Loading...
HomeMy WebLinkAbout42-96 Edwards, RickyPermit Class NEW STATE OF --NORTH CAROLINA Department of Environrirgi 0i6alth & Natural Resources - -' `and t, Coastal Resources Commission P�I1�itu�, 'i for ;, X Major Development in an Area:of Environmental Concern pursuant to NCGS 113A 118 Excav i t and/or filling pursuant to NCGS 113-229 Issued to authorizing development Permit Number 42-96 r RECEIVED ,APR 3 1995 COASTAL NANAGUIENT 1 R, off of SR 1 112 as requeste .�rr e pafinif[e$'ppli on dated 12/7/95 including attached workplan drawings, 3, dated 12/19/95 tom. i This permit, issued on MARCH 26, 1996 is e-ctotescset ompliance with the application (where consistent with the permit), all applicable regulations, special condition forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the pemrittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. bz---� Signature of Permittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight s prevent seepage of backfill materials through the structure. % 5) The bulkhead must be solid and constructed o e ood concrete slabs, metal sheet piles, or other suitable materials approved by Dep a peg 1. No excavation is permitted, except for that which may be required for the co c n P-the ulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any e4'avaE%n rward of the approved alignment. 6) The fill material will be clean and free of any pollutants, e e in trace quantities. Metal products, organic materials, or unsightly debris will not be us 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Permit Class NEW STATE OF NORTH-CAROLINA Department of Environmeritealth & Natural Resources .. and' Coastal Resodrees.Commi'ssion forr;�s �,, % Major Development in an Area.of Enyiinnmental Concern pursuant to NCGS 113A=i18_.. ` z - Excavation and/or filling pd scant to NCGS 113-229 Permit Number 42-96 authorizing development in Camden County at Pasquotank River, Bucko Bay S/D, Lot 1A & III off of SR 1 1 17 as requested in the permittee's application dated 12/7/95 including attached workplan dated 12/19/95 This permit, issued on MARCH 26, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permiLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. �Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Permit Class NEW STATE OF NORTH-Ci Department of Environment,'Health and Coastal Resources Cor. '�-Vr fori4�,m; X Major Development,in an Area "of--E pursuant to NCGS 113A:118 '- s=- & Natural Resources Concern Excavation and/or filling pursuant to NCGS 113-229 Permit Number 42-96 authorizing development in Camden County at Pasquotank River, Bucko Bay S/D, Lot 1A & t R_ off of SR 111 ? , as requested in the permittee's application dated 12/7/95 including attached workplan dated 12/19/95 This permit, issued on MARCH 26, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. n—Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved , alignment. 6) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Permit Class Permit Number NEW STATE OF NORTH=CAROLINA Department of Environtn6nt,'Healtfi & Natural Resources and Coastal Resources Commission I, % Major Development -in an Area of Environmental Concern pursuant to NCGS 113A='l18 , x Excavation and/or filling pursuant to NCGS 113-229 Issued to Ricky L Fdwards, 864 Sandy Hook Road, Shiloh, NC 27974 42-96 authorizing development in Camden County at Pasquotank River, Bucko Bay S/D, Lot 1A & ER nff of CR 11 12 as requested in the permittee's application dated 12n/95 including attached workpian drawings 3 dated 12/19/95 This permit, issued on MARCH 26, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. u+--Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a. ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Permit Class Permit Number STATE OF NORTH-CAROLINA Department of Enviionment,-_Health7& Natural Resources an Coastal Resources Commission forte X Major Development in an Area.dfEnvirorimental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 42-96 authorizing development in Camden County at Pasquotank River, Bucko Bay S/D, Lot 1A & 1 R, nff of SR 1 1 1 ? as requested in the permittee's application dated 1217195 including attached workplan dated 12/19/95 This permit, issued on MARCH 26, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permiLaction may be appealed by the perinittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Permit Class NEW STATE OF -NORTH, CAROLINA Department of Environment, Health& Natural Resources 'rand Coastal Resources Commission a for`"W ;r R Major Development in an Are aof Envrionmental Concern pursuant to NCGS 113A=118:_' Excavation and/or filling pursuant to NCGS 113-229 Permit Number 42-96 Issued to Ricky T Edwards 864 Sandy Hook Road, Shiloh, NC 27974 authorizing development in Camden County at Pasquotank River, Bucko Bay S/D, Lot 1A & 113 nff of SR 11 12 , as requested in the permittee's application dated 12/7/95 including attached workplan drawings 3 dated 12/19/95 This permit, issued on MARCH 26, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed bulkhead shall be located a maximum of five (5) feet beyond the normal water level at any point along its alignment. 2) The authorized alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 3) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. n--Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pennittee Ricky L. Edwards Permit #42-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 8) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 9) The backfill material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 10) No vegetated wetlands will be excavated or filled outside of the authorized fill area. 11) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. NOTE: The Division of Environmental Management authorized this project under General Water Quality Certification No. 3025 on January 25, 1996. NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity. Submit this plan to the Department of Environment, Health and Natural Resources, Land Quality Section, 1424 Carolina Avenue, Washington NC 27889. Form DCM-MP-1 APPLICATIQ (To be completed by all applicants) -------------------------- b. City, town, community or landmark Shiloh 1. APPLICANT a. Landowner: Address :• .b State NQ Zip ?7q74 D. • .. -37 Fax b. Authorized Agent: Name N/A Address City Zip Day Phone Fax c. Project name (if any) State N07H. Pcrndt wiU be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County ramnvNT c. Street address or secondary road number Bucko Bay Lot 1A & 1B d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Pasquotank River 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. b. Is the proposed activity maintenance of an existing project, new work, or both? new work c. Will the project be for public, private or commercial use? private d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Bulkhead Gh,,r,line to protect from erosion. Build pier Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract Whole Tract b. Size of individual lot(s) c. Approximate elevation of tract above MHW or NWL d. Soil type(s) and texmre(s) of tract e. Vegetation on tract trp.q i rira RC f. Man-made features now on tract none g. What is the CAMA classification of the site? Conservation Developed Rural Land Use Plan land (Consult the local laid use plan.) Transitional Community Other h. How is the tract zoned by local government? i. Is the proposed project consistent with the applicable zoning? X Yes No (Anach zoning compliance certificate, ifapplimble) Has a professional done for the tract? If yes, by whom? - archaeological assessment been Yes Y No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes _ No Coastal (marsh) Other x If yes, has a delineation been conducted? No (Anach documentation, if available) existing wastewater treatment facilities. n. Describe location and type of discharges to waters` of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) cnrfa(-a rnnnff o. Describe existing drinking water supply source. iorivate well 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • `A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. •�An accurate, dated work plat (including plan view and cross -sectional -drawings) drawn to scale in black ink on an 8 112" by II" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1.. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Access channel (MLA) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Average Final EAstiog Project Length Width Denth Denth 1 I ...'----------------------� 1. EXCAVATION a. Amount of material to be excavated from below .%4HW or NWL in cubic yards N/A b. Type of material to be excavated c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? _ Yes _ No d. Highground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area N/A b. Dimensions of disposal area c. Do you claim title to disposal area? Yes _ No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? _Yes —No If yes, where? Revised 03195 Form DCbt-N P-2 rax f. 1 � 'Z� l Does the disposal area include any coastalwetlands. ,t If y4s; (marsh), SAVs or other wetlands? ^; - '� (1) Yes No---r.: a S . — - --------- Does the disposal include any area in the wardt? ------- - Yes No (3) Purpose of fill 3. SHORELINE STABILIZATION a. Type of shoreline stabilization X Bulkhead Riprap b. Length qQ5 ' 4-- 6Z OS c. Average distance watgrwazd of MHW or NWL 6 d. Maximum distance waterward of MHW or NWL Z24 e. Shoreline erosion dying preceding 12 months (Source of information) A� �cntia" — o hSF7°VN'1'7 u.t f. Type of bulkhead or riprap material Treated Wood I g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill h. Type of fill material Clean Fill Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? X Yes No S:.2Cwyds Amount of material to be placed in the water None Dimensions of fill area Level Area b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? X Yes No If yes, y ji2 x47�>< 3B (1) Dimensions of fill area /oS0 �J,If (2) Purpose of fill,Le VeL 4g Ei4 S. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? To be contained by bul',chead b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Back Hoa c. Will wetlands be crssed in transporting equipment to project site? _ Yes T._ No If yes, explain steps that will be taken to lessen environmental impacts. 5/ 4i FFWC e w r w 8e ased UIVTiL '5efoey GRWS.S FZ Uk)SNC5 Ricky L=dWwuees Applicau(br Project ame Signature OeceP4 6crQ 179 Date Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Mr.&Mrs. Anthony B. Cartwriaht Address P.O. Box 2 . Camden. NC 27921 Phone Name Mr. & Mrs. S. Michael Sutton Address 1601 Caddy Lane, E�Tz4Ajeth� C Phone Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION Y 111]WY WX#N1W.W1 �7 I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 7 day of Decewgcr 19 9) Print Name l'l,JcY 4 dw�eoS "Y-Signature Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. ✓ DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts _ DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03195 Form DCM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial _Community _ Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy (Color, inscription, size, anchor, etc.) a. Dock(s) and/or Pier(s) _ (1) _ Commercial _Community Private (2) Number 1 (3) Length A Did (4) Width of water body (4) Width 61 (5) Distance buoy(s) to be placed beyond (5) -Finger Piers _ Yes --X No shoreline (i) Number (ii) Length f. Mooring structure (boatlift, mooring pilings, etc.) (iii) Width (1) _ Commercial _Community _ Private (6) Platform(s) Y Yes _ No (2) Number (i) Number 1 (3) Length (ii) Length 20, (4) Width (iii) Width 20 (7) Number of slips proposed I g. Other (Give canptete description) (8) Proximity of structure to adjacent riparian property lines (9) Width of water body (10) Water depth at waterward end of pier at MLW or NWL b. Boathouse (including covered lifts) (1) Commercial Private / RIC/� d��4/PDS (2) Length l (3) Width d0 Applicant "ectN e c. Groin (e.g. wood, sheetpile, etc.) Signature (2) Number ,Deter" Lek 0 Date d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03/95 I , I 1 �Iv 1 J I I I I G1) Ii a1,e US �Re 01)Wl C /51.10N1:{-INS ? doS O/LJ lam, .c /r5U O f3U „o pp000scu 6 x700 PIM A a� x a0 P141 ���,�, A/1 11 12 CoVef'ev fj�A 1�USe a p A 3 r7" wrl rr R �/° f X=Colt' STAK Fo,e 41644009P' P, p pa523 ON �i.An�e,� Y• PLHa VIEW pA, c?LAO r19NIc SCA)e I = 30 R I " r /\ /3 j F-)V f vK TtA1N/A1gJ (IfCGM Bf IQ 11, 1993— ky 1— Slierla E�Iw,a,e0s PRoSCCI— TYPICAL BULKHEAD RQDe Leyel- j 0 XIO TIE Gjk GAS X a a DEAD MAN Wa-reR Level- =0 ........... -------------- 4 41 x a"Xa' T4.G BULK HCADING ALL 2.5SALT *T?,eATedLUMqER F"-iL 7(j c r 11 BoT+o rn - - - - - - 44 d - 2 1'0` TIE'-u I N or U THAN 3'c Fl o4 Root Picky C-dwARdS b,44 Ao,�s vtoi_ 3 +om ory DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS (Elk, P.O. BOX 1890WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF April 11, 1996 Regulatory Branch Action ID No. 199601148 and State Permit No. 42-96 Ricky L. and Sheila R. Edwards 864 Sandy Hook Road Shiloh, North Carolina 27974 Dear Mr. and Mrs. Edwards: Reference your application for a Department of the Army (DA) permit to place fill material in wetlands, construct a bulkhead, pier, platform, and boathouse, on property identified as Lot No. 1, Bucko Bay, located near the intersection of State Road 1111 and State Road 1112, adjacent the Pasquotank River, Camden County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of General Permit No. 198000291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, Raleigh Bland, P.W.S. Regulatory Project Manager Enclosure Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 -2- Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. John Parker / Division of Coastal Management t/North Carolina Department of Environment, VVV Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 'rREc�ED APB 241996 MMAGERENT State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 26, 1996 Mr. Ricky L. Edwards 864 Sandy Hook Road Shiloh, NC 27974 Dear Sir: E)EHNFR The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, John .Parker, Jr. VV Major Permits Processing Coordinator JRP:jr/amw Enclosure P.O. Box 27687, 7�FAX 919-733-1495 Raleigh, North Carolina 27611-7687 �C An Equal FAX Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper f DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Ricky Edwards 2. LOCATION OF PROJECT SITE: Lot 1, Driftwood Trail, Bucko Bay, Shiloh, SR 1111 and SR 1112 intersection, Camden County Photo Index - 1989: 129-11 (J9) 1984: N/A State Plane Coordinates - X: 2865500 Y: 917900 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 11-22-95 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - December 19, 1995 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Camden County Land Classification From LUP - Conservation (B) AEC(s) Involved: ES, EW, PT (C) Water Dependent: Yes (D) Intended Use: Private, Residential (E) Wastewater Treatment: Existing - None Planned - Septic drainfield (F) Type of Structures: Existing - None Planned - Single family residence (G) Estimated Annual Rate of Erosion: 3' Source - Applicant 7. HABITAT DESCRIPTION: [AREA] DRF.DGM) FTT T T:TI I IT TlT (A) Vegetated Wetlands ES 404 1,050 square feet (B) Non -Vegetated Wetlands (C) Other Shallow Water Shaded PT, EW 1,243.5 sq. ft. 1,840 sq. ft. (D) Total Area Disturbed: 4,133.5 square feet (.09 acres) (E) Primary Nursery Area: No (F) Water Classification: SC Open: N/A 8. PROJECT SUMMARY: Applicant proposes to construct 205 feet of bulkhead, backfill 1,243.5 square feet of Estuarine/Public Trust Waters and construct a 6' x 200' pier with a 20'x 20' platform and a 12' x 20' boathouse. Ricky Edwards Bio Report Page Two Site Description The applicant owns a 10 acre wooded tract in Shiloh Township, Camden County. The tract is accessible by a private road known as Driftwood Trail which connects to the state road system at the intersection of SR 1111 and SR 1112. The tract lies along the Pasquotank River in an area known as Bucko Bay. Soils consist of Roanoke silt loam and dominant native trees are red maple, (Acer rubnun , loblolly pine Emus taeda and water oak ercus ni is . Approximately two acres of the tract adjacent to the Pasquotank River have been cleared in preparation for the construction of a single family dwelling. CAMA Minor Permit #951115 was issued by the Elizabeth City Field Office for this activity. Adjacent property consists of like sized tracts with a home under construction on one side and a home planned for the other side. The shoreline of both adjacent riparian tracts are bulkheaded. Tract elevation varies from six inches in areas along the shoreline to four feet towards to center of the property. A possible Section 404 wetland area of 1,050 square feet exists in the Estuarine Shoreline Area of Environmental Concern approximately 10 feet from normal water level. Waters of the Pasquotank River in this area are classified as SC by the NC Division of Environmental Management. Annual shoreline erosion is estimated to be one to two feet. ' Development Proposal In order to protect his shoreline and access the river, the applicant proposes to construct 205 feet of wooden bulkhead. He proposes to connect his bulkhead to the adjacent riparian existing bulkheads. The average distance from shore of the proposed bulkhead is 6.06 feet with a maximum distance from shore of 17 feet. He further proposes to fill the wetland area in order to level and landscape his yard. A 6' x 200' pier with a 20'x 20' platform and a 12' x 20' covered boathouse are also proposed. Anticipated Impacts Construction of 205 feet of wooden bulkhead as proposed would result in 1,243.5 square feet of shallow water habitat being lost. Approximately 115 cubic yards of backfill will be required. One thousand fifty square feet of possible Section 404 wetlands would be filled requiring 97 cubic yards of fill. Ricky Edwards Bio Report Page Three The pier, platform and boathouse would shade 1,840 square feet of Estuarine/Public Trust Waters. Water turbidity will increase during construction of the bulkhead, pier, platform and boathouse. CAMA Review The proposed project involves Public Trust, Estuarine Waters and Estuarine Shoreline Areas of Environmental Concern. The proposed project will result in .03 acres of Public Trust and Estuarine Waters being lost. Total disturbance in the involved AECs will be .09 acres. No historical/archeological significance is associated with this lot. No endangered or threatened species of plants or animals have been identified in the project area. The pier, platform and boathouse could be permitted under a CAMA General Permit. The tract is not part of any unique geologic formation. There are no submerged aquatic vegetation beds within the project area. A consistency review of the project with the Camden County Land Use Plan will be sent under a separate letterhead. Submitted by: Frank A. Jennings, III Date: December 13, 1995 ' State of North Carolina Department of Environment, Health and Natural Resources Washington Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ti..r IDFEE HNF1 DIVISION OF LAND RESOURCES LAND QUALITY SECTION April 2, 1996 LETTER OF APPROVAL WITH MODIFICATION Mr. Ricky L. and wife, 864 Sandy Hook Road Shiloh, North Carolina Mrs { Sheila R.- Edwar 27974 RE: Erosion and Sedimentation Control Plan VAPR - f Edwards Homesites SR 1111 and SR 1112 - Camden County IVE1996Date Received: March 19, 1996TAL Responsible Party: Ricky L. and Sheila R. EdwEMENT Dear Mr. and Mrs. Edwards: This office has completed its review of the erosion�r sedimentation control plan for the referenced 2 acre disturbance. We find the plan for the site preparation for construction of 2 private residences to be acceptable and hereby issue this LETTER OF APPROVAL WITH the following MODIFICATION. In the absence of any submitted seeding specifications, this office suggests the attached tables, 6.11p, s and t, be considered for use. We recommend that the sericea and kobe lespedezas be deleted from the final mix. These are not the only seeding options available to you. If these specifications are not to your satisfaction, we recommend that you contact Mr. Duane Hinson at the Pasquotank County office of the US. Natural Resource and Conservation Service for assistance. The Sedimentation Pollution Control Act (copy available upon request) established a program requiring a project owner or developer to protect adjoining natural resources and properties, both during and after construction, from the effects of accelerated erosion. This program is performance oriented. It is your responsibility to understand and comply with the requirements of the Act. 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Mr. Ricky L. and wife, Mrs. Sheila R. Edwards April 2, 1996 Page 2 In addition to any listed modifications or conditions, the following also apply to the approved plan: -- an erosion and sedimentation control plan is only valid for 3 years following the date of initial approval, if no land -disturbing activity has been undertaken; -- a copy of the latest approved soil erosion and control plan must be on file at the job site; -- a buffer zone, sufficient to restrain visible sedimentation, must be provided and maintained between the land -disturbing activity and any adjacent property or watercourse; -- new or affected slopes must be at an angle that can be retained by vegetative cover; -- barren slopes must be provided with a ground cover sufficient to restrain erosion within 30 working days of completion' of any phase (rough or final) of grading (RYE GRASS IS NOT in the approved seeding specifications nor is it an ACCEPTABLE substitute for the providing of a ground cover); -- a permanent ground cover, sufficient to restrain erosion, must be provided within the shorter of 30 working or 120 calendar days after completion of construction or development; and -- this approval is not automatically transferred with a change in project ownership. .Be advised that to ensure compliance with the approved plan and the program requirements, unannounced periodic inspections will be made. If the implemented plan is determined to be inadequate, this office may require that it be revised to comply with state law. Failure to comply with any part of the approved plan or with any requirements of this program, could result in the taking of appropriate legal action against the financially responsible party (Ricky L. and Sheila R. Edwards). One option is the assessing of a civil penalty of up to $500 per day for each day the site is out of compliance. In recognizing the desirability of early coordination of sedimentation control, we believe it would be beneficial for you and your contractor to arrange a preconstruction conference to discuss the requirements of the approved erosion and sedimentation control plan. It would be appreciated if you would contact this office to let Richard Peed (ext. 374) know the date of construction start-up and the date of the preconstruction conference. Mr. Ricky L. and wife, Mrs. Sheila R. Edwards April 2, 1996 Page 3 The land -disturbing activity described in this plan may require approval or permitting from other Federal, State or local agencies. These could include the U.S. Army Corps of Engineers under Article 404 jurisdiction, the Division of Environmental Management under water quality regulations (contact Bill Moore, 919-946-6481, Ext. 264), county, city or town agencies under other local ordinances, or other approvals that may be required. This approval cannot supersede any other approval or permit. Sincerely, Patrick H. McClain, P.E. Assistant Regional Engineer PHM:pm Enclosure cc: Frank Jennings, Division of Coastal Management John Parker, Division of Coastal Management DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAUPROCESSING RECORD 0\ A). APPLICANT: Ricky Edwards COUNTY: Camden °j RFMVED LOCATION OF PROJECT: Lot 1 Driftwood Trail, Bucko Bay, Shiloh ccDEC 21 ib95 MANAGEMENT DATE APPLICATION RECEIVED COMPLETE BY FIELD: December 19, 1 FIELD RECOMMENDATION: Attached - No To Be Forwarded - Yes 9 "1'4� CONSISTENCY DETERMINATION: Attached - No To Be Forwarded - Yes FIELD REPRESENTATIVE: Jennings DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: RU,J la ll'yhS' B) DATE APPLICATION RECEIVED IN RALEIGH: FEE REC'D: $ PUBLIC NOTICE REC'D: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES REC'D: DEED REC'D:y APPLICATION ASSIGNED TO: Qo..A-sue ON: t-I- -t - g5 C) 75 DAY DEADLINE: — 150 DAY DEADLINE: � MAIL OUT DATE: q STATE DUE DATE: " 7 p P FEDERAL DUE DATE: / FED. COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON -*5 6 AGENCY DATE COMMENTS RETURNED���+++ OBJECTIONS YES NO NOTES Coastal Management Dist. Office Div. of Community Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives & History y 3LQa_9Y6 Div. of Env. Health Div. of Highways I(Q Wildlife Resources Commission _ _ y b Div, of Water Resources Div. of Marine Fisheries State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM: [DEHNFR • �. J(VVa�rO TO: John R. Parker FROM: Frank A. Jennings, III SUBJECT: Ricky Edwards Major Permit Recommendations G 9 DATE: January 2, 1996 I recommend the above permit application be approved with the following conditions: .Z 1. The alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. 2. The bulkhead must be constructed prior to any backfilling activities. 4 3. The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. s 4. The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6 5. The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 6. All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10%post-consumer paper John R. Parker January 2, 1996 Page Two 7. All fill material to be placed below normal water level will be confined behind the permitted bulkhead. q 8. The backfill material will be properly graded and provided a ground cover 1 sufficient to restrain erosion within thirty (30) working days of project completion. State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM: TO: John R. Parker FROM: Frank A. Jennings, III f// [DEHNFR SUBJECT: Ricky Edwards Major Permit Land Use Plan Consistency Review DATE: January 2, 1996 This proposal involves the construction of 205 feet of bulkhead, backfilling 1,243.5 square feet of estuarine/public trust waters, filling 1,050 square feet of 404 wetlands located in the estuarine shoreline AEC, and constructing a 6' x 200' pier with a 20' x 20' platform and a 12' x 20' boathouse. AEC's and 404 wetlands are included in the Conservation land classification of the Camden County land use plan. All uses that can be permitted under existing local, state and federal regulations are allowed in the Conservation class. The County's specific policy on freshwater swamps and marshes echoes that position. Based on the above, so long as this proposal satisfies applicable permit regulations, it is consistent with the Camden County land use plan. 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper qj,�x rl-" State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director December 19, 1995 /' ea ,a [DEHNFR MEMORANDUM TO: Mr. A. Preston Howard, Director Division of Environmental Management - FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: LAMA/D DOE & FILL Permit Application Review Applicant: Rick Edwards RECE WASH NGTON OFFICE Project Location: Lot 1, Driftwood Trail, Bucko Bay, Shiloh, Camden DEC 2 2 1995 IL E IL Proposed Project: Construct 205 ft. of bulkhead, backfill 1,243.5 sq. ft. of estuarine/public trust waters and construct a 200' x 6' pier with a 20' x 20' platform and a 12' x 12' boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 9, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY -"-4 _V'� This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed1� Date 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director APPROVAL of 401 Water Quality Certification Mr. Ricky Edwards 864 Sandy Hook Road Shiloh, NC 27974 Dear Mr. Edwards: Affl� A QEHNF1 January 28, 1996 Camden County DEM Project # 960007 You have our approval to place fill material in 2,294 square feet of wetlands or waters for the purpose of constructing a bulkhead, pier and boathouse at lot 1, Driftwood Trail, Bucko Bay, Shiloh, as you described in your application dated 19 December 1995 . After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3025. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits' before you go ahead with your project. If you do not accept apy of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of'the date that you receive this letter. qo ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless. you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733- 1786. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Domey Central Files JoWaParker; DCMV Sincerely, F.estonllarl Jr. eFE 9 WOJ coc,�,i Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50 % recycled/10% post consumer paper 10L' State of North Carolina Department of Environment, 12 1 `" Health and Natural Resourc .�► Division of Coastal Management RECEIVED a' FEB 281996 James B. Hunt, Jr., Governor CGAIAL Jonathan B. Howes, Secretary MANAGEMENT Roger N. Schecter, Director EHNF1 MEMORANDUM TO: Mr. Joe Henderson, Acting Director s State��tce State Property Office �a� proPOki � Department of Administration � 110l. 6 s ll-, i FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ricky kdwards PROJECT LOCATION: Lot 1, SR1111 and 1112 intersection, Shiloh, Camden Co. PROPOSED PROJECT: To construct a bulkhead, pier and boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended p changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed �% L� I )� Date ,5�Nth' _. - orb P.O. Box 27687, Rdeigh, North orolina 2761elephone 919-733-22 FAX 919-733 14 5 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management A7(wal James B, Hunt, Governor p E H N fR Jonathan B. Howes, Secretary Roger N. Schecter, Director December 19, 1995 TO: Mr. Bruce L. Freeman, Director Division of Marine Fisheries FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: LAMA E & FILL Permit Application Review Applicant: Ri ky Edwards Project Location: Lot 1, Driftwood Trail, Bucko Bay, Shiloh, Camden County Proposed Project: Construct 205 ft. of bulkhead, backfill 1,243.5 sq. ft. of estuarine/public trust waters and construct a 200' x 6' pier with a 20' x 20' platform and a 12' x 12' boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 9, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. \ This agency has no comment on the proposed project. \\!L� This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the att d comments. Sign , Date % 2.. — 2-D - 5 J 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper L 1 State of North Carolina IT Department of Environment, Health and Natural Resources 0, Division of Marine Fisheries James B. Hunt, Jr., Governor E) FEE N Jonathan B. Howes, Secretary Bruce L. Freeman, Director I1 Dlu (11:741�I 0111tS Q TO: John R. Parker, Jr., DCM Major Permits Processing Coordinator THROUGH: Maury Wolff, Permit Coordinator nAIftAGEUfIVT FROM: Sara E. Winslow, Biologist Su rvisor ��g Pe SUBJECT: Ricky Edwards Proposal DATE: 21 December 1995 The following comments by the North CarolimaDivision of Marine Fisheries are provided pursuant to General Statute 113-131. Pasquotank River functions as a spawning and nursery area for blueback herring and alewife. The river also functions as a nursery area for striped bass, white perch, yellow perch, spot, croaker, catfishes and other commercially and recreationally important species. This agency is concerned with the loss of 1,243 square feet of shallow water habitat. The proposed average distance from shore is 6.06 feet, with a maximum of 17 feet. However, the Division recognizes the need for this distance to tie into the existing bulkhead on the adjacent properties. u The Division is also concerned with the loss of 1,050 square feet of wetlands. Wetlands N are of great importance serving as sources of biological productivity, and providing food directly and indirectly. Finally, wetlands perform important roles in modifying acute impacts of hydrologic events, moderating stormwater flows, trapping sediments, and providing nutrients for incorporation into resident plants. P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 5, 1996 MEMORANDUM TO: Mr. Charles R. Fullwood, Jr., Director Wildlife Resources Commission Attn: Habitat Conservation Program FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ricky Edwards PROJECT LOCATION: Lot 1, SR1111 and 1112 intersection, Shiloh, Camden Co. ROPOSED PROJECT: To construct a bulkhead, pier and boathouse. Please indicate below your agency's position or viewpoint on the proposed and return this form by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the k�c attached comments.Signed Date i - zu -qu May 21, 1993 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunely Affirmative Action Employer 50%recycled/ 10%post-consumer paper ® North Carolina Wildlife Resources Commission KN 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM TO: John R. Parker, Jr., Coordinator Major Permits Processing Section Division of Coastal Management, DEHNR v FROM: V William Wescott, Coastal Coordinator Habitat Conservation Section DATE: January 26, 1996 SUBJECT: CAMA/Dredge and Fill Permit Application for Ricky Edwards, Lot 1, Driftwood Trail, Bucko Bay, Shiloh, Camden County. Biologists on the Wildlife Resources Commission staff have reviewed this permit application and are familiar with habitat values of the project area. In order to further assess project impacts on fish and wildlife resources, an onsite inspection was conducted on January 24, 1996. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes to construct 205 ft. of bulkhead, backfill 1,243 ft' of Estuarine/Public Trust Waters, fill 1,050 ft' of 404 wetlands, construct a 6 ft. x 200 ft. pier with a 20 ft. x 20 ft. platform and a 12 ft. x 20 ft. covered boathouse. Waters at the site are classified as SC. The Division of Coastal Management estimates the annual erosion rate to be one to two feet. The average distance from shore of the proposed bulkhead is 6 ft. with a maximum distance from shore of 17 ft. According to our guidelines, except for extenuating circumstances, bulkheads should be constructed no more than 5 ft. waterward from the mean high water line. We recommend that the proposed bulkhead be relocated to allow the applicant to reclaim property lost within the last 12 5 months (1 to 2 ft.). We appreciate the opportunity to review and comment of this project. If you need further assistance or additional information, please contact William Wescott at (919) 927-4016. eww - trc -? J�Pzl re---' State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director December 19, 1995 Aj 1DEHNFR TO: Mr. Charles Gardner, Director Division of Land Resources FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/ EDGE & FILL Permit Application Review Applicant: Ric Edw rda � IiQ RECEIVED JAN 111b96 ` CUMIAL tf MANAGEMENT Project Location: Lot 1, Driftwood Trail, Bucko Bay, Shiloh, Camden Proposed Project: Construct 205 ft. of bulkhead, backfill 1,243.5 sq. ft. of estuarine/public trust waters and construct a 200' x 6' pier with a 20' x 20' platform and a 12' x 12' boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 9, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects �ttachents. C Signed to the project for reasons described in the Date 1367 U.S. 17 South, Ellzabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper DIVISION OF LAND RESOURCES LANR QUALITY SECTION MEMORANDUM TO: John R. Parker, Jr./Stephen Benton Major Permits Processing Section Division of Coastal Management FROM: Patrick H. McClain **� Assistant Land Quality Regional Engineer Washington Regional Office SUBJECT: This office will require that: 1. The area be properly graded. 2. A permanent ground cover sufficient to restrain erosion be provided on all exposed areas within the shorter of 30 working or 120 calendar days after project comple- tion. 3. The exterior slopes of the disposal area dikes be at an angle no steeper than 1 1/2 H: 1 V. 4. Appropriate erosion and sedimentation control devices, measures, or structures be used to prevent sediment from entering the adjacent wetlands/watercourses/ property (e.g., silt fence, diversion swales/berms, sand fence, etc.). 5. A ground cover sufficient to restrain erosion be \� provided within 30 working days of completion of any / phase of grading on cut or filled slopes. (/ 6. An erosion and sedimentation control plan be submitted at least 30 days prior to initiation of land -disturbing activities. 7. Additional information concerning the area of the land- ward disturbance be submitted to determine if an erosion control plan is required. 8. Other: State of North Carolina Department of Environment, Health and Natural Resources Washington Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A14; tr_92 IDFEE HNR DIVISION OF LAND RESOUR, LAND QUALITY SECTION January 10, 1996 Mr. Ricky L. and Ms. Sheila R. Edwards 864 Sandy Hood Road Shiloh, North Carolina 27974 RE: Bucko Bay, Lots la & b Camden County Dear Mr. and Ms. Edwards: As an agency involved in the Division of Coastal Management's major permit application review process, we have determined that more than one acre will be disturbed by the activities as described. Therefore, in addition to a permit from the Division of Coastal Management, an erosion and sedimentation control plan must be submitted to and approved by this office before development begins. The requiring of an erosion and sedimentation control plan is based on a mandatory standard for land -disturbing activity of the Sedimentation Pollution Control Act of 1973 [NCGS 113A-57(4) and 113A-54(d)(4)], which states: No person shall initiate any land -disturbing activity, if at least one acre is to be uncovered, unless an erosion and sedimentation control plan for the activity is filed with the agency having jurisdiction and approved. The plan must be submitted at least thirty (30) days prior to project commencement. -The plan must include, but is not limited to, the following: 1. A scaled plat plan of the site, showing the affected areas as well as adjacent properties which may be affected. Include contours if available. 2. Indicate critical areas such as wetlands, creeks, streams, drainageways, marsh, etc. 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946.6481 FAX 919-97s3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10% post -consumer paper Mr. Ricky L. and Ms. Sheila R. Edwards January 10, 1996 Page 2 Include a brief narrative describing the activities to be undertaken and a construction schedule. 4. Indicate on the plat the measures to be utilized to prevent sediment from entering adjacent properties, such as location of silt fences, silt basins, diversion ditches, areas to be seeded,.etc. 5. Include seeding and mulching specifications for both temporary and permanent stabilization. 6. Include any other pertinent information directed at controlling offsite sedimentation, slope degradation, and erosion. Please be advised that the plan will be considered incomplete, and the statutory review period will not begin, unless a non-refundable plan review processing fee, payable by check or money order made out to the Department of Environment, Health and Natural Resources, is included. The amount of the fee is based on $30 for the first disturbed or affected acre, plus $20 for each additional whole or fractional acre of land to be disturbed (including offsite borrow or waste areas). To begin this project without the approval of an erosion/ sedimentation control plan will be considered a violation of the Act and may lead to the assessment of a civil penalty of up to $500.00 per day for each day the project is deemed in violation. For your convenience, we are enclosing a guideline for developing a plan. If you should have any questions, feel free to contact me. Sincerel Patrick H. McClain, P.E. Assistant Regional Engineer PHM:jt Enclosures cc: John Parker, Division of Coastal Management FEB -16 1o: 1 State of North Carolina Department of Environment, ' --,,,,Health and Natural Resources F' Division of Coostal Management James B, Hunt, Jr., Governor Jonathan B H9wg5, §e.9retary Rogvlrectnr FEB ° January 5. 1996 -. pp C �SE`1ut: +.TYDLtiIJAN TO: Ms. Linda Sewall Director L Division of Environmental Health FROM: John Parker, Jr. Major Permits Processing Coordinator SLBJECT: CAAIA,'DREDGE & FILL Perinit Application Review APPLICANT: Ri Edwards PROJECT LOCATION: Lot 1, SRII11 & SR1112 intersection, Shiloh, Camden Co. PROPOiED PROJECT: To construct a b4lkhead. pier and boathouse. Please indicate below, your agency's position or viewpoint on the propused project and return this form- by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293- When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. _ This agem y approves of the project, only if the recomm=ided changes are incorporated. See attached. _ This agency objects to the project for reasons described in the attached comments. Signed Date­.4-1 c6 tY7_ P.O. Boy. 27687.2de4l,h-Ngth(cr:,lna2%611-?<;07 Telepho':e9i9-7.33-2?9 5At919-733-1495 r... a--, n..,..,.. .,._ r.,r _. . _'+c..... i;Y%nnnc State of North Carolina Department of Environment, Health and Natural Resources 1* Ai Division of Coastal Management _ James B. Hunt, Jr., Governor �+� Jonathan B. Howes, Secretary ID E H N F1 Roger N. Schecter, Director January 5, 1996 MEMORANDUM TO: Ms. Renee Gledhill -Early Environmental Review Coordinator Division of Archives and History FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ricky Edwards PROJECT LOCATION: Lot 1, SRllll and 1112 intersection, Shiloh, Camden Co. PROPOSED PROJECT: To construct a bulkhead, pier and boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed I( ,j QL Date P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper J State of North Carolina Department of Environment, Health and Natural Resources • Division of Coastal Management _ James B. Hunt, Jr., Governor p E H N FR Jonathan B. Howes, Secretary Roger N. Schecter, Director CANDecember 19, 1995 f,OMIALNAGEMENT MEMORANDUM � i TO: Mr. Robert E. Chandler, Director. Division of Community Assistance FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/ & FILL Permit Application Review Applicant: Rick Edwar� Project Location: L6t 1, Driftwood Trail, Bucko Bay, Shiloh, Camden Proposed Project: Construct 205 ft. of bulkhead, backfill 1,243.5 sq. ft. of estuarine/public trust waters and construct a 200' x 6' pier with a 20' x 20' platform and a 12' x 12, boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 9, 1996. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY ' ':;This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This a c objects to the project for reasons described in the t a ents. Signed Date /Z ' 1- 7 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources /�✓ Division of Coastal Management -w James B. Hunt, Governorry ID E H N F1 Jonathan B. Howes, SecreLata Roger N. Schecter, Director January 5, 1995 MEMORANDUM TO: Mr. Larry R. Goode, Phd., P.E. Highway Administrator Division of Highways FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ricky Edwards PROJECT LOCATION: Lot 1, SR1111 and 1112 intersection, Shiloh, Camden Co. PROPOSED PROJECT: To construct a bulkhead, pier and boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY \ This agency has no objection to the project as proposed. J / This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. agency objects to the project for reasons described in the Date L P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director January 19, 1996 MEMORANDUM TO: P. A. "Ski" Wojciechowski -- -Division—of 1Gia-rote FisTienes FROM: John Parker Major Permits Processing Coordinator �EHNF1 RECEIVED Ff b 2 Z 1996 DM OE MARINE FISHERIES SUBJECT: CAMA/Dredge and Fill Permit Application Review APPLICANT: Ri y Edwards PROJECT LOCATION: t 1, Driftwood Trail, SRI111 & 1112, '`REc4 EO FEB 26 1996 MANAGEMENT PROPOSED PROJECT: To construct 205' of bulkhead and backfill an area of Public Trust Waters, etc. Please indicate below your agency's position or findings on the proposed project as it relates to matters of public trust. If you have any questions regarding the proposed project, contact John Parker at 733-2293 or the DCM field representative for the project. This form should be used only for tracking and infra -agency commenting. REPLY There are no known public trust conflicts with the project location or design. There appear to be public trust conflicts that require additional investigation. Approximately _ days additional review time is needed. _ It is recommended that changes be made to the project to reduce or eliminate public trust conflicts, as discussed in the attached memo. Go,°y To dz~lr k Z- aR.t/wi,�c- Oosa .✓6T f�fva.� 7/�� Signed Date Z/zJ/9 6 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM TO: FROM: f.Yl1_: 1 A '"' 14**A �EHNF� January 5 1996 9 co FEB £6EF0 Mr. John Sutherland, Chi CunarA(y96 Water Planning Section MANAGEMENT Division of Water Resourc John Parker, Jr. �1 Major Permits Processing Coordinator M JAN XJ JW6 CAMA/DREDGE & FILL Permit Application Review APPLICANT: Ricky Edwards PROJECT LOCATION: Lot 1, SR1111 and 1112 intersection, Shiloh, Camden Co.. PROPOSED PROJECT: To construct a bulkhead, pier, and boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 26, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. X This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date P.O. Box 27687, Raleigh, North Carolina 27611-7687 An Equal Opportunity Affirmative Action Employer Telephone 919-733-2293 FAX 919-733-1495 50%recycled/ 10%post-consumer paper DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF January 26, 1996 Regulatory Branch Action ID No. 199601148 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: <ss I Reference the application of Ricky L. and Sheila R. Edwards for a Department of the Army (DA) permit to place fill material in wetlands, construct a bulkhead, pier, platform, and boathouse, on property identified as Lot No. 1, Bucko Bay, located near the intersection of State Road 1111 and State Road 1112, adjacent the Pasquotank River, Camden County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following condition(s) be included in the State authorization: -" 1. All work authorized by this permit must be performed in strict compliance with the permit plans. V 2. The bulkhead will not be positioned farther waterward than 17 feet from the normal water level elevation contour at any point along its alignment. \I 3. All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. % a 4. No vegetated wetlands will be excavated or filled outside of the authorized fill area. S. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. v 6. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. tR -2- Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919)975-1616, extension 23. Sincerely, Raleig Project Manager Regulatory Branch Copies Furnished: Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries service Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 RECEIVED DEPARTMENT OF THE ARMY WILMINGTON DISTRICT. CORPS OF ENGIN DEC 29 1995 P.O. BOX 1890 CGAS ML WILMINGTON, NORTH CAROUNA28402.18 MANAGEIdENi REPLY TO ATTEMION OF beceM Regulatory Branch A Action ID. 1 ]0 v Waterwa LnSLUVrInk Mr. Larry Hardy National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Applicant Ms. L. R. (Mike) Gantt Fish and Wildlife Enhancement U.S. Fish and Wildlife Service Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Thomas Welborn, Chief Wetlands Regulatory Section -Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Gentlemen: pIW Division of Coas al Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleig A,NPrth Cazol' a 27611-7687 rJiUtAC1 Regional Office Division of Coa tal Management North Carolina Department of Environment, Health and Na ra Resqc rpA CI-1101. 11 Pursuant to Action ID No. 198000291, the CAMA-Corps general permit/processing agreement, a State Field Investigation Report is enclosed. Your comments and/or recommendations would be appreciated on or before rAA (, a Questions or co1m-jme is y be addressed to �-I r I Regulatory Branch, r� Field Office, telephone J'j ) Sincerely, G. Wayne Wright€k, Chief, Regulatory Branch.. II�E_'<: Enclosure s Pdmetl M ® RwyY Paper DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF January 2, 1996 Regulatory Branch Action ID No. 199601148 Ricky L. and Sheila R. Edwards 864 Sandy Hook Road Shiloh, North Carolina 27974 Dear Mr. and Mrs. Edwards: ✓g1996 y£�EIUEO 414, iqt On February 11, 1991, we renewed General Permit No. 198000291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received December 26, 1995, for Department of the Army (DA) authorization to place fill material in wetlands, construct a bulkhead, pier, platform, and boathouse, on property identified as Lot No. 1, Bucko Bay, located near the intersection of State Road 1111 and State Road 1112, adjacent the Pasquotank River, Camden County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State -Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should You begin work. 50' Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 199601148. It will be coordinated by Mr. Raleigh Bland in the Washington Regulatory Field Office. Mr. Raleigh Bland is available at telephone (919)975-1616, ext. 23. Sincerely, QM, MCI V Raleigh Bland Project Manager Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management ✓ North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Ms. L. R. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Habitat Conservation Division Fivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF January 2, 1996 Regulatory Branch Action ID No. 199601148 Mr. John Dcrney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27611-7687 Dear Mr. Dorney: Enclosed is the application of Ricky L. and Sheila R. Edwards for Department of the Army (DA) authorization and a State Water Quality Certification to place fill material in wetlands, construct a bulkhead, pier, platform, and boathouse, on property identified as Lot No. 1, Bucko Bay, located near the Intersection of State Road 1111 and State Road 1112, adjacent the Pasquotank River, Camden County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. According to our administrative regulations, 60 days is reasonable for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by February 25, 1996, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919)975-1616, extension 23. Sincerely, Raleig Bland Project Manager Regulatory Branch Enclosure -2 Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post office Box 27687 Raleigh, North Carolina 27611-7687 rK CITY ,�..-� 0 \N 'T—�. B\ .�d Rick/ DBEACH 4 Lc, i 10 A> M ri M e IV �o U IV 41 A/' C C, N 1, OldT,., 0, PROTECT 1161 3610 A R L E M A State of North Carolina Department of Environment, Health and Natural Resources A'4*e Division of Coastal ManagementJames B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ID E H N FZ10 Roger N. Schecter, Director March 11, 1996 Mr. & Mrs. Ricky Edwards 864 Sandy Hook Road Shiloh, NC 27974 Dear Mr. & Mrs. Edwards: This letter is with reference to your application for a Coastal Area Management Act Major Development and State Dredge and Fill permit to construct 205 feet of bulkhead, backfill 1,243.5 sq. feet of Estuarine/Public Trust Waters and construct a pier and boathouse on property located on Lot 1, Driftwood Trail, SR1111, Shiloh, in Camden County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make May 18, 1996 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact this office. Very sincerely, Jo R. Parker, Major Permits Processing Coordinator JRP:jr/aw cc: Frank Jennings DCM--Elizabeth City P.O. Box 27687. Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper to •o SENDER: er Complete item: to • Complete item: • Print youur-nami N return this Bard tc m tloesAttach this fort ��r ..e.._.. t •=1 also wish to receive :the I following services (for an extra ai fee): 1• ❑ Addressee's Address m N ?• ❑ Restricted Delivery - °• Consult postmaster for fee. - to tr e,Number -- - Ic :e Type .red ❑ Instir'ed• a to �r iiPt, for ercha y� o o y a s (Only' I as ad •x . EST IC RETURN RECEIPT v SENDER: -:_-.:. n Complete items 1 endloi 2 for additional services. I also wish to receive the -m Complete items 3, and 4a & 6.d -,^-„`�.- following services (for an extra m U N • Print your name and address on thereverse of this form sa that we can fee): 2 0 return this card to you. l:9p'='_T ".i;'{ =�'_ _ • 'Attach'this form to the front of the mailpiece, or on the back if space 1.❑ Addressee's Address m l y i does not permit m • Wdte:'aeturn Receipt Requested"on the mail piece below the article number --2. ❑Restricted Delivery a •m L • The fietum Receipt will show to who the article was delivered and the date --'`_"=` - Consult postmaster for fee. o delivered.'. 3 Article Addressed to: -: 4a. Article Number - lr 1 n E E {�/ `� -_ n��.}L1�1� �`1`.` I C, v v 4b. Service Type El ¢ ' ❑ Registered Insured _ - V x .Certified ❑ COD S _ Elailail iSiRetum Receipt for 3 cc -- p -� erchandise 'te¢of, livery c Q o 5 Slgnatur (Addressee) s dre see'a Address (Only if requested cc Nov lend fe 'is'paid) _ -- m _ . cc 6 Signature (Agent) UUI--J�• T- > PS Form 3811, December 1991 .*LL"M.1W-TU4fa DOMESTIC RETURN RECEIPT 12 CERTIFIED MAIL RETURN RECEIPT REOUESTED: Dear S. Michael Sutton (RIPARIAN LANDOWNER'S NAME) nli 2 ^^o5 _..__ �'C="" . I This letter is to notify you as an adjacent riparian landowner of Mr./Mrs. Ricky L. Edwards (YOUR NAME plans to construct bulkhead, pier & fill (YOUR CONSTRUCTION PLANS) in. shilch/camden The sketch on the reverse side accurately depicts the proposed construction. (CITY/COUNTS) Should you have no objections to this proposal, please check the statement below, sign and date the blanks below the statement and return this letter to: Ricky L. Edwards, 864 Sandy Hook Rd., (YOUR NAME AND ADDRESS Shiloh, NC 27974 as soon as possible. Should you have objections to this proposal, please send your written comments to N.C. Division of Coastal Management, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 10 days of receipt of this notice. Failure to respond in either method within 10 days will be interpreted as no objections. Sincerely, I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments. 11 1 - 65 ARIAN LANDO R SIGNATURE) (DATE) By signature below I have agreed to the encroachment of this project within my riparian corridor and have waived the minimum setback of 15 feet from my property line. (RIPARIAN LANDOWNER SIGNATURE) (DATE) e00K L PAGE-.TJQ1 FII..F-- 1. ,D 1115OCT-5 All: lb SET IY 11. JOHES REGISTER OF HESS CAPIJEH COUIITY. H.C. Excise Tax I Recording Time. Hook and Page Tax Lot No.. ....................................... Parcel Identifier No. 03n W9W-OP' ..4¢$- 0$40-59 ... Verified by ....a y.9-.9.4........ ! ......... ..._.......... County on the . 5.... day of .., ' _ ..... _...._.._......_....., 19.QrJ... by..,... ...... ..... gJrr.,7_.......$.r..yQ'....... _.............. ......._... ,....................... ....... ........ ...... ......_..............___._._.._ ...._.._ _ _............ Mail after recording to ....George..-S.,„J,eck.a,p,p.,_...i?_,.9......At?....47.4,_.Elizabe.th... C!..ty-,...NC....27.9A.7.-... _. .......... .... .. ....................I ......... ..... .._.....,_ _.. _.__............. This instrument was prepared by ... George 5...J !gXgPP ,.. ................. ...._ _ _ ..._ __. ..__. __ ......_ _... Brief description for the Index NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this _13th.. day of September ................... _ .... ... , 19 95... , by and between GRANTOR GEORGE S. JACKSON and wife, BLAIR F. JACKSON GRANTEE RICKY LEE EDWARDS and wife, SHEILA RIGGS EDWARDS 864 Sandy Hook Road Shiloh, NC 27974 Enter In appropriate block for each party; name, address, and. If appropriate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of ........... ... ......... ......__.___............. ... , .... ._.Shiloh ---...... _.. .. Township, __......,._Camden_., .... County, North Carolina 'and more particularly described as follows: SEE ATTACHED SCHEDULE A ,U Ll f - -- - - - - � - The property hereinabove described was acquired by Grantor by instrument recorded in ......................... ........ :.......... :. Book 109, Page 626 Camden Public,..Registry. ........................... „_ ............................._............. ...................................I.. A map showing the above described property is recorded in Plat Book ................... :................ page......................... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with. the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinditer stated. Title to the property hereinabove described is subject to the following exceptions: Easement rights as set out in instruments recorded at Book 96, Page 300, & Book 104,-Page 328, & Book 38, Page 171. A 601 utility & passage easement, the boundaries of which are depicted on a plat recorded at Plat Cabinet 2, Slide 79-B. Restrictive Covenants recorded at Book 110; Page 429. Deed of Trust recorded at Book 109, Page 630. IN WITNESS WHEREOF. the craator has hexanto see fits naoa area S.A. or If eo,, /arise, caused his suumMt to be stases in W corporate uame by Its duty authorized officers and its Sell to be Itereanto aff/xed by as -F¢y of 1 zed f Dlr stars, the day and year first above written. aL r ____ ______ _ ____________ ____ _(BRAG) (Corporate lime) 'j G ORGE S. CRSOI :. c _ BY: __________________________________________________________ _ _. Z ____ _____ ___ ______ _ ____---_____ICA __ ______________(SEAL) H BLAIR F. SON ------ ---------------------------- President s ATTEST; ___(BRAE: --------------------------------------------------------- --------------------------------------------------------------- fs ____________________________SeeretarY (Corporate Seal) _ ,7__YY__________________________________________________________(REAL SEAGSTAMP NORTH CAROLINA. 7PO j`��_ _ `y y I, a Notary Public of the Ca-unnity and State alaresaK certify that .VGIII e__me4_L -0— _ 1---------------------------------"--------------------- Grantal a w � neraanally appeared before me thb day 1an�d acknowledcye_d,the a:ee¢tlom of the forerotnB Instt¢menLCwltmats m�, hand and official stamp or seal, this - day at _-S�Zetn�xC--------------------- my commission expires:.__11UP? --_ �S?___--_S.Jn/_S,.dS?_---___-eCWVri_ �1._.$4Y�� Notary Puba SEAL -STAMP NORTR CAROLINA,__-------------------------------- County. I, a Notary Public of the County and State aforesaid, testify that ________________________________________ y personalty carne before me this day and acknowledged Out ___- he Is .... _................ ___... Secretary 1 e ,x------------------------------------------------------- a North Carolina eotporatlon, and that by authority dal u u Schedule A �„p... 11------------------_ George S. Jackson et ux to Ricky Lee Edwards et ux Beginning at a point adjacent to the shores of the Pasquo- tank River in an area now known as Bucko Bay, which beginning point is also adjacent to the southeast corner of lands now or formerly owned by Michael Sutton and wife; thence from said beginning point following the shoreline South 66 degrees 23 minutes East 107.3 feet to a point, then North 45 degrees 51 minutes East 99.6 feet to a point, and South 62 degrees 43 minutes East 50.0 feet to a point, cornering; thence turning from the shoreline and following the dividing line between the proper- ty herein conveyed and property now or formerly belonging to Phillip W. Harrington and wife North 7 degrees 26 minutes 55 seconds East 622.6 feet to a point, cornering; thence North 67 degrees 28 minutes 05 seconds West 103.0 feet to a point, corner- ing; thence North 17 degrees 23 minutes 44 seconds East 780.5 feet to a point, cornering; thence North 80 degrees 13 minutes 20 seconds West 615.76 feet to a point adjacent to lands now or formerly owned by John Jackson; cornering, thence South 3 degrees 51 minutes East 161.44 feet to a point, and South 0 degrees 50 minutes West 299.75 feet to a point, cornering; thence South 60 degrees 22 minutes East 33.6 feet to an existing iron pipe, and South 74 degrees 49 minutes East 275.5 feet to an existing iron pipe, cornering; thence along the eastern margin of lands belong- ing to Michael and Beverly Sutton South 7 degrees 50 minutes fifty seconds West, and South 7 degrees 26 minutes 55 seconds West.640.37 feet to the point and place and beginning, said parcel containing 10.05 acres. For a more exact description, reference is made to that certain -plat entitled in part "Land Surveyed for George Jackson Shiloh Township", dated June 1995, prepared by Henry Cuningham, RLS, a copy of which is recorded at Plat Cabinet 2, Slide-79-B, Camden County Registry, and is incorporated herein by reference. The land described above is identified thereon as lot 1. edwards/deeds/ws N BOOK PAGEI j -------------------------- 194S OCT - 5 All: lb { BET 1 Y H. JONES I REGISTER OF UEEDS CAMUEH COUNTY. N.C. 1 Excise Tax I Recording •rime, Hook and Page Tax Lot No....�.a/� Parcel Identifier No.1�3.-F9!"-•do$'.Q�-�` ��l3•................................................................. Verified by ...9[. .9. 949........M9......................... County on the _:i�... day of -.. .L.......... .........................., by ................... 5.1c r...... ...850............................................ ................................................................. ............ ................. ............ ...... Ri. 4-0 rnP- Mail after recording to ....George.-_S.,•,Jagk4.Q,(l.r-...,R...O...... BQ.X...4.7..4...... Elizabeth ... Cl.tit.r...NC....... 2.7.90.7....... ............................................................................................... . •- - This instrument was prepared by ..... Georgge... S.r.... Jackson ............................................ ............ .. ....... . ................. Brief description for the Index NORTH CAROLINA GENERAL WARRANT' (DEED THIS DEED made this ..1.3th--• day of.50ptembeX................................. 19 RS...... by and betaken GRANTOR GEORGE S. JACKSON and wife, BLAIR F. JACKSON GRANTEE RICKY LEE EDWARDS and wife, SHEMA RIGGS EDWARDS 864 Sandy Hook Road Shiloh, NC 27974 Enter In approprlute black for each party; name, address, and, It appropriate, Character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, sur-cessors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of............................................................ ........Shiloh -- ............. Township, ......... Camden.......•.,....., County, North Carolina and more particularly described as follows: SEE ATTACHED SCHEDULE A A 1 1.!E: +1 F� ta�{( n• f .._..-- ._l,—� U The property hereinabove described was acquired by Grantor by instrument recorded in.................................:..........:..........I...... Book 109, Page 626 Camden Public Registry ................................................................. .................... A map showing the above described property is recorded in Plat Book ................... :................ page ......................... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee Simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the tight to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinditer stated. Title to the property hereinabove described is subject to the following exceptions: Easement rights as set out in instruments 'recorded at Book 96, Page 300, & Book 104,-Page 328, & Book 38, Page 171. A 601 utility & passage easement, the boundaries of which are depicted on a plat recorded at Plat Cabinet 2, Slide 79—B. Restrictive Covenants recorded at Book 110; Page 429. Deed of Trust recorded at Book 109, Page 630. IN WITNESS WHEREOF. the Grantor has hereunto set hie hand and V.I. or If C0134rate. caused his stroment to hefed In Its corporate name by Its duty authorized officers and it, seat to be hereunto affixed by au ity of t d f Olt croft, the day ant � year fit" She written. a. .. (Corporate tr,�m!) '; �._'� �,�' G ORGE S. CRSON c _ BY; __________________________________________________________ __.(SEAL) z BLAIR F. SON _-President ATTEST; V (SBAL; F ____________________________ScetetarY (Corporate 9laq 71 ____________________________________________(SEAL SEAIrSTAMp NORTH 9 1, a Notary Public of the County and State aforesaid, certify thatt-- y -- ------------- Gra R41 N � personally appeared before me this tlilyp 1an�d acknawledC�re-"dt�he eacentlaa of the foregoing Instrument wlOtau m' CYhand and official stamp or seal, this _ l! day of)c \ r ___________________ IB My commission expires: SEAL -STAMP NORTH CAROLINA, 1, a Notary Public of the County and State aforesaid, certify that - Notary Puba ,t personally came before me this day and Acknowledged that ---- he Is ___________________________ Secretary I e Y------------------------------------------------------- a North Carolina cotporatlon, and that by authority dul u �O=_ � L_"Ll J Schedule A -"---- n.nY George S. Jackson et ux to Ricky Lee Edwards et ux Beginning at a point adjacent to the shores of the Pasquo- tank River in an area now known as Bucko Bay, which beginning point is also adjacent to the southeast corner of lands now or formerly owned by Michael Sutton and wife; thence from said beginning point following the shoreline South 66 degrees 23 minutes East 107.3 feet to a point, then North 45 degrees 51 minutes East 99.6 feet .to a point, and South 62 degrees 43 minutes East 50.0 feet to a point, cornering; thence turning from the shoreline and following the dividing line between the proper- ty herein conveyed and property now or formerly belonging to Phillip W. Harrington and wife North 7 degrees 26 minutes 55 seconds East 622.6 feet to a point, cornering; thence North 67 degrees 28 minutes 05 seconds West 103.0 feet to a point, corner- ing; thence North 11 degrees 23 minutes 44_seconds East 780.5 feet to a point, cornering; thence North 80 degrees 13 minutes 20 seconds West 615.76 feet to a point adjacent to lands now or formerly owned by John Jackson; cornering, thence South 3 degrees 51 minutes East 161.44 feet to a point, and South 0 degrees 50 minutes West 299.75 feet to a point, cornering; thence South 60 degrees 22 minutes East 33.6 feet to an existing iron pipe, and South 74 degrees 49 minutes East 275.5 feet to an existing iron pipe, cornering; thence along the eastern margin of lands belong- ing to Michael and Beverly Sutton South 7 degrees 50 minutes fifty seconds West, and South 7 degrees 26 minutes 55 seconds West.640.37 feet to the point and place and beginning, said parcel containing 10.05 acres. For a more exact description, reference is made to that certain plat entitled in part "Land Surveyed for George Jackson Shiloh Township", dated June 1995, prepared by Henry Cuningham, RLS, a copy of which is recorded at Plat Cabinet 2, Slide-79-B, Camden County Registry, and is incorporated herein by reference. The land described above is identified thereon as lot 1. edwards/deeds/ws