Loading...
HomeMy WebLinkAbout87927_Emma Corley_20221114 o`"`tr'r f CAMA I7I DREDGE & FILL N9 87927 ABCD GENERAL PERMIT T-DIT 11 `O ° . D teous previous permit issuedf New ❑Modification I Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected n CW EW PTA ES I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): [7 IDEA n IHA n UW n SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: Shoreline Length Access Length - • _ 1 , Pier(dock)length Fixed Platform(s) Floating Platform(s) Finger pier(s) Total Platform area -- Groinlength/# Bulkhead/Riprap length yr ` Avg distance offshore Breakwater/Sill • Max distance/length • Basin,channel Cubic yards • Boat ramp Boathouse/Boatlift Beach Bulldozing Other SAV observed: yes no Moratorium: n/a yes no Site Photos: yes no Riparian Waiver Attached: yes no A building permit/zoning permit may be required by: Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTEDFar. Permit Officer's PRINTED Name ((„,,�( ; Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie,Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 °``° ';<• CAMA — DREDGE & FILL 87927 A B C D o� — GENERAL PERMIT Previous permit y Date previous permit issued New i I Modification I I Complete Reissue I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC I Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected I I CW EW n PTA n ES I I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): I I OEA IHA n UW n SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length Pier(dock)length Fixed Platform(s) Floating Platform(s) Finger pier(s) Total Platform area Groin length/# Bulkhead/Riprap length Avg distance offshore Breakwater/Sill Max distance/length Basin,channel Cubic yards Boat ramp Boathouse/Boatlift Beach Bulldozing Other SAV observed: yes no Moratorium: n/a yes no Site Photos: yes no Riparian Waiver Attached: yes no A building permit/zoning permit may be required by: I I TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules II See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER Governor MICHAEL S. REGAN Secretory Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(OCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed compiles with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet • landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes • maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be satisfactorily restored as described in condition 5 below. 1. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the • structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. • a. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first • subsequent planting season (November 1 through March 30) after completionpll of the bulkhead. a Pre-project site conditions: r5 /I1"w.44..,_.e..d� j vc.j t 7 Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and co struction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions a f verify that all information is complete and accurate. 41121 {-,st or Appii t intesi Name • i �,: ee' _ -ture y A`-nt or Applicant Signature Is eD- e • CAMA GENERAL P'ERMiT it: ' 27 Siam of North Carolina i Environmental Q,ualtty Coastal Management Washington Office 1943 Washington Square Mail Washington.NC 27869 i 52-946-5481 Wilmington Office 1177 C arrlinal Drive E t'Aahrrngt77r.NC 28aoc-384.5! lie-796_71e Morenead City Office'400 Commerce avenue Morehead City.NC 28557 . 252-308-2808 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner • Address of Property: LQO L a/ �7/h p Mailing Address of Owner 511L/ /Vim ;) CA�P%II/d II/di/VC Owner's email: e (c)r I e y/510e il./c ner's Phone#_ //'/3' 72/2-92j10 Agent's Name: 5rami '[ I Q V 1Jo 1 Agent Phone: d - Agent's Email: brarQbeasoo ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this perrnit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing,with dimensions.must be provided with this letter_ �i•''� I DO NOT have objections to this proposal. {JrU w l f P PSI- I DO have objections to this proposal_ � If you have objections to what is being proposed, you must notify the N.C. Division of Coastal U� (tCIC._ Management(DCM) in writing within 10 days of receipt of this notice Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481.No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock, mooring pangs,boat ramp,breakwater, boathouse, lift,or groin must be set back a minimum distance of-15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign the appropriate hlank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner 7:iffJ c akte-- Typed/Printed name of ARPO: v,_ aitt.`R - Mailing Address of ARPO: Lepa$ i Pt- --2 c ()'I e44t� Lk- 25CS 4-1 ARPO's email: i,�OCW1t/TP �G(YKY �I., -ARPO's Phone#:�514 99 eV39 Date; 161 �a1/ *waiver is valid for up to one year from ARPO's Sig nature* Revised May 2021 phi . Co( kg_ ?We(4t- Proper — 0 • cI QYo 1f p -i U ihy13ullthd i coif &t h0) ) �ft., • Pipped-1 __ _ IiIS g 1v �v_- Jj C, __, . From: Patrick Mahon sea-captain@live.com Subject: Re:Dolphin Point Projects Date: October 25.2022 at 6:21 PM To: Brandi Robertson brandiprobertson@gmail.com Sounds fine with us Brandi.And yes,we are ok with the neighbors building a sea wall. What are the plans for their dock?Curious. Get Outlook for iOS From: Brandi Robertson <brandiprobertson@gmail.com> Sent: Monday, October 24, 2022 2:42:51 PM To: Patrick Mahon <sea-captain@Iive.com> Subject: Dolphin Point Projects Dear Mr. Mahon, Great News about the dock! We would like to put your dock at the same time we do your neighbors dock after the first of the year in January. We use different equipment for bulkheads and docks,so logistically it makes sense for us to do it this way Please let me know if you have any questions Also,your neighbor. Mr.Conley has decided to install a bulkhead. As part of the permitting process we are required to Notify Adjacent Property Owners. Please respond to this email confirming that you have been notified about the project. A drawing is attached to this email. Please do not hesitate to contact me if you have any questions. If you have objections to the project please contact Mr. Kent Vaughan at 252.948.3853. Brandi Prescott Robertson B Prescott Martine Construction, LLC BrandipRobertson@gmail.com 252.249.0149 From: Daniel dcorley510@gmail.com Subject: Re:Authorized Agent Date: October 31,2022 at 1:33 PM To: Brandi Robertson brandiprobertson@gmail.com Yes,thank you and please act as our agent Daniel Corley Sent from my iPhone On Oct 31,2022,at 11:51 AM,Brandi Robertson<brandiprobertson@gmail.com>wrote: Dear Mr. Corley. I am in the process of preparing the paperwork to obtain the General CAMA Permit for the bulkhead at 6026 Dolphin Rd. I have sent out notification letters to your Adjacent Property Owners and as soon as we get those back I will schedule a site visit with the CAMA Field Rep. Mr.Ashley Thomas. Please respond to this email granting me permission to act as your Authorized Agent. This will allow me to obtain the permit on your behalf and you will not need to be present at the time of the site meeting. Please feel free to contact me if you have any questions. Thank you. Brandi Prescott Robertson B Prescott Martine Construction, LLC BrandipRobertson@gmail.com 252.249.0149