Loading...
HomeMy WebLinkAbout87-96 Amended Dull, Kent Pennit Class Permit Number W.VkrJ UI 1 STATE OF;NORTH-.CAROLINA Department of Environment; Health & Natural Resources R fore Major Developmentm an Area of Environmental Concern pursuant to NCGS 113A=Y18:'=':;; UAMm> .4. Excavation and/or filling pursuant to NCGS 113-229 Issued to Ken Dull 6300 Seamist CourtWilmingion NC 28409 87-96 authorizing development in New Hanover County at Greenville Sound. North of Cedar Island Bridge at Cedar Island S/D , as requested in the permittee's application detmletter dated 6/19/96. This permit, issued on JOLY 19. 1.996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit amendment is issued in keeping with your 6/19/96 request to change Condition No. 1 of the original of Permit No. 87-96, which was issued on 6/2/96. Condition No. 1 now reads: "The proposed drawbridge has been determined to be an unacceptable interference wiith navigation. Therefore, in place of the proposed drawbridge, an arch over the most navigable portion of the waterway shall be incorporated into the pier design. The arch shall provide a 10 foot minimum horizontal clearance and a 6 foot minimum vertical clearance, as measured from the bottom of the structure to the mean high water line. The exact location of the arch shall be determined by a representative of the Division of Coastal Management within a maximum of 60 days prior to the start of construction". attached sheet for Additional This permit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. oger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Permit Class Permit Number I: ODDWO17D 1. STATE OF;NORTH;CAROLINA Department of Environineht; Health''& Natural Resources .:=; -::., and'>.• rr CoastilrResources,Comriiission F/ R � for"•��' Major Development' an Are of Env, onmental Concern pursuant to NCGS 143A:``Y18 Excavation and/or filling pursuant to NCGS 113-229 87-96 Issued to Ken Dull6300 Seamist Court Wilmington NC 28409 authorizing development in New Hanover County at Greenville Sound, North of Cedar Island Bridge at Cedar Island S/D , as requested in the permiuee's application da*dletter dated 6/19/96. This permit, issued on JMY 19, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit amendment is issued in keeping with your 6/19/96 request to change Condition No. 1 of the original of Permit No. 87-96, which was issued on 6/2/96. Condition No. 1 now reads: "The proposed drawbridge has been determined to be an unacceptable interference wiith navigation. Therefore, in place of the proposed drawbridge, an arch over the most navigable portion of the waterway shall be incorporated into the pier design. The arch shall provide a 10 foot minimum horizontal clearance and a 6 foot minimum vertical clearance, as measured from the bottom of the structure to the mean high water line. The exact location of the arch shall be determined by a representative of the Division of Coastal Management within a maximum of 60 days prior to the start of construction". attached sheet for Additional This permit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Z��-S�, ger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ken Dull ADDITIONAL CONDITIONS Permit 487-96 Page 2 of 2 2) This amendment must be attached to the original of Permit No. 87-96, and must be readily available on site when a Division representative inspects the project for compliance. All other conditions of the original permit remain in force. Permit Class AMENDED STATE OF-NORTH=CAROLINA Department of Envii6nm6it,1_IieaIdf& Natural Resources G,L llil=' L Fl y. ;.. for Rte _ Major Development in an Ar@a'.of-Envifonmental Concern pursuant to NCGS 113A418.' _ Excavation and/or flIlingpu suant to NCGS 113-229 Issued to Ken Dull 6300 Seamist Court Wilmington NC 28409 Permit Number 87-96 authorizing development in New Hanover County at Greenville Sound. North of Cedar Island Bridge at Cedar Island S/D , as requested in the permittee's application detedletter dated 6/19/96. This permit, issued on JIILY 19. 1996 ; is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit amendment is issued in keeping with your 6/19/96 request to change Condition No. 1 of the original of Permit No. 87-96, which was issued on 6/2/96. Condition No. 1 now reads: "The proposed drawbridge has been determined to be an unacceptable interference wiith navigation. Therefore, in place of the proposed drawbridge, an arch over the most navigable portion of the waterway shall be incorporated into the pier design. The arch shall provide a 10 foot minimum horizontal clearance and a 6 foot minimum vertical clearance, as measured from the bottom of the structure to the mean high water line. The exact location of the arch shall be determined by a representative of the Division of Coastal Management within a maximum of 60 days prior to the start of construction". sheet for Additional This permitLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. -��RogcrK Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pemrittee 11 Roger, Rich, Ideas, rough outline based on discussion last week. Is this close to what you have in mind? We can talk to district managers/staff at crac/crc to nail down presentations if needed. Kim DCM Planning Conference Wednesday, August 14,1996 1:30 p.m. Introduction Roger Purpose/Objectives for Planning Conference Individual Introductions 2:00 p.m. Icebreaker -- DCM Bingo (Kim, Lori to plan) 2:15 p.m. The DCM Experience:Where have we been? Where are we going? Roger DCM in 1989 (staff, budget, program status, coastal population trends, key inititatives, etc.) DCM in 1996 3:00 p.m. What's happening at DCM? Recent Cases. A Planning Experience -- Crew or Stichter? A Permitting Experience -- Parker or Pres? A Policy Experience -- Rich? 3:45 p.m. Breakout Session (4 groups of 8-10 people) Question: What will be the challenges facing DCM in the next 5 -10 years? What are we currently doing well? What will we need to do to meet these challenges? Assumptions: Population growth continues to concentrate along coast. Information technology becomes more accessible to individuals. Regard for environmental quality and historic preservation continues. 4:15 p.m. Group Report and Discussion 5:00 p.m. Recess 6:00 p.m. Social/Dinner State of North Carolina Department of Environment, Health and Natural Resources 1 • Division of Coastal Management _ James B. Hunt, Jr., Governor p E H N IR Jonathan B. Howes, Secretary Roger N. Schecter, Director July 23, 1996 Mr. Ken Dull 6300 Seamist Court Wilmington, NC 28409 Dear Sir The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, John R. arker, Jr. Major Permits Processing Coordinator JRP:jr/amw Enclosure P.O. Box 27687, N �LFAX 919-733-1495 Raleigh, North Carolina 27611-7687 �� An Equal FAX Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLYTO ATTENTION OF August 26, 1996 Regulatory Branch Action ID No. 199403053, State Permit No. 87-96 ?2 e! RfC¢ED AUG 281996 Mr. Ken Dull �tENi 6300 Seamist Court Wilmington, North Carolina 28409 9 5 Dear Mr. Dull: Through coordination with the North Carolina Division of Coastal Management (NCDCM), we have learned of the amendment to your permit whereby the originally proposed drawbridge has been determined to be an unacceptable hazard to navigation. The conditions of the permit have been amended to state that "the arch shall provide a 10 foot minimum horizontal clearance and a 6 foot minimum vertical clearance, as measured from the bottom of the structure to the mean high water line." Your proposed work, originally authorized by a CAMA permit on June 2, 1996, and by a Department of the Army permit on July 2, 1996, is located on Greenville Sound, at 6300 Seamist Court, in the Cedar Island North development, in Wilmington, New Hanover County, North Carolina. Your proposal continues to be consistent with the provisions and objectives of general permit No. CESAW-0080-N-000-0291. Therefore, you may continue your construction activities in strict accordance with your renewed State authorization. It is understood that all conditions of the original permit remain applicable and that the expiration date is December 31, 1999. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If there is a need to further extend the duration of this Federal authorization, or if any change in your work is required because of unforeseen or altered conditions or for any other reason, a written request for renewal of authorization or plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as specific renewal of authorization must be obtained or revised plans must be reviewed and the authorization modified. A request for extension of authorization must be received no later than thirty (30) days before expiration of the permit. Thank you for your cooperation with our regulatory program. Should you have any questions concerning this matter, please contact Mr. Jeff Richter of my Wilmington Regulatory Field Office staff at telephone (910) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch 1.- -2- Copies Furnished: Mr. John Dorney Division of Water Quality North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 f'�r. John Parker /Division of Coastal Management V North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Bob Stroud Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Division of Coastal Management Application Processing Notes Applicant: ien ! " Deadline: �{mP,y�menf �� Pst Date/Time: Message: 7/Y/y6 TPA �n rre77`, S �(aT T'Co� �/�h e n� ✓T P/ly 7/1 A/' � i 9W f96 ` cm 2522 9d6 9>o-452-oo0> June 19, 1996 John Parker Division of Coastal Management PO Box 27687 Raleigh, North Carolina 27611-7687 Dear John: Y.a& >s 2--Y 9-a sWs *, . 9Vd6,W#tM, M twi As discussed by phone, my client, Ken Dull, agrees to elevate a portion of his proposed private pier to 6' above Mean High Water to help accommodate small boat traffic that may wish to navigate the marsh backwater segments on either side of his pier. The raised portion of the pier will be aligned with the "run" of the landwardmost "tidal creek" and will have a width equal to the standard paired piling separations for the project of 8'. I have included some photos of the "tidal creek" for your use. Photos 1 through 7 are a panorama from northeast to southwest. These photos can be overlaid to form one long picture. Photo #7 shows the neighbor's pier to the waterway. He keeps his small sailboat on the far side. Please amend Ken Dull's permit conditions to reflect his proposed raised pier section. Contact me with any questions at your convenience. Sincerely, Steve Morrison Environmental Consultant I.Yy/ 17M Enclosure: photos cc: Ken Dull JUN 241996 WASTAI MAtII&OU f A7 71-01 NNIHN+26. lfn9, V%m KEN bvua Ase 6,01t UNE UP FfloM .SHOWAI " /71i4MMo e,C TVy,i,►Ad eAMCje4 •L� i' 1171 7 j -i ffl NH l H{HJ9 Y_if_i i Yi`i tl- ;> rig. 71-i,l t•It-IIt- 4420 1,=,3 rjkij OZ+111.1 GHN fFa-[l D'I 1 a 0:3 71-01 NNiNN4,A 109 0 a 4 � \' t IT . r sm > u4 71-01 NN{IN4+24 109 Nix." M u5 ? 1- 01 FIFI I F1F44 i 3 I CIC3 9, N ;> 06 71-Pil NN1NN+15 109