Loading...
HomeMy WebLinkAbout118-96 Minor Mod Engelhard Development Corporationass Permit Number. NORTH CAROLINA _ 118-96 F r. ronment and Natural Resources F and*� .•, Y > t � , x esources Commissions r for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 R Excavation and/or filling. pursuant to NCGS 113-229 Issued, to Engelhard Development Corporation; P. O Box 342; Engelhard; NC 27824 authonzm`g development:: Hyde County at Far Creek,`adjacent US 264 m Engelhard, as requested in the permittee's application dated ' letter dated received 1/12/94 including attached work plan drawing dated received 1/12/99. This permit, issued on — 5 — `1 9. is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification authorizes construction"and back fill o_f the bulkhead sections depicted in the revised plans. 2) All bulkhead.construction shall be landward of the previously authorized boardwalk. 3) All bulkhead construction shall occur landward of any coastal wetland vegetation. 4) The bulkhead alignment must be staked by a DCM representative prior to any bulkhead construction. 5) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This pemvl_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. DonnaD.Moffitt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee _ ` Engelli"ard Development Corporation „s , a Permrt 4118-96 ,- ,- Page 2 2` of ADDITIONAL CONDITIONS 6) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 7) - The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by,department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead Wall,- riprap, deadmen cables, etc. This permit does riot authorize any excavation waterward of the approved alignment. 8) The fill material will be clean and free of any pollutants, except in trace quantities. 9) All backfill will be obtained from an highground source and confined behind the permitted bulkhead. 10) This minor modification must be attached to the original of Permit No. 118-96 which was issued on 8/2/96, as well as the minor modification of 9/23/97, and all documents must be readily available on site when a Division representative inspects the project for compliance. All stipulations and conditions of the active permit remain in force under this. modification unless altered herein. NOTE: The permittee is advised to contact the NC Division of Water Quality at (919) 733-1786 to determine whether the authorized activity will require a General Water Quality Certification. Pei ciftClass MODIFICATI Sii w K .a UMINOR=, c ttl. PennitNumbar. A 118-96 esources i J for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or fdling.pursuant to NCGS 113-229 Issued to Engelhard Development Corporation, P. O. Box 342; Engelhard, NC 27824 iiiFaring development nt US264 in Engelhard auihor, -, as requested in the pennittee's application dated ` `- letter dated received 1/12/99 . including attached work plan drawing dated received 1/12/99. This permit, issued on -P— 5 — 9 9 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification authorizes construction and backfill of the bulkhead sections depicted in the revised plans. 2) All bulkhead construction shall be landward of the previously authorized boardwalk. 3) All bulkhead construction shall occur landward of any coastal wetland vegetation. 4) The bulkhead alignment must be staked by a DCM representative prior to any bulkhead construction. 5) The bulkhead must be constructed prior to any backfilling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An -appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Donna D.Moffmtt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Engelhard Development Corporation t - ;'Permit 9118-96 Page 2 of 2 ADDITIONAL CONDITIONS 6) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel: No excavation is permitted, except for Y that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. c: 8) The fill material will be clean and free of any pollutants, except in trace quantities. 9) All backfill will be obtained from an highground source and confined behind the permitted bulkhead. 10) This minor modification must be attached to the original of Permit No. 118-96 which was issued on 8/2/96, as well as the minor modification of 9/23/97, and all documents must be readily available on site when a Division representative inspects the project -for compliance. All stipulations and conditions of the active permit remain in force under this modification unless altered herein. NOTE: The permittee is advised to contact the NC Division of Water Quality at (919) 733-1786 to determine whether the authorized activity will require a General Water Quality Certification. r7S.alf ff( �;'j 0 sv - ff )fwvd ". b,').,2LN W QD iu',n �� S<aCo 4�,�1,�� ] 01 1, r imuhnst4T S JD'4Q , 4 ✓l� ��J� /4!3 va,t� {.Sa`d _IcQ did T r 171a'vI kvj i NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT February 8, 1999 Engelhard Development Corporation P. O. Box 342 Engelhard, NC 27824 Dear Sir The enclosed permit confitutes authoriza5onunderthe CoasW AreaManagementAM andwhereapplicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Ifyou object to the pemilt or any ofthe conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the mattermustbe resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The projectplan is subjectto those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, 1 j hn R. Parker, Jr. Major Permits Processing rdinator JRPJr/amw Enclosure P.O. BOX 27687, RALEIGH, INC 27611-7687 / 272S CAPITAL BLVD., RALEICH, NC 27604 PHONE 919-733-2293 FAX 919-733-1495 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLED/10% POST -CONSUMER PAPER sisn Division of Coastal Management Application Processing Notes Applicant: Deadline: Date/Time: Message: izeV�Bu/. 5, M14/ 1 'S d C'Y.l nt 1a �u 5* /P nP W a 1. ��N w/ 'trace 7zaappbc,,7 f5 pdv,sed to (007� (.t DU/ 0 fa - Set -.,( 401 , S /I/PCPSSG�y RFOEIVED JAN 12 1999 MEMORANDUM '30ASTALMANAGEMENT TO: THROUGH: John Parker �ry ri Terry Moore FROM: Steve Trowe113T% DATE: 7 January 1999 SUBJECT: Minor modification of CAMA Permit No. 118-96 -9 9 -A % , 1', * Major CAMA permit # 118-96 was issued to Englehard Development Corporation on 8 August 1996 for the construction of 1,314' of boardwalk adjacent Far Creek off US 264 in Englehard. It was modified once to include 564' of bulkhead on 23 September 1997. Englehard Development Corporation would like to include an additional 850' of bulkhead landward of the permitted boardwalk. I have submitted to the Division of Water Quality a copy of the request letter and site plan and requested that they respond to you. The $50 check remitted to cover the cost of the minor modification has been deposited. I recommend this permit to be modified to include the bulkhead work with the following conditions: 1) This permit modification authorizes construction and backfill of the bulkhead sections depicted in the revised plans. 2) This permit modification must be attached to the last modification and to the original of Permit No. 118-96 and all documents must be readily available on site when a Division representative inspects the project for compliance. 3) The bulkhead alignment must be staked by a DCM representative prior to any bulkhead construction. 4) The bulkhead must be constructed prior to any backfilling activities. 5) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 6) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation water -ward of the approved alignment. 7) The fill material will be clean and free of any pollutants, except in trace quantities. Metnt— c s, org 8) All backfill will be obtained from an highground source and confined behind the permitted bulkhead. An 9) , Bulkhead construction will occur landward of any coastal wetland vegetation. L I . ENGELHARD DEVELOPMENT CORPORATION P. O. BOX 342 ENGELHARD, NORTH CAROLINA 27824 Mr. Terry Moore Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 Dear Mr. Moore, The Engelhard Development Corporation requests our second minor modification to Major CAMA Permit No. 118-96. We need to revise the original footage of waterfront boardwalk up to 1414 feet rather than 1314 feet. The change is the result of a more accurate measurement on the ground for Phase U. Phase I is complete at 564 feet as shown on the attached map. We would also like to allow for the installation of bulkhead on the landward side of the boardwalk in Phase II as we did in Phase I under modification no. 1. Let us know if there are wetland areas we need to avoid with this bulkhead. -We have received a CAMA access grant to proceed with Phase II. Jane Daughtridge in your office is helping us with implementation of the grant. We would like to begin construction during January or February so that the boardwalk will be ready for our summer and fall festivals. Will you please help us stake the alignment for the boardwalk in early January. Call me at 925-4301 to set up an appointment. Enclosed is a $50 check for the minor modification. Thank you for your help with this project. Sincerely, Tommy Etheridge cc: Jane Daughtridge Rodney Johnson F RECEIVE® JAN 12 1999 COASTAL MANAGEMENT Y,ty Ab LorvarrorY,S 1. �^oirl z rlC D'�1' Re54 {.,en. 'S.Er.jr_l1Mir� �Ia1sF i 3o,les-Luumme. 5 Ikrir igrr- 5'rtp 4. PrrGty„e 51ou:. 1 R.S. 5p lKcrs Uo/e�-1 S\we_ 8 $o,ber S`rol+ 9 1?e+oK S\ant �xl•Idt,K� 'Ua S\o,or�c iu;ldar� 11 U\.,4 Video Slam 0 > ` 1 m�hz r� Z m > Z � m _ m m \ W V\ Ca N Vnt rC,a d ) ,e `la dd-1 /V, C FAWs —, r cbwpicrc,a CraVA 0 — PJO5( I CC �l L�t) — S4rfed .4E — P-s 6 feet Pro®o 5c J,C,I/c /''_ /So( Permit Class MODIFICATION/MINOR STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission hermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Engelhard Development Corporation, P. O. Box 342, Engelhard, NC 27824 Permit Number 118-96 authorizing development in Hyde County at Far Creek, adjacent US 264 in Engelhard , as requested in the pennittee's application dated including attached work plan drawing dated received 1/12/99. letter dated received 1/12/99 This permit, issued on g�— 5 — 9 9 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification authorizes construction and backfill of the bulkhead sections depicted in the revised plans. 2) All bulkhead construction shall be landward of the previously authorized boardwalk. 3) All bulkhead construction shall occur landward of any coastal wetland vegetation. 4) The bulkhead alignment must be staked by a DCM representative prior to any bulkhead construction. 5) The bulkhead must be constructed prior to any backftlling activities. (See attached sheet for Additional Conditions) This permit -action may be appealed by the pemtittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Donna D.Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pernittee ' Engelhard Development Corporation s - permit #118-96 Page 2 of 2 ADDITIONAL CONDITIONS 6) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 7) ' The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or ved by department personnel.= No excavation is permitted, except for other suitable materials appro that which -may be required for the construction of the bulkhead wall,"riprap, deadmen cables, etc. ', This periiut does not authorize any excavation waterward of the "approved alignment. 8) The fill material will be clean and free of any pollutants, except in trace quantities. 9) All backfill will be obtained from an highground source and confined behind the permitted bulkhead. 10) This minor modification must be attached to the original of Permit No. 118-96 which was issued on 8/2/96, as well as the minor modification of 9/23/97, and all documents must be readily available on site :when ,.a Division representative inspects the project for compliance. All stipulations and conditions of the active permit remain in force under this, modification unless altered herein. NOTE: The permittee is advised to contact the NC Division of Water Quality at (919) 733-1786 to determine whether the authorized activity will require a General Water Quality Certification. Vit,i • fj UnrArrvirY,s t IIC pcil' �e54 Ri�cn. �. Er.jelMitl F1or,sV- i 3ones Luum"m S 1�.11r CgYL 5`rc(� u, (pnllque, Stu;.,+ p� pl p1'1 .r]1. U fl[]xx- Mrop 1 q NOA S\mnc 'Qx •,Idi r1 10 C. r dAdl* G.Ws Mum VDa S\oIor� \uiv%,ris 11 l nol s \1040 5ior a I Gnn t ftpp�� 1 m m ZSD LD < � LD LO m v �rd e e l �7� ��; N1 C , "1q 4 f2es`a 4TT Ai CaN��VrI� �e51d L,ti`A o, I Cgi.�.nercfa 'fie .Sr-41t