HomeMy WebLinkAbout87657D-TOWN OF SURF CITY C/O OF KYLE BREWER6&
dtursry CAMA Y DREDGE & FILL 00Ts- N9 87657 A B C 6
GENERAL PERMIT 1� :2 �� Previous permit _
e 1 Date previous permit issued
ViNew U Modification []Complete Reissue �] Pa lal Reissue
As authorized by the State of rth Carolinas, Department of Environmental Quality and the Coastal Resources Comi nissian in an area of environmental concern pursuant to:
I SA NCAC 0 • L vy ___-_ D Rules attached. r General Permit Rules avaih6le at the following link: wwwdca rK 2 &AM ring;
Applicant Name ryit�/N
� r v
v[_T_7_ _ f-...iL7'^� a'
1
-Authorized Agent /R�aL`Rf If
�aT*� u/
Aj
Address i�`f tv
r01
{
Project Location (County):
City -
i/
ZIP
Street Address/State Roadll.- (s) .. _
Phone # ('i( ) 774t--
Email _ __,----_---_--_. .
Subdivisi
City l/ _
-_`.,ZIP � 1L
Affected F] cw W PTA
rn—
11 ES n PTS
Adj. Wtr. Body�fJl'jfilAan/unk)
AEC(s): Ot A U'� UW
n SPIMA U PWS
Closest Mal. Wtc Body
ORW:y no
PNA: no
Type of Project/ Activity
(Scaler 1
Shoreline Length
Access Len h
Pier (dock) le n
��.�•
�[ 1 W VV
I ixed Platform(s)
Floating Platforms)___ _
Finger pierls)
Total Platform area
Groin length/q
Bulkhead/ Riprap length
Avg distance offsWKr
Break er/Sill 7 T -
Max dirt e/ length 2 ax
Basin, channe
Cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
other
SAV observed yes
Moratorium: n/a yes
Site Photos: yes I
Riparian Waiver Attached: yes
A building perrnit/earing permit may be required by:
Permit Conditions
I AM AWARE 9F ST U ES _QtC RULES AN[FCONIFITIONS THAT PLY TO VIO PRQJ
t or Applicant PRINTED Na 1p, 4,�,
t/
ign ure "•Please read compliance statement on back of permit•„ _�
plication Feels} — _ [heck tt/Money Order
41—Nf
TAR/PAM/NEuSE/BLIFFER (circle one)
See note on back regarding River Basin rules
See additional notes/conditions on back
REVIEWED O PUANCE STA ENT. (Please Ini " )
it OfHc&TRRINTED Name
Issuing Date
Z2--
12-,
Expiration Date
❑CAMP► ❑ DREDGE & FILL N9 87657 A B C -E
GENERAL PERMIT Previous permit
Date previous permit issued
0 New ❑ Modification ❑ Complete Reissue ❑ Partial Reissue
As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC ' % ❑ Rules attached. ❑ General Permit Rules available at the following link: www.deq.ncQov/CAMArules
Applicant Name
Address
City `�` r, State x {' ZIP
Phone #
Email
Authorized Agent
Project Location (County):
Street Address/State Road/Lot #(s)
Subdivision
City ZIP
Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Adj. Wtr. Body (nat/man/unk)
AEC(s): ❑ OEA ❑ IHA ❑ UW ❑ SPIMA ❑ PWS Closest Maj. Wtr. Body
ORW: yes/no PNA: yes/no
Type of Project/ Activity'
Shoreline Length
Access Length _
Pier (dock) leng
Fixed Platform(<
Floating Platforr
Finger pier(s)
Total Platform a
Groin length/# _
Bulkhead/ Ripra
Avg distance off
Breakwater/Sill
Max distance/ h
Basin, channel _
Cubic yards
Boat ramp
Boathouse/ Boa
Beach Bulldozin
Other
SAV observed:
Moratorium:
Site Photos:
Riparian Waiver
—
A building permit/zoning permit may be required by: ' ` i 1
Permit Conditions
4'
(Scale: /`J,,r s' 1
❑ TAR/PAM/NEUSE/BUFFER (circle one)
❑ See note on back regarding River Basin rules
❑ See additional notes/conditions on back
I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THATAPPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT.
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature "Please re d compliance statprYent on back of permit" Signature
(Please Initial)
Application Fee(s)
Check #/Money Order Issuing Date
Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
1-1 Tar - Pamlico River Basin Buffer Rules F] Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Mana¢ement Offices
Morehead City Headquarters
400 Commerce Ave Morehead City, NC 28557
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330
(Serves: Carteret, Craven — south of the Neuse River, Onslow
Counties)
Elizabeth City District
401 S. Griffin St. Ste. 300
Elizabeth City, NC 27909
252-264-3901
(Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford,
Pasquotank and Perquimans Counties)
Washington District
943 Washington Square Mall Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Craven — north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext. Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover and Pender Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
AGENT AUTHORIZATION FOR LAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: Town of surf City; Kyle Breuer, Town Manager
Mailing Address: P.O. Box 2475
Surf City, NC 28445
Phone Number: (910) 328-4131 x 100
Email Address: kbreuer@surfcitync.gov
I certify that I have authorized Niels Lindquist with Sandbar Oyster Company Inc.
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: Living Shoreline
at my property located at 517 Roland Drive, Surf City, NC 28445
in Pender County.
1 furthermore certify that 1 am authorized to grant. and do in fact grant permission to
Division of Coastal Management staff. the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
14 y4 N. 2�t4l,6Q 42
Signature
Kyle Breuer
Print or Type Name
Town Manager
Title
08 1 1 2022
Date
This certification is valid through 12 / 31 2022
51.17. Webb Street
. Morehead City
. `.'
SPINDB.NorthCarolina 28557AR:
Niels@SandbarOysterCompany.com
01STER' COMPANY Isheil'FalyMotWa d- 252.732'.4516
To: 'Kyle, Breuer, Town Manager; Town of -Surf city, North Carolina:.
Feom:.NieIs Lindquist,.Sandbar.Oyster Corn pany '
Subject::Proposal for Soundside Park living shoreline
Date: June 30, 20221.
Dear Mr: Breuer,
Sandbar Oyster Company (hereafter SANDBAR) is excited�to work'with the:Town of Surf City
and Tracy Skrabai.with .the -North Carolina.Coastal' Federatiorr(NCCF) to create a.living shoreline
along a-200-ft stretch.of shoreline at the City's Soundside Park (Figure 1). Living shorelines.use .
Nature -based features, including oyster reefs and "saltmarsh plants; to protect shorelines from
degradation and' erosion; and.offer. long-term resilience in the.face of rising sea levels:
Structural Summary: The proposed living shoreline for.Soundside Park; as diagramed (Figures 2-
6) wili.consist of an oyster reef sill created within the ,intertidal Optimal Growth Zone (OGZ).for '
oysters (Figure) A; Ridge et al. 2015) using-two.different shapes of'SANDBAR's
patented/patent-pending biodegradable: hardscape calied Oyster Catch&TM. The "Table".form
of Oyster Catcher?". will -act as a 'reef scaffold on which immense numbers of oyster larvae -will'
settle. Within 1-2 years, oyster•growth will fill in the void space ofthe scaffold: With: tightly fused.
and intermingled:shells of the growing oysters; resulting in an exceptionally dense and resilient
oyster reef. The "'Pillow" form of, our biodegraded'hardscape.is.positioned under the' .
shoreward row.of Tablesto act'as a wave break.and for sediment retention/accumulation: Once.
installed, the Oyster Catcher? sill will provide immediate wave attenuation -services and create
an environment, landward of the sill conducive to sand accumulation that will facilitate�the . .
growth and expansion of the existing Spard a alterniflora saltmarsh (Figure 7:B;C),:. :
Scope: of Work: SANDBAR will. manufacture -the biodegradable hardscape element for,the sill,
transport these, materials to Soundside Park and deployment the Tables and Pillows to create.:
the Oyster.CatcheC1.1,structure as shown•in,the Figures.2-6. Figures. 8.12 show: examples of
shoreline reefs created. with Oyster. CatcherT"". andsaltmarsh plant communities developing. .
behind them.:.
Timin :.Once a contract has been.signed by all. parties, SANDBAR will begin the manufacture.of
the Oyster Catcher?"" elements -for the Soundside Park living shoreline project:. It is.anticipated
that this:manufactu'ring effort will take -!weeks, possibly longer if. inclement. weatherprolongs
the manufacturing process:.Once' the materials are, made, their'deployment.to create.the sill..
structure,;should take three low-tide.cycles"(-9 hours),.'.' Additional deployment .time maybe
needed if water levels are runningsubstantially higher than predicted; on- the scheduled..:_ .
deployment days: if no, substantial occur- we expect to have completed construction of
the sill no;later than.July,22, 2022.
Payment Terms: Payment of 50% of the estimated contract price _(see Table for an itemized.
breakdown of material and; service costs) shall be made.within 2 weeks:of contract:engagement
m to support: aterials.acquisitions and Oyster Catcher TI.:manufacturing efforts.,: The remaining'.
50% of the contract price is due upon completion of the sill -installation- Direct'deposit:of'funds
'is preferred, and secondarily,'checks mailed to Sandbar Oyster Company Inc:, 5117 Webb Street,
Morehead City NC 28557..'. . .
'Limited Warranty: Structures pjaced alorig.estuarine'shorelines are exposed to multiple forces
and stresses that when severe can,cause damage -to structures; no Warranties are made ;
regarding the performance of the sill vender extreme conditions (e.g. a major hurricane).
HOWever;,to date, Table -based. structures have', performed exceptionally well,..eve'n under .
extreme. conditions.- "Sandbar Oyster Company managers will: inspect the, condition of the:
constructed shoreline Structures monthly for 12 months following complete of the construction.
phase'of.the project. Any identified deficiencies will be discussed.with NCCF/Surf City town staff
and a plan for repairs will be developed. Relatively minor repairs to maintain the.function of the.
Oyster Catcii07reefsill. will ;be made.by Sandbar Oyster Company at nocost to NCCF,.or the ;
Town of -Surf City In the event, of a.catastrophic event, for. example. a major hurricane, Sandbar
Oyster_Gompanywill�pariici.pate ''in evaluation: of the damage 6 'd.scope of repairs. needed
but will not be.fin'ncially responsible for affecting the repairs.
SITE CONSIDERATIONS
The structure for the proposed sill was informed by a site visit conducted March 16, :2022."
Environmental Factorv. .
Wind:wave exposure: minimal..'This shoreline is located along. a narrow stretch of the,
Intracoastal Waterway. such that wind waves'are not likely an erosional stress on this
shoreline. :.
Boat wakes: heavy.boat wake- impacts are -occurring alorig this shoreline with the Intracoastal
Waterway channel located ^'300 ftoffshore of:the-park's ex' osed.shoreline.:
turrents: strong tidal. currents... .
Bottom'characteristics: sandy bottom with some:buried shell materials.
Salinity:.high within: SE.NC:coastal sounds, which limits oyster growth the.intertidal O.GZ.
Submerged Aquatic Vegetation, (SAV): none observed. of this site:.. .
Tide.range:-3.ft;:which for the Soundside Park shoreline area yields an intertidal oyster growth
.zone of.'-1.5 ft of tidal.elevation between mean low Water and mean •water level:.'
-Biological "Factors
Oyster and saltmarsh abundance and growth: Figure 7 A show oysters in the OGZ on dock
pilings at Soundside Park. Panels-B and'C of,Figure 7 show the'existing saltmarsh (Spartina
a/te,mif/ora) community along the shoreline where the Oyster Catcher, living•shoreline.will be
. constructed..:. , , . .. .. .
.. "2
Figure 1. Location of the Soundside Park, Surf City, NC. Image from Pender County government GIS
website; 2020 imagery.
Figure 2. Position of the —200 ft-long Oyster Catcher TM sill proposed for Soundside Park. The Oyster
CatcherTm sill is shown to scale. The mean low water (MLW) line lies along the outer edge of the —45-ft long
sill sections. The distances note the positions of the baffled gaps from the western end of the sill. Image
from Pender County government GIS website; 2020 imagery.
-45 ft
Plan view — baffle section
—8 ft
MIMI MIS
r_ MIL7_� —�
T T T T T T T T
999
shoreward
central
intermittent
line
line
waterway
Tables
line
� 2
Pillows SANDBAR
(imbedded
under Tables) OYSTER (ONPANY
Figure 3. Plan views of the proposed Oyster CatcherTm Table -Pillow sill for one of the —45-ft long sill
sections (top) and baffled gap sections (bottom left).
---
-- I E
Pillows
shoreward
central
intermittent (imbedded
line
line
waterway under Tables)
Tables
line
SANDBAR
OYSTER (ONPANY re ro
Figure 4. Plan view of the proposed Oyster CatcherTm Table -Pillow sill with the line of Pillows shown
separated from the Tables to show how the Pillows will be arranged.
4
F1 Oyster Catcher'""
Oyster Catcher'"' Table Pillow -tall/narrow
(red —shoreward line; green —central
line; blue — intermittent waterward line) (wave attenuation)
waterway
M*
MWL
NLW
OL
SANDBAR
OYSTER (ONPANYlvammrwk*w
Figure 5. Cross-section view of the proposed Oyster CatcherTm Table -Pillow sill at a point where a Table of
the intermittent offshore line of Tables is located.
shore $III
-40 in
w
-18 i)
Oyster Catcher•"' Table
(red — shoreward line; green — central
line
Oyster Catcher TM
Pillow
(wave attenuation)
Baffle
-24 in
waterway
f— -MWL
t— -NLW
M.
SANDBAR
OYSTER COMPANY ;ywM
Figure 6. Cross-section view of the proposed Oyster CatcherTm Table -Pillow sill in the area of a baffled gap.
5
r.►
Figure 7. A — view of the tidal range over which oyster reef can develop in the Soundside Park environment.
B,C — views looking east and west, respectively, at low tide from the mid -point of the proposed Oyster
CatcherT"" sill.
Table. Itemized cost estimate for the Soundside CatcherTm Table -Pillow sill.
Item
Quantity
Unit
Description
Unit Price
Total
1
220
each
Oyster Catcher" Table
$70.00
$15,400.00
2
54
each
Oyster Catcher" Pillows (tall)
$70.00
$3,780.00
3
1
Delivery
$1,110.00
$1,110.00
4
1
Installation
$3,340.00
$3,340.00
5
1
DCM CAMA General Permit
$200.00
$200.00
6
1
Project Administration (10% of items 1-5)
$2,383.00
$2,383.00
Subtotal
$26,213.00
Sales Tax (6.75%)
$1,769.38
TOTAL
$27,982.38
Nominal Project Length (ft) — 200
Cost per Project Linear Ft - $139.91
Features and Benefits of the Oyster CatcherTm Table -Based Sills
Figures 8 through 12 show examples of robust oyster community development on Oyster
Catcher TM -based reef foundations placed in the OGZ. These exceptional reef development
outcomes have been realized in environments ranging from high wave/current energies to more
quiescent tidal creeks (see Moore et al. 2020 and Wellman et al. 2021 for projects comparing
oyster community development on Oyster CatcherTm vs. shell bag reefs, a long -used standard for
sill creation).
Figure 8. Examples of
oyster growth on
stacked Oyster
CatcherTm Tables (top; 2
tables each stack); rows
of single Oyster
CatcherTm Tables
(bottom) and close-up of
oyster growth on Tables
(bottom insert) 18
months after
deployment in North
Carolina.
Figure 9. Oyster
CatcherTm reef (185 ft)
at the NC Aquarium at
Pine Knoll Shores. Sill
constructed April 2019;
picture date February
10, 2022.
Figure 10. Oyster reef
development on Oyster
Catcher'"' Tables at
Wachapreague, Virginia.
Project with The Nature
Conservancy. Tables
deployed June 2020;
picture taken January
2022.
Figure 11. Oyster reef
development on Oyster
Catcher'"' Tables vs.
bagged oyster shell
near Savannah,
Georgia. Materials
deployed May 2021;
pictures December
2021.
Features and Benefits of the Oyster Catcher'" Table Sill (cont.)
• Oyster Catcher'"" surface roughness is highly attractive to settling oyster larvae and protective
of juvenile oysters.
• Oyster Catcher TM cm -scale element spacing (i.e. within and among Tables and Pillows)
enhances oyster community development by reducing oyster mortality from larger
predatory fishes and invertebrates.
• The roughness of Oyster Catcher'"" Table legs when buried in sediments ranging from sand to
soft mud provide exceptional vertical stability even after substantial oyster community
development; thus, no underlayment is needed to prevent potential subsidence of the
proposed Oyster Catcher'"" Table -based reefs. Figure 12 shows Tables used in soft
sediments in Georgia and Virginia. No underlayment has ever been needed with Oyster
Catcher TM -based reefs.
Figure 12. Views of Oyster CatcherTm Table deployments in soft, muddy bottoms in Georgia (left) and
Virginia (right).
• Oyster Catcher'" is a non -carbonate reef foundation material that does not allow colonization
by carbonate (oyster shell and limestone rock) boring/eroding oyster pests.
• The ability to created elevated Oyster CatcherTm reef scaffolds is proving to be a game -
changing innovation that yield reefs of fused and intermingled oysters exceptionally
robust to high wave and current disturbances. A central strategy of reef development
with Oyster CatcherT"" is creating a scaffold of elements on which oyster settlement and
growth is facilitated and over time fills in the void space of the scaffold with layered
generations of oysters.
• The initial open void spaces of the proposed Oyster CatcherTI sill will allow facile passage of
mobile species through the sill structure until such time the void space fills in with
oyster growth and/or accumulating sediments. Further, with the height of the Oyster
Catcher TM
sill being at mean water level, at higher tides, mobile species can move over
the top of the sill.
• The current and wave energies of the Soundside Park site are likely to move sand into and
through the sill and allow it to accumulate behind the structure along with oyster feces
and pseudofeces. These sedimentary materials will promote salt marsh expansion up to
the backside of the sill.
• Oyster Catcher.. is a lightweight material that offers ease of handling, lower transportation
costs and contributes to its resistance to sinking in soft sediments. For example, the
average weight of a Table is ^25 lbs. Further, the Tables can be stacked in a spiral
fashion, which reduces the footprint of truck, trailer and boat deck space needed to
transport Tables.
Total Cost of the Proposed Oyster CatcherT"' Table Sill (Figures 2-6) - $27,982.38
Included in this bid are:
Materials (Oyster CatcherT" Tables and Pillows): $19,180.00
Construction (transport to site and deployment): $4,450.00
Project Design & Administration (10% of materials and construction): $2,383.00
CAMA General Permit Application Fee: $200.00
NC Sales and Use tax (Pender County rate — 6.75%): $1,719.38
Cost per foot based on length of the sill (200 ft)—$139.91 per ft
SANDBAR greatly appreciates the opportunity to submit a proposal for this project. For
questions related to our proposal, please contact Dr. Niels Lindquist.
Sincerely, Niels Lindquist
CEO and Co -Founder of Sandbar Oyster Company
Cell: (252) 732-4516
Email: niels@sandbaroystercompany.com
References
Moore, CS, RK Gittman, BJ Puckett, EH Wellman, and AMH Blakeslee. 2020. If you build it, they will come:
restoration positively influences free-living and parasite diversity in a restored tidal marsh. Food
Webs 25: e00167
Ridge, JT, AB Rodriguez, FJ Fodrie, NL Lindquist, MC Brodeur, SE Coleman, JH Grabowski and EJ Theuerkauf.
2015. Maximizing oyster -reef growth supports green infrastructure with accelerating sea -level
rise. Scientific Reports 5; Article number 14785; doi:10.1038/srep14785
Wellman, EH, CJ Baillie, BJ Puckett, SE Donaher, SN Trackenberg and RK Gittman. 2021. Reef design and
site hydrodynamics mediate oyster restoration and marsh stabilization outcomes. Ecological
Applications 2022;32:e2506; https://doi.orp,/10.1002/eap.2506
Proposal Acceptance Signatures
June 30, 2022
Niels Lindquist, Date
CEO Sandbar Oyster Company, Inc.
Kyle Breuer,
Town Manager
Town of Surf City
10
Date
DocuSign Envelope ID: AD2C4FFE-DF4A-445B-9469-773C1AADF56E
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner:
Address of Property:
Laniado Properties LLC
511 Roland Ave., Surf City, North Carolina
Mailing Address of Owner: PO Box 1008, North Myrtle Beach, South Carolina 29598
Owner's email:
Owner's Phone#:
Agent's Name: Joshua Laniado Agent Phone#: (843) 602-5554
Agent's Email: joshualaniado53(a�gmail.com
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing, with dimensions, must be provided with this letter.
X I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. DCM representatives can also be
contacted at (910) 796-7215. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
Docuftned by:
I DO wish to waive some/all of the 15' setback I944F
signhere
...
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requirement (initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO: Joshua Laniado
Mailing Address of ARPO: PO Box 1008, North Myrtle Beach, South Carolina 29 598
josh ualanla o
ARPO's email: gmall.com ARPO's Phone#: (843) 602-5554
Date: 7/26/2022 *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021
■ Complete items 1, 2, and 3. A. Signature
■ Print vour name and address on the reverse x
so that we can return the card to you. B. Received
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
He Burkhart
20Ashland Court
AL
Wiliington, NC 28405
;.e;,ressee
fbyv((Prin d Name} C. Date Of OeJlivery
(drew dffwwtt from them 1? 0 Yen .
r deNveq Wdrrew lb -1 m Ci NIP
_. 3. Service Type
III lilil11NI Illll13 OM MWO
M`°
9402 fi66610fi0 87 80 31 nC*Kft ° ►
WMY
?— tTr rtFari ser Artie Ct l9bttect oh •Det Yay Resbfc Wd DoOmy
7022 0410 0000 4244 �746. Rw t WDeRrerp
kr� �S•
W„ w"c PA%M
+pry z `: ' ♦�x..,,,5 i♦ �i i� �`«`T'ee ar7S i i �`wr , ♦A 1
�mN ♦14L !a ♦ ► -� stl5 ! y.. ::°y9"b -�, L - - r k
a
Ty
NEW
u xy 4Y,
rW°Yik 1 t � „s fl'w"�. � ° e �` �-. ♦�" '�� s ,t.'x- ;€ '^� 5 { �
Ed _v : s
Eb
f ' .. x ..{ t .1.{J► � .�.'X•iA.3 �_ ,.�rsai.k<� rs 6v � ,.a
�—Q n w
who
nk
E{
awp
a
� 1 n ° a •pis', ,e. � s .���7 *` , ix�{wxs��''a''� r1 : r� y,., . ���a, �f�G
fly a� � r t r i t �� � �"�� �• �t i
a�
�L+Po ��Y ?yE. 9' $ 3 • -.t 1 f r: + . q snGwM S�'��: an 5 t � 5
` t� 51 � 3d--rx",a4n..,y �V":'. il"F 4 5 I ��♦ �1 :5%
1 r t 5 • j of • F[
Ar
-_ � '� *� �. `"6 W,r":'�'i�+ �.ysae� r�"j1C{`r a` { : • P ��i {3 �1 �'� a •. a
`+. ° , w
{5 ,
oTm
MAR
xq
1 On
r I
a
1
> kk
r
`�"�
a ilto +a» PEv�y . -' �, ° "•-+"t� � "x"� ���k���,a;�� � K i,; Y 3 �s i�+a'✓` � :.`-»
_
tw�t h.�,�� w 41,
'',i
r ,
`F}x:'hi"
!`4�.ixa tr'i
4n
f 'Zemmola,,
t
no tha,
T�
Y'� ma a 4.
-
¢ Rf
,v.
1
� '
4
r:.♦.* U.
N
" 5117 Webb Street
Morehead City
SANDBAR.
North Carolina 28557
Niels@SandbarOysterCompany.com
0 Y S T E R( 0 M P A N Y I sheilfishty Motivated'" 25 2.732.4516
To: Jason Dail, Field Representative, NC Division of Coastal Management
From: Niels Lindquist, Sandbar Oyster Company
Subject: Application Fee for Soundside Park (Surf City) living shoreline GP
Date: July 26, 2022
Jason,
Enclosed is the $200 fee for the marsh sill GP for the Surf City Soundside Park living shoreline
project.
Cheers,
Niels Lindquist, CEO
Sandbar Oyster Company, Inc.
1
Date Received
Date Deposited
Check From Name
Nome of Permit Holler
Vendor
Check number
Check
amount
Permit Numbeo'Comments
Receipt or Relund/Reelloceted
Columnl
Column2
Cdumn7
Column)
Ca1umn5
Columns
Column?
Columns
Columns
8/3/2022
8/4/2022
Pippin Marine Construction LLC
same
Wells Fargo
6087
$ 200.00
GP #87772D
JD rct. 18109
8/3/2022
8/4/2022
James North
Crowder
Wells Faro
24505
$ 200.00
GP #87656D
JD rct. 18117
8/3/2022
8/4/2022
Sandbar Oyster Company Inc._
Town of Surf City
Wells Fargo
2087
$ 200.00
GP #87657D
JD rct. 18119
8/3/2022
8/4/2022
Stanley West
same
PNC Bank
2649
$ 200.00
1 GP #87794D
BB rct. 18083
8/3/2022
8/4/2022
__
Southern NC Marine LLC
Bryan
First Bank
1538
$ 200.00
GP #87669D
JD rct. 18121
8/3/2022
8/4/2022
AMW Docks & Marine Construction
Tolson
Truist
7249
$ 200.00
GP #87618D
BB rct. 18087
8/3/2022
8/4/2022
Lighthouse Marine Construction Inc
Rhodes
Coastal Bank and Trust
4355
$ 200.00
GP #87777D
JD rct. 17687
8/3/2022
8/4/2022
Carolina Bluewater Construction, Inc.
Miller
BB&T
25192
$ 200.00
GP #87624D
BB rct. 18086
8/3/2022
8/4/2022
NoMac Investments LLC
same
First Citizens
1989
$ 400.00
GP #87622D
BB rct. 18085