Loading...
HomeMy WebLinkAbout7-14 RE Mayo SeafoodPermit Class NEW Permit Number 7-14 STATE OF NORTH CAROD E'qA Department of Environment and Natural Resources and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to R. E. Mayo Seafood c/o Carol Potter, PO Box 100, Hobucken NC 28537 Authorizing development in Pamlico County adi. to the ICW, at 183 Mayo Road, in Hobucken as requested in the permittee's application dated 8/27/13 (MP-1, and 8/26/13 (MP-2), including the attached workman drawings (4) all dated 8/21/13 This:permit, issued on January 14 2014 is subject to compliance with the application (where consistent with -the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization l) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawings and shall be constructed in a straight line between the corners of the two adjacent bulkheads. 2), The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. (See attached sheet for Additional Conditions) W "This ''permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date;, An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department e personnel when the project is inspected for compliance. 1 Any maintenance work or project modification not covered hereunder requires further Division approval. t All work must cease when the permit expires on ;Pecember 31, 2017 i - In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal :ManagementProgram. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. 'D12-Braxton C. Dauis, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Signature ofPennittee R. E. Mayo Seaf d Permit # 7-14 Page 2 of 2 ADDITIONAL CONIDITIONS 3) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved, by department personnel. No excavation landward of the authorized ' alignment is permitted except for that which may be required for the construction of the bulkhead wall and deadmen cables, etc. -: ;4). , All backfill material shall be clean and free of any pollutants except in trace quantities. 3) All. backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control ' -6) - In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 7), Appropriate sedimentation and erosion control devices measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. p 8)j .-All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 3 9}" The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. r, 10), This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. NOTE: NOTE: NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many development or land disturbing activities are not allowed within the Environmental Management Commission's Neuse River Buffer. Contact a representative of the Division of Water Resources at (252) 946- 6481 for more information concerning allowable uses within the Neuse River Buffer. The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No SAW- 2014-00071 Date 8-22-2013 Agent Authorization For Proposed Bulkhead Project @ 183 Mayo Road Hoboken, NC I Carol G Potter Authorize Wayne Manish To secure major development Permit. Wayne has been assigned Project Manager on this project and will assist me though out the duration of this project or until further notice. Thank you Carol G Potter RECENED OCT 18 2013 i DCMMHDCffY RECEIVED AUG 2 9 2013 DCM-MHD CITY NARRATIVE/ 7-12-13 To whom this may concern. Objective Here at Re Mayo seafood are objective is to construct a bulkhead Of applicable materials including wood pilings, Whalers and vertical vinyl sheeting. Our intent is consolidate this proposed bulkhead to an existing bulkhead to the South'and to a existing bulkhead to the North. After completion of said bulkhead we intend to backfill with imported material such as sand and or clean fill dirt. To finalize the project we also would apply a top dressing of topsoil and plant applicable vegetation / Grass for erosion control and stabilization. Supplement Through the years of constant Pounding from Boat traffic on the Intracoastal waterway and from water levels raising and falling we have experienced a fair amount of erosion and damage to our property at the waters edge. We are also concerned with safety issues due to unstable bank conditions. We would like to keep our dock and surrounding area safe for we provide public access for boaters as well as fisherman and their children who frequent our establishment. Conclusion In conclusion I would like to add in my opinion, I feel this would not only protect our property from further damage from boat wakes, rising and falling water levels, It will decrease any negative impact on our waterway and environment from erosion and silt entering our waterways. Our intent is to construct a bulkhead With no negative impact on our environment or waterways. Very truly yours �trcEcvEr� Wayne Manish Project Manager AUG 2 9 2013 REcEIn OCT 18 2013 rry E � yrr 099 MF1 APPLICATION for major Development Pormu (last revised 12I27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Infonmadon Business Name Project Name (if applicable) 11 ♦C I Applicant 1: First Name MI Last Name d d Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) Wffi names fisted. Mailing Address PO Box City state o o & Ca ZIP ai Country Phone No. FAX No. ml e as2-�93s33 eta. a� a Street Address (dddrerentfrom above) C State ZIP /9 3 D ko,u RRY31 Email C gpottetp Pinj ido 2. Agent/Conftlator Information Business Name Al Ii'1404-4 C—NTaAPkltf Agentl Contractor 1: First Name MI Last Name I' MI Last Name _ �= - VC.4,LTD CIZY - Agent/ Contractor 2: Fib Name Mailing Address PO Box JOO City State ,/ / �3ucykE�U /V (_ l ZIP Phone No. 1 Phone No. 2 il� a - �- W--,5331ext- / ext. FAX No. Contractor # a<5a 2 Street Address (if different from above) City state ZIP Email ylu C MANisff L O 1 E 0 &WLI <Form continues on back> OCT 18 2013 252.808.2808 :: 1-888-4RC; .. :: vvv: ,gera6YdllllB�j�s form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. #' n ` e led m0 RD C {µ O Subdivision Name City . Ho 66rC4go State 1W� Zip :2 Phone No. Lot No.(s) Ili many, attach additional page with list) Za- 5331 ext. , , , , a. In which INC river basin is the project located? b. Name of body of water nearest to proposed project IQ1045 Im iRL CJ c. Is the water bogy identified in (b) above, natural or manmade? d. Name the dosest major water body to the proposed project she. []Natural anmade []Unknown 1:3-6/ViS e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes j3No work falls within. 61LJC ou�u 1 4. Site Description a. Total length of shoreline on the tract b. Size of entire tract (sq.8.) 375 c. Size of individual lot(s) 760 i( occ'SQ/ d. Approximate elevation of tract above NHW (normal high water) or NWL(normal level) list) water ❑ or � �4 a� with a (If many lot sizes, please attach additional paget) e. Vegetation on tract G P-A&) TkF45 AUG 2 9 2013 f. Man-made features and uses now on tract A4 JS / "4 40 M)w6l 14s sro/2C, Be,+-rP1"103 pcdk4C /-op- too-g72, poeA< g. Identify angdescribe the existing land uses n to the proposed project site. us eo)sr �+ 0 're T - 4j 'Ta"0S :1��vA u7 eLalR To '� Saµ714) XCU 7VT #C GIST Pa) t/r9-r /jvvflrs rd 77&0 14 Gs T— h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N%$ (Attach zoning compliance certificate, if applicable) ❑Yea ❑No G IAA 1605i S j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ONO— k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No [DNA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes o ❑NA National Register listed or eligible property? <Form continues on next page> i RECEIVED OCT 18 2013 252-808-2808 :: 1-888-4RCl 7 :: www-necoastaimanagement.net DCM-MHDM ,Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? oyes &K0 (ii) Are there coastal wetlands on the site? Oyes 2fio (III) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/a o. Describe existing drinking water supply source. Couu c-w-F-2 p. Describe existing storm water management or treatment systems. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? nmmercial G'J pblirlGovemment 13Prwate/Community It. Give a brief description of purpose, use, and daily operations of the project when complete. u4k/ d W54AIV L_.oArQ LcsT IJar 1-0 94050VAA) 'I-) TO STOP 'rNg09A)0FZ Of L QOSK FAfm Srd,*s Ati9f7 6o.47'T�AFFi� o u mew, paCkiw of ,60A-TS c. Describe the proposed construction methodology, types of consntruction equip nt to be dud construction, the number of each type and where it is to be stored. �%Cki % Q p Lin0 of equipment t; XaA✓k'%bf'L ? / ) '4_)_ To 19 0 S T-01 -n o u S;TG d. List all development activities you propose./lkS7ALL /4N A.%7' O Os 13Ulkh�AO To le>A /STI A-4 i94Zk/ki94S a N t=AdH SIDE. ,B6kl /t t PlzdylsS.�� e. Are the proposed activities maintenance of an a 'sting project, new work, or both? ga - - t A S a 2o17aS CJ m th f. What is the approximate total disturbed land area resulting from proposed project? .Ft or ❑Acres �d0Q g. Will the proposed project encroach on any public easement, public accessway or other area Oyes o ❑NA that the public has established use of? )V h. Describe location and type of existing and proposed discharges to waters of the state. AUG 2 9 2013 A16A) i. Will wastewater or stormwater be discharged into a wetland? []Yes Uri If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA J. Is there any mitigation proposed? ❑Yes o ❑NA If yes, attach a mitigation proposal. <Form continues on back> OCT 18 2013 252-808.2808 :: 1-.. ..v.nccoastalmanagemel aw Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, perrnittee, and issuing dates. h. Signed consul or agent authorization form, if applicable. 1. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project invokles expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify /that theinformationprovided in this application i truthful to the best of my knowledge. / Date n — — j� Print Name Signature RECEIVED PII/�ase indicate application attachments pertaining to your proposed project. AUG 2 9 2013 PI MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts pDCM MP-3 Upland Development 00,;M MP-4 Structures Information DCM'MHDCCTY BBCf1VED OCT 18 2013 252.808-2808 :: 1-888-4RCOAST :: www.nccoest amuffit*e nt.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWLI stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ONone (ii) Describe the purpose of the excavation in these areas: Nla b. Type of material to A)A d. High -ground excavation in cubic yards. section not applicable 12. DISPOSAL OF EXCAVATED MATERIAL ffThis section not applicable a. Location of disposal area. C. e. A � (1) Do you claim title t/oo disposal area? []Yes[]No& A (ii) If no, attach a letter granting permission from the owner. (i) Does the disposal area include any coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. []CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of disposal in these areas: b. area. N) d. (i) Will a disposal are" available for future maintenance? ❑Yes []No NNA (ii) If yes, where? ,. f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? RECEIVED RECEIVED AUG 2 9 2013 OCT 18 2013 DCM MAD CITY DCM MHD CITY 252-808.2808 :: 1-888.4RCOAST :: vv w.nccoastalmanaoement.net revised: 12/26/06 -Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION (If development is a wood groin, use MP-4 — Structures) a. TyWof shoreline stabilization: ❑Riprap ❑Breakwater/Sill ❑Other. c. Average distance waterxard I N W or NW: e. Type of stabilization material: VJA,yi Asay—. to g. Number of square yfe.,e�t qof fill to be placed below water level. J Bulkhead backfill [.i--L/ Riprap Breakwater/Sill _ Other i. Source of fill material. „r i w ...Y ❑This section not applicable Width: 'ik d. Maximum distance watemard of NHW or NWL: i j./ N UI L f. (i) Has there been shoreline erosion during preceding 12 ths? es ❑No ❑NA (ii) If yes, state amount of erosion an source of erosion amount information. 'ds( //iJ 0-0 , , h. Type of fill material. Flu, n,2r 4. OTHER FILL ACTIVITIES j9fhis section not applicable (Excluding Shoreline Stabilization) a. (1) Will fill material be brought to the site?—; YES ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (i) Amount of material to be placed in the water. _ (iii) Dimensions of fill arec-r,� (iv) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? t4rlLul)r �aLl�//�a17 �Q2 �'rCTGc�ue� 1 c. (i) Will naviga��I'oonal aids be required as a result of the project? ❑Yes IZNo ❑NA (ii) If yes, explain what type and how they will be implemented. SUDnro�yw ayuauu voymauuu p�r.v �, a „ �..,q, .. other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB ❑WL []None (ii) Describe the purpose of the fill in these areas: backhoe, or hydraulic dredge)? 5YM A5pi 8049R d. (i) Will wetlands be cpatUd in transporting equipment to project site? []Yes 93ho ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. C oa jram Date Applicent ame n , RECEIVED Project Name fPV1'J=EJTt'"` AUG 2 9 2013 It OCT 18 2013 MI-MIWITY 252-808-2888::1-8$8-4RCOAST :; vrww.nccoastaimanaS.ement.ra M CITY revised: 12126/06 NaUUCal Uhart VleWCr: FaMUCO NOUnd WCSte,M age 1 or L Chart: 11548 Edition: 4,1 NTM: 3413 LNM: 3313 ?Ar BECWW i Goal S�mp�las \ ` I PAS Cr OCT 18 2013 i 0 G isfl3 ,1 i/ DCM—M— a TY ; 3 p r98B ,�� cm 10 m 4 3 ®� U Sage PI i d b i i D sup 5 0 Qd iZZI100E GG19% 7 3 3' 4� W Pip2liaEPdBB � •,, � ; , 'i �yq\,3 i w ioMidd�� 4 W.rdea P, i 11 3 Mesh Pad �W AG4s11�4M'S' 9 10 3 i, 5 � r 1 I U SoN http://www.oceangrafix.com/chart/zoom?chart=11548 8/20/2013 To S /Tr ry 1414P) W 3D41 Sea,; A Potter Melporla! Bridge N O v- 300 yds v 02011MIu ftCoryorclion 02010NAVTEQ ®AND Hobuck n, NC 8,410 0 OGRA) RECEWED AUG 2 9 2013 ncrt4McrN OCT 18 2013 DCM.Mlmc►ry .yellowpages.com/map/print 7/18/2013 JDCM Coordinator: MAIILE'gG DISTRIBUTION SHEET Permit #• % tl & 13 1DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City ✓ Washington Wilmington US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Dave Timpy Cultural Resources: Renee Gledhill -Early or(environmental.review@ncder.gov) Public Water Supply: Debra Benoy (WIRO) / Joey White (WARO) ✓ NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler r State Property: Tim Walton Water Resources: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarborough r/`/ Wilmington: Joanne Steenhuis — 401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WARD) Z LPO: Fax Distribution: Permitee #: Agent #:_ Pat McCrory Governor R.E. Mayo Seafood c/o Carol Potter P.O. Box 100 Hobucken, N.C. 28537 Dear Sir or Madam: NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Braxton C. Davis Director January 14, 2014 John E. Skvarla, III Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliancp. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. "V The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-2808 k FAX: 252-247-3330 Internet: www.nccoastalmanagement.net s An Equal Opportunity 1 Affirmative Acton Employer DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Carol Potter County: Pamlico LOCATION OF PROJECT: 183 Mayo Rd., (SR1240), off of NC Hwy 304 N. in the Community of Hobucken. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 10/18/13 FIELD RECOMMENDATION: Attached: Yes CONSISTENCY DETERMINATION: Attached: No FIELD REPRESENTATIVE: Connell DISTRICT MANAGER REVIEW: Roy Brownlow, B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: Yes To Be Forwarded: No To Be Forwarded: Yes DISTRICT OFFICE: Morehead City FEE REC'D: $400.00 (100%) END OF NOTICE DATE: 12/18/13 ADJ. RIP. PROP NOTICES REC'D: Yes DEED REC'D: Ye APPLICATION ASSIGNED TO: ON: Z( [ C) 75 DAY DEADLINE LW 20I 150 - DAY DEADLINE: MAIL OUT DATE: STATE DUE DATE: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency Determination Division of Community Assistance Land Quality Section Division of Water Quality Storm Water Management (DWQ) State Property Office Division of Archives & History Division of Enviramnental Health Division of Highways Wildlife Resources Commission Local Permit Office Division of Marine Fisheries Corps of Engineers G -- ��� � s W %13116� 48DWERN North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor November 20, 2013 MEMORANDUM: Braxton C. Davis Director TO: Anthony,Scarbraugh r •n "�iott�il�risdu Division of Water Resources FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter John E. Skvarla, III Secretary Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED- v__.:.-- —'jam DATE 400 Commerce Ave., Morehead Clry, NC 28557 Phone: 252.808-28081 FAX: 252-247-3330 Internet: www.nocoastalmanagament.net An Egoal OppooNV WflnaMAdon Employer f,, mfir`� �F-Om---mP-M E—=T� dzezpul ra 7 t—T" I—, NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director December 18, 2013 Mr. Carol G. Potter PO Box 100 I-iobucken, NC 28537 Pat McCrory, Governor John E. Skvaria, Ili, Secretary Subject: EXEMPTION from Stormwater Management Permit Regulations CAMA Major- Dredge & Fill / Bulkhead / Pier R.E. Mayo Seafood Stormwater Project No. SW7131106 Pamlico County Dear Mr. Potter: The Washington Regional Office received a copy of your CAMA Major application for the proposed bulkheading and backfrlling of an existing canal, located at 183 Mayo Road, off of NC Hwy 33 and Hwy 304 in Pamlico County, on November 27, 2013. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff since no new impervious area is proposed. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H,1000 and SL 2008-211. For this reason, we are informing you by way of this letter that your project will not require a State Stormwater management permit at this time. The stormwater rules require the Division to permit the common plan of development, therefore, any future development on the property, regardless of whether a SEC plan or CAMA Major permit is also required, will require a Stormwater Management Permit application and permit issuance from the Division of Energy, Mineral, and Land Resources prior to any construction, Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and SL 2008-211 and may result in appropriate enforcement actions by this Office. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. Please reference the Stormwater Project Number above on all correspondence. Hyou have any questions or need additional information concerning this matter, please contact Samir Dumpor at (252) 946-6481. Sincerely, Samir Dumpor, PE Environmental Engineer PHM/ so: .0 1SDIEXEMPTEMSW7131106 cc: r Doug Huggett, DCM — Morehead Washington Regional Office Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946.64811 FAX: 252-975.3716 Internet; http://mvw.portal.ncdenr.org/weblir/land-quality An Equal Oppodunily I Affirmative Action Employer - 5a°hReoydedlla% Post Consumer Paper ZEN IN' MCDEV, Noidh Cadiha I Udpar.nl'entof Environmen �tqral and,!N Division of Braxton Davts Director ,'R9RR,W,1E .10, J j SeCre*Y Novernlsir-tb,lloll mETVIOJ2ANDUM Co.; Renee Gledtvll-}�1rly Tel AMC) ze 147 PROW vOu'g Huggett M4jor'P.ei-mits Processing Coordinator' subirt-t-t 'C—k-MfVDREbGPi'& FILL Perm-11 Applicailon;ReALNv- P, Putter' App!icar`t: Carolo er Project -location: Pawlico Counly,at ..Tlwy,304 N in tlie,coib.ni4uityof.Ho.b-6c.IcOii: Proposed project: Proposes to constructvary! Stabillizaltion in j: lle'Goose: Cre-lekJi-it6rCoastal Waterway. REPLY: Th'is agencTli asmb.objectioi i to - t lic,project-as; proposed, This AgenCY bas no,cniment 6n,tidoroposed project - This agency, approves' of. tlic, pr9jeett -only. lf, the -recominttnded changes axe- Anwrporat6d, ge n. This agency 0 kr Eau thaw pra:mawoncucnE poya -NOT.'6 7 � 6611 North Carolina Pat McCrory Governor November 20, 2013 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: CCDEENR Department of Environment and Natural Resources Division of Coastal Management Braxton C. Davis Director Maria Dunn NC Wildlife Resources Commission Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Carol Potter John E. Skvarla, III Secretary RDcaflliD DEC 10 2013 DC11�11tHDCfCy Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. !/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED I DATE 1 2- G- 2_V13 400 Commerce Ave., Morehead Ci , NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.ncooastalmanagement.net An Equal Opportunity l Affirm oo Acton Employer .1k WA WEEi R ®� North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director November 20, 2013 MEMORANDUM: TO: Maureen )Wi* JAAC4+ Division of Coastal Management FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter John E. Skvarla, III Secretary Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: _441 This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons desc)'bed' the attached comments. SIGNEU DATE 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-80848081 FAX: 252.247-3330 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary MEMORANDUM To: Doug Huggett, Major Permits Processing Coordinator From: Maureen Meehan, DCM Morehead City District Planner Date: December 16, 2013 Subject: Major Permit Request, by Carl Potter, to construct a vinyl bulkhead on property located at 183 Mayo Rd, adjacent to the ICW, in Hobucken, Pamlico County, North Carolina. LUP Consistency Determination: The proposal is Consistent With & Not in Conflict with the 2004 Pamlico County Land Use Plan as certified and amended July 27, 2012. Overview: Areas of Environmental Concern (AECs) impacted by the proposal include Public Trust Area (PTA), Estuarine Shoreline, and Estuarine Waters (EW). The Waters at the project site are classified as SA; HQW, NSW and are closed to the harvesting of shellfish. The area is not classified a Primary Nursery Area. The Pamlico County Future Land Use Map designates the subject property as Rural with Services. Development within the designated AECs is limited by CAMA regulations and development guidelines. Applicable or related policy includes the following: "Only development associated with water -dependent uses is allowed (in estuarine waters). Examples of appropriate development may include public access facilities, docks and piers, erosion control structures, or other uses that are permitted by CAMA use standards. " (Policy 2.1.1, Land Use Compatibility Policies, pg. 58) "The county supports the CAMA use standards for estuarine shorelines" (Policy 2.3.1, Land Use Compatibility Policies, pg. 59) 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 Fax: 252-24733301 Internet: www.nccoastalmangement.net An Equal Opportunity 1Atfirmafive Action Employer-50% Recycled 110%Past Consumer Paper �G ACDEHR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C, Davls ' Governor 1. 1 Director November 20, 2013 MEMORANDUM: TO: Anthony, S,carbraugh 5cotf Viri's'ori" Division of Water Resources FROM: SUBJECT: Applicant: Project Location: Proposed Project: Doug Huggett Major Permits Processing Coordinator John E, Skvarla, III Secretary u �f NOV 2 6 2013 1 CAMA/DREDGE & FILL Permit Application Review Carol Potter Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Robucken. Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by ` December 10, 2013. If you have, any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments. with supporting data is requested, REPLY: , This agency has no objection to the project as proposed. This agency has no comment on the.proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. objects to the project for reasons described in the attached comments. DATE 11 "A7 ') 4D0 Commereb e:19vo hea City, C28557' Phene:252�0 280X:22-247330 Internet:wwvr.nccoastalmanagementnet An Equal Oppolunity AtN Actloe Employer aKalvED NOV 2 5 2013 REMENR DCM-Pleheries North Carolina Department of Environment and Natural Resources WARa Division of. Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, Ili Governor Director Secretary 4.60 November 20, 2013November 20, 2013 MEMORANDUM: TO: Kevin Hart Division of Coastal Management FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMAIDREDGE & FILL Permit Application Review Applicant: Carol Potter Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214, When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. ' ` This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are. incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE II/ 7/6 400 Commerce Ave., Morehead City, NC 28557 Phone: 252.808-28081 PAX: 252-247.3330 Internet: mmnccoastalmanagement.net An Equal OpperlunilylAHhmaNaActlon Employer RECEIVED CC`OENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor November 20, 2013November 20, 2013 MEMORANDUM: Braxton C. Davis Director TO: Kevin Hart Division of Coastal Management FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter NOV 2 b 1013 DCM-Flaheries WARO John E. Skvarla, III Secretary Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint onthe proposed project and returnthis form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808, Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. XThis agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are. incorporated. See attached. "11iiissfaggeen/cy objects to the project for reasons described in the attached comments. SIGNED �+ d�6 DATE ji f �'}�JS 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX! 252-247.3330 Iritemel: www.ncooastalmanagement.net An Equal eppodunity IAAlrmallva khn Employer ��� REC6rvGD NCDENR North Carolina Department of Environment and Natural 1 bSR5LCgN Zp13 Division of Water Resources Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director pCM-MOCITY Secretary December 10, 2013 MEMORANDUM: To: Doug Huggett Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 From: David Tuten, Environmental Engineer, PWSS/WaRO Subject: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposed to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. This office has no objection to the project as proposed. X This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. Comments: 0, SIGNED V Public Water Supply Section — Jessica C. Godreau, P.E., BCEE, Chief Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-945 8481 \ FAX: 252-948-0040 \ Internet: www.ncwatecorg/pwsl An Equal Opportunity 1 Affirmative Action Employer DATE 91 Pat McCrory Governor I�CDE�IR North Carolina Department of Environment and Natural Resources Division of Coastal Management Braxton C. Davis Director John E. Skvada, III Secretary November 20, 2013 RECEM RECEIVED MEMORANDUM: DEC 0 6 2013 NOV 2 5 2D13 TO: Tim Walton DCM-MHDCrry DOA STATE PROPERTY State Property Office OFFICE FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. / ✓ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. a�IKh�a This agency objects to the project for reasons described in the attached comments. SIGNED DATE 13 400 Commerce Ave., M eh City, 28557 Phone: 252-808-28081 F • 2- -3 0 Internet: www.n as Imanagementnet An Equal Opw1unily 1 AiBfmative Action Ernoo)w 1�. I�CDENR North Carolina Department of Environment and Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director November 20, 2013 MEMORANDUM: TO: Lee Padrick Division of Community Assistance FROM: Doug Huggett Major Permits Processing Coordinator Natural Resources SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Carol Potter John E. Skvarla, III Secretary RECENED DEC 0 B 2013 UCM•MO CITP Project Location: Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposed Project: Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. his agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �a'�� DATE /Z-- 3 — / 3 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-2808 \ FAX: 252-247.3330 Internet: www,nocoastalmanagement.net An Equal Opportunity 1 Alflmiative Action Employer I r I�CDENR North Carolina Department of Environment and Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director November 20, 2013 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Natural Resources Pat McClain Division of Energy, Mineral & Land Resources Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Carol Potter John E. Skvada, III Secretary RECEIVED DEC 0 6 2013 Pamlico County, at 183 Mayo Rd., (SR 1240) adjacent to the ICW, off of NC Hwy 304 N in the community of Hobucken. Proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway. Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 10, 2013. If you have any questions regarding the proposed project, please contact Brad Connell, Permit officer at (252) 808-2808. Ext: 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. 1 'agency objec a project for reasons described in the attached comments. SIGNED DATE Z2,6 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247.3330 Internet: www.nccoastalmanagement.net An Equal Oppftnity 1 Alflnna6ve Adon Employer r° A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director MEMORANDUM DATE: November 19, 2013 TO: Doug Huggett 0 THRU: Roy Brownlow FROM: Brad Connell IF - John E. Skvarla, III Secretary SUBJECT: Comments and Recommendations - CAMA Major Permit —Carol Potter, Pamlico County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal fills 1,900 square feet of Public Trust Waters and 5,120 square feet of high ground. This proposed bulkhead is within the Federal Channel (ICW) setback and will extend more than 5' waterward of the shoreline. These waters of the ICW are closed to shellfish harvest. This waterbody is not a Primary Nursery Area. This proposal will not pose a hazard to navigation. This proposal meets the five criteria established under 15A NCAC 07H .0208 (b)(7)(D) for constructing a bulkhead below the normal water level. The property has an identifiable erosion problem. The proposed bulkhead extends no further waterward than is necessary to tie into the existing bulkheads on either side and due to its great distance from the adjacent properties, it will not have any adverse impact on the adjoining property shorelines. Assuming that state and federal agencies concur with the proposal, I recommend the project be authorized as proposed, contingent upon the following conditions: 1) The bulkhead will not extend waterward more than 12 feet from the normal water level at any point along its alignment at the time of construction; 2) The bulkhead must be constructed prior to any backfilling activities; 3) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure; 4) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment; Potter November 19, 2013 Page 2 of 2 5) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used; 6) All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead; 7) All fill material to be placed below the normal water .level shall be confined behind the permitted bulkhead. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: This permit does not convey any rights, either in real estate or material. CC: Roy Brownlow, DCM Ted Tyndall, DCM 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808.2808 \ FAX: 252-247-3330 Internet: www,nccoastalmanagement.net An Equal OppoMnity\ AHinnalive Acton Employer Govoni, Daniel From: Bland, Raleigh W SAW[Raleigh.W.Bland@usace.army.mil] Sent: Monday, January 13, 2014 2:19 PM To: Govoni, Daniel; Pelletier, Josh R SAW Subject: RE: R.E. Mayo Seafood (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Josh has this one and had to work through our Navigation Section because the applicant did not supply the required information with his application. It is the applicant's responsibility to make that contact but Josh is trying to help them out. He will let you know his progress. Thanks! -----Original Message ----- From: Govoni, Daniel [mailto:daniel.govoni@ncdenr.gov] Sent: Monday, January 13, 2014 12:09 PM To: Pelletier, Josh R SAW Cc: Bland, Raleigh W SAW Subject: [EXTERNAL] FW: R.E. Mayo Seafood (UNCLASSIFIED) Can I get comments on this as soon as you can. Thanks Daniel M. Govoni Asst. Major Permits Coordinator NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.govoni(@ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Govoni, Daniel Sent: Thursday, January 09, 2014 9:15 AM To: 'Pelletier, Josh R SAW' Subject: FW: R.E. Mayo Seafood (UNCLASSIFIED) Any update, thanks Daniel M. Govoni Asst. Major Permits Coordinator NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.govoni(@ncdenr.gov i E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Bland, Raleigh W SAW [mailto:Raleigh.W.Bland@usace.army.mil] Sent: Tuesday, January 07, 2014 1:26 PM To: Govoni, Daniel Cc: Pelletier, Josh R SAW Subject: RE: R.E. Mayo Seafood (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Josh has this one. Thanks! -----Original Message ----- From: Govoni, Daniel [mailto:daniel.govoni@ncdenr.gov] Sent: Tuesday, January 07, 2014 11:26 AM To: Bland, Raleigh W SAW Subject: [EXTERNAL] R.E. Mayo Seafood Can I get comments? Applicant proposes to construct a bulkhead at 183 Mayo Road in Hobucken. Thanks Daniel M. Govoni Asst. Major Permits Coordinator NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.govoniOncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. z Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE December 17, 2014 Regulatory Division Action ID No. SAW 2014-00071 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of Carol Potter, RE Mayo Seafood, for Department of the Army authorization to install approximately 256 linear feet of bulkhead with 1,900 square feet of backfill located adjacent to the ICW at 183 Mayo Road, off NC Hwy 304N, in Hobucken, Pamlico County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 6. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 8. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 9. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 10. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area, of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 11. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wihhington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office, Regulatory Division, telephone (910) 251-4605. Sincerely, Josh Pelletier Regulatory Project Manager Copies Furnished: Mr. Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rhode National Marine Fisheries Service Habitat Conservation Service 101 Pivers Island Road Beaufort, North Carolina 28516 Mr. Jeffrey Garnett Wetlands and Marine Regulatory Section Water Protection Division -Region IV U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Frank Jennings, District Manager Washington Field Office North Carolina Division of Coastal Management 9 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Carol Potter 2. LOCATION OF PROJECT SITE: The project is located adjacent to the ICW at 183 Mayo Road (SR 1240), off of NC Hwy 304N, in Hobucken, Pamlico County. Photo Index — 2006: 86-8315, grids S-11; 2000: 87-1023, grids M-13. State Plane Coordinates - X: 828809.601 Y: 168339.599 Longitude: -076 35 27.67 Latitude: 3514 36.79 INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Date of Site Visit — 4/9/13 & 5/1/13 Was Applicant or Agent Present —Yes Photos Taken — No PROCESSING PROCEDURE: Application Received —cc: 10/18/13 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — 2005 Pamlico County (01/28/05) Land Classification from LUP — Rural with Services (B) AEC(s) Involved: PTA, EW, ES (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing — Septic system Planned - None (F) Type of Development: Existing — Commercial fish house, dockage, bulkheads, rip rap, and boat ramp Planned - Construct a vinyl bulkhead (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED INCORP/SHADED (A) Shallow Bottom 1,900 ftZ (B) High Ground :J 5,120 fe (E) Total Area Disturbed: 7,020 ftL (F) Primary Nursery Area: No (G) Water Classification: SA; HQW, NSW Open: No (H) Cultural Resources: unknown Project Summary: The applicant proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway (ICW), Pamlico County. Field Investigation Report: R E Mayo Seafood Page 2 Narrative Description: The property is located in Hobucken at 183 Mayo Road (SR 1240), off of NC hwy 33 and hwy 304 in Pamlico County. This site is developed with a commercial fish house, driveway, rip rap and bulkheads, boat ramp, and docks. The parcel is 4.01 acres. The adjacent area to the north is the NCDOT highway, and the adjacent surrounding property to the south and west is undeveloped, owned by the NC Goose Creek Island Game Preserve. Both of the adjacent properties are owned by the state of North Carolina. The elevation of the high ground of the parcel is about +4' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are Coastal Wetlands towards the southern end of this property. This lot has approximately 780' of continuous shoreline along the ICW and Jones Bay. Immediate offshore water depths adjacent to the parcel range from —3' to —12' nwl. The subaqueous substrate is firm with shell. There is an identifiable erosion escarpment between two existing bulkheads of approximately 250 linear feet along the shoreline. The existing rip rap rubble at this location has failed to adequately prevent this erosion of the high ground. This erosion is due to wave action from passing boat traffic along the ICW. There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 200 feet across at this location. These waters are not classified as a Primary Nursery Area and there is not any submerged aquatic vegetation present. This area is closed to shellfish harvest and is classified as SA; HQW, Nutrient Sensitive Waters. There is a defined Federal Channel in this area. This project area is subject to the Neuse River Riparian Buffer Rules. 10. Proposed Development: The applicant is proposing to replace existing rip rap rubble with a vinyl bulkhead adjacent to the ICW just north of Jones Bay, near Hobucken. The proposed development will take place at 183 Mayo Road (SR 1240), off of NC HWY 304 and NC HWY 33. The purpose of the proposed improvement is to protect the shoreline from erosion and scouring as a result of boat wake on the ICW. The project area lies between two existing sections of bulkhead, thus exposing the shoreline to greater erosion. This proposed bulkhead will tie into the two existing bulkheads to the north and south sides. The proposed bulkhead will be 256' long. It will connect to two existing bulkheads on either side of the project area. Due to erosion of the exposed area and in order to connect to the other existing bulkheads, the proposed bulkhead will average approximately 7' waterward of the nwl. The proposed bulkhead will extend a maximum of 12' waterward from the nwl, at its greatest extent waterward. This will necessitate approximately 1,900 ft2 of backfill for the bulkhead to be placed below the nwl. There is evidence of shoreline erosion and scouring during the past year from wave action caused by boat wake and the high traffic volume on the ICW. This proposed development activity will be accomplished via traditional marine construction techniques. The work will take place from the high ground. An excavator and bull dozer will be utilized to construct the bulkhead and place backfill. Filter fabric against the bulkhead and silt fence Brad Connell November 20, 2013 Morehead City Field Investigation Report: R E Mayo Seafood Paee 3 will be used to prevent loose fill from entering the Estuarine Waters. In order to install the dead men and tie back rods, a 20'-wide work corridor will occur on the high ground immediately landward of the proposed bulkhead. 10. Anticipated Impacts: The proposed bulkhead appears to fall within the Federal Channel ICW Setback, but this proposal will not encroach into the channel. The proposed bulkhead will extend an average of 7' waterward in order to connect to the existing bulkheads on either side of the project area. This proposed bulkhead will fill 1,900 fe of Public Trust Waters. This proposed bulkhead will fill 5,120 fC of high ground. There is an existing. adjacent side -to dock just waterward of the proposed bulkhead alignment. The ICW is 200' wide at this location. This proposed vinyl bulkhead will protect a vulnerable area of eroding shoreline that is subject to constant wave action as a result of boat wake against the applicant's property. Traditional marine construction methodology (i.e. sheet pile driven with vibratory hammer, dozers and backhoes will place backfill behind the bulkhead) will be utilized during the construction of this bulkhead.. Temporary, short-lived turbidity impacts are anticipated during the setting of the sheet piles. The temporary high ground area of impact for the bulkhead installation will be approximately 256' long and 20' wide along the Estuarine Shoreline AEC. The existing rip rap rubble along this area of shoreline has settled to such an extent, that the applicant wishes to bury it beneath the backfill (as opposed to excavating and removing the debris). There is no known cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. Water depths within the proposed bulkhead are up to -3' deep nwl. These waters of the ICW are not classified as a Primary Nursery Area and there is not any submerged aquatic vegetation present. There are no Coastal Wetlands within the proposed project area. This area is closed to shellfish harvest and is classified as SA; HQW, Nutrient Sensitive Waters. It will not pose a hazard to navigation due to the fact that the proposed bulkhead will be landward of an existing side -to commercial fish house dock. Brad Connell November 20, 2013 Morehead City (Page 1 of 3) IN111111111111®®111 waordid: 0033/17/201, itT02:50::54 aM Fae /at: $2.025.00 Potts 1 of 3 Revanuo Tax: 12,000.00 Paullco. M ant H. Whitford Radiator of 060do ak554 PR245-247 ❑ If checked, the property includes the primary residence of at least one of the parties depicted as grantor. (N.C. Gen. Stet § 105-317.2) ,. NORTH CAROLINA PAMLICO COUNTY WARRANTY DEED THIS DEED, made and entered into this 15ta day of March, 2011, by and between ROY L. WATSON and wife, HILDA S. WATSON, Post Office Box 100, Hobucken, North Carolina 28537, hereinafter called._"grantors", and C. B. Potter, LLC, A North Carolina Limited Liability Company, 569 Kelly Watson Road, Lowland, North Carolina 28552, hereinafter called "grantee"; W I T N E S S E T H_: That grantors, for and in consideration of the sum of ten dollars and other goodand valuable considerations to them in hand paid, the receipt of which is hereby acknowledged, have bargained and sold, and by these presents do bargain, sell and convey to the said C. B. Potter, LLC and its successors and assigns, a certain tract or parcel of land in the Number flour (4) Township, Pamlico County, North Carolina, particularly described as follows: Being all of that tract containing 15.28 acres as shown on that plat entitled "SURVEYED FOR C.H. POTTER, LLC", prepared by Herbert J. Nobles, Jr., dated March 8, 2011 and recorded in Plat Cabinet A, Slide 1$7- $ , Pamlico County Registry. TO HAVE AND TO HOLD the aforesaid tract or parcel of land,.together with all privileges and appurtenances thereunto belonging, to the said C. B. Potter, LLC and its successors and assigns, in fee simple forever. And grantors, for themselves, their executors and administrators, covenant with grantee and its successors and assigns, that they are seized of said premises in fee; that they have a perfect right to convey the same in fee simple; that the same are free and clear of all encumbrances whatsoever, except those hereinabove stated; and that they will warrant and defend Prepared by HOLLOWELL, k HOLLOWELL jQ Atmmrye at Law •f•Tt�RRNED' Baybom, North Carolina 28515 CT 18 2013 Book: 554 Page: 245 Page 1 of 3 DCIKMHDcffy RECEIVED AUG 2 9 2013 .ti I)CM-MUM1'r., Book: 554 Page: 245 Seq: 1 (Page 2 of 3) .4 A. i the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, grantors have hereunto set their hands and adopted as their.seals the typewritten word "SEAL' - appearing beside each name, the day and year first above written. (SEAL) F. - R'OY/ WATSON- -` p�•-� (SEAL) HILDA S. WATSON ` (SEAL) ' BY:ROY L. WATSON ATTORNEY -IN -FACT FOR HILDA S. WATSON STATE OF I�ai COUNTY OFW kO 1, $tWayd_ $, 1 D11 OWtif 1S1 ' , a Notary Public in and for said county and state, do hereby certify that ROY L. WATSON, either being personally known to me or proven by satisfactory evidence (said evidence being ), personally appeared before me this day, and acknowledged the voluntary due execution of the foregoing instrument by he/she/them for the purposes stated therein. Witness my hand and notarial seal/stamp, this the 1-74b day of March, 2011. _--7 '�7 s, My commi Sion expires: Q( a?, C� q'O%� j RECEIVED . ei)c AUG 2 9 2013 ��.. .$ A'3ii NOq)}i GAVa RBCMVED �IIIIIIIIMIIaaaad .Y. Pnpwa by HOLLOWELL & HOLLOWELL OCT 18 2013 T)CM-Ml:nMY Ammeya at Law Baybom. Noatb Cuolioa 28515 DCMMHDaff Book: 554 Page: 245 Page 2 of 3 (Page 3 of 3) NORTH CAROLINA PAMLICO COUNTY I, JLessjCYL. k4• �lU✓!'Dt(_gtiS a Notary Public in and for said county and state, do hereby certify that Roy L. Watson, either being personally known to me or proven by. satisfactory evidence (said evidence being )• who is -the attorney in fact for Hilda S. Watson, personally appeared before me this day, and being by me duly sworn, acknowledged that he voluntarily executed the foregoing and annexed instrument for and in behalf of the said Hilda S. Watson, and that his authority to execute and acknowledge said instrument is contained in an instrument duly executed, acknowledged, and recor�'ed in the office of kegister of Deeds in the County of Pamlico, State of North Carolina, on the 17te day of May, 2010, in Deed Hook 543 at page 720, and that this instrument was voluntarily executed under and by virtue of the authority given by said instrument granting him power of attorney. I do further certify that the said Roy L. Watson acknowledged the due execution of the foregoing and annexed instrument for the purposes therein expressed for and in behalf of the said Hilda S. Watson. Witness my hand and notarial seal/stamp, this the 17A day of AAzwrk My commission expires: I RECEIVED AUG 2 9 2013 D,H� t4Lc {� t�TT RECE HY Pnp=d by HOLLOWELL&HOLLOWELL OCT Attomeya at Lam 18 2013 Baybom, North CatoBaa 28515 Book: 554 Page: 245 Page 3 of 3 DMMOCny Book: 554 Page: 245 Seq: 3 � North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary November 19, 2013 Mr. Carol Potter P.O. BOX 100 Hobucken, NC 28537 Dear Mr. Potter: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval, for development of your property located adjacent to the ICW at 183 Mayo Road in Hobucken, Pamlico County. It was received on October 18, 2013, and appears to be adequate for processing at this time. The projected deadline for making a decision is January 1, 2014. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from October 18, 2013, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project.. Such a meeting will be held within, five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of- way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Intemet: www.nocoastalmanagement.net An Equal Opportunity 1 Affirmative Acton Employer An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely Ad Brad Connell Coastal Management Representative Enclosure CC: Wayne Manish, Authorized Agent Ted Tyndall, Assistant Director Doug Huggett, Major Permits & Federal Consistency Coordinator Roy Brownlow, District Manager 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nocoastalmanagement.net An Equal Opportunity IAffrmative Action Employer womm-,4, MUM North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor The Pamlico News Legal Advertisement Section P.O. Box 510 Oriental, N.C. 28571 Re: Public Notice — R E Mayo Seafood Dear Sir: Braxton C. Davis John E. Skvarta, III Director Secretary November 19, 2013 Please publish the attached Notice in the November 27, 2013 issue of the Pamlico News. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, Brad Connell Coastal Management Representative Enclosure cc: Doug Huggett Ted Tyndall Roy Brownlow 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Intemet: www.ncooastaimanagement.net An Equal Opportunity \ Affimralive Action Employer ilr C- DEEIR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvada, III Governor Director Secretary NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A- 119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on October 18, 2013. According to said application, Mr. Carol Potter proposes to construct a section of vinyl bulkhead in the ICW at 183 Mayo Road (SR 1240), in Hobucken. A copy of the entire application may be examined or copied at the office of Brad Connell, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to December 18, 2013, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: November 27, 2013 400 Commerce Ave., Morehead City, NC 28557 Phone: 252.808-28081 FAX: 252-247-3330 Internet: www.ncooastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer X'O gTnsa,d abed North Carolina Pat kleCmry Doswrot Management Davis Tbc Pomlico New, legal Advertiumem Scour. P.O. Box 510 0onned, N.C. 28571 Re: Public Notice —R E Mayo Seafood Dear Sir: Plane publish the enachrd Notice in Uffi Novem or 27, 2017 in. o The State Office of Budget and Management quints an original Prymed for newspaper advertising, Plee ni d the andavll, in suffix, and an original invoice to Archer sit diem, NC Divine Commerce Avenue, More" City, NorthC .line 28557, Total yw for your assuessoo in this mellsr. I you should have a MoreAeod City often. S It, Brad Comm11 Cmsml Management Rcpmscnretivc £ncl. ce: Doug Nuggen Ted Tindall Roy Bmssnlow IN W mMO aR., AVYMxM clry. Nc A557 anon MINIM'MY 110Mi11, nM im. .venarmne,.,.nu..ema. WOH LEx00 NH6E:OT 6T-TT OPCH amTI amiygzegS John E. Skvarla, III Secretary N.,v mbor 19.2013 'ln Fourth o New, \t5davft of Publication prior in origieal copy of the pubMW of Centel Manakemend, Ian lon,(252)SWIS 8. , questions, plum contact one 9 sazaaS OEXS-XOS d,LaOHW WOO HILL WVT4:OT ETOZ-6T AON 4zodag puag xpd L98064Z6 6ZT sacpnN/a1BEN 'ON ameN TaPOW emeN xe3 sagmnN xea amiS/agea DBvssaon of Coa>j W Mal R5 RE North Ca ollna Department of Environment and Pal McCrory, Goremw Bandon Davis, Direcror FAX b.0VER i TO OFFICE: FNt /V FAX r?G'- TELEPHONER 2 TOTAL PAGES INCLUDING COVER SHEET FROM: Morehead City, Phone: FAX: RE: 28557 Resources Sk da, Ill, Srorzlary r� KOH LV,00 Nd66:TO 9Z-60 �TnsaH abed apow army awiS.4zp4S 6Z66 aewnN/e saizaS OEXS-XOS : eXTT za IlHS FId09:T0 ET0Z-9Z-d3S at gzodag puag xp j KOH LV,00 Nd66:TO 9Z-60 �TnsaH abed apow army awiS.4zp4S 6Z66 aewnN/e saizaS OEXS-XOS : eXTT za IlHS FId09:T0 ET0Z-9Z-d3S at gzodag puag xp j D d v W o 9 of C 'S�� f!i sW -fl 11; ag me J t MCDENR Pat McCrory, Governor DATE: TO: OFFICE: FAX #: Braxton Davis, Director C TELEPHONE #: �23 TOTAL PAGES INCLUDING COVER SHEET: 3 r_� John E. Skvarla, III, Secretary a Morehead City Office 400 Commerce Avenue Morehead City, North Carolina 28557 Phone: 252-808-2808 FAX: 252-247-3330 www.necoastaimanagement.net b TAFAY nnvar nr,M Connell, Brad From: Connell, Brad Sent: Tuesday, September 03, 2013 9:08 AM To: 'obxncva@yahoo.com' Cc: 'Carol Potter Subject: Revisions request to CAMA Major Permit application Importance: High Mr. Manish, This application package is thorough and well prepared. However, the DCM requests the following revisions f before the application can be accepted as complete and ready for review: 1) Form DCM MP-1, 2: please list your name and contact information as the authorized agent instead; 2) Form DCM MP-1, 3f: please list Pamlico County as the planning jurisdiction; 3) Form DCM MP-1, 5a: please only check the box labeled Commercial; 4) Form DCM MP-1, 5h: please state None as your answer; 5) Form DCM MP-1, 6f: please submit both of the signed "green cards" and list the names, addresses, ar numbers of the two adjoining waterfront property owners; 6) Form DCM MP-1, 7: please un-check the DCM MP-4 box; 7) Form DCM MP-2, Excavation & Fill Table: please erase your answers and put N/A in the table; 8) Form DCM MP-2, 1 & 2: please check the "This section is not applicable" box; 9) Form DCM MP-2, 3b-d: please make sure that you indicate the unit of measure for the quantity given, on d that it is relative to the normal water level (i.e.12' NWL); 10) Form DCM MP-2, 3f(ii): please answer. Your prompt attention to this matter is greatly appreciated. If you have any questions or need any assistance, not hesitate to contact me at 252-808-2808 ext. 214. Thank you, Brad Connell Field Representative NC Division of Coastal Management Peace be with you. E-moil correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Connell, Brad From: Connell, Brad Sent: Tuesday, September 03, 2013 8:41 AM To: 'Carol Potter; 'obxncva@yahoo.com' Subject: RE Mayo bulkhead application Importance: High Mr. Manish, Can you please send me the signed and registered "green cards" that were sent to notify the neighbors of yot proposal? Thank you, Brad Connell Field Representative NC Division of Coastal Management PID Peace be with yrou. E-mail correspondence to and from this address may be subject to the North Carolina Public Records (ow and may be disclosed to third parties. ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that A can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: NC�� A. Received by (Please Print Clearly) I B. Date of Delivery C. Signature ,. A ❑ Agent X FYI Z-Addressee D. Is delivery address rED 17 ❑ Yes If YES, entei deliveryaddress be ow: ❑ No OCT 16 Z013 � O�jcN,� It It 3. Servicerype DCM•MHD CertifiedMail ❑ Express Mal ❑ Return Receipt for Merchandise \ %� • , ❑ Insured Mail ❑ C.O.D. Q 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number(Copyhromservice labe 7008 0500 0000 9890 5887 I PS Form 3811, duly 1999 Domestic Return Receipt 102595-00-M-0952 UNITED STATES POSTAL SERVICE ffobl � �.,�cc�8 First -Class Mail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box 11I'I'i'lI'IIIIIIIII) IIIIIII1!'1'i11l1I!111,)1111111111iIII)iIili 1Ltetlnfa f>ohk, LIU'I b hereby certify that i own, p operty adjacent to property located :at ( on �ddresa g . in The applicant has clescril:,e J to me, as shown location. I have no ob action to this propo I Have objiad ons to this proposa (Individual proposing da lopmr IAJSr1W A)rt�t3 `s of RfOerty Owner) u - , Rvuu, ac.l ,1J a(� N. C. (CitylTown and/or County) the development proposed at the above DRAMN< OF PROPOSED DEVELOPMENT must till description below or attach a site drawing) 3 " = r12o4 iFAIs7l-A)4 13gLk11c.4o P P No F�"ISTiNLs Quc/113C,/fiJ .... .__. - --.a-. 7 — 1 Fxisr,t)4 006k. L---J I WAIVER ECTION I understand that !a pier, d , mooring pilings, I reakwater, boathouse, lift, or groin must be set back a minimum distance 15' from my area c f riparian access unless w2ived by me. (If you wish to waive the setback, y u must initial the propriate blank below.) iZ Uil;ED I do wish to wa ve the 1 V .setback r quirement. 1 do hot wish bi.walvethe 15' setb requirement. AUG 2 9 2013 (Property^ nedriformati n) (Adjacen rf�wner 1ni tlgp}rp A or Type Name: ' .044tr +LYY% RECENED Dare OCT 18 201' (Revised 6/1WO12) DCM.MffD ***This is a word processing form to be completed in Microsoft Word*** NC Division of Coastal Management Major Permit Application Computer Sheet (11/1/2012) Applicant: Carol Potter Date: 11/19/13 Project Site County: Pamlico Staff: Brad Connell District: ❑Elizabeth City ❑Washington ®Morehead City ❑Wilmington Project Name: R E Mayo Seafood bulkhead Date of initial application submittal (EX: 1/8/2007): 8/29/2013 Date application "received as complete" in the Field office (EX: 1/8/2007): 10/18/2013 Permit Authorization: ❑CAMA ❑Dredge & Fill ®Both SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes ®No Photos Taken: Yes ❑ No® Setback Required (riparian): [_]Yes ® No Critical Habitat: ❑Yes ®No ❑Not Sure 15 foot waiver obtained: ❑Yes ®No Hazard Notification Returned: ❑Yes ®No SAV: ❑Yes ®No ❑Not Sure Shell Bottom: ❑Yes ®No ❑ Not Sure Temporary Impacts: ®Yes ❑No Sandbags: ❑Yes ®No ❑ Not Sure Did the land use classification come from county LUP: ®Yes ❑No Mitigation Required (optional): ❑Yes ®No Moratorium Conditions: ❑Yes ®No ❑NA Environmental Assessment Done: ❑Yes ❑No N NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) N Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW) ® High Quality Waters (HQW) I ❑ Outstanding Resource Waters (ORW) WETLANDSIMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (BY) Salt reed grass (Spartina alterniflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncus ❑ (SP) Salttmeadow grass (Spartina roeme(anus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ® III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ II. Public or commercial/no dredge $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808.2808 :: 1.888-4RCOAST :: wwwmccoastalmanaaement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: RE Mayo Seafood Date: 11 /19/13 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One 1 New Work ® Replace Bulkhead (vinyl) Maint ❑ MY ❑ N 256' 1' 8' New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N revised 02115/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: RE Mayo Seafood Date: 11/19/13 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount SB Dredge ❑ Fill ® Both ❑ Other ❑ 1,900 ft2 1,900 fe HG Dredge ❑ Fill ❑ Both ® Other ❑ 5,120 fe 0 fe Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOAST :: w .nccoastaimananement.net revised: 02M5/10 OC13 08:39A FROM: w TO:12522473330 P.1 i R E. MAYO. SEAFOOD PO Box wo Hobucken, NC 28537 .252-745-5331 -phone Fax 252-745-4929 —fax cgpotter@pamlico.net Date _ TO _bra Cnrsll,. = �x°M . _pro t_. �..... � i . PAGES:...3.................................. ------------------•-•--•-....•-•--•••---•-,--_ ` FAX' _2- - 4;:4M---------------------------------------- FA%,_.---_--------- ------------- - PHONE: PHONE:. 59-74h_;�31__ ,_.. :..� .•.....v ............... ............................... W: . . . • •F '............ ...... _-..... I. ..... 1--_____________-____.___-______--_-__--__.___.___---___ &CA _ PYICii Iin, youe O�iSiniS D �4 iodr,�� , �-1 �� have. 4ml QueS��ov� le e r 3sZ=2aq-so4a P�iev Ceti ib r Urgent Please review Please comment u OCT 16 *3 OCT-15-2013 08:39A FROM: TO:12522473330 P.2 i ■ Complete Rams 1, 2, and 3. Also complete Item 4 If Restricted Dellvery Is desired. ■ Print your name end address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mallpiece, or on the front R space permits. 1. Article Addressed to: A. Received by (Please Print Clearly) I B. Date of Delivery C. Signature X ❑ Agent mAddrsssee D. Is delivery address different from14 ❑ Yes If YES, enter delivery address bellow ❑ No al..' l ''Q n li0'cN=c— 3. �s,e,wrNn A'Pa ,� CeNrred M811 E3 E>tprese Mell Registered [3Return Receipt for Merchandise 0 C ❑ (' ❑ Insured Mail C.O.D. tON) (e 4. Restricted Dallven/1 MOM Fee) ❑ yes 2. ArtI0leNumber (Copyeoarservf.9A" 7008 0500 0000 9890 5887 PS Form 3811, July 1999 Domestic Return Receipt ta. Complete Items 1, 2, and 3. Also complete •hgm 4 R Restricted Delivery Is desired. ■ Point your name p.nd address on the reverse to that we can return the card to you. Is Attach this card to the beck of the mallpiece, .or on the front It space permits. 1, Article Addressed to: /VCsray'C 102595.00-M 0952 A. Received by (Plessa Print Cleedy) B. Date of Delivery 1 C. Signature X t7 Agent ❑ Addresses D. Is delivery address different from Rem 17 ❑ Yes if YES^„apterdellveryzdBresS-�iNQw: ❑ No "'.r_Iv�:1 uY s owl_ �yrlg pd Me111'`'F?�v Ss eH O j jam" 1", �981stered Cd.le]u Receipt for Merchandise :'6d''reft{a -I O.D. 4. Restricted Delivery? (Extra fee) ❑ Yes 2. Article Number (Dopyfrom ser'--'-`-7008 0500 0000 9890 5627 PS Form 3811. JWy logo Domsetic Return Receipt 102595-00-M-0952 RECEt�D ACM-MHDCTN a a OCT-15-2013 08:39A FROM: TO:12522473330 P.3 UNITED STATES POSTAL SERVICE 11111 I .�hL<, �,� �8 S37 First -Class Mail Postage 8 Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box Qo Qom �(DC) ill'I'I'll'llllllllll Ililllll,Illl,iIIIIII,Illh11IIIIIIII II) II I •aSB Meil UNITED STATES POSTAL SERVICE II pFlfslostagCIe 8 Fees Paid � C �n �.� 3 I USPS d. i permit No. G•10 • Sender: Please print your name, address, and ZIP+4 in this box b u C k-k.I c 285 3 0 5 FA II RECEIVED OC ( 15 20�1�3{/r' l YM CITY A �G Connell, Brad From: Wayne Manish [obxncva@yahoo.com] - n Sent: Friday, October 04, 2013 5:16 AM �� \ To: Connell, Brad ICII Subject: Re: Revisions request to CAMA Major Permit application Please send application I sumitted to you to Wayne Manish 15 Holly point road Lowland NC. 02825 and I will make revisions.. Thank's and have a blessed day! Wayne From: "Connell, Brad" <brad.connell(a)ncdenr.00v> To: Wayne Manish <obxncva(d)yahoo.com> Sent: Thursday; September 26, 2013 4:54 PM Subject: RE: Revisions request to CAMA Major Permit application Whichever you prefer, Mr. Manish. Just let me know Thank you, Brad Connell Field Representative NC Division of Coastal Management Peace be with you. E-mail correspondence to andfrom this address may be subject to the North Carolina Public Records law and may be disclosed to third parties. From: Wayne Manish [mailto:obxncva(a yahoo.com] Sent: Thursday, September 26, 2013 4:51 PM To: Connell, Brad Subject: Re: Revisions request to CAMA Major Permit application Mr.Connell Are you going to send me the submitted application so I can make revisions? Or do I need a new application? Mr. Potter forgot the green cards, I will get them to you. Thank you Wayne Manish From: "Connell, Brad" <brad.connellna ncdenr.gov> To: "obxncva@yahoo.com" <obxncva(@,vahoo.com> Cc: Carol Potter <ccgpotter[7a pamlico.net> Sent: Tuesday, September 3, 2013 9:07 AM Subject: Revisions request to CAMA Major Permit application Mr. Manish, This application package is thorough and well prepared. However, the DCM requests the following revisions from you before the application can be accepted as complete and ready for review: 1) Form DCM MP-1, 2: please list your name and contact information as the authorized agent instead; 2) Form DCM MP-1, 3f please list Pamlico County as the planning jurisdiction; 3) Form DCM MP-1, 5a: please only check the box labeled Commercial; 4) Form DCM MP-1, 5h: please state None as your answer; 5) Form DCM MP-1, 6f: please submit both of the signed "green cards" and list the names, addresses, and phone numbers of the two adjoining waterfront property owners; Connell, Brad From: Connell, Brad Sent: Tuesday, September 03, 2013 9:08 AM To: 'obxncva@yahoo.com' Cc: 'Carol Potter Subject: Revisions request to CAMA Major Permit application Importance: High Mr. Manish, This application package is thorough and well prepared. However, the DCM requests the following revisions from you before the application can be accepted as complete and ready for review: 1) Form DCM MP-1, 2: please list your name and contact information as the authorized agent instead; 2) Form DCM MP-1, 3f: please list Pamlico County as the planning jurisdiction; 3) Form DCM MP-1, 5a: please only check the box labeled Commercial; 4) Form DCM MP-1, Sh: please state None as your answer; 5) Form DCM MP-1, 6f: please submit both of the signed "green cards" and list the names, addresses, and phone numbers of the two adjoining waterfront property owners; 6) Form DCM MP-1, 7: please un-check the DCM MP-4 box; 7) Form DCM MP-2, Excavation & Fill Table: please erase your answers and put N/A in the table; 8) Form DCM MP-2, 1 & 2: please check the "This section is not applicable" box; 9) Form DCM MP-2, 3b-d: please make sure that you indicate the unit of measure for the quantity given, and note on d.that it is relative to the normal water level (i.e.12' NWQ; 10) Form DCM MP-2, 3f(ii): please answer. Your prompt attention to this matter is greatly appreciated. If you have any questions or need any assistance, please do not hesitate to contact me at 252-808-2808 ext. 214. Thank you, Brad Connell Field Representative NC Division of Coastal Management Peace 6e with you. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties. r Connell, Brad From: Connell, Brad Sent: Tuesday, September 03, 2013 8:41 AM To: 'Carol Potter; 'obxncva@yahoo.com' Subject: RE Mayo bulkhead application Importance: High Mr. Manish, Can you please send me the signed and registered "green cards" that were sent to notify the neighbors of your proposal? Thank you, Brad Connell Field Representative NC Division of Coastal Management Peace be vvith you. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. �LEtYtl!! t RECEIVED 24 2414 JAN 2 4 2014 Please use this caPJ'f6;9PaXf a pre -construction conference immediatelyy BEFORE you begin aC work on your permitted project. Dcm-MHD CITY The pre -construction meeting will give you the opportunity to discibs permit conditions, construction techniques and any questions you may have with a Coastal Management representative. This will enable you to proceed with your project as quickly and smoothly as possible. When you are ready to begin construction, fill out his card and mail it to the Division of Coastal Management at the address on the reverse side of this card. Thank You. Permit Number Expiration Date CC 1 Issued to:-/ fie Contact Person: l paL [ 64e_2'_ Telephone Numbers %?J. -J Project Starting Date c COALA AL GA. rz.tp, 23 Q�14 p(Ai North Carolina Division of Coastal Management NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Courier: 11-12-09 OF t,1;INMEN�T RAL�lll�ll,�plll,l,lll NORTH GAROLINA DEPARTMENT OF EMVIAONMEN AN T RAL OU CE ■ Complete items 1, 2, and 3. Also complete A. Received by (Please Print Clearly) S. Date of Delivery item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. C. Signature ❑ Agent ■ Attach this card to the back of the mailpiece, X . or on the front if space permits. RECEWM ❑ Addressee D. Is del' different from darn 1? If YES w: ❑ Yes ❑ No 1. Article Addressed to: 3. S Ice_rype-) -r- Registeredr if1G p i,rearJu,ll O.D. ( 4. Restricted Delivery? (Extra Fee) 2. Article Number (Copyfromser' "7008 0500 0000 9890 5627 PS Form 3811, July 1999 Domestic Return Receipt Merchandise ❑ Yes 102595 00 M-0952 UNITED STATES POSTAL SERVICE 4l t,t_ C a-Qp S First-Class Mail USPS e &Fees Paid Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box }-ti b LL c ham,, -c`� c o�85 R. E. Mayo Seafood s tat cia P.O. BOX 100 Hobucken, N.C. 28537 " ° s 7008 0500 0000 9891 RETURN RECEIPT 06 N.�. Ue�l.o� �nvfROnme �a�UraQ �espurceS REQUESTED qpp �ornmerce Adenue mbyalepd col) W, RETURN RECEIPT ���� REQUESTED . ^i---F% 3 if,ilfufi�i'1�'1f'Iffllf"Ifll'�'9iffi'llll�lil�'�� M�lll'��1 n ,EX1STIlV4 13LIJ�r �s�6 c d- 1`t80 bars `I Lido S�IaR�L>>ur� lk 4 0 T �)CIST/N�j L.�QoD DaCI< �� FuD oFG�tSTiN�i �raG RECEIVED OCT 18 2013 DCM-MHD CITY r0 AFc�s'-- N/ l\Y50- - - 11 ZoNFJ,---30--- WA7�,Q i/A✓G y lam ,30 30 G'cuaR1�F/R��' s 1 � 1:xSri N4 � �On ur_/ llnrl/G ►0 093 . MM ,,SdALG Ft;scug Ras S 6JILD 6U594FS p Pdwc2 Pay r —o—. SwAIL- ELr-Vkr)o U R60VE JU { AECeco'�' Q'�"L Eu o o FX�srt, k t> LXISTlN�7 �Gtii�,Tla �J� l8 3 MOO a853-5� Q-a i—a�a13 I j a� 3 ) 8 S" AM>16 P9- t 4 IS i �,<}D �1RoPoS�D ,�judkbfCrfO ti ay" raa/ x --% u ---. 36- — — Cx,5r1yC� CaRau�O � s\ rw6TIA4 SI' RCI- NE Exlsr1,4 CJoo o oock A,�'L/<h�-.40 jc2Escaw4 &ECENED OCT 18 Z013 ICE A pex, 3 b d osle, )14,eD5 aoo GJtO Em 6 z 9rrd ogsaa SALE L. �2(D t�c,tl.�I?M AD '�ae4�� r'LFl1RT(Gtti ,4 vs -1VwL - N W4, 0, pA.P6F o v.rt)YL S; r�T BuCk#t0r..jrr9 GJcol�{ ak6�VFQ7'.,C,aL f IYS 9AD �xBWA� 6x�' pEn�rra�J '516 64ni�dgc,F' PdDS a a -rlr (NTa FX,5710� Q�tiL�if � G',AP-oL Uy Pe7fr'k �3iClLkr:I��j l ZV14YA)C MAN45 PRkTr--lr IVAAdER pCVV-"DCITY 18-0 /-,;�o /3 t k 4C Rod ,6otr�p rl��nvlvff s►t.��,�� .�,uD on��n1►a 144 8.b f 80 I l9� r 00 N O W Al 4,1 L- wA !N a �v S zn A cry�sik`�� -- t : I M. A 9 a DIVISION bF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Carol Potter 2. LOCATION OF PROJECT SITE: The project is located adjacent to the ICW at 183 Mayo Road (SR 1240), off of NC Hwy 304N, in Hobucken, Pamlico County. Photo Index — 2006: 86-8315, grids S-11; 2000: 87-1023, grids M-13. State Plane Coordinates - X: 828809.601 Y: 168339.599 Longitude: -076 35 27.67 Latitude: 3514 36.79 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Date of Site Visit — 4/9/13 & 5/1/13 Was Applicant or Agent Present —Yes Photos Taken — No 5. PROCESSING PROCEDURE: Application Received — cc: 10/18/13 Office — MHC, 6. SITE DESCRIPTION: O (A) Local Land Use Plan — 2005 Pamlico County (01/28/05) ' Land Classification from LUP — Rural with Services (B) AEC(s) Involved: PTA, EW, ES (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing — Septic system Planned - None (F) Type of Development: Existing — Commercial fish house, dockage, and boat ramp Planned - Construct a vinyl bulkhead (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLEIL INCORP/SHADED (A) Shallow Bottom 1,900 ft (B) High Ground 5,120 ftz (F.) Total Area Disturbed: 7.020 ft (F) Primary Nursery Area: No (G) Water Classification: SA; HQW, NSW Open: No (H) Cultural Resources: unknown Proiect Summary: The applicant proposes to construct a vinyl bulkhead for shoreline stabilization in the Goose Creek Inter -Coastal Waterway (ICW), Pamlico County. V CV4 it 7 10. Field Investigation Report: R E Mayo Seafood Narrative llescription: The property is located in Hobucken at 183 Mayo Road (SR 1240), off of NC hwy 33 and hwy 304 in Pamlico County. This site is developed with a commercial fish house, driveway, rip rap and bulkheads, boat ramp, and docks. The parcel is 4.01 acres. The adjacent area to the north is the NCDOT highway, and the adjacent surrounding property to the south and west is undeveloped, owned by the NC Goose Creek Island Game Preserve. Both of the adjacent properties are owned by the state of North Carolina. The elevation of the high ground of the parcel is about +4' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are Coastal Wetlands wards the southern end of this property. This lot has approximately 780' of continuous shoreline ng the ICW and Jones Bay. Immediate offshore water depths adjacent to the parcel range from — to —12' nwl. TJhe subaqueous substrate is firm with shell. 1 �. � � 4 t"f-!—k — r W /ro -I- Y✓Q s•4--&-e., E�..y-r, Itcr,W /L. 4- &—q )r he s4La There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 200 feet across at this location. These waters are not classified as a Primary Nursery Area and there is not any submerged aquatic vegetation present. This area is closed to shellfish harvest and is classified as SA; HQW, Nutrient Sensitive Waters. There is a defined Federal Channel in this area. This project area is subject to the Neuse River Riparian B(ffRules. Proposed Development: D The applicans proposing to replace existing rip rap rubble wi a vinyl bulkhead adjacent to the ICW just noA of Jones Bay, near Hobucken. The proposed d elopment will take place at Mayo Road S 240), off of NC HWY 304 and NC HW 33N o e of the proposed ' rovement is to rotect the shoreline from erosion-o-boat wake on the ICW. The p ject area lies between two existing sections of bulkhead, thus exposingtdishhorelmie to gre t erosion. This proposed bulkhead will tie into the two existing bulkheadssides:eo �`K o The proposed bulkhead will be 256' long. It will connec ting bulkh ads on ei e; sid of the project area. Due to erosion of the protected area, m order to connect t the othectul�heads, the proposed bulkhead will average a mzimately 7' w e�ward of t 1 he�nsed bulkhead will extend a maximum of 12' wate and from the nw# is v necess�te approximately 1,900 ftz of bacltfill for the bulkheAbced below the nwl. There is evidence of shoreline erosi durin the past year dboatigh traffic volume on the ICW. '�iqm Want� �J This proposed development activity will be accomplished via traditional marine construction techniques. The work will take place from the high ground. An excavator and bulli4lozer will be utilized to construct the bulkhead and place backfill. Filter fabric against the bulkhead and silt fence will be used to prevent loose fill from entering the Estuarine WattersL I v re rtv Joe O •(tic, Brad Connell November 19, 2013 ClYk"li' Morehead City y Field Investigation Report: R E Mayo Seafood 3 10. The_poposed bulkhead appears to fall within the Federal Channel ICW Setback¢ The proposed bulkhead will extend an average of 7' waterward in order to connect to the existing bulkheads on either side of the project area. This proposed bulkhead will #11 1,900 ft2 of Public Trust Waters. This proposed bulkhead will fill 5,120 ft2 of high ground. ere is an existing adjacent side -to dock just waterward of the proposed bulkhead alignment. The IC is 200' wide at this location. This proposed vinyl bulkhead will protect a vulnerable area of IIerod' g shoreline on the applicant's property. `¢ , 0 �', f iuiwd 40 we t Traditional marine construction methodolog*ill be utilized'during the construction of this bulkhead. Temporary, short-lived turbidity impacts are anticipat during the setting of the sheet piles. LtJ )( (, 1-1�k Grate-.( G.- . -�..4,,, �f Coj) ,{p (AV!;L e TKO 7� There is no known cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. Water depths within the proposed bulkhead are up to -3' deep nwl. These waters of the ICW are not classified as a Primary Nursery Area and there is not any submerged aqu tic vegetation present. This area is closed to shellfish harvest and is class Tent-Sensitive..Wal&Is_,_ r s ut this ro osal will ash Sn echannel� It will not pose a hazard to navigation ti e to the fact that the proposed bulkhead will be landward of an existing side -to commercial fish cy ;house dock. C Brad Connell November 19, 2013 Morehead City 14 Date 8-22-2013 Agent Authorization For Proposed Bulkhead Project @ 183 Mayo Road Hoboken, NC I Carol G Potter Authorize Wayne Manish To secure major development Permit. Wayne has been assigned Project Manager on this project and will assist me though out the duration of this project or until further notice. Thank you Carol G Potter RECEIVED AUG 2 9 2013 DCM-MHD CITY i NARRATIVE/ 7-12-13 To whom this may concern. Objective Here at Re Mayo seafood are objective is to construct a bulkhead Of applicable materials including wood pilings, Whalers and vertical vinyl sheeting. Our intent is consolidate this proposed bulkhead to an existing bulkhead to the South'and to a existing bulkhead to the North. After completion of said bulkhead we intend to backfill with imported material such as sand and or clean fill dirt. To finalize the project we also would apply a top dressing of topsoil and plant applicable vegetation / Grass for erosion control and stabilization. Supplement Through the years of constant Pounding from Boat traffic on the Intracoastal waterway and from water levels raising and falling we have experienced a fair amount of erosion and damage to our property at the waters edge. We are also concerned with safety issues due to unstable bank conditions. We would like to keep our dock and surrounding area safe for we provide public access for boaters as well as fisherman and their children who frequent our establishment. Conclusion In conclusion I would like to add in my opinion, I feel this would not only protect our property from further damage from boat wakes, rising and falling water levels, It will decrease any negative impact on our waterway and environment from erosion and silt entering our waterways. Our intent is to construct a bulkhead With no negative impact on our environment or waterways. Very truly yours 4 xr:cl;IVED Wayne Manish Project Manager AUG 2 9 2013 DC-M-MILD CITY 'is-110A F K' tow ;C) t:;; I 'Ji Uri 1wavo el an'! wril to bmilyhr" ry 11mars; lt-Oi_" TOY, 1.Qjy?q -A 14-f N f 4 of! I fir; "if I If :3 mc, A Na lit go it; p 120"! whas wKI Won ww!w? Ar swqnw.-� WK bwwwmn_� i qpw m AN biam MAY x"uWbnc-_. r'o ';.!J"-Y brim A st" uk, w7bibs Jbi Sri; 110, m I i z i i r; a Flo COMMIT) &P j."A 1 maby toy "u( -'+t ii blum I wwj)non u: i 11A em W upavah -Wash wh) %alopy mr; kwnw; 'Aaw Am bilfan; 'o !)j!:'?- .i wwwal; Ta A ykad awya p1do W; quiah kw;N1;7. din h wS You E armsov w ; "wA 1310 MW 2WITAT) .1.11mumm, 2,0011100 -in GlywivA ion um try IN Mr-1 APPLICATION for Major Development Permit (last revlaad 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. P►imary Applicand Landowner information Business Name Project Name (If applicable) Applicant 1: First Name MI Last Name CAROLo Last Name Applicant 2: First Name MI If additional applicants, please attach an additional Page(S) with names frsfed. Mailing Address PO/Box City State / & l� �n ZIP oC Country Phone NO. FAX No. /0 asa 9.�s33 a,2 a Street Address (if ddfarent Gore above) C State ZIP 1 asp Email c3pattetp, pamwo, net, 2. Agent/Contractor information Business Name Two 6 o S , 6A)6MUCT16 0 , Agent/ Contractor 1: First Name MI Last Name Q Agi Contractor 2: First Name MI last Name VCZN1HD CITY Mailing Address PO Box /00 City /7 &(A-/Ek State /V ZIP Phone No. t Phone No. 2 WillYVC— a — 0Sz- W-,633I exL av FAX No. Contractor # asa) R5-- 7 :? Street Address (rf diKerent from above) Cily State ZIP Email YA)C MAVISli- c. Potter Q Pam iie-oi 4 E i <Form continues on back> 252.808-2808 .. 1-888-4RCOAST ..--w.nccoastalmanagernent.n9t Fbrtn DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address �' State Rd. ti r� Q I 4 ftqLle 1 No o oCl Subdivision Name City State Zip / O /3l, aev / 11 Phone No. Za- �s331 ext. Lot No.(s) (Nmany, attach additional page with list) , , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project RIVE I C.J c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural nmade ❑Unknown r'O bSIV e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes j3No work falls within. 4. Site Description a. Total length of shoreline on the tract b. Size of entire tract (sq.ft.) 77 $ 600 c. Size of individual Id(s) SJb a X �rs.O/ 7 d d. Approximate elevation of tract above NMM (normal high water) or level) list) NWL (normal water / ❑NHW OfNWL (If many lot sizes, please attach additional page with a or e. Vegetation on tract I G a/�SS > T2F�.fS :3 �v f. Man-made features and uses now on tract r:A Wn/N% /30)L!)/!V(q P514 P"T'C'["=SAD ,4 P�'� 1804-rRAM/0) Padkl4j? F-ol2 06,47S 1 -foa Fi Waal) Doak g. Idetifn�y an°� describe the existing land usesadia�n to the proposed project site. us co�sr ,Sri Q r* T ZZAOUD IkIUT 0,406 F0 NA—% Sat4714.� 4 )6,aldwCS tCGd 10T#L" e4sr- PQ I 01-r i-lol#G P 7141f W GS r— h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? AI,CS (Attach zoning compliance certificate, it applicable) ❑Yes []No []fTA 16051 S j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes G3Ko— k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No 2NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yea o ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :: 1-888-4RCOAST :: www. nccoastal management. net Farm DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit in. (i) Are there wetlands on the site? ❑Yes @4o (ii) Are there coastal wetlands on the site? ❑Yes 2 o (III) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Sr-PTl t—�DNF/GLD o. Describe existing drinking water supply source. C,vUu 4u*M2 p. Describe existing storm water management or treatment systems. N AL 5. Activities and Impacts a. Will the project be for commercial, public, or private use? M—`oommercial ublidGovemment I�private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. BatklWA / D CfjA� LRA) 0 LOST JJq)= TO rk05AOr A) p TO STOP T/i0 of a dt-som) i�ReH) STrr�'7S Ran ac.47"Td2Apir,d_ o u ;CW , Padk/ub of &A-7,5 c. Describe the proposed construction methodology, types of cons ructions equ' it to be u dun construction, the number of each type of equipment and where d is to be stored. C XaA f/�-�-0/�) (�9+V�R) Pc1�$ /¢�f S a LL 1)oZF2 Ar TO /90 S To R PJ7 a u S/7C d. List all development activities you propose. TNS�TALL 4A) �{P Oc$ p L34Gk i90 To Lh JSTIIVy ✓aCK/%A/JS O A) eMlY S),DE, &4Ltk1-/L-l_ H&PKsA-0 e. Are the proposed activdfes maintenance of an a isting project, new work, or both? 66 I ex 1 a a /1 AS'50 f. What is the approximate total disturbed land area resulting from the proposed project? .R or ❑Acres La0Q to g. Will the proposed project encroach on any public easement, public accessway other area ❑Yea IdNo ❑NA that the public has established use of? IEC1VED h. Describe location and type of existing and proposed discharges to waters of the state. - AUG 2 9 2013 i. Will wastewater or stornwater be discharged into a wetland? ❑Yes2N61-CMUITY If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes 0110 ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252.808-2808 .. 1-888-4RCOAST .. www.nccoastar ma nagement. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit B. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the dead (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No. Address Name Phone No. Address - -� Name . Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permktee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certtifyy that theinformation - iinformation provided in this application i truthful to the best of my knowledge. Date X — -, / — I Print Name ?A R a[, - /JoTrC-R VVPI ase indicate application attachments pertaining to your proposed project. AUG 2 9 2013 C MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts DDCM MP-3 Upland Development DCM MP4 Structures Information DOTS 252.808.2808 :: 1-888-4RCOAST :: www. nccoasta l management. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization) Length a 56 Width !� Avg. Existing NA NA 6 Depth Final Project NA NA Depth CJ 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. W c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 1 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. PEA N)q c. (I) Do you claim title too disposal area? d. []Yes ❑No IadtvA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (I) Will a disposal area "a available for future maintenance? []Yes[]No[RNA (i) If yes, where? , 1 N IJ9L' (i) Does the disposal include an area in the water! ❑Yea ❑No ❑NA (f) If Iles, how much water MMarea is affected? RECEIVED AUG 2 9 2013 DCM-MHD CITY 252-808-2808 :: 1-888.4RCOAST :: wwwmccoastalmanagement.net revised: 12/26/06 •FOrfft DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION (If development is a wood groin, use MP-4 — Structures) a. Typy'of shoreline stabilization: ljtlBulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance wat� Q N � or NWL: a ❑This section not applicable Width: �TI INS d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 ��pp rr���� d 1,�Iuu��.... ��,,,, Wes 044 /JGLKpWO Wes []No ❑NA (h) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. Bulkhead baddill AD Riprap _ Breakwater/Sill _ Other i. Source of fill material. h. Type of fill material. ss4,uy / Flu- nar 4. OTHER FILL ACTIVITIES gThis section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the slte71krYes UNo UNA If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill are= rye (iv) Purpose of fill R ��.. ,r_.tr_,rn 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. (i) Will fill material be placed in coastal wetlands/marsh (CM, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV ❑SB OWL _ []None (i) Describe the purpose of the fill in these areas: controlled? AD r-,« TA AC-, p�ev ll "9Z AaL/%eAL? 62Q SaZoFA ) c. (i) Will navigajjaanal aids be required as a result of the project? d. ❑Yes WC ❑NA (ii) If yes, explain what type and how they will be implemented. —a 6— / 3 Date Project Name What type of construction equipment will be used (e.g., dragline, backhos, or hydraulic dredge)? rar_imm P , 01ZAFR (i) Will wetlands be c sect in transporting equipment to project site? [--]Yes WdNo ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Applicant Signature RECEIVED AUG 2 9 2013 DC1I-M11D CITY 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalman�ement.net revised: 12/26/06 (vcc 9'"Ik bm- is hereby certify tnai i own p oper j adjacent to V?Pot L s ` RAJ a of Oerty Owner) property locatad:at �( ddress, Lot, to, R coad, tc.) :on ►..dL�L _ n N.C. (1Naterbod (Cityrrown and/or County) The applicant has dcsrrib to me, as stcown low, the development proposed at the above location. I have no ob ection to this propos al. i I liave objiaci ons to this proposal DESCRIPTION AND/QR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing cf6V Plopmentmust fill description below oratfachfa site drawing) ItirSr/f1G 'vr_W kl i><D 3 �, rho � c S /� 2 's 5/04 &44;�)34441) b�sE1C -RE' Ex)STIA4 066, I WAIVER ECTION I Understand that !a pier, cloo k. mooring pilings, t reakwater, boathouse, lift, or groin must be set back a minimum distance d 4 16 from my area riparian access unless waived by me. (If you wish to waive the setback, you must initial the a Dpropriate blank below.) RECEIVED I do wish to wai ve the 1 V .setback requirement —Myt'1 I do not wish h waive the 15' setb k requirement. AUG 2 9 2013 (Property ner!Informatl n) (Adjacent�r�r�jPAwne n r Information) y 5i nulure n nt or Type Name: 6 ailing Address C cny/st � f Telepho a Number Dare! (Revised 61182012) (Page 1 o1 3) , 10111111111111111 Doc ID: 002043220003 TVPa: DPP Paeorded: 0/17/2011 at 02:50:54 PM Faa Mt: i2.023.D0 POP, 1 of 3 Pavenue Tax: $2.000.00 Penllco, KD Sure H. Whitford Banister of Doeda OK554 PD245-247 ❑ If checked, the property includes the primary residence of at least one of the panics depicted as grantor. (N.C. Gen. Stet. § 105-317.2) NORTH CAROLINA PAMLICO COUNTY WARRANTY DEED THIS DEED, made and entered into this 15c" day of March, 2011, by and between ROY L. WATSON and wife, HILDA S. HATSON, Post Office Box 100, Hobucken, North Carolina 28537, hereinafter called, -- grantors^, and C. B. Potter, LLC, A North Carolina Limited Liability Company, 569 Kelly Watson Road, Lowland, North Carolina 28552, hereinafter called "grantee"; W I T_ N B S S B T_ H_: That grantors, for and in consideration of the sum of ten dollars and other good and valuable considerations to them in x hand paid, the receipt of which is hereby acknowledged, have bargained and sold, and by these presents do bargain, sell and convey to the said C. B. Potter, LLC and its successors and . assigns, a certain tract or parcel of land in the Number Pour (4) Township, Pamlico County, North Carolina, particularly described as follows: Being all of that tract containing 15.28 acres as shown on that plat entitled `SURVEYED FOR C.B. POTTER, LLC", prepared by Herbert J. Nobles, Jr., dated March 8, 2011 and recorded in Plat Cabinet A, Slide 1$7-8 , Pamlico County Registry. TO HAVE AND TO HOLD the aforesaid tract or parcel of land,. together with all privileges and appurtenances thereunto belonging, to the said C. B. Potter, LLC and its successors and assigns, in fee simple forever. And grantors, for themselves, their executors and administrators, covenant with grantee and its successors and assigns, that they are seized of said premises in fee; that they have a perfect right to convey the same in fee simple; that the same are free and clear of all encumbrances whatsoever, except those hereinabove stated; and that they will warrant and defend RECEIVED AUG 2 9 Z013 Prepared by HOLLOWELL h HOLLOWELL DCM-NA[fD CITY Attorney t Law Baybmm, NorthCarolina 28515 Book: 554 Page: 245 Page 1 of 3 Book: 554 Page: 245 Seq: 1 (page 2 of 3) the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, grantors have hereunto met their hands and adopted as theirseals the typewritten word .SEAL'. appearing beside each name, the day and year first above written. A(SEAL) f. RHOY, WATSON (SEAL) HILDA S. WATSON 44!2 one (SEAL) BY: ROY L.L. WATSON ATTORNEY -IN -FACT FOR HILDA S. WATSON STATE OF NC / COUNTY OFAy11)Co I, 6m6vd- $, k1 owd 1S1 • , a Notary Public in and for said county and state, do hereby certify that ROY L. WATSON, either being personally known to me or proven by satisfactory evidence (said evidence being ), personally appeared before me this day, and acknowledged the voluntary due execution of the foregoing instrument by he/she/them for the purposes stated therein. Witness my hand and notarial seal/stamp, this the 17 day of M My commi Pmpaad by HOLLOWELL & HOLLOWELL Atmmeys at IAw Baybam, Nosth (Awfins 28515 y, 7t RECEIVM AUG 2 9 2013 DCM-MHDCYfy Book: 554 Page: 245 Page 2 of 3 (Page 3 of 3) NORTH CAROLINA PAMLICO COUNTY I, Jessica- )1. Aamwjbs , a Notary Public in and for said county and state, do hereby certify that Roy L. Watson, either being personally known to me or proven by, satisfactory evidence (said evidence being I, who is -the attorney in fact for Hilda S. Watson, personally appeared before me this day, and being by me duly sworn, acknowledged that he voluntarily executed the foregoing and annexed instrument for and in behalf of the said Hilda S. Watson, and that his authority to execute and acknowledge said instrument is contained in an instrument duly executed, acknowledged, and recorded in the office of Register of Deeds in the County of Pamlico, State of North Carolina, on the 17C` day of May, 2010, in Deed Book 543 at page 720, and that this instrument was voluntarily executed under and by virtue of the authority gfven by said instrument granting him power of attorney. I do further certify that the said Roy L. Watson acknowledged the due execution of the foregoing and annexed instrument for the purposes therein expressed for and in behalf of the said Hilda S. Watson. Witness my hand and notarial seal/stamp, this the 1744 day of Uayr.k , 39.1 . — My commission expires: 1 P.Patad by HOLLOWELL a HOLLOWELL Attomeyt at Lam Baybo,o, Nmeb C mbna 28515 RECEIVED rr AUG 2 9 2013 DCV,VL?D CrrY Book: 554 Page: 245 Page 3 of 3 Book: 554 Page: 245 Seq: 3 {o a \ k+ k 1-aleat"' e 8 ♦liYe. > ...,jd .l y a 47 t 4' r„ Pamlico County, NC Q�\++r a PROPERTY MAP me aw poN].a M nie are ere pmpvee ec Te Mvewnn cnea and riper Maria recur arm coon.... aria ere compere from recorded .re eeea.. Brae arbpper dMarieimpo n�rea "� aria a and, lee ear b rm inmrapr purymee on .or eons nwe nor ee weaemc>a y/Hr� ��ll+� Iw a pus CYv search, propeM appreiztl. fully, w la zoning vMficeeon. RECEIVED AUG 2 9 2013 r One Inch = 200 Feet Nautical Chart Viewer: Pamlico Sound Western Part 1 Chart:11548 Edition:41 NTM:3413 LNM:3313 Tdff 1 —�' MarshIt I G' HOCt0�Nf76D91IXf I�mass�l ONO FH11 wa N G01f� AM R 1 eMe 3 �� J RG4s1`14M5 k/' I Page 1 of 2 G '4 3 Sa' R mR08 Marsh v I3 3 3 a J4 1"4 B 3 Marsh hd Vn W 3 D�O�p� 10 ✓ 11 8 1 MsapA rs� o� i http://www.oceangrafix.conVcharttzoom?chart=11548 DC.V-:l°. cr.r.Y 8/20/2013 q,l -17 I Print YP.com y Page 1 of 1 TO S,TE ( V) Cj k, Ty ^4P) 33 j r v Hobuckeh. NC &1 po10 Fao Oi RA) 1 http:// .yellowpages.com/map/print 309yw A Potter Memorial Bridge 300 yds 02oll Mvoe CwWiitbn CZOtUtdAVrEC CMS s RECEIVED AUG 2 9 2013 DCM•MHD CITY 7/18/2013 1 093 Anaamti-woa Doz 6 z 9Ad n /o Mr4\/o R 6,4 d u ,EX,.ST,ti4 3LD4,15r6l�l �- 19 aa.s ri Y/ a o IF la's vv — — a FXISTIA)4 0000 DOCK FuD oFG-x/ST/A)4 BPZ4 D,3� a66 ,G9r AECS/-- w�- w \V50 — — — I© y e/RlP aoo� c�,DE. 1 I� I o Fug �RAsS � y 41 N% Dadl, .51 0 SdALE )f/ FESGu9 GRASS 0 cJILD eUsH-Ars p Pawce Pot E Wl D•D AEC ___ �__ , /IaE, OF Edo�n�ieNFkU- ---So - SoFeo7eo9r>nGSIM2�C,�Bu��R E,u0 of EkISTIv4 8&LkHf ,4D R,E /71A`/O SCAI-o0 (� (WoL �a7tC— i2 - Lx�sT/N� eoND,T101US GJflyar /��tiis�f ®�a7r�rro�,v�ci</� E 183 n)Ay6 P9 a,�j0 PRoPoSEp d3ulklfCAO ti or 0,4 _ _�--- AEC u --- 36 — — zaur-- I Cx,ST/V4 GI?au�u AveR�� 41�?TE4 I�F'r�r1 GXISr1A4 ifiJ00 D o6ck �Cw 7/ l]J.IJ W1M\ YYJIl Eloz 6 9 9nd mad C�k�'iGL pRQf�xSED�IIl1FiC'AD cJrTl%$AND Te����Swi7H'TaPSa,�osvU S>'�D�(„Pr�sK� 84ekFILL Avr-P,40 peR7W APaox, 396 0-aB,c )14&s �gvre,9G1� w�T�Q ro ail=,cct-n 3- � 8 FA-P660 VruYL SAFJFT 8utk&V:)wfT9 timo 6evEo7rCnL PrLES AUD 1x6wAL4y 8V Pc-AoA,AN s/ 6.44 Trl avk Pdos / �?O SILT FE��F X X q0 a C)F 3 SdALE ; �2 o PAoPoSr-o 8edkl1EAD ---�5�-_ARFAofE�v��F NAL 0 oSE VRTIo IV'460vE /NWL — - NWL'c 0,6 XxhXXx S, LT Fr>ja e rlr� lNTes Fx16T1A;4 ec,11440*D ter Mayo ,dARO . (-/? Pllt�-k gav<4FAD pReA64 L 18S /46 )o po 1-4�akr/ + a653'9- PROPA&D a v Nt YVLF H9/410I,51% PRa7�i M�,46cIZ g-a i-ao �3 0 3 &VZO r144)411 Telow,gLI-.) PjIocl S#07*11*40 /JiNNOA) ►a 3,5' 6, I Fo 61x(// )I/ NwL WA MI IJ YCy,¢L LT�,vu7s, �✓ � gE InA/0 SE= gFooD / CAPoL 6 P671=P\ 183 �9 v6 12aA D /� o6 aass� ppalpoSr—,D au«<#ergo ct20.5s SEo-r10J �1D.r pi2t-p4OLr_ 1) 8/ �lgyytiC w4ivls# — �(«,TPUr MA Vl Fl C�s-?) sal-, ZS� N 12 N 3 of 3 R l ' (�96UN /D a• ,S� SAL ROOS Srr %ACK lVaN FACC of daLk#,640 a 0 R CA �83 M1410 P0140 4odadkG-lU tic L�oSS SLCTIQN ��}�� a GJ y�E lW4AIS%V Ca5,2) 6-ol-1.5�2s— S al~aa13 aQ N