM, NC DEQ, and the US ACOE &A.M.P.SO.N.and Company Is � T. A. NEWBOLD MILLER, LLC SHORELINE PROTECTION & PIER DEVELOPMENT PROPOSED MODIFIED BULKHEAD ALIGNMENT TS I -A I- 03/0221 I 06 - 042413 - 004 SHEET 1 OF 5 LEGEND/KEY ��sFTEST l I Proarty Of. SHARE UAR/iVE / l _ SHORELINE )-GPSIXV131017 T. Newbold MiIIBrL-L-C, PARCEL ID 5-0053-0048 Lf�EAEC ' - l / l \ EXEVIOUS YPERMD / / / / Property Of.' 1w1E/ REPLACEDBYP OPOSED8ULKHEAD �30.FTp ( T. A. Newbold Miller, LLC PROPOSED REPLACEMENTBUU(HEAD /a U841C TRU L/ b PARCEL ID 5-0053-0048A S,y(7WATERWARDOFEXBTNG) 0�DISTURBANCE FOR BULKHEAD SACKFU ORE '\ N / ` EXISTING RIPRAP(PREVIOUS PERMIT MOD) ` LOTIBOUNDARYLNE 'IV. \ . ` �� / / • V 1 — EXISTING UNPAVEDROADWAYIDRNEWAY 3 -FT PUBT� LIC TRU = ---= EKISTINGDRAINAGEDITCH C �` l • \ SHORELINE AEC WCAMAPUBLICTRUSTSHORELNEAEC 7SCAMAESTUARINESHORELINEAEC \ TOPOFESCARPMENT BGTTOMOFESCARPMENT +a FTNWL CONTOUR 404WETLANDS APPROX.IANDWARDEDGETREELNE +12 TOP OF ESCARPMENT ELEVATION(NWU CYPRESSTREE(S) 15 ft GENERALNOTES 1) Drawings derived from a survey of Josiah A. Webb, III, L-2989, signed on March 21, 2006, and from information available from the Pwquimans County GIS, NCDENR's NCCREWS data, end from GPS data points -, j, 0� of the shoreline collected on purposes 0ly 2) Drawing is for permitting purposes only and not construction. 3) Copyright © 2021 S.A.M.P.S.O.N. & Co., Inc. AN rights PROPOSED PIER 2: reserved. This material is the property of S.A.M.P.S.o.N. 400 sf Boathouse & Co., Inc., and is protected by the Copyright laws of the Untied States and other countries. II may not be with 2 Boat Lifts, reproduced, distributed, or altered in any fashion by any entity without the express written consent of 384 sf Platform, & S.A.M.P.S.O.N. & Go., Inc. Written consent is hereby 2 Piles for Mooring or granted to T. A Newbold Miller, I.I.C. Written consent is herby grantedBoat Lift at 3rd Boat Slip for Permit pro to ng puroCM, seNICs. DIED, and the US ALOE NO REVISION DAZE PERQUIMANSRIVER PESTAMP SA.M,PSON.mdCompany LOOD RECEIVED RECER'ED EBB> -�---°' MAR 0 5 2021 MAY 1 HUM.n Tran 42021 1.3 MILES TO NEAREST LAND i2a Welk allsab.a27909 PROTECT TITLE: DCM-EC T. A. NEWBOLD MILLER, LLC PAP SECTION Rtf1„ SHORELINE PROTECTION & PIER TJ DEVELOPMENT PROPOSED MODIFIED BULKHEAD ALIGNMENT -50' 0' 50, 100, 200' 300' &EXISTING BULKHEAD REPAIR/REPLACEMENT SCALE: Aslndicated IDRAWING NO.: SCALE: 1 inch = 50 ft DRAWN:TS CHECKED OS - SHEET 2 5 - SHEET 2 OF 5 06 - 042413 45' X 50.5' STEEL BUILDING --———— — — — — —— ---------—------— Property Of: T. A. Newbold Miller, LLC PARCEL ID 5-0053-0048A 75-FT ESTUAR/NE 3HORELINEAEC_ / 30-FT PUBLIC TRUST SHORELINE A9C RECEIVED -50' 0' 50' MAY 1 4 2021 100, FOUND IRON PIN Property Of." T A. Newbold Miller, LLC PARCEL ID 5-0053-0048 1 SCALE: 1 inch = 50 ft SHORELINE (NWL)4PS0323R017 EXISTING BULKHEAD PREVIOUSLYPERMITTED RPRAPTO BE REPLACEDBYPROPOSEDBULKHEAD PROPOSED REPLACEMENTSULKHEAD - — - (7WATERWAROOFEWTNG) DISTURBANCE FOR BULKHEAD BACKFLL EXISTING RIPRAP (PREVIOUS PERMIT MOD) LOTfBOUNDARYLNE — — EXISTING UNPAVED ROADWAY/DRVEWAY ._...=...c EXISTING DRAINAGE DITCH — — — 301CAMA PUBLIC TRUST SHORELINE AEC — — — 75'CAMAESTUARINE SHORELINE AEC — TOPOFESCARPMENT BOTTOMOF ESCARPMENT — — iGFTNWLCONTOUR '111�i111l11! 404WFTLANDS APPROX. LANDWARD EDGETREELNE +12 TOPOF ESCARPMENT ELEVATION(NWU ICYPRESSTREE(S) 1) Orewings derived from a survey of Josiah A. Webb, III, L-2989, signed on March 21, 2006, and from information available tom the Perquimans County GIS, NCDENR's NCCREWS data, and from GPS data points of the shoreline collected on 3/23=17. 2) Drawing is for permitting purposes only and rot Construction. 3) Copyright O 2021 S.AM.P.S.O.N. It Co., Inc. All rights reserved. This material is the property of S.A.M.P.S.O.N. & Co., Inc., and Is protected by the Copyright laws of the United States and other Countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written Consent of SA.M.P.S.O.N. & Co., Inc. Written Consent is hereby granted to T. A. Newbold Miller, U.C. Written consent is herby granted to NC OCM, NC DEO, and the US ACOE PE STAMP S.A,M,P.SOX.andCaapany PERQUIMANS RIVER A 0 FLOOD<= 125 HUMan Traq Wad ElliapaN CI . NC A7909 PROJECT TITLE: EBB T. A. NEWBOLD MILLER, LLC RECEIVED NE PIER SHORELIDEVE 1.3 MILES TO NEAREST LAND DEVELOPMENT DRAWING TITLE: MAR 05 2021 EXISTING PERMITTED SHORELINE PROTECTION 200' 300' SCALE: Aslndicated DRAWING NO.: DCM-EC 06 - 042413 - 004 SHEET 3 OF 5 DRAWN. TS DATE: 0310221 — _ —_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Property Of.' T A. Newbold Miller, LLC PARCEL /D 5-0053-0048 15:FOP E►-►NEA -- -' �� � . ,SIN TRUST / / T P.011 3 �NpRE►- / RECEIVED MAY 1 4 2021 VT SECTION {uiHO i / / SHORELNE (NWL)GPS03f2"0I7 EXBTINGSULK14EAD PREVIOUSLYPERMITTED RIPRAPTO BE REPLACEDBYPROPOSED BULKHEAD PROPOSED REPLACEMENTBUU(HFAD • • (YWATERWARDOFEXISTNG) EXISTING RIPRAP(PREVIOUS PERMIT MOD) LOT)BOUNOARYLNE EXISTING UNPAVED ROADWAY/DRIVEWAY = = EXISTING DRAINAGE DRCH — • — — 301 CAMA PUBLIC TRUSTSHORELINEAEC 75'CAMAESTUARNE SHORELINE AEC TOPOPESCARPMENT BOTTOMOFESCARPMENT �SFTNWLCONTOUR '�Jl11C1Y�I! 401WETLANDS APPROX. LANDWARD EDGETREELNE +12 TOPOF ESCARPMENT ELEVATION(NWL) TCYPRESSTREE(S) / GENERAL NOTES 1) Drawingsderivedfrom a survey of JosiahA.Webb, Ill, L-29ma on available on leMarch the Perq and from information available from the Perquimans County GIS, NCDENR's NCCREWS data, and from GPS data points of the shoreline collected on WZV201 T. 2) Drawing i for permitting purposes only and not constructbn 3) Copyright ® 2021 S.A.M.P.S.O.N. & Co., Inc. All rights reserved. This material is the property of S.A.M.P.S.O.N. & Co., Inc., and is protected by the copyright laws of the United States and other countries. It may not be PERQUIMANS RIVER reproduced, distributed, or altered In any fashion by any entity without the express written consent of L�D S.A.M.P.S.O.N. & Co., Inc. Written consent is hereby � granted to T. A. Newbold Miller, U.C. Written consent is herby granted to NC DCM, NC DEG, and the US ACOE for Pptsingpurposes. EE 6 NO REVISION DAT -50' 0' 50, 100, 200' 300' SCALE: 1 inch = 50 ft PESTAMP SA.M.P.S.CN.and Company 1.3 MILES TO NEAREST LAND � M T. A. NEWBOLD MILLER, LLC RECENED SHORELIDEVELOPMENTNE aPIER DRAWING TITLE: MAR 05 2021 EXISTING PERMITTED SHORELINE PROTECTION SCALE: Aslndicated DRAWING NO.: DCM-EC OS-HEEETET4 -004 S4 OF 5 DRAWN: TS CHECKED DATE: 03f0221 i, 1 N? A. W cB m C � a �• O 7 —n CD O Co 1J (D oa CL RECEIVED Cn o O fD — M AY 1 4 2021 m CD IVP SECTION h"HD Property Of., T A. Newbold Miller, LLC PARCEL /D 5-0053-0048 tjsT AEC' 30-F. E►-I . ,sooR M PERQUIMANSRIVER 1.3 MILES TO NEAREST LAND 1 -50' 0' 50' 100, 200' 300' SCALE: finch = 50 ft T t RECEIVED MAR 0 5 2021 DCM-EC SHORELINE (N WL)aPS 032YlM7 EXISTING BULKHEAD PREVIOUSLYPERMITTED RPRAP TORE REPLACEDBYPROPOSEDBULKHEAD PROPOSEDREPLACEMENTBULXHEAD • • (7WATERWARDOFEXISTNG) DISTURBANCE FOR BULKHEAD SACKFUL EXISTING RIPRAP(PREVIOUS PERMIT MOD) LOT/BOUNDARY LINE EXISTING UNPAVED ROADWAY/DRIVEWAY ._..._...— EXISTING DRAINAGE DITCH • — — 30-CAMA PUBLIC TRUSTSHORELINE AEC 76CAMAESTUARNE SHORELINE AEC TOPOFESCARPMENT BOTTOMOFESCARPMENT �BFTNWLCONTOUR ��Il1L�Y/Y! 404WETLANDS APPROX. LANDWARD EDGETREELNE +12 TOPOF ESCARPMENT ELEVATION(NWL) CYPRESSTREE(S) 1) Drawings id nved from a survey of Josiah A. Webb, III, L-2989, signed on March 21, 2005, and from information available from the Perquimans County GIS, NCDENR's NCCREWS data, and from GPS data points of the shoreline collected on 3/23/2017. 2) Crewing Is for permitting purposes only and not construction. 3) Copyright ® 2021 S.AM.P.S.O.N. & Co., Inc. All rights reserved. This materiel is the property of S.AM.P.S.O.N. & Co., Inc., and is protected by the copyright laws of the United Stales and other countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written consent of S.A.M.P.S.O.N. & Co., Inc. Written consent is hereby granted to T. A. Newbold Miller, LLC. Written consent is herby granted to NC DCM, NC DEQ, and the US ACOE SA.M.P.S.O.N. and company PROJECT TITLE: T. A. NEWBOLD MILLER, LLC SHORELINE PROTECTION & PIER DEVELOPMENT PERMITTED SHORELINE PROTECTION rs 06-042413-004 SHEET 5 OF 5 03/0221 a