Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
82-96 Harrell, Scott
ermit Class Permit Number NEW Issued to 82-96 STATE OF NORTH, CAROLINA Department of Environment, Health & Natural Resources .: and Coastal Resources Commission vP�lit �2 for X Major De e in Area.of-Enviiorimental Concern ��C3T1P pursuant to 113A-118 X Excavation and/or p� t to NCGS 113-229 authorizing development in Chowan Place as requested in the 2/19/96 including attached This permit, issued on-3/21A4 is subjec�ompliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead Construction and Backfill 1) The bulkhead will not be positioned farther waterward than 34 feet from the normal water level elevation contour at any point along its alignment. 2) The bulkhead must be constructed prior to any backfilling or shoreline grading activities. The bulkhead must be structurally tight so as to prevent the seepage of backfill materials through the structure. 3) All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. (See attached sheet for Additional Conditions) This permiLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the pperntit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. R N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. of Permittee J. Scott Harrell Permit #82-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Excavation 6) No excavation within PublicTrust Waters shall occur between February 15th and September 30th of any calendar year without written authorization from the Division of Coastal Management, in consultation with the NC Division of Marine Fisheries. Alternatively, a sediment curtain completly confining the excavation area may be acceptable within the moratorium. The permittee must request a determination from DCM and DMF. 7) Excavation will not exceed 5.5 feet below the elevation of normal water level (NWL). 8) No excavated or fill materials will be placed'at any in any vegetated wetlands or waters outside of the permitted area. 9) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 10) All dredge spoil will be placed landward of Public Trust Waters and wetlands. All dredge spoil will be de -watered behind a suitable retention structure. Spoil material shall not be used as bulkhead backfill until it has been completely de -watered. Other Project Activity 11) Erosion and sediment control devices and measures shall be used as necessary to prevent the discharge of any dredge spoil or sediment runoff into any adjacent wetland or Public Trust Waters. 12) The culvert crossing shall be installed in accordance with US COE and NC Sediment Control Rules and the plats dated February 19, 1996. The filling of this man-made ditch other than work specified on these referenced plats is not authorized. 13) The boat lift structure shall be constructed as per the plats dated February 19, 1996. The structure shall not interfere with the public's use or access to the man-made canal. The lift structure, in no case, shall extend beyond one-third the canal width at NWL. This authorization does not provide for any dock or pier to access the boat lift structure. NOTE: The Division of Environmental Management approved this project under General Water Quality Certification No. 3025 on May 13, 1996. Permit Class Permit Number NEW 82-96 STATE OF -NORTH, CAROLINA Department of Environineri4�9ealtki & Natural Resources :::•.�•r �;^'`and'=,.'., err i'. ' �P�Il�rlt t a.. X Major Development;in`an Area ofErivironmental Concern pursuant to NCGS 113A=318.i`i% _ ,r; X Excavation and/or filling puisuant to NCGS 113-229 Issued to J. Scott Harrell, Sr., 605 West Oueen Street, Edenton, NC 27932 authorizing development in Chowan County at Pembroke Creek.canal off of. at Queen Ann's Place as requested in the permittee's application dated 2/19/96 including attached worknlan drawings, sheets 1-4 of 4 dated 2/19/96. This permit, issued on 3— !/94 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead Construction and Backfill 1) The bulkhead will not be positioned farther waterward than 34 feet from the normal water level elevation contour at any point along its alignment. 2) The bulkhead must be constructed prior to any backfilling or shoreline grading activities. The bulkhead must be structurally tight so as to prevent the seepage of backfill materials through the structure. 3) All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. (See attached sheet for Additional Conditions) This permit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the ppermit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the Notch Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. foc R N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee J. Scott Harrell Permit #82-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Excavation 6) No excavation within PublicTrust Waters shall occur between February 15th and September 30th of any calendar year without written authorization from the Division of Coastal Management, in consultation with the NC Division of Marine Fisheries. Alternatively, a sediment curtain completly confining the excavation area may be acceptable within the moratorium. The permittee must request a determination from DCM and DMF. 7) Excavation will not exceed 5.5 feet below the elevation of normal water level (NWL). 8) No excavated or fill materials will be placed at any time in any vegetated wetlands or waters outside of the permitted area. 9) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 10) All dredge spoil will be placed landward of Public Trust Waters and wetlands. All dredge spoil will be de -watered behind a suitable retention structure. Spoil material shall not be used as bulkhead backfill until it has been completely de -watered. Other Project Activity 11) Erosion and sediment control devices and measures shall be used as necessary to prevent the discharge of any dredge spoil or sediment runoff into any adjacent wetland or Public Trust Waters. 12) The culvert crossing shall be installed in accordance with US COE and NC Sediment Control Rules and the plats dated February 19, 1996. The filling of this man-made ditch other than work specified on these referenced plats is not authorized. 13) The boat lift structure shall be constructed as per the plats dated February 19, 1996. The structure shall not interfere with the public's use or access to the man-made canal. The lift structure, in no case, shall extend beyond one-third the canal width at NWL. This authorization does not provide for any dock or pier to access the boat lift structure. NOTE: The Division of Environmental Management approved this project under General Water Quality Certification No. 3025 on May 13, 1996. r Permit Class Permit Number NEW STATE Department of Em ..- X Major Develdpmen, pursuant to NCGS ] X Excavation and/or ealth & Natural Resources Commission Concern QUAM pursuant to NCGS 113-229 Issued to J. Scott Harrell, Sr.. 605 West Queen Street. Edenton, NC 27932 82-96 authorizing development in Chowan County at Pembroke Creek.canal off of. at Queen Ann's Place as requested in the permittee's application dated 2/19/96 including attached workolan drawines. sheets 1-4 of 4 dated 2/19/96. This permit, issued on-}7.2/194 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead Construction and Backfill 1) The bulkhead will not be positioned farther waterward than 34 feet from the normal water level elevation contour at any point along its alignment. 2) The bulkhead must be constructed prior to any backfilling or shoreline grading activities. The bulkhead must be structurally tight so as to prevent the seepage of backfill materials through the structure. 3) All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.199E In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. poi R N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee J. Scott Harrell ' ADDITIONAL CONDITIONS Permit #82-96 Page 2 of 2 4) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Excavation 6) No excavation within PublicTrust Waters shall occur between February 15th and September 30th of any calendar year without written authorization from the Division of Coastal Mahagement, in consultation with the NC Division of Marine Fisheries. Alternatively, a sediment curtain completly confining the excavation area may be acceptable within the moratorium. The permittee must request a determination from DCM and DMF. 7) Excavation will not exceed 5.5 feet below the elevation of normal water level (NWL). 8) No excavated or fill materials will be placed at any time in any vegetated wetlands or waters outside of the permitted area. 9) The temporary placement or double-liandling of excavated or fill materials within waters or vegetated wetlands is not authorized. 10) All dredge spoil will be placed landward of Public Trust Waters and wetlands. All dredge spoil will be de -watered behind a suitable retention structure. Spoil material shall not be used as bulkhead backfill until it has been completely de -watered. Other Project Activity 11) Erosion and sediment control devices and measures shall be used as necessary to prevent the discharge of any dredge spoil or sediment runoff into any adjacent wetland or Public Trust Waters. 12) The culvert crossing shall be installed in accordance with US COE and NC Sediment Control Rules and the plats dated February 19, 1996. The filling of this man-made ditch other than work specified on these referenced plats is not authorized. 13) The boat lift structure shall be constructed as per the plats dated February 19, 1996. The structure shall not interfere with the public's use or access to the man-made canal. The lift structure, in no case, shall extend beyond one-third the canal width at NWL. This authorization does not provide for any dock or pier to access the boat lift structure. NOTE: The Division of Environmental Management approved this project under General Water Quality Certification No. 3025 on May 13, 1996. Permit Class NEW STATE OF-NORTH-CAROLINA Department of Environment, -Health' &Natural Resources Coastal. Resources Commission 'l for % Major Developmentm an Area of Environmental Concern pursuant to NCGS 113A=Plg QUA", • :- _ Excavation and/or filling' puis'uant to NCGS 113-229 Issued to J. Scott Harrell Sr 605 West Queen Street Edenton, NC 27932 Permit Number 82-96 authorizing development in Chowan County at Pembroke Creek.canal off of. at Queen Ann's Place as requested in the permittee's application dated 2/19/96 including attached workDlan drawings, sheets 1-4 of 4 dated 2/19/96. This permit issued on }�a/,Z9'e� , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead Construction and Backfill 1) The bulkhead will not be positioned farther waterward than 34 feet from the normal water level elevation contour at any point along its alignment. 2) The bulkhead must be constructed prior to any backfilling or shoreline grading activities. The bulkhead must be structurally tight so as to prevent the seepage of backfill materials through the structure. 3) All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. �o R N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee J. Scott Harrell Permit #82-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Excavation 6) No excavation within PublicTrust Waters shall occur between February 15th and September 30th of any calendar year without written authorization from the Division of Coastal Management, in consultation with the NC Division of Marine Fisheries. Alternatively, a sediment curtain completly confining the excavation area may be acceptable within the moratorium. The permittee must request a determination from DCM and DMF. 7) Excavation will not exceed 5.5 feet below the elevation of normal water level (NWL). 8) No excavated or fill materials will be placed at any time in any vegetated wetlands or waters outside of the permitted area. 9) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 10) All dredge spoil will be placed landward of Public Trust Waters and wetlands. All dredge spoil will be de -watered behind a suitable retention structure. Spoil material shall not be used as bulkhead backfill until it has been completely de -watered. Other Project Activity 11) Erosion and sediment control devices and measures shall be used as necessary to prevent the discharge of any dredge spoil or sediment runoff into any adjacent wetland or Public Trust Waters. 12) The culvert crossing shall be installed in accordance with US COE and NC Sediment Control Rules and the plats dated February 19, 1996. The filling of this man-made ditch other than work specified on these referenced plats is not authorized. 13) The boat lift structure shall be constructed as per the plats dated February 19, 1996. The structure shall not interfere with the public's use or access to the man-made canal. The lift structure, in no case, shall extend beyond one-third the canal width at NWL. This authorization does not provide for any dock or pier to access the boat lift structure. NOTE: The Division of Environmental Management approved this project under General Water Quality Certification No. 3025 on May 13, 1996. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402-1890 REPLY TO ArrENTION of June 3, 1996 Regulatory Branch Action ID No. 199601461 and State Permit No. 82-96 J. Scott Harrell, Sr. 605 West Queen Street Edenton, North Carolina 27932 Dear Mr. Harrell: Reference your application for a Department of the Army (DA) permit to install a culvert in a man-made ditch, construct a bulkhead and place fill material in wetlands and an existing basin, maintenance dredge a canal, and construct a boatlift, on property located off Queen Anne Drive, adjacent a man-made canal to Pembroke Creek, Edenton, Chowan County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of General Permit No. 198000291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919)975-1616, extension 23. Sincerely, Raleigh Bland, P.W.S. Regulatory Project Manager Enclosure Copies Furnished without enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 -2- Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 COurtland Street Atlanta, Georgia 30365 Mr. John Parker .Zivision of Coastal Management rth Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Hefner U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 5 �isfl CWTAL PAAh'k E&jerj 96 Form DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: Name J. Scott Harrell, Sr Address 605 West Queen Street City Edenton State N. C. (919)986-2494 Zip 27932 Day Phone (919)482-3720 Fax (919)482-4816 b. Authorized Agent: Name Heidi R. Bowen Address PC Box 237 City, Edenton State N.C. (919)796-o482 Zip 27932 Day Phone (919)482-2840 Fax (915)482-4816 c. Project name (if any) none NOTE: Permit will be issued in name of la downer(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Chowan RECE!VPn FEB 2 8 1996 b. City, town, community or landmark Edenton c. Street address or secondary road number 9ueen Anne's Place d. Is proposed work within city limits or planning jurisdiction? X Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Manmade canal off of Pembroke Creek originally excavated to be log storage area for a saw mill. 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. bulkhead, backfill, boat slip excavation, boat lift, slope, grade, and seed for a single family residential developement b. Is the proposed activity maintenance of an existing project, new work, or both? both c. Will the project be for public, private or commercial use? private d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. A backhoe or draeline will be used for sliti excavation and bulkhead installation. The lot will be graded with a tractor and blade or a small dozer. The intended use of the lot is private residential development. Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS m. Describe existing wastewater treatment facilities. none a. Size of entire tract 10,284 sq. ft. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individuallot(s) 10,284 sq. ft* wastewater, industrial/commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above MHW or none NWL average 3.5' d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. sanv, sandy clay city water e. Vegetation on tract upland vines, grasses and trees L Man-made features now on tract old deteriorated bulkhead What is the CAMA Land Use Plan land classification of the site? (r: wuh the local lad the plat.) Conservation Transitional X Developed Community Rural Other h. How is the tract zoned by local government? R10 -must have 10,000 so. ft. to build i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach zoning aonrliance certificue, if applicable) Has a professional done for the tract? If yes, by whom? - archaeological assessment been Yes _ L_ No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes _ No Coastal (marsh) no Other 404 If yes, has a delineation been conducted? Yes (Attach documentation, if amailable) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy or the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is'not claiming to be the owner of said property, thed- forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the uPaod n:tos RECEIVID Form DCM-MP-I site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) Landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name E.G. Burroughs Address 303 Queen Anne Dr Phone Edenton NC 27932 Name Landis W. Voight Address 301 Queen Anne Dr Phone Edenton, NC 27932 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves. the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. FEB 2 8 1996 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application.. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 19th day ofFebruary , 1996 Print Name J. Scott Harrell, Sr. Signature,_NVJu-L - rP �jBIA �cJ Landow r or Authorized Agenr 2S eo-o N CUtAtk&) fit.. Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03195 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form'to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Access channel (MLW) or (NWL) Canal Boat 1 BOATLIFT Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Average Final Eusting Project Length width Depth Depth _T 24, 121 2.51 5.51 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards 32 _cy, b. Type of material to be excavated sand and silt sediments c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? _ Yes X No d. Highground excavation in cubic 'yards none 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area onsite, backfill for proposed bulkhead — b. Dimensions of disposal area 651 x Avg. 11 1 c. Do)you claim title to disposal area? Yes —No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? X Yes _ No, If yes, where? ���� �=ter �. , �. � �_•�, s t , r Revised 03195 Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes X No f. Does the disposal include any area in the water? x Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization x Bulkhead Riprap b. Length -+/- 65, c. Average distance waterward of MHW or NWL 111 d. Maximum distance waterward of MHW or NWL qht e. Shoreline erosion during preceding 12 months �t (Source of information) owner f. Type of bulkhead or riprap material wood bulkhead g. Amount of fill in cubic yards to be placed below water level (1) Riprap N/A (2) Bulkhead backfill 66 cy h. Type of fill material sandy silt and sandy clay i. Source of fill material basin eycavation and upland borrow 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No If yes, (1) Amount of material to be placed in the water (2) Dimensions of fill area (3) Purpose of fill b. Will fill material be placed in coastal "wetlands (marsh), SAVs or other wetlands? Yes No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Slone, grade, seed, silt fence as needed b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? dragline, backhoe, dozer, and hand . tools c. Will wetlands be cussed in transporting equipment to project site? X Yes No If yes, explain steps that will be taken to lessen environmental impacts. this area of the 404 wetlar_d is to be filled J. Scott Harrell, Sr. Ap 'cant or Project Name nat�o(4 _G c-t,�-46✓ lot aC, February 19, 1996 Date Revered 03/95 Form DCM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a.- Dock(s) and/or Pier(s) N/A (1) _ Commercial _Community _ Private (2) Number (3) Length (4) Width (5) Finger Piers Yes No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes No (i) Number (ii) Length (iii) Width (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines (9) Width of water body (10) Water depth at waterward end of pier at MLW or NWL b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) • Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) N/A (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands FEB 2 8 1996 e. Mooring buoys N/A (1) _ Commercial _Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) (5) Width of water body - Distance buoy(s) to shoreline be placed beyond f. Mooring structure6QDmooring pilings, etc.) (1) _ Commercial _Community % Private (2) Number one (3) Length 2lT'— (4) Width 121 g. Other (Give complere description) J. Scott Harrell. Sr. Applicant or Project Name _ c� tom- �• CJlyI.UFLv �� signature /' ,S& o r Februl4ry 19, 1996 Date Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Perinit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. L. BRIDGES rvn a. Public . Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge. (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No r If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL ICE M FEB 2 8 1996 (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge It. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. Revised 03l95 Form DCbI-11IP-5 2. CULVERTS a. Water body in which culvert is to be placed Manmade stormwater ditch running through highground to Pembroke Creek b. Number of culverts proposed one c. Type of culvert (construction material, style) circular, concrete culvert d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes X No j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above C. the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert 301 g. Width of proposed culvert 2 t h.' Height of the top of the proposed culvert above the MHW or NWL 21 — normally this manmade st im ator di ch is dry. water is present ��Q�urang s o Ovate conditions. i. W7i 1 the propos curvert afrfect existing water flow? Yes X No If yes, explain yards Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards Will the placement of the proposed bridge or culvert -_ require any highground excavation? Yes x No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. Revised 03195 Form DCM-MP-S RS Ii-DV"D FEB 2 8 1996 (4) Will the disposal area be available for future maintenance? Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes _ No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill b. Will the proposed project require the any existing utility lines? Yes If yes, explain in detail relocation of X No c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? slope, grade, seed. and silt fence as needed. f. -Will the placement of the proposed bridge or culvert f. What type of construction equipment will be used result in any fill (other than excavated material (for example, dragline, backhoe or hydraulic described in Item d. above) to be placed within: dredge)? dumptruck, backhoe and hand _ Coastal Wetlands _ SAVs _ Other Wetlands tools If yes (1) (2) (3) NO Length of area to be filled Width of area to be filled Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 301 (2) Width of area to be filled 4.5' (3) Purpose of fill To 'enclose culvert and provide access to owners private residential lot. 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen - environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail J. Scott Harrell, Sr. Applicant or P Ject Name D Q,�,,p i .0 "w s Revised 03195 tic3 -ems �. us HU s. zal 7 0 L-o GA"ClOty MAP Jr D21VEW T J. SCOTT HARRELL, SR. ay 605 WEST QUEEN STREET `II .� R EDENTON, N.C. 27932 Q FEBRUARY 19, 1996 LOCATION MAP & SITE PLAN SHEET NO. 1OF 4 R, di uLv62T MArq.-rh ADE 3o."X2'. 51'02MWpTE� 1)1TGH Jl p O \ + � �,• - FCC v C E ,v - $• $ F� CVA-C�oNS AQE APP0.o x,. .%}S� NINN MADL cm - wiotN So' > -S.S N N L RECEIVED d-- FEB 2 8 1996 J. SCOTT.HARRELL, SR. � 2 CROSS SECTION OF EXCAVATION AREA 605 WEST QUEEN STREET SHEET NO. 2 OF 4 EDENTON, N.C. 27932 1" = 21 FEBRUARY 19, 1996 NWL 5.5' mac` --FINISH DEPTH 2.5' I EXISTING BOTTOM r / r / % 3f AREA TO BE EXCAVATED p ovIED FEE 2 a 1996 S. SCOTT HARRELLST, SR. BULKHEAD AND BOATLIFT CROSS SECTION 605 WEST QUEEN REET SHEET N0. 3 OF 4 EDENTON, N.C. 27932 NOT TO SCALE FEBRUARY 19, 1996 FILTER.FABRIC LIFT PILE -�- CAP $OARD ---yam PILE / BOATLIFT . TIEBACK/ / / L DEADMAN AREA TO BE FILLEDI / 5 51 RECEIVED '� / 12' EB 2 8 1996 J. SCOTT HARRELL, SR. V-"t 605 WEST QUEEN STREET EDENTON, N.C. 27932 FEBRUARY 19, 1996 SHEET NO. 4 OF 4 NOT TO SCALE CROSS SECTION OF EXISTING MANMADE STORMWATER DITCH AND ADJACENT ROAD EXISTING ROAD RECEIVED FEB 2 8 1996 E STORMWATER DITCH HIGHGROUND HIGHGROUND CROSS SECTION OF MANMADE STORMWATER DITCH WITH CULVERT AND FILL CULVERT AREA TO BE FILLED T F- 2, � HIGHGROUND 1.5' 1 �% / HIGHGROUND i E 6.5' ----� (1LIffin a INtifian NORTH CAROLINA INCORPORATED 1722 May 13, 1996 Mr. John R. Parker, Jr. Major Permits Processing Coordinator North Carolina Department of Environment, Health & Natural Resources P.O. Box 27687 Raleigh, NC 27611-7687 Dear Sir: I have reviewed the CAMA application you sent to me regarding the property at Queen Anne's Place owned by Mr. J. Scott Harrell, Sr. In reviewing the application I have found no problems with Mr. Harrell's request. Also, I would like to say that I will try to work on getting a revision of our Zoning Ordinance that will establish a Conservation Zone for areas where hydric soils or "404" are present along Pembroke Creek. Should you have any questions or comments feel free to call my office anytime. Sincerely, C Chris Brabble Zoning Administrator U 12 Building Inspector tmfiMANACEMENT REC4 EOAY17 1996 CUSIAt Printed on Recycled Paper P. O. Box 300, Edenton, N. C. 27932 - (919) 482-2155 (919) 482-7377 - FAX State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director May 23, 1996 Mr. J. Scott Harrell, Sr. 605 Queen Street Edenton, NC 27932 Dear Sir:: 1t •�' � W IDE,HNR The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may. contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. ry sincerely, ry John R. Parker, Jr. Major Permits Processing Coordinator JRP jr/amw Enclosure P.O. Box 27687, Mgq �CFAX 919-733-1495 Raleigh, North Carolina 27611-7687 An Equal FAX Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: J. Scott Harrell, Sr. 2. LOCATION OF PROJECT SITE: man-made canal off Pembroke Creek, Edenton Photo Index - 1989: 1 9-5, J18 1984: 110-856 State Plane Coordinates - X: 2,702,400 Y: 849,400 3. INVESTIGATION TYPE: CAMA / D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/20/96;3/11/96 Was Applicant Present - yes 5. PROCESSING PROCEDURE: Application Received - 2/28/96 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - The Town of Edenton 1991 LUP Update Land Classification From LUP - Developed (B) AEC(s) Involved: PTW, CW (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing - none Planned - single family residential (F) Type of Structures: Existing - failed bulkhead, basin Planned - bulkhead and boatlift (G) Estimated Annual Rate of Erosion: 3 ft. Source - owner 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED (A) Vegetated Wetlands 4356 sf. (0.10A) Coastal Wetlands 100 sf. 0 (B) Shallow water/Public Trust 300 sf. 1200 sf. 300 sf. Waters boatlift moorage (C) Other (D) Total Area Disturbed: 5956 sf. (0.137 A) (** Does not include 300 sf. allocated for boat lift) (E) Primary Nursery Area: No (F) Water Classification: SB Open: n/a 8. PROJECT SUMMARY: The applicant proposes to construct a culvert crossing over a man-made ditch, fill a 240 sf. man-made slip/basin in public trust waters, bulkhead and grade the adjacent shoreline, maintenance dredge 300—sf. of the adjacent canal, and construct a 288 sf. boat lift. ~ J. Scott Harrell, Sr. Edenton Bin Report Page Two Site Description The proposed development is on a vacant waterfront lot in the subdivision, Queen Anne's Place, in Edenton. Specifically, the proposed development is on an undeveloped lot located on a man-made canal which connects to Pembroke Creek. The adjacent waterfront lots are bulkheaded and single family residences are located on the adjacent properties. Current roadfront access to the lot is restricted by an adjacent neighbors driveway and a drainage ditch. A significant portion of the lot has been delineated as '404' wetlands. The current shoreline configuration includes a small shallow basin or slip area approximately 20 ft. by 12 ft. in size. The remaining shoreline includes a zigzag alignment of approximately 60 ft. of failing and deteriorating wooden bulkhead. The water depth offshore adjacent to the failing bulkhead is approximately 2.5 ft. at NWL. The canal depth is 5.5 ft. at NWL a distance of 15 ft. from the shoreline. The waters of Pembroke Creek are classified by the Wildlife Resources Commission as Inland Waters. However, the Fisheries boundary line is approximately 700 ft. downstream. The waters of Pembroke Creek are classified as Public Trust Waters by the Division of Coastal Management and part of the Estuarine System Area of Environmental Concern. The shoreline is vegetated in lawn grasses and sedges and littered with concrete, bulkhead and block debris. The landward portion of this lot is vegetated in a canopy of Taxodium distichum (bald cypress) . The upland portion of the lot was filled several years prior. A gravel driveway and easement run across the front end of the lot. A 6.5 ft wide drainage ditch runs parallel to the high ground portion of the lot adjacent to this driveway. The ditch is vegetated in wetland species including 7ypha spp. and Juncus roemerianus. Proposed Work The applicant proposes to replace the existing deteriorating zigzag bulkhead alignment with a straight alignment. The proposed bulkhead will be 65 ft. in length. This alignment requires filling the existing basin/slip and bulkheading waterward of the existing alignment an average distance of 11 ft. The applicant also proposes to construct a 24 ft. by 12 ft. boat lift adjacent to the new bulkhead. Due to the shallow water depths in the man-made canal, the applicant also proposes to excavate 720 cf. of spoil in the vicinity of the proposed lift to the connecting water depth of 5.5 ft. NWL. The spoil will be dewatered on the applicant's lot and then later graded out. The applicant then would backfill the bulkhead and lot with acceptable fill. To access the lot, the applicant proposes to construct a 24 ft. wide driveway across a man-made drainage ditch. ,i J. Scott Harrell, Sr. Edenton Bio Report Page Three Anticipated Impacts The proposed work will impact coastal and water resources in five areas. The proposed bulkhead alignment, including the basin fill will require the filling of 1200 sf. of Public Trust Waters. The proposed maintenance dredging of the adjacent man-made canal will require the excavation of approximately 300 sf. within Public Trust Waters and 288 sf. of Public Trust Waters would be allocated for the proposed boat lift. The proposed lift structure would be well within the current 1/3 rule in 7H.1200. The applicant will also impact 0.1 acre of other wetlands landward of CAMA jurisdiction so that the applicant could construct a SFR structure on the subject lot. The applicant has also requested authorization to construct a driveway across a man- made ditch. This ditch connects to Pembroke Creek. Coastal wetlands (mostly 7ypha spp.) have established up this ditch. The proposed crossing is less than 200 ft. from Pembroke Creek and would impact about 100 sf. of coastal wetland plant species. CAMA Review The site is not within the Edenton Historical District. The proposed project will impact some 1500 sf. of public trust waters. The driveway crossing will impact 100 sf. of coastal wetland vegetation. The Town of Edenton 1991 Land -Use Plan Update supports CRC and USCOE resource protection and management policies. The Plan suggests revising the Zoning Ordinance to establish a Conservation Zone in areas where hydric soils or "404" wetlands are present along Pembroke Creek and encourage the development of vegetative buffers between development and Public Trust Waters (pg. 42). Currently, there is not an Estuarine Shoreline AEC or required vegetative buffer along Pembroke Creek. It would appear that the LUP would support such a designation. Submitted by Dennis W. Hawthorn March 19, 1996 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director APPROVAL or 401 Water Quality Certification Mr. J. Scott Harrell 605 West Queen Street Edenton, NC 27932 • /A� A21 �� 1:3FEE HNF1 May 13, 1996 Chowan County DEM Project # 960M COE #199601461 You have our approval to place fill material in 0.1 acres of wetlands or waters for the purpose of constructing a culverted crossing over a ditch, fill a basin, construct a bulkhead and boat lift and conduct maintenance dredging at Pembroke Creek in Edenton, as you described in your application dated 21 March 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3025. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless,you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act If you have any questions, please telephone John Domey at 919-733- 1786. Sincerely, `p + ``<- RfCEIVEQ 0� MAY 22 J ton Howar , Jr. P.E. (MANAGEMENT Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Dorney Central Files John Parker; DCM Environmental Sciences Branch, 4401 Ready Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/1 0%post consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 19, 1996 FMWA [DEHNFR 366286 MEMORANDUM TO: Mr. A. Preston Howard, Director Division of Environmental Management FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Applicant: J. Scott Harrell, Sr. Project Location: Man-made canal off Pembroke Cree WASH EIIN CEED OFFICE MAR 2 1 1996 D. E. M. inty Proposed Project: To construct a culvert crossing over a man-made ditch, fill a 240 square foot man-made slip/basin in public trust waters, bulkhead and grade the adjacent shoreline, maintenance dredge 300 square feet of the adjacent canal, and construct a 288 square foot boat lift. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 9, 1996. If you have any questions regarding the proposed project, please contact Dennis Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects attached comments. Signed to the project for reasons described in the Date 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 28, 1996 MEMORANDUM TO: Mr. Joe Henderson, Acting Director State Property Office Department of Administration FROM: John Parker, Jr. Major Permits Processing Coordinator EDEHNFR SUBJECT: CAMA/DREDGE & FILL Permit Application Review 13 �123 S APR 1996 Received Property p (rice APPLICANT: J. Scott Harrell PROJECT LOCATION: Man-made canal off Pembroke Creek, Edenton, Chowan County. PROPOSED PROJECT: To construct a culvert, fill basin, bulkhead and grade, etc. w Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 18, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. \---- This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed K- Date o P.O. Box 27687, 4 FAX 919-733-1495 Raleigh, North Carolina 27611-7687 NiAWf C An Equal Opportunity/Afflrmative Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper BOOK 20 PAGE 23 2 Highway #17; thence North 760 03' East along the margin of said Highway 132.14 feet to the P.C. of a curve; thence along the Southern margin of said Highway #17 the various courses of a curve, curve data being: Delta = 29° 38', R= 993.19 feet, Tangent = 262.64 feet and L = 515.53 feet; thence North 460 25' East along the Southern margin of Highway 389.25 feet to a tack, the place of beginning, the same constituting 14.99 acres according to the survey plat of Charles H. Wood, Jr., dated May 21, 1968 and duly recorded in Plat Book 5, Page 78 of the Office of the Register of Deeds for Chowan County. And being a part of that same tract of land conveyed by Beulah P. Boswell and husband, et als, to Edenton Tractor & Implement Company, Inc. by deed dated February 25, 1956 and duly recorded in Book of Deeds 13 at Page 10 of said Registry, reference to which aforesaid plat and deed is hereby made for further description and chain of title. See further deeds of record in Book 120, Page 543 and of record in Book 123, Page 263 from Edenton Marina, Inc. to J. Scott Harrell, Sr., Chowan County Registry. LESS and EXCEPT that property conveyed by J. Scott Harrell, Sr. and wife to Edenton Enterprises Co., Inc. by deed dated December 1, 1983 of record in Book 145, Page 395, Chowan County Registry with plat thereof recorded in said Book 145, Page 398, Chowan County Registry, incorporated herein by reference for further description of the property herein conveyed as security. SECOND TRACT: (Portion of M. G. Brown property owned by J. Scott Harrell, Sr.) TOWN OF EDENTON. FIRST TOWNSHIP, CHOWAN COUNTY, N.C. (PIN #7804-27-7854) BEGINNING at a control point in the Southern margin of Queen Anne Drive, said point constituting the Northwest corner of Lot 55 of the Subdivision of Queen Anne's Place Subdivision as shown in Plat Book 4, Page 9 of the Chowan County Register of Deeds office; thence from said beginning point South 670 47' East, 210 feet to a point; thence South 220 13' West, 270 feet to a point; thence South 670 47' East, 180.5 feet to a point in the shoreline of Pembroke Creek; thence South 00 28' East along the shoreline of Pembroke Creek, 64.7 feet to a point; thence North 670 47' West, 165.4 feet to a point; thence South 220 13' West, 161.7 feet to the shoreline of Pembroke Creek; thence along the shoreline of Pembroke Creek North 85' 21' West, 59.3 feet to a point; thence South 240 51' West, 188.7 feet to a point; thence South 29' 49' West, 222.7 feet; thence South 45' 22' West, 140.2 feet; thence South 210 42' West 208.2 feet; thence South 320 10' West, 133.5 feet; thence South 710 36' West, 56.1 feet; thence North 540 02' West, 172 feet; thence North 350 38' West, 100 feet; thence North 200 55' East along the line of the Edenton Marina property 1,350 feet, more or less, to the Southwest corner of Lot #44 of Queen Anne's Place Subdivision; thence along the Southern line of Lot #44 South 670 47' East, 186.7 feet to the Western margin of Miles Brown Street; thence along the Western margin of Miles Brown Street to a point at which the Southern margin of Queen Anne Drive Extended would intersect the Western margin of Miles Brown Street; thence South 670 47' East, 60 feet to a control point, the point and place of beginning. See deed dated September 10, 1979 of record in Book 132, Page 415, Chowan County Registry from M. G. Brown Company, Inc. to J. Scott Harrell, Sr. A portion of the westerly line of this Third Tract is shown on plat of record in Plat Cabinet 1, Slide 5D which shall control the location of the said line to the extent shown. The foregoing descriptions of the First and Second Tracts shall expressly exclude the Albemarle Boats, Inc. property owned by J. Scott Harrell, Sr. (PIN #7804-06-28-6968) as shown on plat of record in Plat Cabinet 1, Slide 5-D of the Chowan County Public Registry and the property conveyed by J. Scott Harrell, Sr. to Edenton Enterprises Co., Inc. (now J. Scott Harrell, Jr. and wife, Nelson C. Harrell) of record in Book 145, Page 395 with plat at Page 398, Chowan County Registry, but shall include the remainder of the property of J. Scott Harrell, Sr. as conveyed in deeds of record in Book 111, Page 616; Book 112, Page 429; Book 120, Page 543; Book 123, Page 263; Book 132, Page 415; Book 150, Page 190; and Book 151, Page 159 of the Chowan County Registry subject to the other exceptions noted above and any rights of way or easements of record to the Town of Edenton or other such easements for drainage. This transfer and conveyance is expressly subject to any and all liens, BOOK 2 2 d PAGE 233 encumbrances and debts against the property above described. Grantees do not assume such liens, encumbrances and debts by acceptance of this Gift Deed. TO HAVE AND TO HOLD the aforesaid tract or parcel of land together with all rights, privileges, and appurtenances thereunto belonging unto Grantees, as tenants in common [Elizabeth Harrell Johnstone and husband, E. Hall Johnstone, an eight percent (8.0%) undivided interest as tenants by the entirety; Elizabeth Harrell Johnstone as custodian for Joseph N. Johnstone under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest; and Elizabeth Harrell Johnstone as custodian for Alexander H. Johnstone under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest], their heirs and assigns, in fee simple forever. IN TESTIMONY WHEREOF, Grantor have hereunto set their hands and seals the day and year first above written. �•11 J n (SEAL) J. 79OTT HARRELL, SR. LA1\t� (SEAL) SHIRLEY GSGO HARRELL STATE OF NORTH CAROLINA COUNTY OF 010o,'01d I, a Notary Public of the County of (1110tw d and State aforesaid, certify that J. SCOTT HARRELL, SR. and wife, SHIRLEY GLASGOW HARRELL, Grantor personally appWitreaE !b'r4�if6une this day and acknowledged the execution off the foregoing instrument. R�Q fdofficial stamp or seal, this9 _day 995. o: 1JBL% . ; No ary Public MY :P9, CO NORTH CXWdCI„N.��:�rBs_ NA COUNTY OF _ Cbnwaa The foregoing »za0rx)9e&certificateof_Juliette L. Sharpe Notary Public of Chowan County State of N C is/We certified to be correct. This instrument and this certificate are duly registered &R-m cdatecawslx#naexa�d V e*14>:sl`d69x on December 29, 1995 at 4:00 o'clock P.M. Susan S. Rountree Register of De�ed/s� four Chowan County aae11136 ®epxdy/awgsterxo6cedecxx Recorded & Verified: No Stamps: BGBK 2020 PAGE 231 PFrFNED Prepared by and return to: NORTH CAROLINA CHOWAN COUNTY FEB 2 d 1996 M. H. Hood Ellis PO Box 220 Elizabedi City, NC 27907- 0220 THIS GIFT DEED, made this the 22nd day of December, 1995, by J. SCOTT HARRELL, SR. and wife, SHIRLEY GLASGOW HARRELL, Grantor, to ELIZABETH HARRELL JOHNSTONE and husband, E. HALL JOHNSTONE, an eight percent (8.0%) undivided interest as tenants by the entirety; ELIZABETH HARRELL JOHNSTONE as custodian for JOSEPH N. JOHNSTONE under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest; and ELIZABETH HARRELL JOHNSTONE as custodian for ALEXANDER H. JOHNSTONE under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest, as tenants in common, 4016 62nd Street, Bethesda, Maryland 20816, Grantees; WITNESSETH:. That the Grantor, for and in consideration of the natural love and affection borne for Grantor by the Grantees, has given, granted, and conveyed and by these presents does give, grant, and convey unto the Grantees as tenants in common [Elizabeth Harrell Johnstone and husband, E. Hall Johnstone, an eight percent (8.0%) undivided interest as tenants by the entirety; Elizabeth Harrell Johnstone as custodian for Joseph N. Johnstone under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest; Elizabeth Harrell Johnstone as custodian for Alexander H. Johnstone under the North Carolina Uniform Transfers to Minors Act, a four percent (4.0%) undivided interest], their heirs and assigns, all that certain tract or parcel of land lying and being in the First Township, Chowan County, State of North Carolina, more particularly described as follows: FIRST TRACT: (Remainder of Edenton Marina Property owned by J. Scott Harrell, Sr.) TOWN OF EDENTON, FIRST TOWNSHIP, CHOWAN COUNTY, N.C. (PIN #7804-28-4123) N BEGINNING at a tack driven in the Southern margin of US Highway #17, the t N center of a road lying between the Edenton Tractor & Implement Company sales v and service building and the Edenton Marina sales and service building, said tack ° being located South 460 25' West 163.16 feet from a manhole, the Western corner of a lot belonging to J. H. Conger; and running thence from said beginning point, a tack, South 57° 49' East 434.42 feet along the center of the aforesaid road to an iron stake, the western boundary of Queen Anne's Place, a subdivision; thence South 200 55' West 1,299.57 feet along the Queen Anne's Place line to an iron pipe, the mean high water line of Pembroke Creek; thence along the bank of said Creek North 100 48' West 249.10 feet to a stake, North 16° 50' West 203.19 feet, North 48° 12' West 250.16 feet, North 350 38' West 182.87 feet, and North 670 56' West 388.95 feet to an iron stake in the edge of the aforesaid creek where it intersects the Southern right of way line of US n A) C) DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL/PROCESSING RI APPLICANT: J. Scott Harrell, Sr. COUNTY: Chowan LOCATION OF PROJECT: Man-made canal off Pembroke Creek, Edento " DATE APPLICATION RECEIVED COMPLETE BY FIELD: February 28, FIELD RECOMMENDATION: Attached - No To Be Forwarded - Yes CONSISTENCY DETERMINATION: Attached - No To Be Forwarded - Yes FIELD REPRESENTATIVE: Dennis W. Hawthorn DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: tiW DATE APPLICATION RECEIVED IN RALEIGH: PUBLIC NOTICE REC'D: ADJ. RIP. PROP NOTICES REC'D: --� APPLICATION ASSIGNED TO: %bh!� FEE REC'D: $ END OF NOTICE DATE: \`\ DEED REC'D: ON: 75 DAY DEADLINE: S = % ,5— / 6 150 DAY DEADLINE: MAIL OUT DATE: a 9� STATE DUE DATE: q FEDERAL DUE DATE: —t�- z FED. COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS YES NO NOTES Coastal Management Dist. Office Div. of Community Assistance Land Quality Section Div. of Env. Managemen State Property Office Div. of Archives & History _ ... O LIZ Div. of Env. Health /t# Div. of Highways 1 Wildlife Resources Commission ( Div. of Water Resources Div. of Marine Fisheries r State of North Carolina 'Department of Environment, Health and Natural Resourc Division of Coastal Manageme REC�ENEO - 4 James B. Hunt, Jr., Governor APR 1996 E Jonathan B. Howes, Secretary MANAGEMENT Roger N. Schecter, Director MEMORANDUM < 9 CA TO : John Parker FROM Dennis W. Hawthorn Application SUBJECT J. Scott Harrell, Sr. Major Permit Recommendations DATE March 26, 1996 The applicant proposes to develop a lot and construct a single- family residence located on a man-made canal which connects to Pembroke Creek. To accomplish this, to access the lot, the applicant proposes to construct a culvert crossing over a small man-made ditch which connects to Pembroke Creek. To create a larger lot, and to straighten and stabilize the shoreline, the applicant proposes to fill 1200 sf. of Public Trust Waters and 4356 sf. of 1404' wetlands. The applicant also proposes to dredge 300 sf. of Public Trust Waters and construct a boat lift on the same man-made canal. A small Coastal Wetland stand of mostly Typha 1. is currently present in the ditch and crossing area. The proposed '404' area to be filled is between two previously filled lots. The existing bulkhead is in serious need of replacement. The existing slip area contains debris and is of little use in its current condition. The area where the applicant proposes to dredge and construct a boat lift is also shallow and littered with debris. Although the proposed development will directly impact a small Typha stand and the proposed bulkhead alignment exceeds the 7H Rules for shoreline stabilization, the proposed development will improve access and use of the adjacent Public Trust Waters. In this regard, I have no objections to the proposed application so long as the following conditions are placed upon the permittee. 1] The site work and bulkhead alignment will le constructed as depicted on the applicants plat dated Fetruary 19, Sheets 1 - 4. 2] The permittee sirall�,call for a pre—construct,on site meeting between the Division of Coastal Management andthe permittee's contractor prior to the onset of any site w•.rk. The above referenced alignment will be set by a DCM representative prior to construction. 1367 U.S. 17 South, Elizabeth City. North Carolina 27909 Telephone 919-2640 9D�suK 919-264-3723 An Equal Opportunity Afflrmailve Action Employer 50% recYclad/ 1096 P . paper - r John Parker J. Scott Harrell, Sr. Major Permit Application Recommendations March 26, 1996 3] The bulkhead must be constructed prior to any backfilling or �- shoreline grading activities. The bulkhead must be structurally tight so as to prevent the seepage of backfill materials through the structure. 1I 4] Erosion and sediment control devices and measures shall be used as necessary to prevent the discharge of any dredge spoil or sediment runoff into any adjacent wetland or Public Trust Waters. v 5] All fill material will be clean and free of any pollutants, except in trace amounts. Metal and wood debris shall not be used as backfill material. b 6] No excavation within Public Trust Waters shall occur between February 15th and September 30th of any calendar, year without written authorization from the Division of Coastal Management in consultation with the NC Division of Marine Fishe`riieess.�,, 7 ] Exc�on� _be� tr erence on.$-`date� 4111 v February 19, 1996, Sheets 1 of 4 and 2 of 4. Excavation depths shall not exceed connecting water depths or 5.5 ft. below the NWL. 1 8] All dredge spoil will be placed landward of Public Trust Waters or any wetlands. All dredge spoil will be de -watered behind a suitable retention structure. Spoil material shall not be used as bulkhead backfill until it has been completely de -watered. 9] No excavated or fill materials will be placed at any time in any wetlands or waters -outside the permitted area. 101 The temporary placement or double -handling of excavated or fill materials within any un-authorized wetlands or Public Trust Waters is not authorized. Z 11] The culvert crossing shall be installed in accordance with US COE and NC Sediment Control Rules and the plats dated February 19, 1996. The filling of this man-made ditch other than work specified on these referenced plats is not authorized. 12] The boat lift structure shall be constructed as per the plats dated February 19, 1996. The structure shall not interfer with the public's use or access to the man-made canal. The lift structure, in no case, shall extend beyond one-third the canal width at NWL. This authorization does not provide for any dock or pier to access the boat lift structure. State of North Carolina Department of Environment, Health and Natural Resources • Division of Coastal Management James 13, Hunt, Jr., Governor p E H N fR Jonathan B. Howes, Secretary Roger N, Schecter, Director March 19, 1996 TO: Mr. Bruce L. Freeman, Director Division of Marine Fisheries FROM: John R. Parker, Jr.rlolkr&0, Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: J. Scott Harrell, Sr. Project Location: Man-made canal off Pembroke Creek, Edenton; Proposed Project: To construct a culvert crossing over a man-made ditch, fill a 240 square foot man-made slip/basin in public trust waters, bulkhead and grade the adjacent shoreline, maintenance dredge 300 square feet of the adjacent canal, and construct a 288 square foot boat lift. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 9, 1996. If you have any questions regarding the proposed project, please contact Dennis Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. V This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the a tached comments. Signs Date — z 1 % 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919.264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Marine Fisheries James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Bruce L. Freeman, Director MEMORANDUM: /� .:' AI 1� IL ID FE F I MAR 2 5 1996 W-PUB. TUSUBLANDS TO: John R. Parker, Jr., DCM Major Permits Processing Coordinator THROUGH: Ski WojciechowsId '_'i?Z - FROM: Sara E. Winslow, Biologist Supervisor SUBJECT: J. Scott Harrell, Sr. DATE: 21 March 1996 The following comments by the North Carolina Division of provided pursuant to General Statute 113-131. �R �vEO�' MAR��p �L Pembroke Creek and its tributaries function as a spawning and nursery area for blueback herring and alewife. White perch, yellow perch, catfishes and other commercially and recreationally important species also utilize the area. This agency is concerned with the loss of 4,356 square feet of wetlands and 100 square feet of coastal wetlands. Wetlands are of great importance serving as sources of biological productivity and providing food directly and indirectly. Finally, wetlands perform important roles in modifying acute impacts of hydrologic events, moderating stormwater flows, trapping sediments, and providing nutrients for incorporation into resident plants. Based on the width (6.5 feet) of the drainage ditch, the Division would recommend a culvert larger than 2 feet in width. Constricting the flow to a two foot width could result in stormwater backup, resulting in flooding. The proposed excavation for the boat lift should not exceed the connecting depth in the canal (5.5 feet). This agency would recommend a moratorium associated with the proposed excavation of 720 cubic feet for the boat lift. The moratorium period would be 15 February through 30 September. This will ensure the environmental integrity of the area is protected during critical times of usage by the previously mentioned species. However, if some type of turbidity curtain or boom could be utilized, the work could be conducted within the moratorium time frame. P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, 19 V AVA Health and Natural Resources / • v Division of Marine Fisheries f James B. Hunt, Jr., Governor p E H N Jonathan B. Howes, Secretary Bruce L. Freeman, Director 26 March 1996 MEMORANDUM TO: John R. Parker, Jr. FROM: P.A. Wojciechowski SUBJECT: CAMA/DREDGE & FILL Permit Application J. Scott Harrell, Sr. Attached is the Division's reply for the above referenced project. If you have any questions, please don't hesitate to contact me. PAW/bc R C�VED MAR 28 966t COASTAL MANAGEMENT P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, ` Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM April 3, 1996 TO: P. A. "Ski" Wojciechowski Division of Marine Fisheries FROM: John Parker Major Permits Processing Coordinator ED EE H N FR APR 1 5 n% Wr PUB. TUSUBLANDS R�C�.�" 19g6 SUBJECT: CAMA/Dredge and Fill Permit Application Review ? PQR���t APPLICANT: J. Scott Harrell �' NP PROJECT LOCATION: Man-made canal off Pembroke Creek, Edent PROPOSED PROJECT: To construct a culvert over a man-made ditch, etc. Please indicate below your agency's position or findings on the proposed project as it relates to matters of public trust. If you have any questions regarding the proposed project, contact John Parker at 733-2293 or the DCM field representative for the project. This form should be used only for tracking and intra-agency commenting. REPLY There are no known public trust conflicts with the project location or design. Signed There appear to be public trust conflicts that require additional investigation. Approximately _ days additional review time is needed. ,-`�It is recommended that changes be made to the project to reduce or !eliminate public trust conflicts, as discussed in the attached memo. GA�'T /+lg 7Gy .TH/S .O!/..9 w•Th' SG,B>c�j /!'ir/O /�,CTJ6.G .q,f� Z llf.�T//f1✓6- �6/Nil. C,QlGM�XO Date /�L6T wo...GO P.O. Box 27687, N7`� C FAX 919-733-1495 Raleigh, North Carolina 27611-7687 1, ` An Equal FAX Action Employer Voice 919-733-2293 50% recycled/ 10% post -consumer paper ��i NC UEM WO ENVSCI Fax:919-733-9959 State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N, Schecter, Director March 19, 199E May 17 ' 96 13:53 F'. 02 / 02 1NA iZ 9+' . n`�'•- snmr� IDE�H1 FZ M&MORANDtJM TO: Mr. A. Preston Howard, Director Division of 5nviran-mental Management FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDC FILL Permit Application Review Applicant: .7. Scott ar=ell, Sr. wgsHrNG7-0,N OFpce MAR 2 f 1996 Project Location: Man-m;—de_canal off Pembroke Creek, Edenton, C'howan County Proposed Project: To construct a culvert crossing over a man-.;ade ditch, fill a square foot man-made slip/basin in public trust waters, bulkhead grade the adjacent shoreline, maintenance dredge 300 square fee:: the ad-jacent canal, and construct a 288 square foot boat lift. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 9, 1996. If you have any questions regarding the proposed project, please contact Dennis Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY Signed This agency has no objection to the project as proposed. This agency has no comment on the proposed roject. This agency approves of the project only if -he recommended changes are ir-corporated, see attached. This agency objects attached comments. Ni �.. to the project for reasons described in the Date 1367 U.S. 17 South, Eltzabeth Chy, North Coro4no 27909 Telephone 919-264-3401 FAX 919-264-3723 AnEoualOppoitunffy.4tflrmaflveAcr!cr)Emoloyer 50%recyclad/10%post-consurrwpaper NC DEM WQ ENVSCI Fax:919-733-9959 May 17 '96 13:52 P.01102 State ofN.orth'Carolina Department of Environment, 'Health and Natural Resources Division of Environmental Managemel James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director APPROVAL of 401 Water Quality Certification Mr. J. Scott Harrell 605 West Queen Street Edenton, NC 27932 Dear Mr. Harrell: May 13, 1996 Chowan County DEM Project # 960288 COE #199601461 You have our approval to place fill material in 0.1 acres of wetlands or waters for the purpose of constructing a culverted crossing over a ditch, fill a basin, construct a bulkhead and boat lift and conduct maintenance dredging at Pembroke Creek in Edenton, as you described in your application dated 21 March 1996, After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3025, This approval is only valid for the purpose and design that you described in your application- If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. ,You must act within 60 days of the date that you receive this lcuer. To ask for a hearing, send a writien,petition which conforms to Chapter 15011 of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611 7447. This certification and its conditions are final and binding unless,you. ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domry at 919-733- 1786. Sincerely, 1 i on Hower , Jr. P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Domey Central Files John Parker; DCM 96028R.1tr Envlronmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1796 FAX # 793-9059 An Equal Opportunity Aifkmative Action Employer • 5o°% recycled/10% post consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 28, 1996 MEMORANDUM TO: Mr. Charles R. Fullwood, Jr., Director Wildlife Resources Commission Attn: Habitat Conservation Program FROM: John Parker, Jr. Major Permits Processing Coordinator 1� 1DEHNFR co rs MANq� I SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: J. Sc tq t Harrell PROJECT LOCATION: Man-made canal off Pembroke Creek, Edenton, Chowan County ROPOSED PROJECT: To construct a culvert, fill a basin, bulkhead and grade, etc. Please indicate below your agency's position or viewpoint on the proposed and return this form by April 18, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached %% comments. Signed l��r0 acb�"ef eazs�,i -Lro., Date - (9 -"f May 21, 1993 P.O. Box 27687, ��FAX 919-733-1495 Raleigh, North Carolina 27611-7687 �C An Equal FAX Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper State of North Carolina Department of Environment, 17 Health and Natural Resources M Division of Coastal Management AMA��� James a, Hunt, Governor p E H N FR Jonathan B. Howes, Secretary Roger N. Schecter, Director March 19, 1996 MEMORANDUM TO: Mr. Charles Gardner, Director Division of Land Resources FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: J. Sco Harrell, Sr. Project Location: Man-made canal off Pembroke Creek, Edenton, Chowan County Proposed Project: To construct a culvert crossing over a man-made ditch, fill a 240 square foot man-made slip/basin in public trust waters, bulkhead and grade the adjacent shoreline, maintenance dredge 300 square feet of the adjacent canal, and construct a 288 square foot boat lift. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 9, 1996. If you have any questions regarding the proposed project, please contact Dennis Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY \ his agency has no objection to the project as proposed. \�I This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the ttacheMce s. Signed C.- Date RICENEO APR 2 1996 COASTAL MANAGEMENT 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-2 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 28, 1996 MEMORANDUM TO: Mr. Larry R. Goode, Phd., P.E. Highway Administrator Division of Highways FROM: John Parker, Jr. Major Permits Processing Coordinator sL EDEHNR pO APR 12 1996 oomf XIMENT SUBJECT: C DGE & FILL Permit Application Review APPLICANT: J. 1 7ttHaff ell PROJECT LOCATION: Man- de canal off Pembroke Creek, Edenton, Chowan County. PROPOSED PROJECT: To construct a culvert, fill a basin, bulkhead and grade, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 18, 19%. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REP Y This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency obje is to the project for reasons described in the attached comments. Signed C2- Date 9 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Voice 919-733-2293 FAX 919-733-1495 An Equal Opportunity/Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 28, 1996 MEMORANDUM TO: Ms. Renee Gledhill -Early Environmental Review Coordinator Division of Archives and History 1� EDEHNFR FROM: John Parker, Jr. c RF�t �g96 Major Permits Processing Coordinator N?V 00o,!,Ot SUBJECT: CAMA/DREDGE & FILL Permit Application Review �pN APPLICANT: J. Sco Harrell C 9 PROJECT LOCATION: Man-made canal off Pembroke Creek, Edenton, Chowan County PROPOSED PROJECT: To construct a culvert, fill a basin, bulkhead and grade, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April. 18, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date ��� -6/ P.O. Box 27687, 'q FAX 919-733-1495 Raleigh, North Carolina 27611-7687 Ni� C An Equal FAX Action Employer Voice 919-733-2293 50% recycled/10% post -consumer paper I_ NPP 19 ,96 02:710M State partmeorthnt of desources nment, ,r (J-He(4th and Nat Division of Coastal Management fJ, James B. Hunt, Jr., Governor Jonathan B'. Howes. Secretary Roger N. Schecter. Director {-�� R E C E 14 ' (larch 28. 1996 APR I MEMORAND W. OF TO: Ms. Linda Sewall, Director Division of Environmental Health FROM: John Parker, Jr. Major Permits Processing Coordinator t F' . 2 e�� E)EHNR RECEIVED Div, OF E1NV1R0iVw1E1,`7AL NLg17N SUBJECT: CAMA/D GE & FILL Permit Application Review APPLICANT- J. Scott rrell PROJECT LOCATION: Man ma canal off Pembroke Creek, Edenton, Chowan County PROPOSED PROJECT: To construct a culvert, fill basin, bulkhead and grade, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 18, 1996. 1f you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. V This agency has no continent on the Proposed project.— viG.�ti-' r�ld��..'v This agency approves of the project, only if th ..recomnl¢nded changes are incorporated. See attached. /G�/��Z This agency objects to the project for reassorns de�Zd in the att�hed cornInents. Signed_ %( r L�'t �,•__ Date SIC' /lam P.G. Box 27687, �� FAX 919733-1496 Rplelgh, North Carolina 27611-76@7 N �� CAn Equal .'i^n Employer Voice 919-733.2293 50% recycled% 10% post-cons,z� Jpoper State of North Carolina Department of Environment, • Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 28, 1996 10101uC111):7: ►I\` IIIIiLI TO: Mr. John Sutherland, Chief Water Planning Section Division of Water Resources FROM: John Parker, Jr. Major Permits Processing Coordinator 1� EDEHNFR •ti C i.i� (��, SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: J. Scott Harrell PROJECT LOCATION: Man-made canal off Pembroke Creek, Edenton, Choran County. PROPOSED PROJECT: To construct a culvert, fill basin, bulkhead and grade, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 18, 1996. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. Y \ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described comments. RECEIVED APR 29 199 Signed //�` COASTAL � S MANAGEMEN' Date 9 P.O. Box 27687, Nam`«, 4 FAX 919-733-1495 Raleigh, North Carolina 27611-7687 1, An Equal Opportunity/Afflrrnative Action Employer Voice 919-733-2293 G_ a 50% recycled/10% post -consumer paper DEPARTMENT OF THE ARMY r WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 J COS WILMINGTON, NORTH CAROLINA 28402.1890 REPLY TO ATTENTION OF April 24, 1996 Regulatory Branch Action ID No. 199601461 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of J. Scott Harrell, Sr. for a Department of the Army (DA) permit to install a culvert in a man-made ditch, construct a bulkhead, and place fill material in wetlands and an existing basin, maintenance dredge a canal, and construct a boatlift, on property located off Queen Anne Drive, adjacent a man-made canal to Pembroke Creek, Edenton, Chowan County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following condition(s) be included in the State authorization: v 1. All work authorized by this permit must be performed in strict compliance_ with the permit plans. 2. The bulkhead will not be positioned farther waterward than 34 feet from the normal water level elevation contour at any point along its alignment. 3 3. All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. 4. No excavated or fill materials will be placed at any time in any vegetated wetlands or waters outside of the permitted area. 5. Excavation will not exceed 5.5 feet below the elevation of mean low water (MLW). Q 6. The temporary placement or double handling of excavated or fill 1 materials within waters or vegetated wetlands is not authorized. dr 7. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. APR28 jyu MAMA EMENTT -2 8. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, Raleig P.W.S. Regulatory Project Manager Copies Furnished: Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 U.S. Fish and wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLYTO G ATTENTION OF Marl G Al Regulatory Branch Action ID. 19 q h D I� I Applicant Waterway QPxhb4-nke Cree�C County � Mr. Larry Hardy National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Fish and Wildlife Enhancement U. S.Fish and Wildlife Service Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr.. Thomas Welborn, Chief Wetlands Regulatory Section -Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Gentlemen: Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 PILVI UJ4 OizA�kf�Regional Office Division of Coasial Management North Carolina Department of Environment, Heallth and Natural Resources 130 y5 Q Stm 2a Ci if L XMIl Pursuant to Action ID No. 198000291, the CAMA-Corps general permit/processing agreement, a State Field Investigation Report is enclosed. .h Your comments and/or recommendations would be appreciated on or before YI �r� I as I116 Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, 4 . r..R4 "4 Raleigh Bland Regulatory Project Manager Enclosure DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 REPLYTO ATTENTION OF March 27, 1996 Regulatory Branch Action ID No. 199601461 Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27611-7687 Dear Mr. Dorney: Enclosed is the application of J. Scott Harrell, Sr. for Department of the Army (DA) authorization and a State Water Quality Certification to install a culvert in a man-made ditch, construct a bulkhead and place fill material in wetlands and an existing basin, maintenance dredge a canal, and construct a boatlift, on property located off Queen Anne Drive, adjacent a man-made canal to Pembroke Creek, Edenton, Chowan County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. According to our administrative regulations, 60 days is reasonable for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by May 25, 1996, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (919) 975-1616, extension 23. Sincerely, Raleigh Bland, P.W.S. Project Manager Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker D' ision of Coastal Management orth Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF March 27, 1996 Regulatory Branch Action ID No. 199601461 J. Scott Harrell, Sr. 605 West Queen Street Edenton, North Carolina 27932 Dear Mr. Harrell: On February 11, 1991, we renewed General Permit No. 198000291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received March 22, 1996, for Department of the Army (DA) authorization to install a culvert in a man-made ditch, construct a bulkhead and place fill material in wetlands and an existing basin, maintenance dredge a canal, and construct a boatlift, on property located off Queen Anne Drive, adjacent a man-made canal to Pembroke Creek, Edenton, Chowan County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State -Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should You begin work. Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 199601461. It will be coordinated by Mr. Raleigh Bland in our Washington Regulatory Field Office. Mr. Bland is available at telephone (919) 975-1616, extension 23. Sincerely, Raleigh Bland, P.W.S. Project Manager Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker vision of Coastal Management VI/XPO,rth Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 U.S. Fish.and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Richard Watts, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 U.S. 17 South Elizabeth City, North Carolina 27909 RECEIVED FEB 2 8 1996 I, J.Scott Harrell, Sr., authorize Heidi Bowen to act as agent for any and all permits required for property located on Pembroke Creek in Edenton, N.C. Signature: State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director March 19, 1996 J. Scott Harrell, Sr. 605 West Queen Street Edenton, NC 27932 Dear Mr. Harrell: ��� [DEHNFR The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located man-made canal off Pembroke Creek, Edenton, Chowan County. It was received on February 28, 1996, and appears to be adequate for processing at this time. The projected deadline for making a decision is May 13, 1996. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any 1367 U.S. 17 South. Elizabeth City. North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10%post-consumer paper March 19, 1996 Page #2 questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, 4pa�q�� Dennis W. Hawthorn Field Representative I DWH/kh Enclosure cc: John Parker Richard L. Watts tj ��yijjjj t I 3 5 CAMA PERMIT APPLIED FOR PROJECT: _To construct a culvert cross-ing over a man-made ditch fill a 240 square foot man-made slip/basin in public trust waters, bulkhead and grade the adjacent shoreline, maintenance dredge 300 square feet of the adjacent canal, and construct a 288 square foot boat lift. COMMENTS ACCEPTED THROUGH April 16, 1996 APPLICANT: �pourca FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: J. Scott Harrell, Sr. -N.C. Division of Coastal Management 605 West Queen Street Y 1367 U.S. 17 South Edenton, NC 27932 Elizabeth City, NC 27909 I K Article! ' Solry We Missed You! No. We PDEI1V21' For You! Today's Date Sender's Name UMIR032fE5 / L IUSNt3EfYCEu Item []Post Office (see reverse). is at: ❑ .. . . ❑ IF CHECKED i'OU MUST BE PRESENT AT TIME OF DELIVERY TO SIGN FOR ITEM. ❑ Letter FE Mail (redelivery Article Requiring Payment: ❑ FINAL NOTICE ,. very day ❑ Postage Due Article will be returned .2Large envelope, ou call to hold ❑ COD ❑ Customs to sender on: magazine, catalog, etc.ffice) Amount Due:S❑ Parcel dAddressee-N a ` r red Address ❑ Delivery Restricted ❑ Return Receipt �f,,c� to Addressee for Merchant , .7 c✓<G L! /� 6, Cr �/ .� ❑ Perishable Item ❑ Recorded- pelivery Received y (Print ame and Sign (International) ❑. ❑ Special Deliveryy X. -'i - - Delivered By I_Dafle� Customer: Describe any Visibfe Damage Delivery Notice/Reminder/Receipt PS Form 3849, December 1994'� - ` tko& MAIUN'GOfFlCE: Postmalkfoitdwatefee orn fetetmshaded to are aandertter oIFriameand address onthe rel pmvioustypa' for desclbedin hsm2ox wasrRECE[FrAFTER next to desired service: IPfAFTER MAILING -Provide name of indiudrat company, or N ¢atlon towhom deNeredanddate ddefitery 42� CATERECEIPT-pmvi&narredindnidualwmpanyorgyan¢alonto detiered and date ofdeMry. CATERECEIPT(wMaddressofdeleery)-Provide name ofincNiduatny, ororgan'9atm lowlin delivered, date of deMiy, andaddressee'ss. Attach appropriate fee as shown in DMM 3. MIil-Dater^ 4. COD Number S. ReNm Recent for ra ronfl •yt71 7-A, April 1992 ' Domestic Return Receipt (After Complete hems 1'anAlor 2 tar etldibonat servmes - I alsc Wlsh`.to receive the_ Complete items 3, and 4, & to } ^-- z` ` follOWInd services (for an extra Print your name end address on the reverse of this form so that we can return this bard to you. _.:rk r� .-.. fee): <. Attach his form to the front of the madpiece or on the back If space 11 Addressees Address ``>, _ tloes not permit. r l ..',� w. r r ,'❑ Wdtefleturn Receipt Requested" onthemailpiecebelowtheartielenumber •Jbefletuni Receipt Fee will provide you the signature of the person der.vere ; ,2m D Restricted Delivery .,;_� .. - .to end the date of delivery. : " = _ Consult postmaster for fee. '. -- 3 Article Addressed to:.'� 4a- Article Number DR LANDIS W VOIGHT �301 QIIEEN 'ANNE ' DHIVE ab. Service Type ., EDENTON 27932; ❑Registered ; ❑ Insured -NC /,. � `.. Er Cerhfled ❑ COD �,+ r IA- ❑ Express Mail 11 Return Receipt for - Merchandise - -,: a 7. D(at��n7f very J 5. 8. Addressee's Address (Only if requested and fee is paid) 8. ignature (Agent) _.. - - PS Form 3811, November 1990 'trU.S.GPO:1991-2a7-M DOMESTIC ~RETURN RECEIPT J. Scott Harrell 605 West Queen Street Edenton, N.C. 27932 February 23, 1996 Mr. E. G. Burroughs 303 Queen Anne Drive Edenton, N.C. 27932 Dear Mr. Burroughs: REGEi,/rn FEB 2 8 1906 As you are aware, I am in the process of applying for a permit from the Division of Coastal Management. I want to improve my waterfront property located next to you so that I may build a house there. My plans are to build a bulkhead that will be backfilled, a, boatlift and to place a culvert- in the manmade stormwater ditch to make a driveway. The enclosed drawings are revised to inlcude the culvert. Should you have any questions, please call me (482-3720) or Heidi Bowen (482-7071). Sincerely, J. Scott Harrell, Sr. CERTIFIED MAIL RF.CE(VED RETURN RECEIPT REQUESTED: FEB 2 8 1996 Dear Mr. E.G. Burroughs (RIPARIAN LANDOWNER'S NAME) This letter is to notify you as an adjacent riparian landowner of Mr./Mrs. J. Scott Harrell, Sr. (YOUR NAME plans to construct a boatlift, bulhead w/backfill, and driveway culvert (YOUR CONSTRUCTION PLANS) in Edenton, NC . The sketch on the reverse side accurately depicts the proposed construction. (CITY/COUNTY) Should you have no objections to this proposal, please check the statement below, sign and date the blanks below the statement and return this letter to: Heidi Bowen (YOUR NAME AND ADDRESS PO Box 237 Edenton, NC 27932 as soon as possible. Should you have objections to this proposal, please send your written comments to N.C. Division of Coastal Management, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 10 days of receipt of this notice. Failure to respond in either method within 10 days will be interpreted as no objections. Sincerely, n ) I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments. (RIPARIAN LANDOWNER SIGNATURE) (DATE) By signature below I have agreed to the encroachment of this project within my riparian corridor and have waived the minimum setback of 15 feet from my property line. (RIPARIAN LANDOWNER SIGNATURE) (DATE) RECEIVE© J. Scott Harrell 605 West Queen Street Edenton, N.C. 27932 February 23, 1996 Dr. Landis W. Voight 301 Queen Anne Drive Edenton, N.C. 27932 Dear Dr. Voight: FEB 2 8 195 As you are aware, I am in the process of applying for a permit from the Division of Coastal Management. I want to improve my waterfront property located next to you, so that I may build a house there. My plans are to build a bulkhead that will be backfilled, a boatlift and to place a culvert in the manmade stormwater ditch to make a driveway. The enclosed drawings are revised to inlcude the culvert. Should you have any questions, please call me (482-3720) or Heidi Bowen (482-7071). Sincerely, J. Scott Harrell, Sr. CERTIFIED MAIL RETURN RECEIPT REOUESTED: Dear Dr. Landis Voight (RIPARIAN LANDOWNER'S NAME) This letter is to notify you as an adjacent riparian landowner of Mr./Mrs. RECEIVED FEB 2 8 1996' J. Scott Harrell, Sr. (YOUR NAME plans to construct a boatlift, bulkhead w/backfill, and driveway culvert (YOUR CONSTRUCTION PLANS) in Edenton, NC The sketch on the reverse side accurately depicts the proposed construction. (CITYICOUNTY) Should you have no objections to this proposal, please check the statement below, sign and date the blanks below the statement and return this letter to: Heidi Bowen (YOUR NAME AND ADDRESS PO Box 237 Edenton, NC 27932 as soon as possible. Should you have objections to this proposal, please send your written comments to N.C. Division of Coastal Management, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 10 days of receipt of this notice. Failure to respond in either method within 10 days will be interpreted as no objections. Sincerely, �J I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments. (RIPARIAN LANDOWNER SIGNATURE) (DATE) By signature below I have agreed to the encroachment of this project within my riparian corridor and have waived the minimum setback of 15 feet from my property line. (RIPARIAN LANDOWNER SIGNATURE) (DATE)