HomeMy WebLinkAbout14-96 MM The Harbor at King's LynnPermit Class
MODIFICATION/MAJOR
Permit Number
14-96
STATE OFNORTH-CAROLINA
Department of Envimrinie`.nt,-Health & Natural Resources
and,-',:,
Coastal:R'esources Commission
_ Major Development in ^an Area of-Env_ir`orimental Concern
pursuant to NCGS 113A'=1'18,_'" ti
Excavation and/or filling pursuant to NCGS 113-229
Issued to The Harbor at King's Lynn - Phase II, 20 E. 2nd Street, Ocean Isle Beach, NC 28469
authorizing development in
Brunswick
County at Lockwood Folly Sound, The Harbor at King's Lynn
S/D -,as requested in the permittee's application dated 6/25/96 including attached workplan
drawing dated revised 9/11/96, and attached AEC Hazard Notice dated 7/19/95.
This permit, issued on \\ — \. — C� 1. , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This modification authorizes the platting of 32 additional single-family lots, the extension of
water lines and the construction of a cul-de-sac to serve the Harbor at King's Lynn Phase II
development. This major modification must be attached to the original of permit No. 14-96,
which was issued on 1/26/96, and all documents must be readily available on site when a
Division representative inspects the project for compliance.
Stormwater Management
2) The Division of Water Quality approved this project under stormwater management rules of the
Environmental Management Commission on June 20, 1996. Any violation of or deviation from
the plan approved by the D. W.Q. will be considered a violation of this CAMA permit
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel wherf the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the ppermit expires on
December 31. 1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEBNR and the
Chairman of the Coastal Resources Commission.
Roger W. Scheeler, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
The Harbor at King' Lynn - Phase H Permit 914-96
Page 2 of 2
ADDITIONAL CONDITIONS
Sedimentation and Erosion Control
3) In order to protect water quality, runoff from construction must not visibly increase the amount
of suspended sediments in adjacent waters.
4) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain
erosion within thirty days of project completion.
General
5) No public funds may be utilized for the construction or perpetual maintenance of the water line
'and associated facilities. This condition shall remain in force throughout the life of this project.
6) Prior to the initiation of construction, the permttee shall contact the NC Department of
Transportation at (910) 251-5727 to ensure that any required NCDOT approvals are obtained.
NOTE: Subsequent residential development of individual lots within any Areas of Environmental
Concern will require additional permitting. Contact a representative of the Division at
(910) 395-3900 prior to any such development for this determination.
NOTE: Plans and specifications for all water system improvements must be approved by the
Division of Environmental Health prior to the reward of a contract of the initiation of
construction (as required by 15A NCAC 18A.0300, et. seq.). For information, contact the
Public Water Supply Section at (919) 733-2460.
NOTE: The applicant is advised to contact the local health department regarding their
requirements for septic tank installations (as required by 15A NCAC 18A.1900, et. seq.).
For information concerning septic tank and other on -site waste disposal methods, contact
the Brunswick County Health Department.
NOTE: The permiee is requested to contact the Public Health Pest Management Section at (919)
733-6407 to discuss mosquito control measures.
NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No.
960897.
Permit Class
MODIFICATION/MAJOR
Permit Number
14-96
STATE OF NORTH CAROLINA
Department of Environment, Hea1tH 8c Natural Resources
;.Y.;-:;:
Coastal Resources Commission
V. PrM
for:
%
Major Development in an Area of Env_ifomnental Concern
pursuant to NCGS 113A-118._
Excavation and/or filling pursuant to NCGS 113-229
Issued to The Harbor at King's Lynn- Phase H, 20 E. 2nd Street, Ocean Isle Beach, NC 28469
authorizing development in Brunswick County at Lockwood Folly Sound, The Harbor at King's Lynn
S/D as requested in the permittee's application dated6/25/96 including attached workplan
drawing dated revised 9/11/96, and attached AEC Hazard Notice dated 7/19/95.
This permit, issued on \\ — b — 9 �= , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special- conditions and notes set forth below. Any violation of these terms may-
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This modification authorizes the platting of 32 additional single-family lots, the extension of
water lines and the construction of a cul-de-sac to serve the Harbor at King's Lynn Phase II
development. This major modification must be attached to the original of permit No. 14-96,
which was issued on 1/26/96, and all documents must be readily available on site when a
Division representative inspects the project for compliance.
Stormwater Management
2) The Division of Water Quality approved this project under stormwater management rules of the
Environmental Management Commission on June 20, 1996. Any violation of or deviation from
the plan approved by the D.W.Q. will be considered a violation of this CAMA permit
(See attached sheet for Additional Conditions)
This permiLaction may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the ppermit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
Roger . Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
The Harbor at King' Lynn - Phase H Permit 914-96
Page 2 of 2
ADDITIONAL CONDITIONS
Sedimentation and Erosion Control
3) In order to protect water quality, runoff from construction must not visibly increase the amount
of suspended sediments in adjacent waters.
4) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain
erosion within thirty days of project completion.
General
5) No public funds may be utilized for the construction or perpetual maintenance of the water line
and associated facilities. This condition shall remain in force throughout the life of this project.
6) Prior to the initiation of construction, the pennittee shall contact the NC Department of
Transportation at (910) 251-5727 to ensure that any required NCDOT approvals are obtained.
NOTE: Subsequent residential development of individual lots within any Areas of Environmental
Concern will require additional permitting. Contact a representative of the Division at
(910) 395-3900 prior to any such development for this determination.
NOTE: Plans and specifications for all water system improvements must be approved by the
Division of Environmental Health prior to the reward of a contract of the initiation of
construction (as required by 15A NCAC 18A.0300, et. seq.). For information, contact the
Public Water Supply Section at (919) 733-2460.
NOTE: The applicant is advised to contact the local health department regarding their
requirements for septic tank installations (as required by 15A NCAC 18A.1900, et. seq.).
For information concerning septic tank and other on -site waste disposal methods, contact
the Brunswick County Health Department.
NOTE: The permittee is requested to contact the Public Health Pest Management Section at (919)
733-6407 to discuss mosquito control measures.
NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No.
960897.
Permit Number
Permit Class
MODIFICATION/MAJOR
STATE OF NORTHCAROLINA
Department of Environment;�iealtlf`'& Natural Resources
_,'and;
Coastal Resources,Commi'ssion
g
Major Developmenrih an Areaiof Environmental Concern
pursuant to NCGS 113A-118 :. -- ,
_ Excavation and/or filling'puisiiam to NCGS 113-229
14-96
Issued to The Harbor at King's Lynn - Phase H, 20 E. 2nd Street, Ocean Isle Beach, NC 28469
authorizing development in Brunswick County at Lockwood Folly Sound, The Harbor at King's Lynn
SID as requested in the permittee's application dated 6/25/96 including attached workplan
drawing dated revised 9/11/96, and attached AEC Hazard Notice dated 7/19/95.
This permit, issued on \\ — b — 9 1, , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This modification authorizes the platting of 32 additional single-family lots, the extension of
water lines and the construction of a cul-de-sac to serve the Harbor at King's Lynn Phase II
development. This major modification must be attached to the original of permit No. 14-96,
which was issued on 1/26/96, and all documents must be readily available on site when a
Division representative inspects the project for compliance.
Stormwater Management
2) The Division of Water Quality approved this project under stormwater management rules of the
Environmental Management Commission on June 20, 1996. Any violation of or deviation from
the plan approved by the D.W.Q. will be considered a violation of this CAMA permit
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the ppermit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
Roger W. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Petmittee
The Harbor at King' Lynn - Phase II Permit #14-96
Page 2 of 2
ADDITIONAL CONDITIONS
Sedimentation and Erosion Control
3) In order to protect water quality, runoff from construction must not visibly increase the amount
of suspended sediments in adjacent waters.
4) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain
erosion within thirty days of project completion.
General
5) No public funds may be utilized for the construction or perpetual maintenance of the water line
and associated facilities. This condition shall remain in force throughout the life of this project.
6) Prior to the initiation of construction, the permittee shall contact the NC Department of
Transportation at (910) 251-5727 to ensure that any required NCDOT approvals are obtained.
NOTE: Subsequent residential development of individual lots within any Areas of Environmental
Concern will require additional permitting. Contact a representative of the Division at
(910) 395-3900 prior to any such development for this determination.
NOTE: Plans and specifications for all water system improvements must be approved by the
Division of Environmental Health prior to the reward of a contract of the initiation of
construction (as required by 15A NCAC 18A.0300, et. seq.). For information, contact the
Public Water Supply Section at (919) 733-2460.
NOTE: The applicant is advised to contact the local health department regarding their
requirements for septic tank installations (as required by 15A NCAC 18A.1900, et. seq.).
For information concerning septic tank and other on -site waste disposal methods, contact
the Brunswick County Health Department.
NOTE: The permittee is requested to contact the Public Health Pest Management Section at (919)
733-6407 to discuss mosquito control measures.
NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No.
960897.
Form DCM-MI'-1
- -
A PF kJJN1\ JUL 10 1996
DIVISION OF
(Co be completed by all applicants) -O ASTAL MANAGEMENT
b. City, town, community or landmark
Town of Long Beach
1. APPLICANT
c. Street address or secondary road number
69th Place West
a. Landowner:
_
d. Is proposed work within city limits or planning
Stuart Cooke & John Sutton
Name jurisdiction? X Yes No
Address 20 E.
2nd Street e. Name of body of water nearest project (e.g. river,
creek, sound, bay) Lockwood Folly Sound
Cit Ocean Isle
y
Beach State NC
Zip 28469
Day Phone (910)579-3535
3. DESCRIPTION AND PLANNED USE
Fax (910) 579-2121
OF PROPOSED PROJECT
b. Authorized Agent:
Name Jay R.
Houston, P.E. a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities. 61-waterline
Address Post Office Box 2927 Extension to existing 12" waterlines
fire hydrant Pavpmant
wZvalvca and
City Shallotte State NC extension 4 ul-d -actroad conqtruction
Zip 2p459 Day Phone (910) 754-6324
Fax
(910)754-2121
c. Project name (if any) Harbor �5) King s Lynn
Phase II
NOTE: Pernct Nil! be issued in name of lmdo r(s), 4 door
project name.
2. LOCATION OF PROPOSED
PROJECT
a. County Brunswick
b. Is the proposed activity maintenance of an existing
project, new work, or both? New Work
c. Will the project be for public, private or commercial
use? Private
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. Construction will be
by conventional means, Waterline will be
installed 3' deep -(please see attached
plans)
Form DCM-NIP-1
m. Describe existing wastewater treatment facilities.
4. LAND AND WATER c„ �,r On -site septic tanks
CHARACTERISTICS ID
a. Sze of entire tract
15.16 acres, II JUL 1 O 1996n. Describe location and type of discharges to waters
U!Viblu" OF of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) 5OX400 !tqp�5d1iL MAN AGEMENWastewater, industrial/commercial effluent, "wash
down" and residential discharges.) Nnna
c. Approximate elevation of tract above MHW or
NWL ± 6- MSL
d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source.
Newhan & Corolla Complex sands Long Beach Municipal System via
Brunswick County Water System
e. Vegetation on tract
Maritime shrubs
f. Man-made features now on tract
Existing buried 12" waterline
g. What is the CAMA Land Use Plan land
classification of the site? (Coosa!, the lost la�d use pl=.)
Conservation Transitional
_Developed Residential Community
Rural Other
h. How is the tract zoned by local government?
Residential (R-1)
i. Is the proposed project consistent with the applicable
zoning? x Yes No
(Artach zoning wmpUance urdfim c, if applimble)
j. Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X No
Are there wetlands on the site? _ Yes X No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Awch documenmdon, if Mailable)
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Form DCM IMP-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed 32— Single—family
Residences
b. Number of lots or parcels 32
c. Density (give the number of residential units and the
units per acre) 32 units on 15.16 acres
2.11 units/acre
d. Size of area to be graded, filled or disturbed
including roads, ditches, etc. waterline
5' wide x1200=6000 ft
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? Yes X No
If yes, date submitted
oIR(OMHVI
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
h. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
X Yes No
If yes, date submitted 4/30/96
Describe proposed method of sewage disposal.
On site septic tanks, 14 permits
issued. 32 Permits pending
Have the facilities described in Item i. above
received state or local approval? No
(Anaeh appropriate doc .entauor)
Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial/commercial effluent,
"wash down" and residential discharges).
Describe proposed drinking water supply source
(e.g. well, community, public system, etc.)
Town of Lona Beach via Brunswick Co.
in. Will water be impounded? Yes _7x No
If yes, how many acres?
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces. n. If the project is a oceanfront development, when
Asphalt, Concrete or marl will be used was the lot(s) platted and recorded? nandinrr
for driveways.
Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. Less than 1%
Harbor at Kincr'sLynn
Applior
ell Name
S" ture �[(�
K -2s- 9 6
Date
Revised 03195
Form DCM-MP-1
J
JUL 10 1990
DIVISIOiN OF
COASTAL MANAGEMENT
site. Include highway or secondary road (SR)
numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
• A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Mr. Jerry A. Walters, Manage
Address Town of Tnno Rearn
*Phbbb 4601 E. Oak Tsland Dr -
Name Mrs Myra Teasley
Address 271� Town Edge Ct.
py�t Raleigh, NC 27612
Name
Address
Phone
• A list of previous stale or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
None
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project -
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 24 day of June , 19-g5_.
Print Name Joh/n SUL
/
Signature
weer or AwhoriZed Ag51�
Please indicate attachments pertaining to your proposed
project.
DCM MP-2
Excavation and Fill Information
_
X DCM MP-3
Upland Development
X DCM MP-4
Structures Information
DCM MP-5
Bridges and Culverts
_
DCM MP-6
Marina Development
NOTE. Please sign and date each attachment in the
space provided at the bottom of each form.
AEC HAZARD NOTICE
Project Is In An: _Y_ Ocean Erodible Area _X_ High Hazard Flood Area --F_ Inlet Hazard Area
Date Lot Was Platted: I `�iS
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on building standards, oceanfront
setbacks and dune alteration are designed to minimize, but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
2 feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as,J�Sfeet landward in a major storm.
The flood waters in a major storm are predicted to be about
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for developmentin this
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
,Nvl fZ_ NS-1 nw�t e i l M &(
Local Permit Officer
To Rig � `7
Address
1 nV� rJi �2 a� h N c 2_,�Aq6
Locality
a-78-5(6o.5
Phone
n
JUL u 7 1995
DIVISION OF
COASTAL MANAGEMENT
Revised 11193
State of North Carolina
Department of Environment,
Health and Natural Resources 4 •
Division of Coastal Management _
James B. Hunt, Jr., Governor �
Jonathan B. Howes, Secretary E)E H N FR
Roger N. Schecter, Director
Novemberr 7, 1996
The Harbor at King's Lynn
Phase II
20 E. 2nd Street
Ocean Isle Beach, NC 28469
Dear Sir:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,
the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is
retained by you and it must be available on site when the project is inspected for compliance. Please sign both the
original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1
or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this
decision on your permit. You should also be aware that if another qualified party submits a valid objection to the
issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved.
If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all
permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we request that
you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning
permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for
assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal
resources.
Very sincerely,
John . Parker, Jr.
Major Permits Processing Coordinator
JRP:jr/amw
Enclosure
P.O. Box 27687, Ntv«,CAn
FAX 919-733-1495
Raleigh, North Carolina 27611-7687 Equal Opportunity/Affirmative Action Employer
Voice 919-733-2293 50% recycled/10% post -consumer paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Stuart Cooke & John Sutton/Harbor at Kings Lynn -Phase II
Major Modification of State Permit #14-96
2. LOCATION OF PROJECT SITE: King's Lynn Dr. and 69th Place West, west end of Long
Beach.
Photo Index - 1995:8-77, B-D, 2-8 1989: 184-24, B-E, 3-8 1984: 11-118, E-G, 11-
16
State Plane Coordinates - X: 2234200 Y: 60800
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/10/96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9/11/96
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Long Beach
Land Classification From LUP - Developed Residential
(B) AEC(s) Involved: OH
(C) Water Dependent: No
(D) Intended Use: Single-family residential
(E) Wastewater Treatment: Existing - None
Planned - Individual septic tank systems
(F) Type of Structures: Existing - None
Planned - Single-family residences
(G) Estimated Annual Rate of Erosion: 2 ft./yr.
Source - LTAAER Small Scale Map-Pg. 2 of 14
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
03) Non -Vegetated Wetlands
(C) Other
Highground disturbance
12,410 sq.ft.
(D) Total Area Disturbed: 12,410 sq.ft.
(E) Primary Nursery Area: NO
(F) Water Classification: Atlantic Ocean - SB, Eastern Channel - SA Open: Yes
8. PROJECT SUMMARY: The applicant is requesting to modify to his existing State Permit
#14-96, to include Phase II, of the Harbor at Kings Lynn Subdivision. Phase II would include
the platting of 32 additional single-family lots, and the extension of water lines and construction
of a cul-de-sac to serve the development.
11
!'i'he Harbor at King's Lynn -Phase H
Page 2
9. PROJECT DESCRIPTION
The project is the proposed Phase II of Harbor at King's Lynn Subdivision that was previously
permitted by State Permit #14-96, in January 1996. The project site is located adjacent to Kings Lynn
Drive (SR 1828) and West Beach Dr., at the west end of Long Beach, in Brunswick County, North
Carolina. The 15.16 acre tract is situated, both east and west of the fourteen (14) Phase I lots. The
property is bordered by the Lockwood Folly Sound (also known as Eastern Channel) to the north,
Lockwood Folly Inlet to the west, and the Atlantic Ocean to the south. The existing Kings Lynn Drive
runs through the eastern portion of the property, and adjacent to the northern edge of the western
section of the proposed subdivision expansion. There is an existing 12 inch water line within the Kings
Lynn Drive right-of-way which continues to the west, under Lockwood Folly Inlet to Holden Beach.
The road right-of-way separates the tract from MHW on the northwestern side of the property, but the
highground widens to both sides of Kings Lynn Drives in the eastern section. Topography in the eastern
section consists of large dunes on the north side of the road, with elevations up to 29 feet mean sea
level (MSL). On the north side of the property, these dunes drop sharply to the shoreline of Eastern
Channel/Lockwood Folly Sound. Along the shoreline, there is a border of coastal wetland vegetation.
High coastal marsh species observed along this transition from highground were; Groundsel Bush
(Baccharris halimifolial, Marsh Elder (Iva fmtescens), Salt Meadow Grass (Spartina patensl, Spike
Grass (Distichlas spicata), Sea Ox-eye Borrichia frutescensl, Sea Lavender (Limonium spp.), and
Saltwart (Salicornia spp.). The high marsh transitions into regularly flooded, Smooth Cordgrass
(Snartina alterniflora) marsh, which is approximately 400 feet wide. On the south side of the road, the
topography is relatively low and flat, at approximately 6-10 feet elevation MSL. This area may have
been used as a sand barrow sight at some time in the past. Both areas appear to be typical Newhan fine
sand/dune systems, with typical dune vegetation, predominately, Sea Oats, Smilax, Yucca, other dune
grasses, Wax Myrtle and an occasional Red Cedar and Dune -Elder (Iva imbricatal.
The waters of Lockwood Folly Sound are classified SA, by the N.C. Division of Environmental
Management, and are OPEN to the harvest of shellfish., Portions of the tract are within the Ocean
Erodible and Inlet Hazard areas of the Ocean Hazard Area of Environmental Concern, as designated
by the North Carolina Coastal Resources Commission. The Long Term Average Annual Erosion Rate
is 2 ft./yr. on the west end of Long Beach. Historically, the west end of Long Beach has experienced
significant erosion. Originally, the road made a complete loop around the end of the island. The road
was over -washed a number of times during the 1960's and 1970's. After it was washed out by a storm
in 1979, NCDOT never rebuilt the'road. In recent years, Lockwood Folly Inlet has been migrating
west, and the west end of Long Beach has been accreting, with dune development and natural vegetation
colonization, 800 to 1200 feet west and south of it's 1979 location.
The applicants have subdivided the Harbor at Kings Lynn subdivision, Phase H property, into 32
additional single-family lots (15-46). Lots 15-39 are located east of the Phase I tract. Lots 40-46 are
located west of the original Phase I section (Lots 1-14). Individual septic tank systems would provide
wastewater disposal for each residence. The applicants propose to extend the potable water line that
was approved for Lots 8-14, to also, serve Lots 40-46. The established utility easement, adjacent to
the road, 20 feet wide, along the north side of Lots 1-8, would continue through Lots 40-46. The
waterline extension would be approximately 200 feet long and six (6) inches in diameter. Similarly, a
waterline extension is proposed for Lots 25-29, on West Beach Drive. This line would be 130 feet long
and 4 inches in diameter. The water lines would be installed by the applicant and ownership
Cooke/Sutton
The Harbor at Kings Lynn -Phase 11
Page 3
subsequently transferred to the subdivision property owners for long term maintenance and/or repair.
A paved cul-de-sac, (King's Lynn Court), off King's Lynn Drive, is proposed to access Lots 15-18. A
two (2) inch waterline would be installed within this right-of-way to serve these lots.
10. ANTICIPATED IMPACTS
The installation of the proposed waterline extensions and cul-de-sac would disturb approximately 12,410
square feet of highground area. Additional soil disturbance and creation of impervious surface area
would occur with the subsequent construction of single-family houses, by individual lot owners. There
may be substantial loss of the high dune area north of Kings Lynn Drive, as the area is outside of the
Ocean Hazard AEC, and lot owners will be able to modify their landscapes as they so choose.
Submitted by: E.F. Brooks Date: 9/14/96 Office: Wilmington
The Harbor at King's Lynn Phase II
Project Narrative
Coastal Area Management Act Permit Applic
(Modification of Permit No. 1496)
JUL 10 1996
Introduction DIVISION OF
COASTAL MANAGEMENT
Phase II of The Harbor at King's Lynn is proposed to have 32 lots which
will be numbered in compatibility with the Phase I section of the subdivision.
The proposed Phase II lots vary in width dimension from approximately 51 feet
to approximately 104 feet and in depth from 520 feet to approximately 136 feet.
The proposed lots are located adjacent to each end of Phase I, directly across
the roadway (north) of the Brunswick County Water Booster Pumping Station,
and north of West Beach Drive. The project for Phase II consists of the
addition of three six-inch waterlines, an extension of the asphalt roadway at
the west end of King's Lynn Drive, and the construction of an asphalt cul-de-
sac roadway, King's Lynn Court. It is our intent, with the submittal of
NCDEHNR forms DCM-MP-1 and DCM-MP-3, that a modification be made to
Permit Number 1496, issued on January 26, 1996 by the NCDEHNR for the
project associated with Phase I of The Harbor at King's Lynn, to include Phase
II. A brief description of each of the items associated with the project for Phase
II is listed below:
A. Six-inch waterlines
A six-inch waterline approximately 420 feet in length and located within
the Department of Transportation (D.O.T) Right of Way, will be connected to
the existing six inch line at the west end of West Branch Drive. A Right of Way
Encroachment Agreement has been submitted to the D.O.T. for this area.
A second six-inch waterline will be a continuation of the six-inch water
line that was previously permuted for Phase I of The Harbor at King's Lynn.
Approximately 400 feet of six-inch waterline will be added to the 360-foot water
line described in the Coastal Area Management Act (C.A.M.A.) Permit # 1496 for
The Harbor at King's Lynn. This additional waterline will be located at the
west end of King's Lynn Drive and will be constructed within the 20 foot
easement located on the north east end of Lots 40 through 46.
A third six-inch waterline will connect to the existing twelve -inch
waterline located within the D.O.T. Right of Way for King's Lynn Drive and will
be used to service lots 15 through 19. The six-inch line will be constructed
within a twenty -foot easement located on the north-east end of lots 15 through
19.
B. Roadway extension
The asphalt roadway of King's Lynn Drive will be extended westerly
approximately 210 feet in order to provide paved access to Lots 44 through 46
of Phase II of The Harbor at King's Lynn. The roadway extension will be 20
feet in width and will be located in the approximate center of the D.O.T. Right \ j
of Way.
C. Roadway construction
King's Lynn Court will be an asphalt roadway 20 feet in width,
approximately 190 feet in length, originating from King's Lynn Drive and
terminating with a 45-foot radius cul-de-sac. King's Lynn Court will be located
approximately 400 feet north west from the intersection of 69th Place West and
King's Lynn Drive and will intersect the southern edge of King's Lynn Drive.
The roadway will be constructed in accordance with the current construction
standards as defined by the NCDOT.
A site development plan for Phase I and Phase II of The Harbor at King's
Lynn was submitted to the Division of Environmental Management on April
30, 1996 for approval.
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
Form DCM-MP-1 I Tv VIM D
APPI JUL 10 1996 "LICA"d"A
DIVISION OF
(To be completed by all applicants) COASTAL MANAGEMENT
1. APPLICANT
a. Landowner:
Name Stuart Cooke & John Sutton
Address 20 E. 2nd Street
City Ocean Isle Beach State NC
Zip 28469 Day Phone (910)579-3535
Fax (910)579-2121
b. Authorized Agent:
Name Jay R. Houston, P.E.
Address Post Office Box 2927
City Shallotte
State NC
Zip 2?459 Day Phone (910) 754-6324
Fax
(910)754-2121
c. Project name (if any) Harbor Q Kina Is Lvnn
Phase II
No7E. Permit wits be issued in come of 1=do r ft)- and/or
project name.•
2. LOCATION OF PROPOSED
PROJECT
b. City, town, community or landmark
Town of Long Beach
c. Street address or secondary road number
69th Place West
d. Is proposed work within city limits or planning
jurisdiction? X Yes No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) Lockwood Folly Sound
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities. you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities. 6°waterline
Extension to existing 12" waterlines
vr1s tc> s and fire hydrant Pavomant
extpnqion & 631 de car road construction
b. Is the proposed activity maintenance of an existing
project, new work, or both? New Work
c. Will the project be for public, private or commercial
use? Private
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. Construction will be
by conventional means, Waterline will be
installed 3' deep -(please see attached
plans)
a. County Brunswick
Form DCM-M1'-1
in. Describe existing wastewater treatment facilities.
4. LAND AND WATER D 190 TRH7Tgo -site se tic tanks
CHARACTERISTICS
15.16 acres, II JUL 10 1996n. Describe location and type of discharges to waters
a. Size of entire tract
" OF of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) 50X400 (DOA5F'14L MANAGEMEN%iastewater, industrial/commercial effluent, "wash
down' and residential discharges.) Nnna
c. Approximate elevation of tract above MHW or;
NWL t 6' MSL
d. Soil type(s) and texture(s) of tract
Newnan g Corolla Complex sands
e. Vegetation on tract
Maritime shrubs
f. Man-made features now on tract
Existing buried 12" waterline
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land we Plan.)
Conservation Transitional
x_ Developed Residential Community
Rural Other
It. How is the tract zoned by local government?
Residential (R-1)
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(Attach Zoning compliance eerdficate, if applicable)
Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X No
Are there wetlands on the site? _ Yes X No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Anach documentation, if available)
o. Describe existing drinking water supply source.
Long Beach Municipal System via
Brunswick County Water System
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said. property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7.1.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Form DCM ,Y1P-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed 32- Single-family
Residences
b. Number of lots or parcels 32
c. Density (give the number of residential units and the
units per acre) 32 units on 15.16 acres
2.11 units/acre
Size of area to be graded, filled or disturbed
including roads, ditches, etc. waterline
5' wide x1200=6000 ft
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? 'Yes X No
If yes, date submitted
r1o'E"'VIED
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
h. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
X Yes No
If yes, date submitted - - 4/30/96
1. Describe proposed method of sewage disposal.
On site septic tanks, 14 permits
issued: 32 Permits pending
j. Have the facilities described in Item L above
received state or local approval? No
(Aaach appropriate docamcnration)
k. Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial/commercial effluent,
"wash down" and residential discharges).
None
Describe proposed drinking water supply source
(e._&..well, community, public system,. etc.)
Town of Long Beach via Brunswick (n_
m. Will water be impounded?
If yes, how many acres? _
Yes x_ No
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces, n. If the project is a oceanfront development, when
Asphalt,. Concrete or marl will be used was the lot(s) platted and recorded? pending
for driveways.
g. Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. Less than 1%
Aarbor at King's Lynn
Appli or a �
5 ture
K -2 S_ 6
Date
Revised 03/95
� 12 -,�D
Form DCM-MP-I JUL 10 1996
DIVISIO,N OF
COASTAL MANAGEMENT
site. Include highway or secondary road (SR)
numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
• A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy or the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Mr. Jerry A Walters, Manager
Address Town of Long Reach
4601 E. nob Tslond nr_
Long ,eac1i NCTe2a8465
e MrsMvraNsley
Address 2713 Town Edcre Ct.
Pltctt& Raleigh, NC 27612
Name
Address
Phone
• A list or previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
None
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, 'attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
I understand that any permit issued in response to this
application will allow only the development described in
the application. 'Ile project will be subject to conditions
and restrictions contained in the permit.
I certify that to the.best of my knowledge; the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 24 day of June , 1956_.
Print Name Joh/n/Su
Signature t/
1 r or Authorized Ag
Please indicate attachments pertaining to your proposed
project.
DCM MP-2
Excavation and Fill Information
X DCM MP-3
Upland Development
X DCM MP-4
Structures Information
DCM MP-5
Bridges and Culverts
_
DCM MP-6
Marina Development
NOTE. Please sign and date each attachment in the
space provided at the bottom of each form.
1
K. �r
SSF17FO7AMN(/yytGYJK9
', a� 07 ANSWIy
yy I, Audat S. S.•adn,'a Nduy A," of'said Cavity, do Aaweby centdfy tAat L. P. McLendon •
,,�
�''J
fnT.Wtte♦ and Many I. McLendon, pnantoA,, psuonaVy appeened 6e fans we tAie day and acAn w4d-
py. Ae e"cua n of tAe ueeyainy deed.
Wienu, V Aand and nodaniaL.,ead, .tAi•, tAt'16 day of JruLy, 1y61.
My cowaieadan elyinar 115/6) •. Pauline S. Swain
e;l
4 P.-Seed •.. - .., ' Natany A,"
•
r s
SYLCOl WW (ULM
U
e!!• 1
BMNSWU LUN71J
f ..
At fwcyainy ee&Ujica.te'of Pauline S. Swain, aNatany A,6dic of BnuusicA Cou,iiy, Slob
I of Na4<maLina, L, odOdysd to 6s conned. Lat Ad Zw4, weiU, -IA Ad cantifiedu 64septa--
fi
lened.WUAt y Aand and official .,tad tAi. 76 day o f yuly, A. 0. 1p61, .
1
Vidan.ia L. Aldu'dpei
7
yhet.0C A SuPeAna Cauat
i
Y"d fan n.pistn.Uon an'4L e6tA. day of 94,1y61, at / oW.Ch,A� A. �andj ady nscondsd.
y•.
, T,
. . Re ten o Oesd,
M45 C. OHM enx
L"G S. plim, lu
V WNW&DOtnnA2VmA"z
1;•1
Lllr/gt RR/ alarov £rur �
�
S07C O7 ACRN CAV_M
6N;Y O7 MN9VIQC
A,
Nli. AVVW Made and antened into " Ad if day o f 1Ju4, 1p61, Sy and 6e.6veen
C. Cannail and Wife, Gewtnude Cannon, o f BnauuicA Cannty, NantA Cana&no, and Lacy S. Cod Lien,
,
F
Tnuttte, o um Ae Md o , NontA
f C C unty Canalina, pantie o f tAe f,nnt pant; and LutAen'Ray Ba6.on
1�
and Wife, Annit Pean.l Ba6,cn, of BAan ,eicA Canty, NontA Carolina, pant,ia of Ad secondpan.tt
WI TNfSSETN;
W7diffl 6y Add 01 to t necondtd in At BnuntwiCh County Rey.i.u.fny in SooA 145, at Pope
246, yanu C. CannaU and Wife, Gatnude Ca.uall, conveyed certain neC24 dna "y At tnaei
'. .. �•
,',:
Aaainaf•W d""ed and conveyed to Lacy S. CaUian, T.Wtee, a tecunity fan an .inde6tednw
aainp to Ad Cuo.Una 1A.Al Noes Conponaum of rfac(,anvi•Lle, NantACanaidna, and
- �•
��.
W'Idt &, A. 4add ha C. Cann.0 and wife de,dn. I convey to iAe pa&u&, of At weeand
e.
aant a valid and dull .to Ad tn.d Aenadnaftu duuv6ad and conveyed
and to tAat end Aaw neyuabd raid Tnwtee and As Aaldu o f iadd inde6.iedneu to ne.4a,e fna.
d. open.U.n of ♦.id deed of twlt Ad pnopnty Aeneinafttn duani6ed and conveyed, Sul wWat t.
iA ony w " a flee.tiny fAe .,atd dead *I t v .i a ;o SAC ne.ain.inp neatV tAent6y conveyed to
Laid ?Au ,iee; and
y
WldtA At Aaddu of raid inde6tednw Aa con,enied to Ad nedaue of Laid tnaat Awiin=,
}
''
a fttn d"c"d and conveyed, and Au autAoni.Sed aa,d Lwebe to nedeue Ad lane �nat At opewa.
,
Uan of said deed of tnud;
,
AM Nd1pOtE fu and do eoneiduatdan of Ad pntwi.,u and do funtAen Cw .dCAWM of Ad
1u, of W&WLlxlh2f (1760.O0) and otAu va4ad4 eon.,.iduation, paid 6y �Ae pantie of
6At tecandput to As pantitt o f Ad fdnat pant, Accept RAM90 f .0 Ae u6y ocon"dyed, Ad
At Anve
uantiu of fiul pant given, granted, 6anyained and sold , "ned, Conveyed, and At -
and by :'Aue pnuen.0 do Aensby give, pn.nt, 6anyain and 4,U, adlan, Canvey and AC4"e
..,to Ad laid pantie .1 A. �etond p.n.t and to tA.dn Aain., and ."" fonavu aU o f tAat ea%..
tain toad an pascal o f land, utaatt, 4Y and 6ednp do NonAA..e.t Twn,Atp,:Bnun,ric4 County, y
VaatA (pnaC.n was pantnaudani� u foLLaw1
dauibed
IUN
MP
a a. /�r7•'d+l)„'�iCIC• S �tk�l ro'�''� ,i Y :� � �1(, i;Csiu} L . ^a;.r•r+ll .:e: r. A�1.. , :"<a r'an !� S%�xpp`Ilse
,
7H7* Se Aald pantie o f the f in.t pawt, f w and in eau.idsnation al the Aux o f 76V D:XI4U
AID 07le U9W9 Z 02VSIDL%4MS, to As- in hond paid 6y the pawty o� the Aemnd pant, the es.
C94i of ahich iA. hue6y acknowledged, have 6uyainsd and AaLd, and 6y ,true pnuenL do bushy,
6uyain, AeU, and cmvey unto Ac Aaid panty of tlia Aecmd pant. iU /!ai u and auiyne, au 4A,4
eswtaln 10.4 a paaae/A of land lying and 6eeny in the Tan of Long Beach, Seitlivwa Taenehip,,,_
Bwn,wivA County, NMA (woline, and ewe pawties(anly duani6ed a foUawl
The faUoa.ing deiu bed lotA.n BLoeh 130A Lao, !, 1, 3, 4, 5, 6, 7. 8,. and 9..
The faUawiny dua4i6ed late .in Bloch 13o: Lotu 8, 14, 13, 14, and 16,
7h. faUsv.ing duowi6ed late in Blocs 1321 Lao 1, 1, 4, 5, 6, 7, 8, 9. 10, '11,
11, 13, end 1y. - . v.
The faUwainy deeewibed 1044 i„ Black 133, LOte 1, 1, 5, 6, 1, 6. 9, 70,11y11,_:
11, 1y, 15, 16, 17, 18, old 19.
t
ai7,e
oUowin duani6ed lot,.in Bloch I Lots! 1. •''Y`
➢ 34J 3: 4; 'S: 6. 7.
. j ..
11. 13, 1$ 15. 16,17, 18, and 19. "-'
The aUwi ducwibed Lo4 in Bloc/ 1 61 LotA d' ➢ 3, 3, y, 5. 6,7, 8, 9, 1a, 11, 11,
r
Old 13. r
The aUou.i„ ducnibed Late in Bloc{ 1 1 Labe I, 1. d1 ➢ 37. 3, 4, 5,'6, 7, 6, 9. 10, it,
*'
r.
11. 13, ly, 16, 17, 18, 19, 10, 17, 11.`13: 14. 15, 16. 17, and 18. r
As faUOY'in➢ ducwi6ed lotA wn Bloch 1381 Lot, 1, 1, 3, 4.'5, 6, 8, 1o:.77.
' -
7, 9,
12, 13, 16, 17, l8, 19, 10, 11, 12, 13, 14, 25, 16, 17, 18, and 29. r'
The JoUaa.iny duu.ibed tote in BLoch,g9l,Lot, 13, 1y, and 15.
,
744 foUoa.iny ducu6ed latA.n Bloch lyo: Lot, 1, 1, 3, 4, S; 6, 7..8,.9. �0,.•:P,
_
,:• 6
`11, 13. 14.ond 15. tlNi
joUouuny dsea i6ed lat, in BlocA.1y11 Lot, .l, 2, 3, 4, S, 6. 7, 8, 9, to, NI )thh
15, 16, 17 18, 19, �,%Y?
•
10, 111 13, 14, 15, 16, 27, 21, 19, and 30. 1
The J-41" Ag duani6ad lo.le in Bloc.{ 1y11 Lao 1, 1, 3, 4, 5, 6, 7, 8, 9;
r.Q
.; �
'
11. 1314, 1516, 17 18, 19, 20, 21, 12, 13, 24, 25, 16, 17, 18, 19, and 30,. (•I
The Lo.4 .in Bloch 1431 Lot, 1, 3, 4, 6, 8. 10,
5. 7, 9, 11, tF!
.. 11, lj, ly, and 15.
',•7U.JaUo,.l„y duui6ad Lot, in Bloc{ lLabe 1, A:%i
1, 3, y, 5, 6, 7, 8, 9, !0, 11,
11,
13, 14, 15, 16. 11. /B. 19, 10, 111 11, 13, 14, 15, 16, 27, 18, 19, 30, and 31,
... The 3aUauung duaai6ed Lots in Bloch 10: LatA 1„ 2, 6,
3, 4. 5, 7, 8, 9, 10, 11,12 6.
- 74 follae.iny duawi6ed lot, in BloaA ly6r Lai, 1,1,3, 4. 5, 6. 7, 6.9, l0, 11, 12, 13, 1411f+•
`G16,17,
18, and 19, 1
!• •
,:•; f The o,",4n pe,i6en BlocI
➢ dud" ih KP ,3, 4,5,6,7,8,9,10,11.11,13,14,and iS��,
„�,., aU acconding to a sop Aeeaeded in Poap Book 21, Pay" 181 tinouyh 189, and a sap
.. wscanded in Booh 3, Pays 113, DV fice o f the Reyi,tu o f Deed, a j Bn,.mwich Court
Now.d, (;marina.. r ,
u fuwthew conveyed 6Y 444 deed o� conveyance any and aU lmd, awned 6y the _•4q
' '- 1
,,.•. pantie o f the ezw4 pant not henetoeme conwyeTdwli.ich !ls me,.e ve Swain Stweet, nm.t
Y'
-Me', O� e Atiantxc DceM, ewt J
o� Lockwood, oL4 lnlst, and Aaad. of Loc6aoo4 3aUy Revsn�;
. Loakwondu 3aL Rivu Sound, DaviA
y and Gseh Sound, aVi.iah ma "led 6y the panuae of , :
AS 11:4t pant.
r
,.
", •Said eoliveymet iu sane 4u6jtat to deeds of twat of'wecaed wk.ial, the ynmtee seeusL('S L
'and
_
agneu to pay, one Aaid dead ae twwt hemp dated.Sep.4.6m I$, 1959. �now_Bnunewwe.{,�;
�' ReeL_ty,_Ine, to �a.0 C•. Bw•xm, Tnwtee, fan i B Wmd, Vwda {l, Aott 6 D. [ %lenw.ny�1
and neeonded .u, At Bnunewick [•ouniy RegiAlny. {•
7"
P
conveymce iA wle 6y Ae ynaMw, L, P. Ac endon, 94•, TwuA.ke, vho pmchaned 44r' ••'
duu.(6cd
r
Aopent yAuein
em and on 6e6a1j of i,�ye�Lynn,,IInc. .OldOld -9 w Tnwteethusof �f
time hw acted
1 •�;'4
pona.v, ca/,+.e pae.ty a, ' Acid %nwtec,
:..t. A/!A3¢AVO %i fA7LD the above ductibed premluu, wit/, aU tke appwtenalc" Ameunto
on in myw,:se appenta:':f unto the Snanlsa.:44 Auccat Me and a 4" fondue.
lV WIDVfSS Wl,'R(D3, the ynontow, have A"cunto
ALL Aein hmde on eale, the day and `
3 t
gem ftnut above wzutn•r.
L•
'� I LJ _l'I, L�'�,r J� ., �i .> �i1�`I r \[ �10. AcLendonanA. �SeU�
9
'
S
I11 d
1,5.
I
, Tna.tee l
P�W.cI�>•.`ti61�.AA:l.4�✓,'.''w{J..Y.G�u�..t
:'.,
�,aii Y',Nnµi.l fie:.. -I W.L.:FF .. ..r:,"•%e:iw' IM
�?
. i. �d;• - 1t71v3 : J, : i t. t, , (i^e%} , ,e. , S. : -.) ,...•.3viyr.:.:F•t°i ii- ire?irl,�}1}'0� 4v iS d{•i�f.G"�,'��%y^
:
!:: -
N" A
7A
t IJ 1- nu Anwe tau m panceu at Lana Located on Long Oeach, IVon.t/r LanaCina,
` : p: :{nounR�a,nd duiynoted a Lot, Jy and 15. .in BLoc/! 131, accor
1°ding la a map
II yy-i�r•;:::.de "r N. R. Newe.U, Awv<yon, and duly neemded..in Map Boob 21
at PageA
Q! t/uouyA 18y, Office oI A. RegiAtm aI D�<"ede oI BnunaWieA Cmnly, to
'((1 , _g all nipati and aemetive 44" in[ident .to tAe owneM ':'i,':. •.:
I, '• a�F' a�,c��mv once iA made 6y tAe g�an_(mrLr P. McLendon, 1Jn:, rw.at[e, wlra i `•:••:
ij� //
'M`?hJ!' oAaed lt,pno l�uein dum•i6ed on and on 6abai u . r'A L Inc..,.
\ penty I I. I Kyng. ynn, ,
:..:,and w Tnw4t teaeof and at aU.Limee Aw acted Ion <aid co'maim in Iw
••cap" ad Aa.id . wtee. .
-7he above land at glveyed 20 Sna,.tan, 6y Manion L<. S , f.Gvood N. SMZ. A, See B00/1, �X No. ip, Page 373.. \ .
i .' -:1 •' "•V NAI 40 V htXO At a6gve dewmibed pnemi,e,, wW ail the oppan.unmcu fAeneuMo belon
l- :ny, m in myw.C,e oppeAtaim ny, wUo .die 94antce, la, Rdiiu and/an, wuccenaau and a444M fonev
M tAe ynantm eovenan.0 .d,"a .i4'<jed of ,fiid pnemiew .in leg, , and Au At 44Ai .to
convey tAe Aame in Iee iziole, Act Aa+e
above Atated, iI any): and Act Ad will
dCwl� Clairol oI a� pGL aM W6om,oev".
Ken nelenence .0 made to .tAe Gnaw
tAe mucatzne AAaLL include fAe Ieminin,
IV WINLSS fW8t({)7, At Gnantm
above ivnitten.
S847,503AM77 (/Yt9 M
I PauLine S. Swain, a
h. rnw.tee and MI. /4
edtAe execution 7A
Witneu my hand , no
Cmlmt{Alm tXpMU i�5�'
P, SeaL
SME 03 MR (!j'+l1' M
ig eesttfuate(A)'of Paat,ina'S,Swain,a'Notany A" o�tlui
w odjadytd to Si connect,. Ltt .aid deed and Ad cen.Ujicate,
day o f 9uLy, Jy6J: ,
V,atonia L. A
. Aast: GLenA S
e Inee Isom encum64anew(wUA At exieptioM '
defend Ae said title to tAe Aame agakWY iAe
e, tAe Aingal" AAau ine6lde xkA plural and'
en: •
t AiA hand and Real, tAe.day and'yean Iin,t
Many I. McLendon'
L. P. McLendon A. rnw.tee(Seal)
i fi,6Lie of .ad ('ounty, do "C6y CCAVIy tAa L. P. McLendon
Snan.tan, pcndona4 appeanea, a fore me Ai., day and ac•4nowledg-
deed. .
.eat, tAiA th 16 day of•)4
Pa S. Swam . .. •. 1
Notary 6Lic "'^ S. •.
to on tAe,26tA. day oI 9uty, 1y61, at J 0 a.CA P. A.. and duly na d d. .
[. P. AWM A. X67ff 1 T7IX � I ';' Itj" 7}UN O,t :t°C•15 J
(SHT6 C8 AM N (MZCL' M .':..
i atNBcaBPraAvrpc • . .. .. ._. ..
N3S AffflMade Aid At 1At. day o f tfaly, 1y61, 6y and between L. P. McLendon, 9n.: rnwtee,
'ardMany I.AcLendon (wile o L, AMcLendon 9n.) pantic, oI Ad fi ut pant/ and KDO S LYW -r
a"ca Ppmation duly mgani6edand exi ainy undm*'and 6y, vin.tue oI AtLaw, o f tA, S" oI N" ;
(=-Ca: pant oI Ad Aecond • — .
�:. w.I TN 6 S's g
• •� IH111..�nu.Nlru.'
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL/PROCESSING RECORD
A) APPLICANT: Stuart Cooke& John Sutton
COUNTY: Brunswick
Harbor at Kings Lynn Phase II - Major Mod to Permit #14-96
LOCATION OF PROJECT: King's Lynn Drive & 69th Place West, Long Beach
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 09/11/96
FIELD RECOMMENDATION: Attached - Yes To Be Forwarded - No
CONSISTENCY DETERMINATION: Attached - N/A To Be Forwarded - N/A
FIELD REPRESENTATIVE: Ed Brooks DISTRICT OFFICE: Wilmington
DISTRICT MANAGER REVIEW:
B) DATE APPLICATION RECEIVED IN RALEIGH: �2-1b 9-6 FEE REC'D: $ 2
C)
PUBLIC NOTICE REC'D:
ADJ. RIP. PROP NOTICES REC'D:
END OF NOTICE DATE: /0
DEED REC'D: Z
APPLICATION ASSIGNED TO: \ - ON:
75 DAY DEADLINE: / / " -W 150 DAY DEADLINE:
MAIL OUT DATE: / _ � J — 9 4
FEDERAL DUE DATE:
STATE DUE DATE: / P - / l - %k
FED. COMMENTS REC'D:
PERMIT FINAL ACTION: ISSUE ✓ DENY DRAFT ON /0- '� yl
AGENCY
DATE COMMENTS
RETURNED
OBJECTIONS
YES NO
NOTES
Coastal Management Dist. Office
Div. of Community Assistance
Land Quality Section
Div. of Env. Management
/ 0 7 0 Il
State Property Office
pm - l y-0 i
/
-2O <'� ire /✓'rn 7
Div. of Archives & History
�/, _. -
Div. of Env. Health
a _I/. f'/
Div. of Highways
d - �4
Wildlife Resources Commission
Div. of Water Resource
/1/m /
Recommendations for State Permit - Cooke/Sutton - The Harbor at Kings Lynn Subdivision
The applicant proposes to overcome the project's inconsistency with 711.0306(c), by assuming the cost
of water line installation, and subsequently transferring perpetual maintenance to the property owners
association. Provided this is accomplished, and adequate documentation provided to satisfy DCM
requirements, I have no objection to the project subject to the following conditions:
1. Adequate sedimentation and erosion control measures shall be implemented and maintained to
prevent erosion of unconsolidated soil into adjacent wetlands and/or waters.
�/2. Subsequent residential development of individual lots within any area(s) of Environmental
Concern will require additional permitting through the Division which implements the Long
Beach Minor CAMA Permit Program.
3. NOTE: Plans and specifications of all water system improvements must be approved by the
Division of Environmental Health prior to the award of a contract or the initiation of
construction (as required by 10 NCAC, 10D.0900, et. seq). For information, contact the Public
Water Supply Section at (919) 733-2460.
biaxe oT n:ortn "rouna
DQpartment of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Q��
IDEHNR
September 13, 1996
Zoe D. Bruner, District Planner
Division of Coastal Management
John R. Parker
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Stuart Cooke & John Sutton/Harbor at King's Lynn Phase II
King's Lynn Dr & 69th Place West, west end of Long Beach, Brunswick Co
Proposed Project: The modification of existing permit #14-96 to include Phase H of the Harbor at
King's Lynn Subdivision. Phase H will include the platting of 32 additional
single family lots and the extension of water lines and construction of a cul-de-sac
to serve the development.
Please indicate below your office's position or viewpoint on the proposed project and return this form
by Oct 4, 1996. If you have any questions regarding the proposed project, please contact Ed Brooks
at 910/395-3900. When appropriate, in-depth comments with supporting data is requested.
REPLY: This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the project only if the recommended changes are
incorporated. See attached.
This office objects to the project for reasons described in the attached comments.
SIGNED , DATE
127 Cardi I Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
SA
EDFEE HNR
TO: John R. Parker, Major Permits Processing Coordinator
cc: J.Walters, P.Pate, C.R.Stroud, Jr., E.F.Brooks
FROM: Zoe D. Bruner, DCM District Planner
SUBJECT: CAMA/DREDGE & FILL Major Permit Modification
Cooke & Sutton/The Harbor at King's Lynn Subdivision,
Town of Long Beach, Brunswick County
DATE: October 2, 1996
This permit consistency opinion is based on my review of the Stuart Cooke & John Sutton/The Harbor
at King's Lynn Subdivision application for a major modification of permit #14-96, the Field
Investigation Report (EF Brooks, 9/12/96), and my understanding and interpretation of the policies
presented in the Town of Long Reach 1993 Land iie Plan.
The applicant is requesting a modification to his existing State Permit #14-96 to add Phase II of the
Harbor at Kings Lynn Subdivision. Phase 11 would include the platting of 32 additional single-family
lots and the extension of water lines and construction of a cul-de-sac to serve the development. The
location and complete description of the project are in the Field Investigation Report.
LAND USE CLASSIFICATION: Conservation; Developed Residential
CLASSIFICATION DESCRIPTION:
Conservation areas include all Ocean Hazard Areas of Environmental Concern. King's Lynn is in
FEMA VE and AE Zones according to a 1991 FEMA map. From the Plan:
Development shall be permitted which is allowed by the policies contained in this plan, the Long Bach Zoning Ordinance,
and 15A NCAC 7H.0306.
Developed Residential areas are defined as those areas where utilities and urban services are provided
and the major land use is residential.
RELATED POLICIES AND IMPLEMENTATION MEASURES:
*The Town of Long Beach is concerned about flood hazard areas, and will coordinate any
development within the special flood hazard area with NC-DCM, FEMA and US COE.
*The Town will support state regulation relating to stormwater runoff resulting from
development.
•The Town of Long Beach Land Use Plan supports only uses within Ocean Hazard Areas of
Environmental Concern (includes Inlet Hazard Areas) which are consistent with 15A NCAC
7H, and the Town's zoning and dune protection ordinances.
CONSISTENCY OPINION:
This proposal is consistent with the land use plan when all recommended conditions placed on the
permit by the Division of Coastal Management are met. Development restrictions may vary from lot
to lot and over time as the inlet migrates and the ocean shoreline changes. It should be noted that the
hazard areas in which this development is situated are dynamic. Recent controversy about the accuracy
of Inlet Hazard Areas as mapped by the Division of Coastal Management suggests that the delineation
of the Inlet Hazard area in question be carefully reviewed before this permit modification is issued.
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 20, 1996
MEMORANDUM
TO: Mr. Charles R. Fullwood, Jr., Director
Wildlife Resources Commission
Attn: Habitat Conservation Program
IDEHNFR
FROM: John Parker, Jr. o Es,
Major Permits Processing Coordinator OCT I7 1596
a
SUBJECT: CAMA/DREDGE & FILL Permit Application Review •••<.;;., ,YT
APPLICANT: Harbor at King's Lynn --Phase II (Maj. Mod. Of permit #14-
r-
PROJECT LOCATION: King's Lynn Dr. and 69th Place West, Long Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit to include Phase II, etc..
Please indicate below your agency's position or viewpoint on the proposed and return this form by October
y1.1; 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-
2293. When appropriate, in-depth comments with supporting data are requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
"h
04,01(o,
4-�Vl
—/P
This agency approves of the project, only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached memo.
Signed 64�mta Date Z D —L#—C
P.O. Box 27687, ��FAX 919-733-1495
Raleigh, North Carolina 27611-7687 �C An Equal FAX
Action Employer
Voice 919-733-2293 r� 50% recycled/10% post -consumer paper
Norcl•i C-c-a- ,lij is Wildli%- F��uu, �_�� Cx,itiiissio n
r
titrc.l,)i:.,L• ��;L 1�'n1 tl1 (''ll c,.iu,] .' ; (ill. t11' 1-; ' %- 3 ••'+1
1 ;•1111i`'d, L.?.CIIII RI' i]P C\I1'.
i•iCr:,r,g � :d�,':twl
TO: John Parker,
M.rj•JJ. 1)Ul:1d", :1L UVl'o�.i1:,1
Ha}:ilat conservar i qn Prose:^.
ilia. �•�: Cl-440061*1-0-4ti-ACA}!{Qh
SUBJECT: CAI �'L ID-cd_7a aT,a Pcl:r:iC :IpplI ,.'._::,
ai. i(11t�� ..11 :1I!--Pl-:u�l. 11 , iaJ T.i: 1. .)i 1�F•t. ".I.' 6J9-
c7(•1, �{,C;co-7;;C;2 i':'+ill, TIIiUi•, i-_% .. c. a'.'_.r �)b. �. _.i1 ili:Ci,
'1}l2 I'7i'I'1 -.'i-P R(S^l<i_t='¢ __t`lt.l C:o1n.'I 1. _l _'•I+iC .'_c''_r_l ii
rc.11.C.1:* Ji rY12 FJ1 .i 1C'CL' ❑'.,.1 a6'.�_C_d.La _ �",aC ., vI _.'.Ii LAC- ri`l.f
l`i:l:Oflcr C', Jgnt OU" ocIPmen-S are.
{,F :1-1-- I', 31, d;:C1
-:me_Ide'i: �' Il.i;.i;. •.1:i ter. _•.} :-i_.-i t_}tc.
`.-�-
1G81
dw
J }]f; r. uF111CdL� t.rG1�:15 .aOiii LV ;1I"1 r- Y. TC.
•TIJ1 _I mil Lllc SF..-+;nCl p).'l i?<.r ^.J .?_K111 V'-. .W r'. .. 1•it'7 L'-_ 1_i'+
1!_T_!C' 6C.i,__C( i_ J i.__u_ of _.1C,1
1) th/� J 9ii laLCi i�3 iO' :9, 1• S. -_ _.. C!E':'-l'_ ;=C. <...�L _IU 1:.
i"r <'{•.= V@a)_..., .i1=1�.1, `i1P __JT: fj b::i .f'1.,'.. .: �J,� ._..Lud_ i`•: .,a?<::1
Rolle 1 s T yr. Por'-1GL lL LI.-- C._ac,
F-'ijl. 1$!-L 111_1_E2 rslll".t _'7iJ ��. i'1 c17-::]:1 a,ua: _i1 �l;i-' I.. E-i•f. 1'lUG%.L _1
:_L c?a ui I_'.I]•i�?:!]]171 i=L t(1 .. .1Jti: cYl:. r.F C.LC, :fFr-!1, 1'.ti. v1:-f"•L
=Bi.YIC ri:.}:� ': i.__i�(:1 .'(' ,:. ..a .1 ❑C <C I;r, 1-
3_t,2.
•.l'. 1_Y 1'.d] UL:lU1.::i d' r;1G .. iI119 UL c)U,' .11+I
n
U
Y .1y d' _- 01 z r -, ,e Pt ,, '.In l a -1
"av- na, t . ''a SAS' m t-r _ 11, .. . . i. 1 7. -.1.'. I
_D, "1 a - Oi . 1, n I. if_ .i 1: i. . n- -.I. AM, 4 ,.c._l
_-W _.1S 2:i! =0 I 10 11 L111 M:: -I . C 12, •,Wp 1_.CUA,
am i 1 r rl ka at; . rob:
i�- 1- me by
j -:i,. ..1 .-. .nl: _ ,._.1., . .
TVs m_ -lociL:iP p--,L 4 1' for J'_-1 '111[_, I_ i_nq -:i
n r•,0 . _ , tri:• -31li1 -,.,.... il.... ._L: n'y c'a,lse Ci. _..;.. . L _
.,r :s. ,C' `a •s 7_:lr` and -1:p 1111 74•.r
- 1 _ -wm will is-. .... leinin'_ i by _. =_.ni.
tip:. .! Lu 1! .}-r1_ap , = wavLe_.=,.'_v _..:k..__'a CA,— S,:..1.'.]
Id•. 3A _. jeL: .le?-,...-_:r. .-..:tu=_-_tr wrlCe:_.- K_. L.�.':
._.._ ._.- _. aI. l cY:II:I S. ._d11 fish f.y ?d_''_it1... A.= ' !'t? I.
10, _`1 7. HA :'WC 11 b'..:j,l__l _.1Ut^_.W?, evu, G'.S_ in 7Ke Met
'.]_C _- _. it . ._ilr !A1:•1.1.L .'1. IL-. MY
14, A4111
-1LJ i-." a .: %1 F,`k cd:rL ,_ ��'.�. t-1'.r.L` ..Ii .
' 1
,a np - i to ;7 1U_ - 1-.r.•,._ r_ . 9P
uS_1_ 1:._', P± va'P CHI, 7F_' a1 1... 1
rho: or! ._. ..
VlT 1e 1_+6 U-: 27FT1
State of North Carolina
,Department of Environment,
' Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. 3checter, Director
MEMORANDUM
1TP
OCT 15
�F:=- HNF2
B!V. OF
September 20, 1996
TO: Ms, Linda Sewall, Director
Division of Environmental Health
R E 0 E I V E D
�fo
FROM: John Parker, Jr. _ /
:Major Permits Processing Coordinator
SUBJECT: CA-AAIDREDGE & FILL Permit Application Review
APPLICANT; ase II (Maj. blod. of Permit #14-96)
9
PROJECT LOON: King's Lynn Dr. & 69th Place West, Luna Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit to include Phase II, etc.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
October 11,1996. If you have any questions regarding the proposed project, please contact John Parker
at 733-2'_y3. when appropriate, in-depth comments with supporting data are requested.
REPLY 'This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes
incorporated. See attached n 1 4 c :I1cJ CC.° yam/ '71
l,i'lC�� __7 �" t CCi?��ct •mil <-c=. ,pfG�/ Lill-f LL, i7;%ltr�J «YD [�C'i7'
This agency objects to the project for re sons desci`lbed in the attached comments.
Signed
P.C. BOX 27687,
9-7t FAX 919-733-1495
Raleig^, North Corouna 27611-1687 An Equal Opportunity/Atfir riotive Action Fpc- o r
Voice 919-733-2293 ;-, 5M recycled,,10`X, post•Conswrler PO
-- -» $
P. E
Comments
B
t
n
Harbor at Kings Lynn Phase 11 Bruswick county
:he applicant should be advise n
that plans and specifications for all water system
improvements must be approved 1:y the Division of rnviYOnmettal Health prior to the
award of a centtact or the initiation, of canstrcction (as required by 15A NCAC
8C 0. 01-00 et• 4eq.!. For infcrrmation, contact the Public Stater supply Section,
1E0.
The apclica:at should be advi"d to contact the local health der)artment regarding
their re"iremente for septic tank installations iaE zegvired under 15A iTcAc
14A. 1900 et. =.eq For information concerning septic tank, .and Other on -site waste
disposal methods, contact the Brunswick COunty Health DPpaYtmet:t,
Page 1
CCT 16 19h 00,:28FI9
F.7
u✓%! 2 ! '1
m,.
01 :
DATE:
%71 1 u Z. ,
€ h �,y e V i—
Daij. rjj EN-VIROWi.ENTAL HEALTH
7 /
From: �S. 7
North Carolina Department of Environment,
�
Health,
and Natural Resources �{y�
Mate of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 20, 1996
MEMORANDUM
TO: Mr. Joe Henderson, Acting Director
State Property Office
Department of Administration
FROM:
SUBJECT:
APPLICANT:
John Parker, Jr.
Major Permits Processing Coordinator
EDEHNR
456
s
N `�aa ads ad
d
9�,a2£Z ez tZ 026�0
CAMA/DREDGE & FILL Permit Application Review
A
N
Harbor at King's Lynn --Phase II (Maj. Mod. Of permit
PROJECT LOCATION: King's Lynn Drive & 69th Place West, Long Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit to include Phase II, etc.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by October 11, 1996. If you have any questions regarding the proposed project, please contact John
Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested.
REPLY_ This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the nrn;—� if the recommended changes are
incorporated. S h(.01etf- hrs 6 '
This agency obje _Ousl 9 A (� .scribed in the attached comments.
�' w"
Signed
-�.u�-►� �.�, (ems--�-��
f1V1S1f�1L
/e(ocoHflun r5 lte la
IMA
P.O. Box 27687, FAX 919-733-1495
Raleigh, North Carolina 27611-7687 N�� An Equal Opportunity/Affirmative Action Employer
Voice 919-733-2293 50% recycled/10% post -consumer paper
r
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 20, 1996
MEMORANDUM
TO: Mr. Larry R. Goode, Phd., P.E.
Highway Administrator
Division of Highways
FROM: John Parker, Jr.
Major Permits Processing Coordinator
r_
1DEHNFR
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
APPLICANT: Harbor at King's Lynn --Phase II (Maj. Mod. Of permit #14-96)
PROJECT LOCATION: King's Lynn Drive & 69th Place West, Long Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit to include Phase II, etc.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by October 11, 1996. If you have any questions regarding the proposed project, please contact John
Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested.
REPLY This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated. See attached.
This agenc o ec to the project for reasons described in the attached comments.
Signed Date A6 a t ?
.e /0,2 o n o s A-c, 5 Hu✓ �A �3
0f S-r-/LtL-r OrA c L •
P.O. Box 27687,
Raleigh, North Carolina 27611-7687
Voice 919-733-2293 FslAlslt7�A
Go02.d „uA►- <a µJ, 9'0 Wi e-4,-o ivNOY
FAX 919-733-1495
An Equal Opportunity/Affirmative Action Employer
50% recvcled/10% post -consumer paper
Oct. 31 ' 96 9:C19 Hi �IJSTOH At ID ASSOCS. P. A. FA`: 1-910-75=-2121 P. 2
6
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. John V. Sutton, Jr.
20 Fast Second Street
Ocean Isle Beach, North Carolina 2S469
Dear Mr. Sutton:
June 20, 1996
Subject: Permit No. SWS 951211 Modification
The Harbor at King's Lynn
Low Density Subdivision Stormwater Project
Brunswick County
The Wilmington Regional Office received the Stormwater Application for The Harbor at King's Lynn on
April 24, 1990', with final information oil June 3, 1996. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth in 'Title 15A
NCAC 211.1000. We are forwarding Permit No SWH 951211 Modification dated June 20, 1996, to you.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions
and limitations as specified therein, and does not supersede any other agency permit that may be required.
If any parts, requirements, or limitations contained in this pennit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina
General Statutes, and tiled with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC
21611-7447. Unless such demands are matte this pennit shall be final and binding.
If you have any questions, or need additional infonmation concerning this matter, please contact either Linda
Lewis or me. at (910) 395-3900.
Sincerely,
d
Dave Adkins
Regional Water Quality Supervisor
DA/arl: S:\WQStSTORWQIAT\PF-RNE'n951211.M,;
cc: Jay Houston, P.E.
Janet Russell, DCM-WiRO
Delaney Aycock, Brunswick County Inspections
Wilmington Regional Office- `
Central Piles
Linda Lewis r7.!!
P 0. Box 29535, Raleigh, North Caro;ina 27629-0535 Telephone 919-733-5083 FAX 919.733-9919
An Fqual Oopottunrty Affirmative Action Employer
oct.31 196 9:E9 HOUSTON R-ID ASS'O-_-S. F.H. FAX 1-910-754-2'121
F. 3
State, Stormwatnr Moagumont Systems
Pevnit No.Sw8 951211 41(d'fi¢ntion
Y
STATE OF NORTH CAROLINA
DEPARTIITLENT OF EN VIRONNIENT, HE, ALM JUND NATURAL RESOURCES
DIVISION OF ENVIRONYIENfAL NIA\rAG>-MENT
STATE STORINTWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of Notch Carolina as amended,
and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANT= TO
Ayr. John V. surton
The Harbor at King's Lynn
Brunswick County
FOR THE
construction, operation and maintenance of a 25 % low density development in compliance with the provisions
of 15A NC _AC 2H .1000 (hereafter referred to as the "vorinwater rides") and the approved stormwater
management plans and specifications, and other supporting data as attached and on file with and approved by
the Division of Environmental Management and considered a part of this permit for The Harbor at King's
Lynn.
The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following
specific conditions and limitations:
L DESIGN STANDARDS
1. Each of the 46 lots in the subdivision is limited to 5,500 square feet of built -upon area. Lots
within CAMA's Area of Environmental Concern may have the allowable built -upon area reduced
due to additional LAMA Permit requirements.
2. The overall tract built -upon area percentage for the project must be maintained at 25%, per the
low density requirements for projects that drain to SA waters.
3. Approved plans and specifications for projects covered by this permit are incorporated by
reference and are enforceable carts of the permit.
4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with
minimum side slopes of 3:1 (H:V) or curb outlet systems as defined in the storm water rules and
approved by the Division.
Oct.31 '96 9:10 HOUSTON ONE) HSSOCS. P.H. Fk: 1-910-754-2121 P. 4
State Storm%hmr Managemcm Systems
Permit No Sw8 95 121 1 hindificatlnn
5. No piping shall be allowed except:
a, That minimum amount necessary to direct runoff beneath an impervious surface such as
a road.
b. That minimum amount needed under driveways to provide access to lots.
6. Projects covered by this permit will maintain a minimum 30 foot wide vegetative buffer between
all impervious areas and surface waters.
7. The permittee is responsible for verifying that the proposed built -upon area does not exceed the
allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be
revised without approval from the pernittee, and responsibility for meeting the built -upon area
limit is transferred to the individual property owner,
8. Deed restrictions are incorporated into this permit by reference and must be recorded with the
Office of the Register of Deeds prior to the sale of any lot. A copy of the recorded restrictions
must be received by this Office within 30 days of the date of recording. Recorded deed
restrictions must include, as a minimum, the following statements related to stormwater
management:
a. A statement of the allowable built -upon area per lot in the following form:
"The allowable built -upon area per lot is 5,500 square feet, inclusive of that portion of the
right-of-way between the front lot line and the edge of the pavement, structures, pavement,
walkways of brick, stone, slate, but not including wood decking."
b. Items related to stormwater management must remain in the deed restriction, and this
must be indicated by including the following:
"The covenants pertaining to stormwater regulations may not be changed or deleted without
concurrence of the State."
C. To assure that vegetated conveyances are not piped (in accordance with item 5) deed
restrictions must indicate that:
"Pilling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the
development except for average driveway crossings, is strictly prohibited by any persons."
9. The Engineer/ Owner/Developer/Pernittee must certify in writing that the project's stormwater
controls, and impervious surfaces have been constructed within substantial intent of the approved
plans and specifications. Any deviation from the approved plans must be noted on the
Certification.
Oct.31 '9E 9:11 H�DLiSTON AND ASSOCS. P.A. FAY 1-916-?5_-2121 P. 5
State Stot wamrr Mnnagemctn syeternb
Permit yv.sw8 951211 Mndifica Ion
10: The followhlg items will require a modification to the permit. Revised plans, specifications and
Calculations must be permitted prior to the pennittee beginning construction on the modification:
a• t'•ny revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision of the project area.
f. Filling in, altering or piping any vegetative conveyance shown on the approved plan.
In addition, the Director may determine that other revisions to the project should require a modification
to the permit.
11. The Director may notify the pernittee when the permitted site does not meet one or more of the
minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made,
H. SCHEDULE OF COMIPLIANCE
The permittee shall comply with the following schedule for construction and maintenance of the
I.ow Density Option stormwater systems:
a. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated,
and be Operational for their intended use prior to the construction of any built -upon
surface except roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the
stvales or other vegetated conveyurcea will be repaired immediately.
2. The perrnittee shall at all times provide the operation and maintenance necessary to operate the
permitted stormwater management systems at optimum efficiency to include:
a. Inspections
b. Sediment removal,
C. Mowing, and revegetating of the side slopes.
d. Immediate, repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications
3. The permittee shall submit recorded deed restrictions Limiting built -upon area per lot in
accordance with Part I item 10 within 30 days of the date of recording,
4- The penuittee shall submit the Engincer/Owner, Designer,'pernrittee Certification in accordance
with Part I Item 1 I within 30 days of completion of the project.
5. The pertnittee shall submit all information requested by the Director or his representative within
the time frame specified in the written information request.
L)rr. 31 "S6 �':11 HOUST01Y A"!D HSSCCS. P. FAX 1-910-754-2121 P. E
Stntc Smrmwntcr Mcnegenixnt 51'sta:na
'-'� F'emi,t ?ln.St1'8 95f2i I Mudificai un
III. GEN RAL CONDITIONS
I. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to an enforcement action by the Division of Environmental Management, in
accordance with North Carolina General Statutes 143.215.6A to 143-21.5.6C.
2. The permit issued shall continue in force and effect until revoked or terminated.
3. The permit may be modified, revol':ed and reissued or terminated for cause. The filing of a
request for a permitt modification, revocation and reissuance, or termination does not stay any
Permit condition.
4. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revolting and reissuing the permit, or terminating the permit as allowed by the laws,
rules, and regulations contained in Title 15A of the North Carolina Administrative Code,
Subchapter 213.1000; and North Carolina General Statute 143-215.1 et, al.
S. The permit is not transferable to any person except after notice to and approval by the Director.
The Director may require modification or revocation and reissuance of the permit to change the
name and incorporate such other requirements as may be necessary. A formal permit request
must be submitted to the Division of Environmental Management accompanied by the
appropriate fee, documentation from both parties involved, and other supporting materials as
may be appropriate. The approval of this request will be considered on its merits, and may or
may not be approved.
6. The Permittee grants permission to Regional Office Staff to enter 111e property for the purpose
Of inspecting all components of the permitted stormwater facility.
7. The issuance of this permit does not preclude the Permittee from complying with any and all
statutes. rules. regulations, or ordinances which may be imposed by other government agencies
(local, state and federal) which have jurisdiction.
Permit issued this the 20th day of June, 1996
NORTH CAROLINA ENVIROl\?1<iENTAL i.IANTAGE, ,fEENT COMNIISSION
---------------------------
A. Preston Howard, Jr., P.E. Director
Division of Environmental Management
By Authority of the Environmental Management Commission
Permit Number SWS 951211 Modification
Ni: DEM Ili] E14VSCI
Fa J—'J_i5_i
Uct LU '`Jb IU:U2 F.Ua/U5
Division
of
Water
Quality
October 30, 1996
N�RMO]R_ ANULfM
To: John Parker, DCM
From: John Dorney, D16�P
Re: Water Quality comments
Stuart Cooke & John Sutton/Harbor at'Kings Lynn -Phase H
DWQ 4960897
Brunswick County
The Division of Water Quality has reviewed the expansion of a single family
subdivision with utilities and has no objections to the issuance of a CA1viA Permit. Please
call me at 733-1786 if you have any questions.
cc: WilmingtonDWQ Regional Office
Central Piles
Enrlronntentnl Sciences TBranch ll'ater Quality Section
t# State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
i4t1& �Rjm
TO:
FROM:
September 24,
P. A. "Ski" Wcjciechowski
Division of Marine Fisheries
[DEHNFR
QCT II/EO
9
Hiq��gG,EM�N
John Parker
Major Permits Processing Coordinator
25 19%
W-PUB. TRISUBLANDS
SUBJECT: CAMA/Dredge and Fill Permit Application Review
APPLICANT: Harbor at Kings Lynn --Phase II (Maj. Mod. Of Permit #14-96)
PROJECT LOCATION: King's Lynn Drive & 69th Place West, Long Beach, Brunswick
Co.
PROPOSED PROJECT: Proposes to modify existing permit #14-96 to include Phase II, etc.
Please indicate below your agency's position or findings on the proposed project as it relates
to matters of public trust. If you have any questions regarding the proposed project, contact John
Parker at 733-2293 or the DCM field representative for the project. This form should be used only
for tracking and intra-agency commenting.
REPLY There are no known public trust conflicts with the project location or design.
There appear to be public trust conflicts that require additional investigation.
Approximately _ days additional review time is needed.
It is recommended that changes be made to the project to reduce or eliminate
public trust conflicts, as discussed in the attached memo.
T/f /ae> czq CGNaYr Atoot�-Y T �liz d� cr B.s�ro.� �va�-�/r6/canf
Signed Date - 6-
f1v/✓1<iwSQ 4C/*C wr it
P.O. Box 27687, N%` AnEqualOpportFAX 919-733-1495
Raleigh, North Carolina 27611-7687 unity/Af irrnative Action Employer
Voice 919-733-2293 TR9*4Jr! 50% recycled/10% post -consumer paper
State of North Carolina
Department of Environment,
Health, and Natural Resources , •
WA
Division of Marine Fisheries �/
l-_
James B. Hunt, Jr., Governor p E H N R
Jonathan B. Howes, Secretary
Bruce L. Freeman, Director
24 September 1996
MEMORANDUM
TO: John R. Parker, Jr.
DCM Major Permits Prcessing Coordinator
FROM: P.A.. Wojciechowski X� '
SUBJECT: DREDGE AND FILL PERMIT
Stuart Cooke and John Sutton/Harbor at King's Lynn Phase II
Attached is the Division's reply for the above referenced project. If you have any
questions, please don't hesitate to contact me.
PAW/bc
i'JEO
S€P 25 996
cutaiP.L
P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
State iIt Ivortn Larouna
Department of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
MEMORANDUM:
AO ftft00W_AW0^1a
ek
IDFEE HNR
September 13, 1996
TO: Mr. Bruce Freeman, Director
Division of Marine Fisheries
FROM: John R. Parker
Major Permits Processing Coordinator c� RECEIVED
SE 225 ,94
SUBJECT: CAMA/DREDGE & FILL Permit Application Review Pr;;.+<.,-; -�T
Applicant: Stuart Cooke & John Sutton/Harbor at King's Lynn Phase H
Project Location: King's Lynn Dr & 69th Place West, west end of Long Beach,
Proposed Project: The modification of existing permit #14-96 to include Phase H of the Harbor at
King's Lynn Subdivision. Phase H will include the platting of 32 additional
single family lots and the extension of water lines and construction of a cul-de-sac
to serve the development.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by Oct 4, 1996. If you have any questions regarding the proposed project, please contact Ed Brooks
at extension 247. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED 1 DATE a - (� -9
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 20, 1996
MEMORANDUM
TO: Mr. John Sutherland, Chief
Water Planning Section
Division of Water Resources
FROM: John Parker, Jr.
Major Permits Processing Coordinator
1, •ram
IDEHNR
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
APPLICANT: Harbor at King's Lynn --Phase II (Maj. Mod. Of permit #14-96)
PROJECT LOCATION: King's Lynn Drive & 69th Place West, Long Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit to include Phase II, etc.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by October 11, 1996. If you have any questions regarding the proposed project, please r,,0nfR4.
Op -
Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested, ^ ��
91996
REPLY This agency has no objection to the project as proposed. 1 yI
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
Signed / Date
P.O. Box 27687, N%4q«,CFAX 919-733-1495
Raleigh, North Carolina 27611-7687 An Equal Opportunity/Affirmative Action Employer
Voice 919-733-2293 50% recycled/10% post -consumer paper
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 20, 1996
MEMORANDUM
TO: Ms. Renee Gledhill -Early
Environmental Review Coordinator
Division of Archives and History
FROM: John Parker, Jr.
Major Permits Processing Coordinator
ASWWAW�
EDEHNFR
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
R C VE0
OCT 101996
C .a�1L
MANAGEMENT
APPLICANT: Harbor at King's Lynn --Phase II (Maj. Mod. Of Permit #14-96)
PROJECT LOCATION: King's Lynn Drive & 69th Place West, Long Beach, Brunswick Co.
PROPOSED PROJECT: To modify existing permit #14-96 to include Phase II, etc..
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
October 11,1996. If you have any questions regarding the proposed project, please contact John Parker
at 733-2293 when appropriate, in-depth comments with supporting data are requested.
REPLY This agency has no objection to the project as proposed.
'0 V This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
Signed J/,U, �P, ZLJ�" Date
P.O. Box 27687, Ni
FAX 919 733-1495
Raleigh, North Carolina 27611-7687 � An Equal FAX
Action Employer
Voice 919-733-2293 50% recycled/10% post -consumer paper
--rtment of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
f
C) FEE HNF1
September 13, 1996
MEMORANDUM: O 113 I (12
TO: Mr. Charles Gardner, Director REC 11-EO
Division of Land Resources SEP 23 1996 t_\D'
Cotis ru
CA �/
FROM: John R. ParkerhiANMEI4ENT
Major Permits Processing Coordinator
AJ
SUBJECT: CAMA/DREDGE & FILL Permit Application Review 9 I 5
Applicant: Stuart Cooke & John Sutton/Harbor at King's Lynn Phase H
Project Location: King's Lynn Dr & 69th Place West, west end of Long Beach, Brunswick Co
Proposed Project: The modification of existing permit #14-96 to include Phase H of the Harbor at
King's Lynn Subdivision. Phase R will include the platting of 32 additional
single family lots and the extension of water lines and construction of a cul-de-sac
to serve the development.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by Oct 4, 1996. If you have any questions regarding the proposed project, please contact Ed Brooks
at extension 247. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED ( DATE ' E47 20 �o
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
State cti North Carolina
Department of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
MEMORANDUM:
Ad
[DEHNR
September 13, 1996
TO: Mr. William A. McNeil, Director
Division of Community Assistance
FROM: John R. Parker
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FII,L Permit Application Review
Applicant: Stuart Cooke & John Sutton/Harbor at King's Lynn Phase II
Project Location: King's Lynn Dr & 69th Place West, west end of Long Beach, Brunswick Co
Proposed Project: The modification of existing permit #14-96 to include Phase II of the Harbor at
King's Lynn Subdivision. Phase II will include the platting of 32 additional
single family lots and the extension of water lines and construction of a cul-de-sac
to serve the development.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by Oct 4, 1996. If you have any questions regarding the proposed project, please contact Ed Brooks
at extension 247. When appropriate, in-depth comments with supporting data is request11-
REPLY: This agency has no objection to the project as proposed. MAryq� f fNT
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED41L4ff
DATE
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
State of North Carolina
Department of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 13, 1996
of 1 flu C177_`►11111�� fl
TO: Town of Long Beach
Inspections Department SFp2cF��FQ ✓
FROM: John R. Major Permits rProcessing Coordinator T' �Ayfry996
�u
SUBJECT: CAMA/DREDGE & FILL Permit Application Revie
Applicant: Stuart Cooke & John Sutton/Harbor at King's Lynn Phase II
Project Location: King's Lynn Dr & 69th Place West, west end of Long Beach, Brunswick Co
Proposed Project: The modification of existing permit #14-96 to include Phase II of the Harbor at
King's Lynn Subdivision. Phase II will include the platting of 32 additional
single family lots and the extension of water lines and construction of a cul-de-sac
to serve the development.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by Oct 4, 1996. If you have any questions regarding the proposed project, please contact Ed Brooks
at 910/395-3900. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED (/ DATE
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Stuart Cooke & John Sutton/Harbor at Kings Lynn -Phase II
Major Modification of State Permit #14-96
2. LOCATION OF PROJECT SITE: King's Lynn Dr. and 69th Place West, west end of Long
Beach.
Photo Index - 1995:8-77, B-D, 2-8 1989: 184-24, B-E, 3-8 1984: 11-118, E-G, 11-
16
State Plane Coordinates - X: 2234200 Y: 60800
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/10/96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9/11/96
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Long Beach
Land Classification From LUP - Developed Residential
(B) AEC(s) Involved: OH
(C) Water Dependent: No
(D) Intended Use: Single-family residential
(E) Wastewater Treatment: Existing - None
Planned - Individual septic tank systems
(F) Type of Structures: Existing - None
Planned - Single-family residences
(G) Estimated Annual Rate of Erosion: 2 ft./yr.
Source - LTAAER Small Scale Map-Pg. 2 of 14
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
(C) Other
Highground disturbance
12,410 sq.ft.
(D) Total Area Disturbed: 12,410 sq.ft.
(E) Primary Nursery Area: NO
(N) Water Classification: Atlantic Ocean - SB, Eastern Channel - SA Open: Yes
8. PROJECT SUMMARY: The applicant is requesting to modify to his existing State Permit
#14-96, to include Phase II, of the Harbor at Kings Lynn Subdivision. Phase Il would include
the platting of 32 additional single-family lots, and the extension of water lines and construction
of a cul-de-sac to serve the development.
The Harbor at King's Lynn -Phase H
Page 2
9. PROJECT DESCRIPTION
The project is the proposed Phase H of Harbor at King's Lynn Subdivision that was previously
permitted by State Permit #14-96, in January 1996. The project site is located adjacent to Kings Lynn
Drive (SR 1828) and West Beach Dr., at the west end of Long Beach, in Brunswick County, North
Carolina. The 15.16 acre tract is situated, both east and west of the fourteen (14) Phase I lots. The
property is bordered by the Lockwood Folly Sound (also known as Eastern Channel) to the north,
Lockwood Folly Inlet to the west, and the Atlantic Ocean to the south. The existing Kings Lynn Drive
runs through the eastern portion of the property, and adjacent to the northern edge of the western
section of the proposed subdivision expansion. There is an existing 12 inch water line within the Kings
Lynn Drive right-of-way which continues to the west, under Lockwood Folly Inlet to Holden Beach.
The road right-of-way separates the tract from MHW on the northwestern side of the property, but the
highground widens to both sides of Kings Lynn Drives in the eastern section. Topography in the eastern
section consists of large dunes on the north side of the road, with elevations up to 29 feet mean sea
level (MSL). On the north side of the property, these dunes drop sharply to the shoreline of Eastern
Channel/Lockwood Folly Sound. Along the shoreline, there is a border of coastal wethmd vegetation.
High coastal marsh species observed along this transition from highground were; Groundsel Bush
(Baccharris halimifolia), Marsh Elder Qva frutescensl, Salt Meadow Grass (Spartina patens), Spike
Grass (Distichlas spicata), Sea Ox-eye (Borrichia frutescens), Sea Lavender (Limonium spp.), and
Saltwart Salicornia spp.). The high marsh transitions into regularly flooded, Smooth Cordgrass
(Spartina alterniflora) marsh, which is approximately 400 feet wide. On the south side of the road, the
topography is relatively low and flat, at approximately 6-10 feet elevation MSL. This area may have
been used as a sand barrow sight at some time in the past. Both areas appear to be typical Newhan fine
sand/dune systems, with typical dune vegetation, predominately, Sea Oats, Smilax, Yucca, other dune
grasses, Wax Myrtle and an occasional Red Cedar and Dune -Elder (Iva imbricatal.
The waters of Lockwood Folly Sound are classified SA, by the N.C. Division of Environmental
Management, and are OPEN to the harvest of shellfish. Portions of the tract are within the Ocean
Erodible and Inlet Hazard areas of the Ocean Hazard Area of Environmental Concern, as designated
by the North Carolina Coastal Resources Commission. The Long Term Average Annual Erosion Rate
is 2 ft./yr. on the west end of Long Beach. Historically, the west end of Long Beach has experienced
significant erosion. Originally, the road made a complete loop around the end of the island. The road
was over -washed a number of times during the 1960's and 1970's. After it was washed out by a storm
in 1979, NCDOT never rebuilt the road. In recent years, Lockwood Folly Inlet has been migrating
west, and the west end of Long Beach has been accreting, with dune development and natural vegetation
colonization, 800 to 1200 feet west and south of it's 1979 location.
The applicants have subdivided the Harbor at Kings Lynn subdivision, Phase Il property, into 32
additional single-family lots (15-46). Lots 15-39 are located east of the Phase I tract. Lots 40-46 are
located west of the original Phase I section (Lots 1-14). Individual septic tank systems would provide
wastewater disposal for each residence. The applicants propose to extend the potable water line that
was approved for Lots 8-14, to also, serve Lots 40-46. The established utility easement, adjacent to
the road, 20 feet wide, along the north side of Lots 1-8, would continue through Lots 40-46. The
waterline extension would be approximately 200 feet long and six (6) inches in diameter. Similarly, a
waterline extension is proposed for Lots 25-29, on West Beach Drive. This line would be 130 feet long
and 4 inches in diameter. The water lines would be installed by the applicant and ownership
The Harbor at King's Lynn Phase II
Project Narrative
Coastal Area Management Act Permit Applic ��7 D
(Modification of Permit No. 1496) 77 JUL 10 1996
Introduction DIVISION OF
COASTAL MANAGEMENT
Phase II of The Harbor at King's Lynn is proposed to have 32 lots which
will be numbered in compatibility with the Phase I section of the subdivision.
The proposed Phase II lots vary in width dimension from approximately 51 feet
to approximately 104 feet and in depth from 520 feet to approximately 136 feet.
The proposed lots are located adjacent to each end of Phase I, directly across
the roadway (north) of the Brunswick County Water Booster Pumping Station,
and north of West Beach Drive. The project for Phase II consists of the
addition of three six-inch waterlines, an extension of the asphalt roadway at
the west end of King's Lynn Drive, and the construction of an asphalt cul-de-
sac roadway, King's Lynn Court. It is our intent, with the submittal of
NCDEHNR forms DCM-MP-1 and DCM-MP-3, that a modification be made to
Permit Number 1496, issued on January 26, 1996 by the NCDEHNR for the
project associated with Phase I of The Harbor at King's Lynn, to include Phase
II. A brief description of each of the items associated with the project for Phase
II is listed below:
A. Six-inch waterlines
A six-inch waterline approximately 420 feet in length and located within
the Department of Transportation (D.O.T) Right of Way, will be connected to
the existing six inch line at the west end of West Branch Drive. A Right of Way
Encroachment Agreement has been submitted to the D.O.T. for this area.
A second six-inch waterline will be a continuation of the six-inch water
line that was previously permuted for Phase I of The Harbor at King's Lynn.
Approximately 400 feet of six-inch waterline will be added to the 360-foot water
line described in the Coastal Area Management Act (C.A.M.A.) Permit #1496 for
The Harbor at King's Lynn. This additional waterline will be located at the
west end of King's Lynn Drive and will be constructed within the 20 foot
easement located on the north east end of Lots 40 through 46.
A third six-inch waterline will connect to the existing twelve -inch
waterline located within the D.O.T. Right of Way for King's Lynn Drive and will
be used to service lots 15 through 19. The six-inch line will be constructed
within a twenty -foot easement located on the north-east end of lots 15 through
19.
B. Roadway extension
The asphalt roadway of King's Lynn Drive will be extended westerly
approximately 210 feet in order to provide paved access to Lots 44 through 46
of Phase II of The Harbor at King's Lynn. The roadway extension will be 20
feet in width and will be located in the approximate center of the D.O.T. Right
of Way.
C. Roadway construction
King's Lynn Court will be an asphalt roadway 20 feet in width,
approximately 190 feet in length, originating from King's Lynn Drive and
terminating with a 45-foot radius cul-de-sac. King's Lynn Court will be located
approximately 400 feet north west from the intersection of 69th Place West and
King's Lynn Drive and will intersect the southern edge of King's Lynn Drive.
The roadway will be constructed in accordance with the current construction
standards as defined by the NCDOT.
A site development plan for Phase I and Phase II of The Harbor at King's
Lynn was submitted to the Division of Environmental Management on April
30, 1996 for approval.
TC111711U
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
Cooke/Sutton
The Harbor at Kings Lynn-Pbase H
Page 3
subsequently transferred to the subdivision property owners for long term maintenance and/or repair.
A paved cul-de-sac, (King's Lynn Court), off King's Lynn Drive, is proposed to access Lots 15-18. A
two (2) inch waterline would be installed within this right-of-way to serve these lots.
10. ANTICIPATED IMPACTS
The installation of the proposed waterline extensions and cul-de-sac would disturb approximately 12,410
square feet of highground area. Additional soil disturbance and creation of impervious surface area
would occur with the subsequent construction of single-family houses, by individual lot owners. There
may be substantial loss of the high dune area north of Kings Lynn Drive, as the area is outside of the
Ocean Hazard AEC, and lot owners will be able to modify their landscapes as they so choose.
Submitted by: E.F. Brooks Date: 9/1$/96 Office: Wilmington
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Stuart Cooke & John Sutton/Harbor at Kings Lynn -Phase 11
Major Modification of State Permit #14-96
2. LOCATION OF PROJECT SITE: King's Lynn Dr. and 69th Place West, west end of Long
Beach.
Photo Index - 199595:8-77, B-D, 2-8 1989: 184-24, B-E, 3-8 1984: 11-118, E-G, 11-
16
State Plane Coordinates - A: 2234200 Y: 60800
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/10/96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9/11/96
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Long Beach
- Land Classification From LUP - Developed Residential
(B) AEC(s) Involded: OH
(C) Water Dependent: No
(D) Intended Use: Single-family residential
(E) Wastewater Treatment: Existing - None
Planned - Individual septic tank systems
(F) Type of Structures: Existing - None
Planned - Single-family residences
(G) Estimated Annual Rate of Erosion: 2 ft./yr.
Source - LTAAER Small Scale Map-Pg. 2 of 14
7. HABITAT DESCRIPTION: [AREA]
. DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
(C) Other
Highground disturbance
12,410 sq.ft.
(D) Total Area Disturbed: 12,410 sq.ft.
(E) Primary Nursery Area: NO
(F) Water Classification: Atlantic Ocean - SB, Eastern Channel - SA Open: Yes
8. PROJECT SUMMARY: The applicant is requesting to modify to his existing State Permit
#14-96, to include Phase II, of the Harbor at Kings Lynn Subdivision. Phase 11 would include
the platting of 32 additional single-family lots, and the extension of water lines and construction
of a cul-de-sac to serve the development.
The Harbor at King's Lynn -Phase H
Page 2
9.
The project is the proposed Phase II of harbor at King's Lynn Subdivision that was previously
permitted by State Permit #14-96, in January 1996. The project site is located adjacent to Kings Lynn
Drive (SR 1828) and West Beach Dr., at the west end of Long Beach, in Brunswick County, North
Carolina. The 15.16 acre tract is situated, both east and west of the fourteen (14) Phase I lots. The
property is bordered by the Lockwood Folly Sound (also known as Eastern. Channel) to the north,
Lockwood Folly Inlet to the west, and the Atlantic Ocean to the south. The existing Kings Lynn Drive
runs through the eastern portion of the property, and adjacent to the northern edge of the western
section of the proposed subdivision expansion. There is an existing 12 inch water line within the Kings
Lynn Drive right-of-way which continues to the west, under Lockwood Folly Inlet to Holden Beach.
The road right-of-way separates the tract from MHW on the northwestern side of the property, but the
highground widens to both sides of Kings Lynn Drives in the eastern section. Topography in the eastern
section consists of large dunes on the north side of the road, with elevations up to 29 feet mean sea
level (MSL). On the north side of the property, these dunes drop sharply to the shoreline of Eastern
Channel/Lockwood Folly Sound. Along the shoreline, there is a border of coastal wetland vegetation.
High coastal marsh species observed along this transition from highground were; Groundsel Bush
(Baccharris halimifolia), Marsh Elder (1va frutescensl, Salt Meadow Grass (Spartina patens), Spike
Grass (Distichlas spicata), Sea Ox-eye (Borrichia frutescens), Sea Lavender imonium spp.), and
Saltwart Salicomia spp.). The high marsh transitions into regularly flooded, Smooth Cordgrass
(Spartina alterniflora) marsh, which is approximately 400 feet wide. On the south side of the road, the
topography is relatively low and flat, at approximately 6-10 feet elevation MSL. This area may have
been used as a sand barrow sight at some time in the past. Both areas appear to be typical Newhan fine
sand/dune systems, with typical dune vegetation, predominately, Sea Oats, Smilax, Yucca, other dune
grasses, Wax Myrtle and an occasional Red Cedar and Dune -Elder (Iva imbricata).
The waters of Lockwood Folly Sound are classified SA, by the N.C. Division of Environmental
Management, and are OPEN to the harvest of shellfish. Portions of the tract are within the Ocean
Erodible and Inlet Hazard areas of the Ocean Hazard Area of Environmental Concern, as designated
by the North Carolina Coastal Resources Commission. The Long Term Average Annual Erosion Rate
is 2 ft./yr. on the west end of Long Beach. Historically, the west end of Long Beach has experienced
significant erosion. Originally, the road made a complete loop around the end of the island. The road
was over -washed a number of times during the 1960's and 1970's. After it was washed out by a storm
in 1979, NCDOT never rebuilt the road. In recent years, Lockwood Folly Inlet has been migrating
west, and the west end of Long Beach has been accreting, with dune development and natural vegetation
colonization, 800 to 1200 feet west and south of it's 1979 location.
The applicants have subdivided the Harbor at Kings Lynn subdivision, Phase II property, into 32
additional single-family lots (15-46). Lots 15-39 are located east of the Phase I tract. Lots 40-46 are
located west of the original Phase I section (Lots 1-14). Individual septic tank systems would provide
wastewater disposal for each residence. The applicants propose to extend the potable water line that
was approved for Lots 8-14, to also, serve Lots 40-46. The established utility easement, adjacent to
the road, 20 feet wide, along the north side of Lots 1-8, would continue through Lots 40-46. The
waterline extension would be approximately 200 feet long and six (6) inches in diameter. Similarly, a
waterline extension is proposed for Lots 25-29, on West Beach Drive. This line would be 130 feet long
and 4 inches in diameter. The water lines would be installed by the applicant and ownership
1.
Cooke/Sutton
The Harbor at Kings Lynn -Phase II
Page 3
subsequently transferred to the subdivision property owners for long term maintenance and/or repair.
A paved cul-de-sac, (King's Lynn Court), off King's Lynn Drive, is proposed to access Lots 15-18. A
two (2) inch waterline would be installed within this right-of-way to serve these lots.
10. ANTICIPATED IMPACTS
The installation of the proposed waterline extensions and cul-de-sac would disturb approximately 12,410
square feet of highground area. Additional soil disturbance and creation of impervious surface area
would occur with the subsequent construction of single-family houses, by individual lot owners. There
may be substantial loss of the high dune area north of Kings Lynn Drive, as the area is outside of the
Ocean Hazard AEC, and lot owners will be able to modify their landscapes as they so choose.
Submitted by: E.F. Brooks Date: 9/14/96 Office: Wilmington
The Harbor at King's Lynn Phase II
Project Narrative
Coastal Area Management Act Permit Applic M 1171j D
(Modification of Permit No. 1496) 7 JUL 10 1996
Introduction DIVISIOiV OF
COASTAL MANAGEMENT
Phase II of The Harbor at King's Lynn is proposed to have 32 lots which
will be numbered in compatibility with the Phase I section of the subdivision.
The proposed Phase II lots vary in width dimension from approximately 51 feet
to approximately 104 feet and in depth from 520 feet to approximately 136 feet.
The proposed lots are located adjacent to each end of Phase I, directly across
the roadway (north) of the Brunswick County Water Booster Pumping Station,
and north of West Beach Drive. The project for Phase II consists of the
addition of three six-inch waterlines, an extension of the asphalt roadway at
the west end of King's Lynn Drive, and the construction of an asphalt cul-de-
sac roadway, King's Lynn Court. It is our intent, with the submittal of
NCDEHNR forms DCM-MP-1 and DCM-MP-3, that a modification be made to
Permit Number 1496, issued on January 26, 1996 by the NCDEHNR for the
project associated with Phase I of The Harbor at King's Lynn, to include Phase
II. A brief description of each of the items associated with the project for Phase
II is listed below:
A. Sig -inch waterlines
A six-inch waterline approximately 420 feet in length and located within
the Department of Transportation (D.O.T) Right of Way, will be connected to
the existing six inch line at the west end of West Branch Drive. A Right of Way
Encroachment Agreement has been submitted to the D.O.T. for this area.
A second six-inch waterline will be a continuation of the six-inch water
line that was previously permuted for Phase I of The Harbor at King's Lynn.
Approximately 400 feet of six-inch waterline will be added to the 360-foot water
line described in the Coastal Area Management Act (C.A.M.A.) Permit # 1496 for
The Harbor at King's Lynn. This additional waterline will be located at the
west end of King's Lynn Drive and will be constructed within the 20 foot
easement located on the north east end of Lots 40 through 46.
A third six-inch waterline will connect to the existing twelve -inch
waterline located within the D.O.T. Right of Way for King's Lynn Drive and will
be used to service lots 15 through 19. The six-inch line will be constructed
within a twenty -foot easement located on the north-east end of lots 15 through
19.
B. Roadway extension
The asphalt roadway of King's Lynn Drive will be extended westerly
approximately 210 feet in order to provide paved access to Lots 44 through 46
of Phase II of The Harbor at King's Lynn. The roadway extension will be 20
feet in width and will be located in the approximate center of the D.O.T. Right
of Way.
C. Roadway construction
King's Lynn Court will be an asphalt roadway 20 feet in width,
approximately 190 feet in length, originating from King's Lynn Drive and
terminating with a 45-foot radius cul-de-sac. King's Lynn Court will be located
approximately 400 feet north west from the intersection of 69th Place West and
King's Lynn Drive and will intersect the southern edge of King's Lynn Drive.
The roadway will be constructed in accordance with the current construction
standards as defined by the NCDOT.
A site development plan for Phase I and Phase II of The Harbor at King's
Lynn was submitted to the Division of Environmental Management on April
30, 1996 for approval.
Z3 01 3 1 HVJRD
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
Form DCM-MP-1 �' �� L V JS"d D
APPLICAT104
JUL 10 1996
DIVISION OF
(ro be completed by. all applicants) COASTAL MANAGEMENT
1. APPLICANT
a. Landowner:
Name Stuart Cooke & John Sutton
Address 20 E. 2nd Street
City Ocean Isle Beach State NC
Zip 28469 Day Phone (910)579-3535
Fax (910)579-2121
b. Authorized Agent:
Name. Jay R. Houston, P.E.
Address Post Office Box 2927
City Shallotte State NC
Zip 2?459 Day Phone (910) 754-6324
Fax (910)754-2121
c. Project name (if any) Harbor I& KinaIs Lynn
Phase II
NOTE: Pcrndt %W be issued in mine of tmido r(tj, and/or
' projen mine.
2. LOCATION OF PROPOSED
PROJECT
b. City, town, community or landmark
Town of Long Beach
c. Street address or secondary road number
69th Place West
d. Is proposed work within city limits or planning
jurisdiction? X Yes No
e. Name of body of wafer nearest project (e.g. river,
creek, sound, bay) Lockwood Folly Sound
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities, you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities. 6^waterline
Extension to existing 12" waterline,
wA lcoc and fire i'tydrant, Pavemani-
�Pxtengion 4 rul-de car road construction
b. Is the proposed activity maintenance of an existing
project, new work, or both? New Work
c. will the project be for public, private or commercial
use? Private
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. Construction will be
by conventional means Waterline will be
installed 3' deep -(Please see attached
plans)
a. County Brunswick
Form DCM-MP-1
in. Describe existing wastewater treatment facilities.
4. LAND AND WATER VD
0 -site septic tanks
CHARACTERISTICS
a. Size of entire tract
15.16 acres, zl JUL 10 1996n. Describe location and type of discharges to waters
N OF of the state. (For example, surface runoff, sanitary
b. Size of individual lots) 50X400 (,MA0ML MANAGEMENrTiastewater, industrial/commercial effluent, "wash
down" and residential discharges.) TTnnp
c. Approximate elevation of tract above MHW or;
NWL t 6 - MSL
d. Soil type(s) and texture(s) of tract
Newnan & Corolla Complex sands
e. Vegetation on tract
Maritime shrubs
f.. Man-made features now on tract
Existing buried 121, waterline
g. What is the CAMA Land Use Plan land
classificatioti of the site? (Coosa!+ the local land are plat.)
Conservation Transitional
x Developed Residers.iai Community
Rural - Other
h., How is the tract zoned by local government?
Residential (R-1)
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(Attach zoning conVIlanee Certificate, if applicable)
j. Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve. a National
Register listed or eligible property?
Yes X No
1. Are there wetlands on the site? _Yes R No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Attach documentation, ifavailabL-)
c. Describe existing drinking water supply source.
Long Beach -Municipal System via
Brunswick County Water System
S. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
A copy of the.deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said. property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
s An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an 8 1/2' by 1I" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for. a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use, of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently•detailed to
guide agency personnel unfamiliar with the area to the
Form DCM MP-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed 32— Single-family
Residences
b. Number of lots or parcels _32
C.
9
e.
Density (give the number of residential units and the
units per acre) 32 units on 15.16 acres
2.11 units/acre
Size of area to be graded, filled or' disturbed
including roads, ditches, etc. waterline
5' wide x1200=6000 ft
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? Yes T X No
If yes, date submitted -
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
h. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site, development plan been submitted to the
Division of Environmental Management for review?
X Yes . No
If yes, date submitted __ 4/30/96
I. Describe proposed method of sewage disposal.
On site septic tanks, 14 permits
issued. 32-Permits pending
j. Have the facilities described in Item i. above
received state or local approval? No
(Attach appropriate domtnen=don)
k. Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial/commercial effluent,
"wash down" and residential discharges).
None
I. Describe proposed drinking water supply source
(e.p. well, community, public system,. etc.)
Town of Lona Beach.via Brunswick cn.
m. Will water be impounded?
If yes, how many acres? _
Yes _x No
List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces. n. If the project is a oceanfront development, when
Asphalt,. Concrete or marl will be used was the lot(s) platted and recorded? gend;nq
for driveways.
Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case'of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. Less than 1%'_
Harbor at Kina's Lvnn
Appli o jet fa�
W �ture
-2S- 9 6
Date
Revised 03195
oJN 974 7v\77�
Form DCM-NQ'-1 JUL 10 MO
DIVISION OF
COASTAL MANAGEMENT
site. include highway or secondary road (SR)
numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
• A Stormwater Certification, if one is necessary.
a A list of the names and complete addresses of the I understand that any permit issued in response to this
application will allow only the development described in
adjacent waterfront (riparian) landowners and the application. The project will be subject to conditions
signed return receipts as proof that such owners and restrictions contained in the permit.
have received a copy or the application and plats
by certified mail. Such landowners must be advised I certify that to the.best of my knowledge; the proposed
that they have 30 days in which to submit comments activity complies with the State of North Carolina's
on the proposed project to the Division of Coastal proved Coastal Management Program and will be
Management. Upon signing this form, the applicant conducted in a manner consistent with such program.
further certifies that such notice has been provided.
Name Mr. Jerry A Walters, Manager I certify that I am authorized to grant, and do in fact,
Address Town of Long React, grant permission to representatives of state and federal
*Ph'dhb 4601 F. Dak Tg1 and nrreview agencies to enter on the aforementioned lands in
Long Beach,NC 28465 connection with evaluating information related to this
Name Mrs Myra Teasley permit application and follow-up monitoring of the
Address 2713 Town Edcte Ct. project.
phdrf& Raleigh, NC 27612
I further certify that the information provided -in this
Name application is truthful to the best of my knowledge.
Address
Phone
This is the 24 day of June , 19 96
A list or previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
None
A check for $250 made payable to the Department of
Environment, Health, ' and Natural Resources
(DEHNR) to cover the costs of processing the
application.
A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement or compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the proJect involves the expenditure of public
funds or use of public lands,'attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
Print Name Joh/n/Sutton -
Signature Y
weer ar Authored Ag
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
X 'DCM MP-3 Upland Development
X DCM MP-4 Structures Information
_ DCM MP-5 Bridges and Culvert
DCM MP-6 Marina Development
NOTE. Please sign and date each attachment in the
space provided at the bottom of each form.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Stuart Cooke & John Sutton/Harbor at Kings Lynn -Phase Il
Major Modification of State Permit #14-96
2. LOCATION OF PROJECT SITE: King's Lynn Dr. and 69th Place West, west end of Long
Beach.
Photo Index - 1995:8-77, B-D, 2-8 1989: 184-24, B-E, 3-8 1984: 11-118, E-G, 11-
16
State Plane Coordinates - X: 2234200 Y: 60800
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/10/96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9/11/96
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Long Beach
Land Classification From LUP - Developed Residential
(B) AEC(s) Involved: OH
(C) Water Dependent: No
(D) Intended Use: Single-family residential
(E) Wastewater Treatment: Existing - None
Planned - Individual septic tank systems
(F) Type of Structures: Existing - None
Planned - Single-family residences
(G) Estimated Annual Rate of Erosion: 2 ft./yr.
Source - LTAAER Small Scale Map-Pg. 2 of 14
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
(C) Other
Highground disturbance
12,410 sq.ft.
(D) Total Area Disturbed: 12,410 sq.ft.
(E) Primary Nursery Area: NO
(I) Water Classification: Atlantic Ocean - SB, Eastern Channel - SA Open: Yes
8. PROJECT SUNOdARY: The applicant is requesting to modify to his existing State Permit
#14-96, to include Phase H, of the Harbor at Kings Lynn Subdivision. Phase II would include
the platting of 32 additional single-family lots, and the extension of water lines and construction
of a cul-de-sac to serve the development.
The Harbor at King's Lynn -Phase H
Page 2
9. PROTECT DESCRIPTION
The project is the proposed Phase 11 of Harbor at King's Lynn Subdivision that was previously
permitted by State Permit #14-96, in January 1996. The project site is located adjacent to Kings N nn
Drive (SR 1828) and West Beach Dr., at the west end of Long Beach, in Brunswick County,s The
Carolina. The 15.16 acre tract is situated, both east and west of the fourteen (14) Phase
property is bordered by the Lockwood FollySound (also known as Eastern Channel) to the north,
Lockwood Folly Inlet to the west, and the Atlantic Ocean to the south. The existing Kings Lynn Drive
runs through the eastern portion of the Property, and adjacent to the northern edge of the western
section of the proposed subdivision expansion. There is anexisting12 inch water line within the Yjngs
Lynn Drive right-of-way which continues to the west, under Lockwood Folly Inlet to Holden Bach -
The road right-of-way separates the tract from MHW on the northwestern side of the propertythe eastern
highground widens to both sides of Kings Lynn Drives in the eastern but the
section. T°P° to 29 feet mean sea
section consists of large dunes on the north side of the road, with elevations up
level (MSL). On the north side of the property, these dunes drop sharply to the shoreline of Eastern
Channel/Lockwood Folly Sound. Along the shoreline, there is a border of coastal wetland eese�Bon.
High coastal marsh species observed along this transition from high Grass were;
(Baccharris halimifolia), Marsh Elder (Iva frutescensl, salt Meadow Grass /nramenspP )Spy
Grass (Distichlas spicata), Sea Ox-eye (Borricbia frutescens), Sea Lavender (1- i CP,)1 and
Saltwart Salicornia spp.). The high marsh transitions into regularly flooded,
(Spartina alterniflora) marsh, which is approximately 400 feet wide. On the south side of them ad, the
topography is relatively low and flat, at approximately 6-10 feet elevation M bUe. � � w� fine
been used as a sand barrow sight at some time in the past. Both areas appear Lucca, other dune
sand/dune systems, with typical dune vegetation, predominately, Sea Oats, Smilax,
grasses, Wax Myrtle and an occasional Red Cedar and Dune -Elder Uva imbricata).
The waters of Lockwood Folly Sound are classified SA, by the N.C. Division of
thin ronmepee�
Management, and are OPEN to the harvest of shellfish. Portions of the tract
Erodible and Inlet Hazard areas of the Ocean Hazard Area of Environmental Concern, as designated
by the North Carolina Coastal Resources Commission. The Long Term Average Annoal Erosion Rate
is 2 ft./yr. on the west end of Long Beach. Historically, the west end of Long Beach has experienced
significant erosion. Originally, the road made a complete loop around the end of the island. The road
asheq out by a storm
was over -washed a number of times during the 1960 s and 1I9770c�s. ) ood Fo y sett has been migrating
in 1979, NCDOT never rebuilt the road. In recent yam' with dune development and moral vegetation
west, and the west end of Long Beach has been accreting,
colonization, 800 to 1200 feet west and south of it's 1979 location.
The applicants have subdivided the Harbor at Kings Lynn,subdivision, Phase I1 Property, into 32
additional single-family lots (15-46). Lots 15-39 are located east of the phase I tract. lots 40-46 are
located west of the on Phase I section (Lots 1-14). Individual septic tank systems Ater Provide
line that
wastewater sal four ea h residence. The applicants propose to extend the Po
was approveddtsf r Lots 8-14, to also, serve Lots 40 46. The established van' easeme k adjacent to
the road, 20 feet wide, along the north side of Lots 1-8, would con ric a through Lot 3imila The
waterline extension would be approximately 200 feet long and six (6) tgs L in would be }pu feet long
waterline extension is proposed for Lots 25-29, on West Beach Drive- t., �li�t and 'vnership
and 4 inches in diameter. The water lines would be installed by the app
CooketSutton
The Harbor at Kings Page 3 Lynn -Phase II
subsequently payed
cul-de-sac,
transferred to the subdivision property owners for long term maintenance and/or repair.
Paved cul de -sac, (King's Lynn Court), off Ring's Lynn Drive, is proposed to access Lots 15-18. A
two (2) inch waterline would be installed within this right-of-way to serve these lots.
10. ANTICIPATED Ly1PACTS
The installation of the proposed waterline extensions and cul-de-sac would disturb approximately 12,410
square feet of highground area. Additional soil disturbance and creation of impervious surface area
would occur with the subsequent construction of single-family houses, by individual lot owners. There
may substantial loss of the high dune area north of Kings Lynn Drive, as the area is outside of the
ocean Ord AFC, and lot owners will be able to modify their landscapes as they so choose.
Submitted by.::.F. Brooks Date: 9/W96 Office: Wilmington
r
The Harbor at King's Lynn Phase II
Project Narrative
Coastal Area Management Act Permit Applic (71 19I (VTTC1D
(Modification of Permit No. 1496) 7 JUL 10 1996
Introduction DIVISION OF
COASTAL MANAGEMENT
Phase II of The Harbor at King's Lynn is proposed to have 32 lots which
will be numbered in compatibility with the Phase I section of the subdivision.
The proposed Phase II lots vary in width dimension from approximately 51 feet
to approximately 104 feet and in depth from 520 feet to approximately 136 feet.
The proposed lots are located adjacent to each end of Phase I, directly across
the roadway (north) of the Brunswick County Water Booster Pumping Station,
and north of West Beach Drive. The project for Phase II consists of the
addition of three six-inch waterlines, an extension of the asphalt roadway at
the west end of King's Lynn Drive, and the construction of an asphalt cul-de-
sac roadway, King's Lynn Court. It is our intent, with the submittal of
NCDEHNR forms DCM-MP-1 and DCM-MP-3, that a modification be made to
Permit Number 1496, issued on January 26, 1996 by the NCDEHNR for the
project associated with Phase I of The Harbor at King's Lynn, to include Phase
II. A brief description of each of the items associated with the project for Phase
II is listed below:
A. Sig -inch waterlines
A six-inch waterline approximately 420 feet in length and located within
the Department of Transportation (D.O.T) Right of Way, will be connected to
the existing six inch line at the west end of West Branch Drive. A Right of Way
Encroachment Agreement has been submitted to the D.O.T. for this area.
A second six-inch waterline will be a continuation of the six-inch water
line that was previously permuted for Phase I of The Harbor at King's Lynn.
Approximately 400 feet of six-inch waterline will be added to the 360-foot water
line described in the Coastal Area Management Act (C.A.M.A.) Permit #1496 for
The Harbor at King's Lynn. This additional waterline will be located at the
west end of King's Lynn Drive and will be constructed within the 20 foot
easement located on the north east end of Lots 40 through 46.
A third six-inch waterline will connect to the existing twelve -inch
waterline located within the D.O.T. Right of Way for King's Lynn Drive and will
be used to service lots 15 through 19. The six-inch line will be constructed
within a twenty -foot easement located on the north-east end of lots 15 through
19.
B. Roadway extension
The asphalt roadway of King's Lynn Drive will be extended westerly
approximately 210 feet in order to provide paved access to Lots 44 through 46
1
of Phase II of The Harbor at King's Lynn. The roadway extension will be 20
feet in width and will be located in the approximate center of the D.O.T. Right
of Way.
C. Roadway construction
King's Lynn Court will be an asphalt roadway 20 feet in width,
approximately 190 feet in length, originating from King's Lynn Drive and
terminating with a 45-foot radius cul-de-sac. King's Lynn Court will be located
approximately 400 feet north west from the intersection of 69th Place West and
King's Lynn Drive and will intersect the southern edge of King's Lynn Drive.
The roadway will be constructed in accordance with the current construction
standards as defined by the NCDOT.
A site development plan for Phase I and Phase II of The Harbor at King's
Lynn was submitted to the Division of Environmental Management on April
30, 1996 for approval.
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
r
Form DCM-MP-1
APPLICATIO?
J U L 10 1996
DIVISION OF
(To be completed by all applicants) COASTAL MANAGEMENT
b. City, town, community or landmark
Town of Lonct Beach
1. APPLICANT
-
c. Street address or secondary road number
_ 69t1n Place West
a. Landowner:
Stuart Cooke & John Sutton d. Is proposed work within city limits or planning
Name jurisdiction? X Yes No
Address -20 E. 2nd Street e, Name of body of water nearest project (e.g. river,
City Ocean Isle Beach' State
NC creek, sound, bay)' Lockwood Folly Sound
Zip 28469 Day Phone (910)579-3535
3. DESCRIPTION AND PLANNED USE
Fax (910) 579-2121 OF PROPOSED PROJECT
b. Authorized Agent:
Name Jay R. Houston, R.E. a. List all development activities, you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities. 611waterline
Address Post Office Box 2927 Extension to existing 12" waterlines
xAmlirps and £ire YLya.-ant. Payement
City Shallotte State NC extension � c i-de-Gac road construction
Zip 29459 Day Phone (910) 754-6324 b. Is the proposed activity maintenance of an existing
project, new work, or both? New Work
Fax (910)754-2121
c. Will the.project be for public, private or commercial
use? Private
C. Project name (if any) Harbor IQ KingIsLynn
Phase II d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
NOTE.- Permit willbe uraedin name affardowncr(sJ, and/ar additional pages. Construction will be
Project 1Q1ne• by conventional means Waterline will be
installed 3' deep -(please see attached
plans)
2. LOCATION OF PROPOSED
PROJECT
a. County Brunswick
Form DCM-NIP-1
in. Describe existing wastewater treatment facilities.
4. LAND AND WATER D ��� on -site se tic tanks
CHARACTERISTICS
15.16 acres, II JUL 1 0 1996n. Describe location and type of discharges to waters
a. Size of entire tract
UIVIOlulm OF of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) 5OX400 ODA5ML MANAGEMEN%iastewater, industrial/commercial effluent, "wash
down" and residential discharges.) Nnna
c. Approximate elevation of tract above MHW or
NWL ± 6' MSL
d. Soil type(s) and texture(s) of tract
Newman & Corolla Complex sands
e. Vegetation on tract
Maritime shrubs
f. Man-made features now on tract
Existing buried 12" waterline
g. What is the CAMA Land Use Plan land
classification of the site? (matt the taazt lane are ptanJ
- Conservation Transitional
X Developed Residential Community
Rural Other
h. How is the tract zoned by local government?
Residential (R-1)
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(Attach zoning conrlianee ceniftcvte, ifapptiozble)
j. Has a professional archaeological assessment been
done for the tract? Yes X -No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X No
1. Are there wetlands on the site? _ Yes X No
Coastal (mush) Other
If yes, has a delineation been conducted?
(Attach doaannua+ion, if asmtable)
o. Describe existing drinking water supply source.
Long Beach -Municipal System via
Brunswick County Water'System
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said. property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7.1.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a put of plat
requirements and it must be sufficiently -detailed to
guide agency personnel unfamiliar with the area to the
I
Form DCM-,MF-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed 32- Single-family
Residences
b. Number of lots or parcels
c. Density (give the number of residential units and the
units per acre) 32 units on 15.16 acres
2.11 units/acre
r(013�11VIEID
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
X Yes No
If yes, date submitted 4/30/96
i. Describe proposed method of sewage disposal.
On site septic tanks, 14 permits
issued: 32-Permits pending
Have the facilities described in Item i. above
received state or local approval? No
(Attach appropriate docameuauon)
k. Describe location and type of proposed discharges to
Size of area to be graded, filled or disturbed waters of the state (for example, surface runoff,
including roads, ditches, etc. waterline sanitary wastewater, industrial/commercW effluent,
5' wide x1200=6000 ft "wash down" and residential discharges).
None
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? 'Yes X No
If yes, date submitted
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces.
Asphalt,. Concrete or marl will be used
for driveways.
g. Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. Less than 1%
m
Describe proposed drinking water supply source
(e.p..well, community, public ;system,. etc.)
Town of Long Beach via Brunswick Co-
Will water be impounded?
If yes, how many acres? -
Yes _7X No
If the project is a oceanfront development, when
was the lot(s) platted and recorded? nendina
Harbor at Kincr's Lvnn
App=
S" tore
Date
Revised 0319S
Form DCM hfI'-1 JUL 10 1996
DIVISIOIN OF
COASTAL MANAGEMENT
site. include highway or secondary road (SR)
numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION
• A Stormwaler Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Mr. Jerry A Walters, Manager
Address Town of Long 'Beg rh
*Ph7ft a 460T E. Oak Tsl and T)r.
Long Beach,NC 28465
Name Mrs Myra Teasley
Address 2713 Town Edge Ct.
Pit" Raleigh, NC 27612
Name
Address
Phone .
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
None
A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands,' attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained 1-i the permit.
I certify that to the.best of my knowledge; the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission -to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 24 day of June , 19-96_.
Print Name John Sutt
Signature
weer or Au+horied Ag
Please indicate attachments pertaining to your proposed
project.
DCM MP-2
Excavation and Fill Information
X DCM MP-3
Upland Development
X DCM MP-4
Structures Information
DCM MP-5
Bridges and Culverts
_
DCM MP-6
Marina Development
NOTE. Please sign and dare each attachment in the
space provided at the bottom of each form.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Stuart Cooke & John Sutton/Harbor at Kings Lynn -Phase Il
Major Modification of State Permit #14-96
2. LOCATION OF PROJECT SITE: King's Lynn Dr. and 69th Place West, west end of Long
Beach.
Photo Index - 1995:8-77, B-D, 2-8 1989: 184-24, B-E, 3-8 1184: 11-118, E-G, 11-
16
State Plane Coordinates - A: 2234200 Y: 60800
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/10/96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9/11/96
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Long Beach
Land Classification From LUP - Developed Residential
(B) AEC(s) Involved: OH
(C) Water Dependent: No
(D) Intended Use: Single-family residential
(E) Wastewater Treatment: Existing - None
Planned - Individual septic tank systems
(F) Type of Structures: Existing - None
Planned - Single-family residences
(G) Estimated Annual Rate of Erosion: 2 ft./yr.
Source - LTAAER Small Scale Map-Pg. 2 of 14
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
(C) Other
Highground disturbance
12,410 sq.ft.
11
(D) Total Area Disturbed: 12,410 sq.ft.
(E) Primary Nursery Area: NO
M Water Classification: Atlantic Ocean - SR, Eastern Channel - SA Open: Yes
8. PROJECT SUMMARY: The applicant is requesting to modify to his existing State Permit
#14-96, to include Phase 11, of the Harbor at Kings Lynn Subdivision. Phase Il would include
the platting of 32 additional single-family lots, and the extension of water lines and construction
of a cul-de-sac to serve the development.
The Harbor at King's Lynn -Phase H
Page 2
9.
The project is the proposed Phase II of Harbor at King's Lynn Subdivision that was previously
permitted by State Permit #14-96, in January 1996. The project site is located adjacent to Kings Lynn
Drive (SR 1828) and West Beach Dr., at the west end of Long Beach, in Brunswick County, North
Carolina. The 15.16 acre tract is situated, both east and west of the fourteen (14) Phase I lots. The
property is bordered by the Lockwood Folly Sound (also known as Eastern Channel) to the north,
Lockwood Folly Inlet to the west, and the Atlantic Ocean to the south. The existing Kings Lynn Drive
runs through the eastern portion of the property, and adjacent to the northern edge of the western
section of the proposed subdivision expansion. There is an existing 12 inch water line within the Kings
Lynn Drive right-of-way which continues to the west, under Lockwood Folly Inlet to Holden Beach.
The road right-of-way separates the tract from MHW on the northwestern side of the property, but the
highground widens to both sides of Kings Lynn Drives in the eastern section. Topography in the eastern
section consists of large dunes on the north side of the road, with elevations up to 29 feet mean sea
level (MSL). On the north side of the property, these dunes drop sharply to the shoreline of Eastern
Channel/Lockwood Folly Sound. Along the shoreline, there is a border of coastal wetland vegetation.
High coastal marsh species observed along this transition from highground were; Groundsel Bush
(Baccharris halimifolia), Marsh Elder (Iva frutescens), Salt Meadow Grass '(Spartina patensl, Spike
Grass (Distichlas spicata), Sea Ox-eye (Borrichia frutescens), Sea Lavender (Limonium spp.), and
Saltwart Salicornia spp.). The high marsh transitions into regularly flooded, Smooth Cordgrass
(Spartina alternifloral marsh, which is approximately 400 feet wide. On the south side of the road, the
topography is relatively low and flat, at approximately 6-10 feet elevation MSL. This area may have
been used as a sand barrow sight at some time in the past. Both areas appear to be typical Newhan fine
sand/dune systems, with typical dune vegetation, predominately, Sea Oats, Smilax, Yucca, other dune
grasses, Wax Myrtle and an occasional Red Cedar and Dune -Elder (Iva imbricata).
The waters of Lockwood Folly Sound are classified SA, by the N.C. Division of Environmental
Management, and are OPEN to the harvest of shellfish. Portions of the tract are within the Ocean
Erodible and Inlet Hazard areas of the Ocean Hazard Area of Environmental Concern, as designated
by the North Carolina Coastal Resources Commission. The Long Term Average Annual Erosion Rate
is 2 ft./yr. on the west end of Long Beach. Historically, the west end of Long Beach has experienced
significant erosion. Originally, the road made a complete loop around the end of the island. The road
was over -washed a number of times during the 1960's and 1970's. After it was washed out by a storm
in 1979, NCDOT never rebuilt the road. In recent years, Lockwood Folly Inlet has been migrating
west, and the west end of Long Beach has been accreting, with dune development and natural vegetation
colonization, 800 to 1200 feet west and south of it's 1979 location.
The applicants have subdivided the Harbor at Kings Lynn subdivision, Phase 11 property, into 32
additional single-family lots (15-46). Lots 15-39 are located east of the Phase I tract. Lots 40-46 are
located west of the original Phase I section (Lots 1-14). Individual septic tank systems would provide
wastewater disposal for each residence. The applicants propose to extend the potable water line that
was approved for Lots 8-14, to also, serve Lots 40-46. The established utility easement, adjacent to
the road, 20 feet wide, along the north side of Lots 1-8, would continue through Lots. 40-46. The
waterline extension would be approximately 200 feet long and six (6) inches in diameter. Similarly, a
waterline extension is proposed for Lots 25-29, on West Beach Drive. This line would be 130 feet long
and 4 inches in diameter. The water lines would be installed by the applicant and ownership
.,
Cooke/Sutton.
The Harbor at Kings Lynn -Phase H
Page 3
subsequently transferred to the subdivision property owners for long term maintenance and/or repair.
A paved cul-de-sac, (King's Lynn Court), off King's Lynn Drive, is proposed to access Lots 15-18. A
two (2) inch waterline would be installed within this right-of-way to serve these lots.
10. ANTICIPATED EMPACTS
The installation of the proposed waterline extensions and cul-de-sac would disturb approximately 12,410
square feet of highground area. Additional soil disturbance and creation of impervious surface area
would occur with the subsequent construction of single-family houses, by individual lot owners. There
may be substantial loss of the high dune area north of Kings Lynn Drive, as the area is outside of the
Ocean Hazard AEC, and lot owners will be able to modify their landscapes as they so choose.
Submitted by: E.F. Brooks - • Date: 9/l$/96 Office: Wilmington
f.'
I
The Harbor at King's Lynn Phase II
Project Narrative
Coastal Area Management Act Permit Applic h7,011�11V`l
(Modification of Permit No. 1496)
JUL 10 1996
Introduction DIVISION OF
COASTAL MANAGEMENT
Phase II of The Harbor at King's Lynn is proposed to have 32 lots which
will be numbered in compatibility with the Phase I section of the subdivision.
The proposed Phase II lots vary in width dimension from approximately 51 feet
to approximately 104 feet and in depth from 520 feet to approximately 136 feet.
The proposed lots are located adjacent to each end of Phase I, directly across
the roadway (north) of the Brunswick County Water Booster Pumping Station,
and north of West Beach Drive. The project for Phase II consists of the
addition of three six-inch waterlines, an extension of the asphalt roadway at
the west end of King's Lynn Drive, and the construction of an asphalt cul-de-
sac roadway, King's Lynn Court. It is our intent, with the submittal of
NCDEHNR forms DCM-MP-1 and DCM-MP-3, that a modification be made to
Permit Number 1496, issued on January 26, 1996 by the NCDEHNR for the
project associated with Phase I of The Harbor at King's Lynn, to include Phase
II. A brief description of each of the items associated with the project for Phase
II is listed below:
A. Six-inch waterlines
A six-inch waterline approximately 420 feet in length and located within
the Department of Transportation (D.O.T) Right of Way, will be connected to
the existing six inch line at the west end of West Branch Drive. A Right of Way
Encroachment Agreement has been submitted to the D.O.T. for this area.
A second six-inch waterline will be a continuation of the six-inch water
line that was previously permuted for Phase I of The Harbor at King's Lynn.
Approximately 400 feet of six-inch waterline will be added to the 360-foot water
line described in the Coastal Area Management Act (C.A.M.A.) Permit #1496 for
The Harbor at King's Lynn. This additional waterline will be located at the
west end of King's Lynn Drive and will be constructed within the 20 foot
easement located on the north east. end of Lots 40 through 46.
A third six-inch waterline will connect to the existing twelve -inch
waterline located within the D.O.T. Right of Way for King's Lynn Drive and will
be used to service lots 15 through 19. The six-inch line will be constructed
within a twenty -foot easement located on the north-east end of lots 15 through
19.
B. Roadway extension
The asphalt roadway of King's Lynn Drive will be extended westerly
approximately 210 feet in order to provide paved access to. Lots 44 through 46
of Phase II of The Harbor at King's Lynn. The roadway extension will be 20
feet in width and will be located in the approximate center of the D.O.T. Right
of Way.
C. Roadway construction
King's Lynn Court will be an asphalt roadway 20 feet in width,
approximately 190 feet in length, originating from King's Lynn Drive and
terminating with a 45-foot radius cul-de-sac. King's Lynn Court will be located
approximately 400 feet north west from the intersection of 69th Place West and
King's Lynn Drive and will intersect the southern edge of King's Lynn Drive.
The roadway will be constructed in accordance with the current construction
standards as defined by the NCDOT.
A site development plan for Phase I and Phase II of The Harbor at King's
Lynn was submitted to the Division of Environmental Management on April
30, 1996 for approval.
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
i
Form DCM-MP-1 T, io� 1 V J1 O
APPLII JUL 10 1996
4
DIVISION OF
(To be completed by all applicants) COASTAL MANAGEMENT
1. APPLICANT
a. Landowner:
Name
Stuart Cooke 6 John Sutton
Address 20 E. 2nd Street
City Ocean Isle Beach State NC
Zip 28469 Day Phone (910)579-3535
Fax (910)579-2121
b. Authorized Agent:
Name Jay R. Houston, P.E.
Address Post Office Box 2927
City Shallotte State NC
Zip 2?459 Day Phone (910) 754-6324
Fax (910)754-2121
c. Project name (if any) Harbor 9 Kina Is Lynn
Phase II
NOTE: Pend/ w0 be issued in namc of tondo r(s), aid/or
project name.
2. LOCATION OF PROPOSED
PROJECT
b. City, town, community or landmark
Town of Long Beach
c. Street address or secondary road number
69th Place West
d. Is proposed work within city limits or planning
jurisdiction? X Yes No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) Lockwood Folly Sound
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities. you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities. 6"waterline
Extension to"existing 12" waterline,
whm 1ys ,..a f irp liydra„+, Pavement.
extension cul-de-sac road construction
b. Is the proposed activity maintenance of an existing
project, new work, or both? New Work
c. Will the project be for public, private or commercial
use? Private
d. Give a brief description of purpose, use, methods of
construction and duly operations of proposed
project. If more space is needed, please attach
additional pages. Construction will be
by conventional means Waterline will be
installed 3' deep -(please see attached
plans)
a. County Brunswick
Form DCM-MP-1
in. Describe existing wastewater treatment facilities.
4. LAND AND WATER qD
im (c im Eva -site septic tanks
CHARACTERISTICS
JUL 10 1996n.
a. Size of entire tract
15.16 acres, II Describe location and type of discharges to waters
DITSION OF of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) - 50X400 eCAOiI10CL MANAGEMEKastewater, industrial/commercial effluent, "wash
down" and residential discharges.) Nnna
c.. Approximate elevation of tract above MHW or;
NWL t 6' MSL
d. Soil type(s) and texture(s) of tract
Newhan & Corolla Complex sands
e. Vegetation on tract
Maritime shrubs
-
f. Man-made features now on tract
Existing buried 12" waterline
g. What is the CAMA Land Use Plan land
classification of the site? (qua die tacai land ure plan.)
Conservation Transitional
_ X Developed Residential Community
Rural
Other
h. How is the tract zoned by local government?
Residential (R-1)
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(Armch zoning mmpiipnce eerdfimre, ifappGmble)
j. Has a professional archaeological assessment been
donefor the tract? Yes X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X No
1. Are there wetlands on the site? —Yes X No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Anaeh doeumcnwdon, ifayslable)
o. Describe existing drinking water supply source.
Long Beach Municipal System via
Brunswick County Water System
5. ADDITIONAL INFORMATION
In addition to the completed application form, the -
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to -be the owner of said. property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An acatrate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an.8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant.. (Contact the U.S. Army Corps of
Engineers regarding that agency's use, of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently -detailed to
guide agency personnel unfamiliar with the area to the
Form DCM ,MP-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, units or
structures proposed 32- Single-family
Residences
b. Number of lots or parcels 32
c. Density (give the number of residential units and the
units per acre) 32 units on 15.16 acres
2.11 units/acre
d. Size of area to be graded, filled or disturbed
including roads, ditches, etc. waterline
5' wide x1200=6000 ft
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
-Resources? Yes X No
If yes, date submitted
r,0311VIM
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
h.. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
X Yes No
If yes, date submitted • 4/30/96
L Describe proposed method of sewage disposal.
On site septic tanks, 14 permits
issued: 32 Permits pending
Have the facilities described in Item i. above
received state or local approval? No
(Attach appropriate doa,nentadon)
k. Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial/commercial effluent,
"wash down" and residential discharges).
None
In
Describe proposed drinking water supply source
(e.p..well, community, public system,. etc.)
Town of Long Beach. via Brunswick (In.
Will water be impounded?
If yes, how many acres? -
Yes X No
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces, n. If the project is a oceanfront development, when
Asphalt, Concrete or marl will be used was the lot(s) platted and recorded? nendina
for driveways.
g. Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. Less than 1%.
Harbor
at Kina's Lvnn
Applicen o
jet ia�
Sig4ture
�
-2 S_ 9 6
Date
Revised 03195
Form DCM-NIT-1
site. Include highway or secondary road
numbers, landmarks, and the like.
D I013 JS V M O
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
(SR)
6. CERTIFICATION AND PERMISSION
s A Stormwater Certification, if one is necessary.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proor that such owners
have received a copy or the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Mr. Jerry A Walters, Manager
Address Town of Long Aeac b
Ttdtib 4601 R. naij TRIand Dr. -
Long 13each,NC 28465
Name Mrs Myra Teasley
Address 2713 Town Edge Ct.
p}� Raleigh, NC 27612
Name
Address
Phone
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
® A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
® A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, 'attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the.best of my lzrowledge; the proposed .
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 24 day of June , 19 S6 .
Print Name John SSutton
Signature
caner or AurhorLed Ag
Please indicate attachments pertaining to your proposed
project.
DCM MP-2
Excavation and Fill Information
_
X DCM MP-3
Upland Development
X DCM W-4
Structures Information
DCM MP-5
Bridges and Culverts
_
DCM MP-6
Marina Development
NOTE. Please sign and date each attachment in the
space provided at the bottom of each form.
State -of North Carolina
Department of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
Stuart Cooke & John Sutton
The Harbor at King's Lynn -Phase II
20 E. 2nd St.
Ocean Isle Beach, NC 28469
Dear Sus:
IL
E)FEE HNR
September 12, 1996
The Division of Coastal Management hereby acknowledges receipt of your application for State
approval for development of your property located at the west end of Long Beach, NC, in Brunswick
County. It was received on September 11, 1996, and appears to be adequate for processing at this time.
The projected deadline for making a decision is November 25, 1996. An additional 75-day review
period is provided by law when such time is necessary to complete the review. If you have not been
notified of a final action by the initial deadline stated above, you should consider the review period
extended. Under those circumstances, this letter will serve as your notice of an extended review.
However, an additional letter will be provided on or about the 75th day.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the
proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be
posted at the property of your proposed development. You should post this notice at a conspicuous
point along your property where it can be observed from a public road. Some examples would be:
Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property;
or at a point along the road right-of-way where a private toad would lead one into your property.
Failure to post this notice could result in an incomplete application.
A field report has been prepared and is in the process of being circulated to the various state and
federal review agencies for their comments. If additional information is required based on this review,
the agencies may contact you directly. z_
,
E.F. rooks
Field Representative III
Enclosure
cc: -John Parker
Bob Stroud
Town of Long Beach
Jeff Richter, COE
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An Equal Opportunity Affirmative Action Employer
STATEMENT OF COMPLIANCE
NORTH CAROLINA ENVIRONMENTAL POLICY ACT
In accordance the laws and regulation of the State of North Carolina specifically
related to the Environmental Policy Act, the owners/developers of the Harbor at King's
Lynn, Phase II at Long Beach, North Carolina hereby declare the intent to dedicate the
proposed 6" waterline extension, proposed to serve the residential development, to
the Harbor at King's Lynn Homeowners Association for perpetual maintenance. The
Town of Long Beach will install and read service meters in accordance with Town
policy.
) SSA �-,;2J=1�
John Sutton Date
The Harbor at King's Lynn
930 l
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
--fA"or @
P 485 365 906
US Postal Service
Receipt for Certified Mail
No Insurance Coverage Provided.
Do not use for International Mail See reverse
Sant to
Street & Number
Post Offica. State, & ZIP Cade
Postage
$ r
Certified Fee
U
Speaal Delivery Fee
Restncted OeI very Fee
Return Receipt Sho
Wham & Date v
w
Rehm RK
& Date, es
0
TOTALP
ffi tF-as'
t�
�
Postmark rh�te n
s
r
""D
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
P 485 365 907
US Postal Service
Receipt for Certified Mail
No Insurance Coverage Provided.
Do not use for International Mail See reverse
Sent to
Street & Number
Post Offka. State, & ZIP Code
s
:3
Certified Fee
U
Spedal Delivery Fee
Re micted Delivery Fee
Return Recdpt Shovvina to
Whom &Dal ua
r
Return R
Dale, & ess PdNeu
�
TOTA F
96y f�
1�
c
Pastrn Da - CD
.s v
sy'°6
m SENDER:
o •Compete items 1 and/or 2 for additional services. I also Wish t0 receive the
0 •Complete items 3, 4a, and 4b. fOIIOWIOg SerVIC05 (for an
m • Prim your name and address on the reverse of this forth so that we can return this
card to you. extra fee):
j •Attach this torte to the front of the mailpiece, or on the back if space does not ri
permit.1. ❑ Addressee's Address 2 u •Wdfe •Retum Receipt Requested' on the mailpiece below the article number. o
•The Return Receipt will show to whom the article was delivered and the date 2• Restricted Delivery y
delivered. C O Consult Postmaster for fee.
m 3. Article Addressed to: 4a. A e Number
E ids. ► y Tec4.Si
o '�-' j 4b. Service ype a`
R *CGrtlfiedCC
9 sl"V ❑ Insured
.� NL mRetxiipt fo 'Se ❑ COD
8 arc, to 7-36yf2e� ry T 5. Received By: (print Name) B. dressee's Add ess ( my if requested
es is pat i
g 6. Signs id e V 2J
X 612 - 999a
PS Fdnn 3$1 , D ember 19 Donnnstir. Rpti irn lao,oir,t
JUL 10 1996
D
DIVISION OF
SENDER: - - L MANAGEMENT
•Complete items 1 and/or 2 for additional semces. I also Wish to receive the
n• •Compete items 3, 4a, and 4b. fOIIOWIng SefVICOS (for an
m • Prim your name and address on the neveree of this form so that we can return this
card to you. extra fee):
m•Attach this form to the from of the mailpiece, or on the back if space does not u
pemut. 1. ❑ Addressee's Address
it
ar • Write'Return Receipt Requested' on the mailpiece below the article number.
£ •The Return Receipt will show to whom the article was delivered and the date 2. Restricted Delivery W
delivered. G o Consult postmaster for fee.
m o..Jn�%r__Licit Addressed to: 4a. Artcle Nu r
n,'lid• Terr ' \ '' �or.ar�.^ - W
E It—>�'�YSA�IyR. J 3�� c
o I 40. Service Type 1
�'�• ❑ Registered}-6ertified
�Sinasa J ❑Express Mail ❑ Insured
00 � ❑ Retum Receipt for Merchandise ❑ COD
Date of Delivery
/ r
6. R c d By ( nt ame)
ressee's Address (Only if requested
• ��f O fee is paid) t
c6. ign : (A ressee gR gent)
T �r ('"(ice
W L
PS Form 3 1, December 1994 Domestic Retum Receipt
HOUSTON and ASSOCIATES, P.A.
Consulting Engineers
SHALLOTM, NORTH CAROLINA 28459
Telephone (910) 754.6324
Facsimile (910) 754-2121
Mrs. Myra Teasley
2713 Town Edge Court.
Raleigh, North Carolina 27612
Subject: The Harbor at King's Lynn Phase H
Notification of proposed project
Dear Mrs. Teasley:
117 Pine Street
Post Office Box 2927
Tuesday, June 25, 1996
D �"' D
JUL 10 1996
DIVISI&I4 OF
COASTAL MANAGEMENT
Please find enclosed for your review, copies of a Project Narrative
describing the proposed project for The Harbor at King's Lynn Phase II,
drawings including a site map showing the location of the proposed project,
and the application for Major Development in an Area of Environmental
Concern, for Phase II of The Harbor at Kings Lynn. These items have been
submitted to the N.C. Division of Coastal Management in order to obtain a
modification to an existing CAMA Permit.
In accordance with the requirements of this application, landowners of
adjacent waterfront property must be notified of the proposed project. Please
be advised that you have 30 days from receipt of this notice in which to submit
comments to the Division of Coastal Management.
We appreciate your attention to this matter. Should you have .any
questions or comments concerning the information that has been provided for
you, please do not hesitate to call our office.
Sincerely,
Gregory R. Thompson, P.E.
Houston and Associates, P.A.
pc: Mr. John Sutton
File; 95-1043 (The Harbor at King's Lynn)
HOUSTON and ASSOCIATES, P.A.
Consulting Engineers
SHALLOTTE, NORTH CAROLINA 28459
Telephone (910) 754-6324
Facsimile (910) 754-2121
Mr. Jerry A. Walters
Town of Long Beach
4601 E Oak Island Drive.
Long Beach, North Carolina 28465
Subject: The Harbor at Hing's Lynn Phase II
Notification of proposed project
Dear Mr. Walters:
117 Pine Street
Post Office Box 2927
Tuesday, June 25, 1996
JUL 10 1996
DIVISION OF
COASTAL MANAGEMENT
An application for Major Development in an Area of Environmental
Concern for Phase II of The Harbor at Kings Lynn has been filed with the NC
Division of Coastal Management. In accordance with the requirements of this
application, landowners of adjacent waterfront property must be notified of
proposed development. An application package containing all appropriate
information for your review and comment will be sent to your office from the
Division of Coastal Management.
We appreciate your attention to this matter. Should you have any
questions or comments concerning this issue, please do not hesitate to call our
office.
Sincerely,
A"'-
Grego R. Thompson, P.E.
Houston and Associates, P.A.
pc: Mr. John Sutton
File: 95-1043 (The Harbor at icing's Lynn)
permit Class
Permit Number
JUL 10 1996
DIVISION OF _X_
OASTAL MANAGEMENT
STATE OF NORTH CAROLINA
Department of Environment, Health & Natural Resources
and
Coastal Resources Commission
/ /
for Le !
Major Development in an Area of Environmental Conce
pursuant to NCGS 113A-118
_ Excavation and/or filling pursuant to NCGS 113-229
LKine's Lvnn.Z0.E..2nd Street._Ocean_Isle_Beach
authorizing development in Brunswick County at Lockwood Folly Sound, The Harbor at King's Lynn
S/D
as requested in the permittee's application dated 5/31/95 & attached work plan
drawinag. dated received 7/ 7/95
This permit, issued on X or !^G is subject to compliance with the application (when; consistent
with the permit), all applica le regulations, special conditions and totes set forth below. Any violation of these terns may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) The Division of Environmental Management approved this project under stormwater management
rules of the Environmental Management Commission on 1/12/96. Any violation of or deviation
from the plan approved by the DEM will be considered a violation of this CAMA permit.
Sedimentation and Erosion Control
2) In order to protect water quality, runoff from construction must not visibly increase the amount
of suspended sediments in adjacent waters.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31. 1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
rmi JKger N. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
The Harbor at King's Lynn T D Z (r"� ppit !/14-96
Pagel2 of 2
ADDITIONAL CONDI1IO10 JUL 10 1996
pl1/IS�fnti OF
NOTE: An Erosion and Sedimentation Control Plan will be,requi#ed fR ; d it pj iv This Plan
must be filed at least thirty (30) days prior to the beginning of any land -disturbing activity.
Submit this Plan to the Department of Environment, Health and Natural Resources, Land
Quality Section, 127 Cardinal Drive, Wilmington, NC 28405-3845.
General
3) No public funds may be utilized for the construction or perpetual maintenance of the water line
and associated facilities. This condition shall remain in force throughout the life of this project.
4) The temporary placement or double -handling of excavated or fill materials within waters or
vegetated wetlands is not authorized.
5) No excavated or fill material will be placed at any time in any marsh or surrounding waters
outside of the alignment of the fill area indicated on the work plans.
NOTE: Subsequent residential development of individual lots within the Areas of Environmental
Concern will require additional permitting through the Division or the Town of Long
Beach Minor CAMA Permit Program.
NOTE: Plans and specifications of all water system improvements must be approved by the
Division of Environmental Health prior to the award of a contract or the initiation of
construction (as required by 10 NCAC 10D.0900 et. seq.). For information, contact the
Public Water Supply Section at (919) 733-2460.
. . ..- J .
� •\.\TMYi �.q, .
emmememmm�.mnl
'I .. .
fj5l ..
i1 A" tows tau a puce" at .rand .eoca.ua on Long Death, /Youth LaAoUna, F.
An and d".ipnated u Lot" 1y and 15 in Bloch 131, occondinp to a map
yS4 mods 6y N. R. Hewett, AwveyOA, and daffy necanded..in Map Book 21 ai Papu
'' t2 thnouph 18y, Of Tice o f the Rep.uten o f Deede o f Bnunawich County, .to
�S `pe7li�n with all nipan.ian and acuetive Aipht" incident io the owner" } (,1
a
t 1' ;.. , 744 cane yonce .A mode by the Aclendon, A., Tnw s, RAO "
41ro ., j(
h 1 punch"ed th�,pnapsnty huu ain dut6ed fu and on 6ehalf..of_l%ynp.�A Lynn, Inc ,. s�
and a Twte
aa e cof and at all UAe4 hie acted for rail c�puation in 44U
pac-Uy ai.eaid . wtee. 6l
7h4g a6ave land was �C veyed to Snanton, 6y Mauon f S ' ,�Guood N. Sma th, See Boot.
.' No. 152, Pape 373-
V MIC" AfXXO th a ove d"ut6ed pnemiAu, with a.0 the appuntenanceA thuewUo 6elon
anp, an An anyw.ire oppenta-& np, unto the Grantee, hAh'ein.e and/on Auccueou and au.ipu JOAeVV,
AID the ynanion covenant" A&Ne .ir iei6ed of 149tid pnemiree in fee, , and har the A.ipht to
convey the Aame An fee AZ7ple, ,that i pAC4 ", dire free JAom encumbnaneu(w.ZA the exception
a6ove Atated, if any), and that he weU�"
a" and defend the Aa.id add to the dame apa.,h"t the �
.tar fud claims o f at peaAon whomooevu. 1
gAen ne f uence AA made to the Snantonlo ,Aan.tee, the ".ingulan "hall Anclude the plural and' `
At m"cudine Ahall.include the femin.ine,64 Ae\neutcn. y•
7VW17VSSW M-7, .the grantor hai hueuntd.Aet hu hand andAead, the,day andyean f.,:ut j
above iwu:Uen. /
Many I. AcIendon ` (Seal) "•' U
L. P. McLendon ;A. Tnwtse(Sead)
SPrT6 03 AO? N (4LP4lA
&PlN.9WZ-K CaN;Y l
I, Pauline S. Swa.in, a atany Ao" o f Aaid (County, do ue6y CCAti f y that L. A McLendon
9A. TAwiee and Muy I. &l endan, Smut", peuanaddy oppeued e f one me th;A day and nchnowledy- 1. '
ed the execution of the // epaing deed. i,
WZMW my hand an notarial -deal, thiA the 26 day of 9udy;
eommiteian expin" '215/63' Pa S. Swain
IV. P. Seal Nodany 6Lic 4••
t
SM7L'03Na? N D�
KWIC( Cl7N
f L+
NC fuep,oing cen.Gi fica.te(-d) o f Paudrins S,SWa.in,, a iVotany A<6Lic oj w,i� (' r •
Naeth C44 �A,' rA adjudged to 6e connect. Let Raid deed and the cent i f icatsA 6�nspZAidAed. • _ s ; ,
" the 26 day of 9u4,
Vutaua L. Aldn.idAA
Aut. Gluh Sup z Caw, } ':
1
"W' f as Aep,utnaUon on .the,26th. day o f ;,4, 1y61, at 1 u /adac6 P. M. and duly Asc4lldtd..
-_ .. RepieteA i f �1e7G'
L. P Mr1JM p? �'WS76TlA rT
1 x7 �} r't J OF }..
` 'Sa�>�03t1azNCm�nwa
11tN8 CD BRlNA4IQl .. ,: t'!:?I
YIIS Co, made thin the /At. day o }
f 9uly, 1y61, 6y and between L, PC McLendon, 9A.. Tnw.tee,
endmay I.. McLendon (wife of L. P. McLendon 9n.J anti" o the .nAt
d P f f � pa^•t1 and Ka�5�5 [yvv AC: � r;
/a'Don cation duly uparap and ex4ainy undo 'and 6y.VAA4UC of Ad law" of the Stab of North
WPL/na, �Oanty 0 f th! AICMd pM.t! . • .. � ,
4 WI TN ES'S TNr ..
• I,
r 'V
i
0
>1
t
1
,1.
N1T.f/e .4a•id pan.tiee o� .the I•,ndt pant, 04 and .in eaw.edenation oe the dun 'ol UV L17CLJis
r M 07109 KUINZ ONS48072OVS, to them to handpaid 6 the panty q the second pant, t/le n4.-.
ce•lpt of w4.,:ch.-4 hene6y achnauledyed, have 6anya.lned and.4ald; and 6y ,iAeae pneaente do 6ene6y,
6alyala, dens, and convey unto 'the'sand panty ol ehe decals pant, dta A" and as 4u, and .t/ia.
{. centan lots, an panc" 0� land ly.lny and 6e•iny in the Tol.v; o f Lan y Beach, S^ZMVWC Tawnahip, ..
1 Bnurw1. Wieh C , Nand/ Canodlna, and mane
°Uj•ty panticwlanly deacni6ed as Jolla".
The �Oldaoiny 'deeau:6ed Lo.ta in Block J30 A Lots, J, '2, 3, y, S, 6, 70 8, . and.y,
Re 1al[auinp deaeu6ed data � Bloch J3o, Late 8, 12, 13, 14, and 16.
the olloWin 'deer i6ed data .in Bloch , 21 Late ! 2 y 3 y, 5, 6, 7, 8,
12, !3, and !y,
The 14111 ny de 4-"ed data en Bloch 1331 Lota 1, 2, 5, 6, 7, 8, 12,`,
13, Jy, 15, 16, 17, 18, and 1y. a;1
The iollowiny 4"eaald6ed date .in Bloch 1341 Lots 1, 2, 3,• y, '5; 6, 7,. 8, F, 104 11,1%1.
d;
12, 13, 14, 15, 16,, 17, 18, and 19,
Me �aUow. Ay dede4e6ed Loa .in Bloch 131 Late
( t6, 3, y,.5,, 6,' 7, 8, 9, 10, 11,
and ,)
r The jal ftiny deacn.i.bed Latd an Bloch 1371 Lata 1, 2, 3, y, 5, 6, 1,
12, 13, ly, 16, 17,' 18, 19, 20, 21, 22, 23; 2y, 25, 26, '27, and 28. ;•' Is+1
The faLlow•uly deaa1:i6ed dots , A Bloch 138, Lote 1, 2, 3, y,5, 6, 7, 8, 9, 10';
"`... 12, 13, 16, 17, 18, 19, 20, 21, 22, 23, 2y, 25, 26, 27, 28, and 2y. ;:•'.1u1.
) nx; Me �Oldautny deaau:bed data .,n Bloc4.1391 Lots !;, 1y, and 15,
I The jallowiny deda4.i6ed lad un Bloch !yo1 Lots J 2
3a,
y, 5, 6, 7, , 8,19,.104.41 ,
'11, 13 ly,and J$...r.�''
�/
At f nKGowlily deea4i6ed dote zn Blodf •1y11 .LoU , J, 103, 4. S, 6, 7, 8, 9,. 10, 11, L ;11t
15, 16, 17, 18, 19, 20, 21; j-3, 2y, 25, 26, 27, 28, 2y, and 10. i.,,j
The jaLl"any deaeni6ed dots .Jn Bloch 1y21 Lots 1, 2, 3, y, 5, 6, 7, 8. 9: 10411,
12, 13, Jy, 15, 16, 17, 18, IF, 20, 21, 22, 23, 2y, 25, 26, 27, 28, 29, and 30.. t;rrCi!
At 1o•Uoluinp 3'eden.,:6ed Lots .41 Bloch l431 Lot. 1, 3. �i, 5. 6, 7, 8, 9 JO 11, J1.?
and 15, '� fi-
1;, The , f aUoauny dedcni6ed Lots in Bloch 1yy1. Lata 1, 2, 8
3, y, 5r 6r 7, , 9, 10,
12, J3, Jy,15, 16, 17, 18, Jy, 20, 21, 22, 23, 2y, 25, 26 27 28 2?,'30 3
At 3alloWrin deaaei6ed Lata in Bloch J Lots J 2 , , , ,and 1�;1:�''
y y51 ,. 3, y, S, 6, 7, 8, 9, 10; 1I:.17:.S:li
: `At lallow.,ny, deaen.,:6ed data an;Bloch ly6r Lots 1 2 .
3, y, S, 6, 7, 8, 9,10,11,1z 1 !
16017,18, and 19, 3,.yf1 1,
The Boll y cad6ed .lata .in Blodt J Lots 1,2, , , ,
.. :1:1• awls sea �E7.t. 3 y56, 1,8, y, 10,lJ, J2,"J ,l cold
3 y,
accondiny to a map neeanded ul Map Boob 21, Pa ed 182 AAOu 18 and a ma
y yh 9, P
necanded .in Baoll 3,, Paye l / 3, O j jice oe .tile Re palm O j Deeds o f Bnunawirh (aunt x
j . NOW Cmolina. • r °i'j �
,i,..:. 771ene .w ju4Ae4 conveyed 6y .di.id deed o� conveyance any and all dandd owned 6y
Pan•t/:ea 1o� .the ee wt pant nOt hene/to�aie conveyed/which ,Lie west o� Swain Stneet, na+t/i�'v�
•/ll,e Atlaatw Ocean, east O� Laeh.w0ada 3aUy Inlet,, andda, Og LOt�W00� 30ldy RiVs e�i
:' „ • LochWoode 3aLly RlVen Sound, and Davis G,eeh Sound, &A.ZrA ane awned 6y the paol_" O j; ,r11.
the fawi pant.
`'`':i,: • *;•u:',''..`;.'Said conveyance id made du6ject to deeds ol'.tnuat o�'necaiduvUcA tAe ynantee assumes."I�'
and ayneea to pay, one da,ii deed oe tnlut 6einy dated.Sep.lem6en 18, lysy,
r ReaLtyi Inc, ta�ameQa L;. BaumIan, ,Tnu.a.eee, jan �; B. Wand, Vida N .ate 6 D. C
and neeanded in t%la LAundWlCn t aunty Reyldtny.
]hie conveyance Ge made 6y the pan -tan, L, P, AcLendon, A., Tnu•atae, who pmcXa4ed•4"',,"2;
?'PAO?" hene.in de4a4Jed Ian and an 6e4al� o Kina a Li,al, Inc.. and as T tee tl es j(f
.and 'at all times has acted el" dais cwpon on -Zn A.Z.4 capac.r.ty a, said Tnudtee, 17
•IVW/NO 70AVW tl.e above deeaaed emieea 1.I
6e.Lon , Oa :n an Pn , Wad/{ all .she appl,n,tenaneea .i�eleunto • .j,t�
y�y, yaude appe44aZi•iny unto tle Snantee, d* duccesaone and aae.ipw �oneven,
JV WIk55 W M3, tine Gnantaw have hereunto set MeiA hands an ea4, dle d and
year fandt above w4xitten,
r:�111any jr, Alclendon (Seadf
iI en on n, (Seal) tl
1 Trustee I
1 �,' i t r l tin I41 1i1 a II I� 1
:+," 1, � -;;� X:r,i � •p'I�Wi.L1M.1••�sdAiiwGd��4La.r '+1� �'nT{•"G+rnT'+1"C�p�rl t"+',C^,I':^'•^•�,'I'i
• iiv(14•:1JN Fl.-L.ik'i. (ra.+H l,.f. "M f•4.:,
Rccord tlY
STATE 03 AVAN CNWAD69
ZWj 03 ANSWIO<
I, Pau.Line S. Swain, a Notary Pu" o f eaid County, do hereby centi f y that L. A McLendon
in. Tnw.tee, and Many I. McLendon, ynan.tou, peneonaUy appeared 6efore me A-i4 day and aclo"d- t�
Fed the execution of the foreyabiy deed.
W,,tne my hand and naean.iaL 4eal, thiw .the 26 day of 7uly, I y61.
ny cmunir•e.ion t5oira4: 215163 . Pau.line S. Swain
V. A Sea[ Notary Al<6(ie r' c
131TLC 03ACRN CAUYDld9
MSWIQC CUNT! ?i
The f m egaing cen.ti f ieate of Pauline S. Swain, a Natary &U-ic o f Brunawich Couri•lft, State
,f No..V&"a, 14 adjudged to 6e connect, Let the AutAweni, wUA the cer.tificatu rey.i.e- 1
tered.WUnuA my hand and official deal thAa 26 day of fuly, A, D. 7961.
l aa,aa L. AU4-id c 1
lq"l' lent Supereat Cowl ;
t.Lled m re trataon on 'xAe 26tA. I ` ' f y''" day o f 9uty, 7961, al r o dock P. M.and�"til neconded. � r f• �.,.
- Aeyi,aten o f Deedr ;4
M5 C. OVUL aw
IG S. 6XLIffl, Off AY1 ti
uW"ea M crux
"FITjr 03 "I/ CAnM
aNV 03 &W.WIp( i
70 20 JW Made and entered .into thAe .die 19 day of Jiuly, 1961, 6y and between tfamu 1 r 'r '
CanroLl and wile, C North analina, and Lac S. oUien'
f Ge.41AUde arraU, of BnunawicA County, C y C
nwtte, obi Cumberland County, North Canalina, partiu o f .ire jLu i part; and Lutlrer'Ray Baluon
(,
nd wife, Ann it PeanlBa6eon, of BnunaWAch County, North COVIa&na, Par." of At aecona pa4C;
WI TN6SS6TN:
IWN-5ff, by deed a f trwt neconded .in .the Bnunewicit County Rey.ia.tny .in Booh !t/S, at Page
46, 9amu C. Como. and wife, Gertrude CarraU, conveyed certain reaby-nclU(!ny the trac
ene.inaften duen.ibed and conveyed to Lacy S. CaUL en, Trwtee, as .decu4ay for an .indebteanew+
wing to ,the Canot-ina Model Home Conponation o f ft ael+aonvi,Lle, Non.drCaral!na, and
WL &, the maid omu C. ann Q C oll and wife duire to convey to .the pan.tiu o f .the wecmd it
ant a valid and rodefeaei6.ie fee .jZple i" to At tract here-lnaftew dua,Jed and conveyed
nd to •drat end have reguutrd said Tnuetee and the Aa(den of eaid inde6tedne." io nele we from
At operation of said deed o f tnult the property hereina ft" ducAi6ed and conveyed, but w.UAoul
,
n any manner a f fectiny the Raid deed of trwt w to At remaining neaL[ thereby conveyed to 1 i�
aid Ar lee; and
WIF,X, the haides of said ind't tedne." ha4 consented to .ire neleaee of said tract AereiA-
fttr 44au6ad and conveyed, and has a, hori6ed .aaAd Tnustte to relewe the name fran the opera- ; � rir..
ion of said deed of trwt; - '�: ..�n • i''.
l.C1U, FT for and -in coneidera4Uon of the pnemi.su and in further cm.a.ideration o the
f
wn of Wirl/IYX�G>al1A'� (1100.00) and other valua6.le corwidtratio,u paid 4 fire pantis.e of r i' '�iti;
it Atcond pant to .ire pantiew of the f.rat part, receipt whereof i.e hene6y achnowledyed, the � t � • �!<«:;
mtiew of .dre f.iut part have g ven, proud, bargained md'.eold; "ned, conveyed, andAt-
ewed, and ly . thue paue is do lrene6y y.ive, ynant, 6a4yain and ae.U, aiwzn, convey and neieaee I
nto the ..aid pantis.s of fire .second part and to th..ir h..ir.s and aasty,u forever aU of that eer
ain tract on parcel o f •land, "ate,lying and "IF in Nanthwut TowMhip, Bnu,uwici County,
arch Cµ"tino, wa!e panticularLy dd,4L cd w foUouut { �,