Loading...
HomeMy WebLinkAbout87657D-TOWN OF SURF CITY C/O OF KYLE BREWER6& dtursry CAMA Y DREDGE & FILL 00Ts- N9 87657 A B C 6 GENERAL PERMIT 1� :2 �� Previous permit _ e 1 Date previous permit issued ViNew U Modification []Complete Reissue �] Pa lal Reissue As authorized by the State of rth Carolinas, Department of Environmental Quality and the Coastal Resources Comi nissian in an area of environmental concern pursuant to: I SA NCAC 0 • L vy ___-_ D Rules attached. r General Permit Rules avaih6le at the following link: wwwdca rK 2 &AM ring; Applicant Name ryit�/N � r v v[_T_7_ _ f-...iL7'^� a' 1 -Authorized Agent /R�aL`Rf If �aT*� u/ Aj Address i�`f tv r01 { Project Location (County): City - i/ ZIP Street Address/State Roadll.- (s) .. _ Phone # ('i( ) 774t-- Email _ __,----_---_--_. . Subdivisi City l/ _ -_`.,ZIP � 1L Affected F] cw W PTA rn— 11 ES n PTS Adj. Wtr. Body�fJl'jfilAan/unk) AEC(s): Ot A U'� UW n SPIMA U PWS Closest Mal. Wtc Body ORW:y no PNA: no Type of Project/ Activity (Scaler 1 Shoreline Length Access Len h Pier (dock) le n ��.�• �[ 1 W VV I ixed Platform(s) Floating Platforms)___ _ Finger pierls) Total Platform area Groin length/q Bulkhead/ Riprap length Avg distance offsWKr Break er/Sill 7 T - Max dirt e/ length 2 ax Basin, channe Cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing other SAV observed yes Moratorium: n/a yes Site Photos: yes I Riparian Waiver Attached: yes A building perrnit/earing permit may be required by: Permit Conditions I AM AWARE 9F ST U ES _QtC RULES AN[FCONIFITIONS THAT PLY TO VIO PRQJ t or Applicant PRINTED Na 1p, 4,�, t/ ign ure "•Please read compliance statement on back of permit•„ _� plication Feels} — _ [heck tt/Money Order 41—Nf TAR/PAM/NEuSE/BLIFFER (circle one) See note on back regarding River Basin rules See additional notes/conditions on back REVIEWED O PUANCE STA ENT. (Please Ini " ) it OfHc&TRRINTED Name Issuing Date Z2-- 12-, Expiration Date ❑CAMP► ❑ DREDGE & FILL N9 87657 A B C -E GENERAL PERMIT Previous permit Date previous permit issued 0 New ❑ Modification ❑ Complete Reissue ❑ Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC ' % ❑ Rules attached. ❑ General Permit Rules available at the following link: www.deq.ncQov/CAMArules Applicant Name Address City `�` r, State x {' ZIP Phone # Email Authorized Agent Project Location (County): Street Address/State Road/Lot #(s) Subdivision City ZIP Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Adj. Wtr. Body (nat/man/unk) AEC(s): ❑ OEA ❑ IHA ❑ UW ❑ SPIMA ❑ PWS Closest Maj. Wtr. Body ORW: yes/no PNA: yes/no Type of Project/ Activity' Shoreline Length Access Length _ Pier (dock) leng Fixed Platform(< Floating Platforr Finger pier(s) Total Platform a Groin length/# _ Bulkhead/ Ripra Avg distance off Breakwater/Sill Max distance/ h Basin, channel _ Cubic yards Boat ramp Boathouse/ Boa Beach Bulldozin Other SAV observed: Moratorium: Site Photos: Riparian Waiver — A building permit/zoning permit may be required by: ' ` i 1 Permit Conditions 4' (Scale: /`J,,r s' 1 ❑ TAR/PAM/NEUSE/BUFFER (circle one) ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THATAPPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature "Please re d compliance statprYent on back of permit" Signature (Please Initial) Application Fee(s) Check #/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: 1-1 Tar - Pamlico River Basin Buffer Rules F] Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Mana¢ement Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven — south of the Neuse River, Onslow Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Craven — north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover and Pender Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 AGENT AUTHORIZATION FOR LAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Town of surf City; Kyle Breuer, Town Manager Mailing Address: P.O. Box 2475 Surf City, NC 28445 Phone Number: (910) 328-4131 x 100 Email Address: kbreuer@surfcitync.gov I certify that I have authorized Niels Lindquist with Sandbar Oyster Company Inc. Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Living Shoreline at my property located at 517 Roland Drive, Surf City, NC 28445 in Pender County. 1 furthermore certify that 1 am authorized to grant. and do in fact grant permission to Division of Coastal Management staff. the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: 14 y4 N. 2�t4l,6Q 42 Signature Kyle Breuer Print or Type Name Town Manager Title 08 1 1 2022 Date This certification is valid through 12 / 31 2022 51.17. Webb Street . Morehead City . `.' SPINDB.NorthCarolina 28557AR: Niels@SandbarOysterCompany.com 01STER' COMPANY Isheil'FalyMotWa d- 252.732'.4516 To: 'Kyle, Breuer, Town Manager; Town of -Surf city, North Carolina:. Feom:.NieIs Lindquist,.Sandbar.Oyster Corn pany ' Subject::Proposal for Soundside Park living shoreline Date: June 30, 20221. Dear Mr: Breuer, Sandbar Oyster Company (hereafter SANDBAR) is excited�to work'with the:Town of Surf City and Tracy Skrabai.with .the -North Carolina.Coastal' Federatiorr(NCCF) to create a.living shoreline along a-200-ft stretch.of shoreline at the City's Soundside Park (Figure 1). Living shorelines.use . Nature -based features, including oyster reefs and "saltmarsh plants; to protect shorelines from degradation and' erosion; and.offer. long-term resilience in the.face of rising sea levels: Structural Summary: The proposed living shoreline for.Soundside Park; as diagramed (Figures 2- 6) wili.consist of an oyster reef sill created within the ,intertidal Optimal Growth Zone (OGZ).for ' oysters (Figure) A; Ridge et al. 2015) using-two.different shapes of'SANDBAR's patented/patent-pending biodegradable: hardscape calied Oyster Catch&TM. The "Table".form of Oyster Catcher?". will -act as a 'reef scaffold on which immense numbers of oyster larvae -will' settle. Within 1-2 years, oyster•growth will fill in the void space ofthe scaffold: With: tightly fused. and intermingled:shells of the growing oysters; resulting in an exceptionally dense and resilient oyster reef. The "'Pillow" form of, our biodegraded'hardscape.is.positioned under the' . shoreward row.of Tablesto act'as a wave break.and for sediment retention/accumulation: Once. installed, the Oyster Catcher? sill will provide immediate wave attenuation -services and create an environment, landward of the sill conducive to sand accumulation that will facilitate�the . . growth and expansion of the existing Spard a alterniflora saltmarsh (Figure 7:B;C),:. : Scope: of Work: SANDBAR will. manufacture -the biodegradable hardscape element for,the sill, transport these, materials to Soundside Park and deployment the Tables and Pillows to create.: the Oyster.CatcheC1.1,structure as shown•in,the Figures.2-6. Figures. 8.12 show: examples of shoreline reefs created. with Oyster. CatcherT"". andsaltmarsh plant communities developing. . behind them.:. Timin :.Once a contract has been.signed by all. parties, SANDBAR will begin the manufacture.of the Oyster Catcher?"" elements -for the Soundside Park living shoreline project:. It is.anticipated that this:manufactu'ring effort will take -!weeks, possibly longer if. inclement. weatherprolongs the manufacturing process:.Once' the materials are, made, their'deployment.to create.the sill.. structure,;should take three low-tide.cycles"(-9 hours),.'.' Additional deployment .time maybe needed if water levels are runningsubstantially higher than predicted; on- the scheduled..:_ . deployment days: if no, substantial occur- we expect to have completed construction of the sill no;later than.July,22, 2022. Payment Terms: Payment of 50% of the estimated contract price _(see Table for an itemized. breakdown of material and; service costs) shall be made.within 2 weeks:of contract:engagement m to support: aterials.acquisitions and Oyster Catcher TI.:manufacturing efforts.,: The remaining'. 50% of the contract price is due upon completion of the sill -installation- Direct'deposit:of'funds 'is preferred, and secondarily,'checks mailed to Sandbar Oyster Company Inc:, 5117 Webb Street, Morehead City NC 28557..'. . . 'Limited Warranty: Structures pjaced alorig.estuarine'shorelines are exposed to multiple forces and stresses that when severe can,cause damage -to structures; no Warranties are made ; regarding the performance of the sill vender extreme conditions (e.g. a major hurricane). HOWever;,to date, Table -based. structures have', performed exceptionally well,..eve'n under . extreme. conditions.- "Sandbar Oyster Company managers will: inspect the, condition of the: constructed shoreline Structures monthly for 12 months following complete of the construction. phase'of.the project. Any identified deficiencies will be discussed.with NCCF/Surf City town staff and a plan for repairs will be developed. Relatively minor repairs to maintain the.function of the. Oyster Catcii07reefsill. will ;be made.by Sandbar Oyster Company at nocost to NCCF,.or the ; Town of -Surf City In the event, of a.catastrophic event, for. example. a major hurricane, Sandbar Oyster_Gompanywill�pariici.pate ''in evaluation: of the damage 6 'd.scope of repairs. needed but will not be.fin'ncially responsible for affecting the repairs. SITE CONSIDERATIONS The structure for the proposed sill was informed by a site visit conducted March 16, :2022." Environmental Factorv. . Wind:wave exposure: minimal..'This shoreline is located along. a narrow stretch of the, Intracoastal Waterway. such that wind waves'are not likely an erosional stress on this shoreline. :. Boat wakes: heavy.boat wake- impacts are -occurring alorig this shoreline with the Intracoastal Waterway channel located ^'300 ftoffshore of:the-park's ex' osed.shoreline.: turrents: strong tidal. currents... . Bottom'characteristics: sandy bottom with some:buried shell materials. Salinity:.high within: SE.NC:coastal sounds, which limits oyster growth the.intertidal O.GZ. Submerged Aquatic Vegetation, (SAV): none observed. of this site:.. . Tide.range:-3.ft;:which for the Soundside Park shoreline area yields an intertidal oyster growth .zone of.'-1.5 ft of tidal.elevation between mean low Water and mean •water level:.' -Biological "Factors Oyster and saltmarsh abundance and growth: Figure 7 A show oysters in the OGZ on dock pilings at Soundside Park. Panels-B and'C of,Figure 7 show the'existing saltmarsh (Spartina a/te,mif/ora) community along the shoreline where the Oyster Catcher, living•shoreline.will be . constructed..:. , , . .. .. . .. "2 Figure 1. Location of the Soundside Park, Surf City, NC. Image from Pender County government GIS website; 2020 imagery. Figure 2. Position of the —200 ft-long Oyster Catcher TM sill proposed for Soundside Park. The Oyster CatcherTm sill is shown to scale. The mean low water (MLW) line lies along the outer edge of the —45-ft long sill sections. The distances note the positions of the baffled gaps from the western end of the sill. Image from Pender County government GIS website; 2020 imagery. -45 ft Plan view — baffle section —8 ft MIMI MIS r_ MIL7_� —� T T T T T T T T 999 shoreward central intermittent line line waterway Tables line � 2 Pillows SANDBAR (imbedded under Tables) OYSTER (ONPANY Figure 3. Plan views of the proposed Oyster CatcherTm Table -Pillow sill for one of the —45-ft long sill sections (top) and baffled gap sections (bottom left). --- -- I E Pillows shoreward central intermittent (imbedded line line waterway under Tables) Tables line SANDBAR OYSTER (ONPANY re ro Figure 4. Plan view of the proposed Oyster CatcherTm Table -Pillow sill with the line of Pillows shown separated from the Tables to show how the Pillows will be arranged. 4 F1 Oyster Catcher'"" Oyster Catcher'"' Table Pillow -tall/narrow (red —shoreward line; green —central line; blue — intermittent waterward line) (wave attenuation) waterway M* MWL NLW OL SANDBAR OYSTER (ONPANYlvammrwk*w Figure 5. Cross-section view of the proposed Oyster CatcherTm Table -Pillow sill at a point where a Table of the intermittent offshore line of Tables is located. shore $III -40 in w -18 i) Oyster Catcher•"' Table (red — shoreward line; green — central line Oyster Catcher TM Pillow (wave attenuation) Baffle -24 in waterway f— -MWL t— -NLW M. SANDBAR OYSTER COMPANY ;ywM Figure 6. Cross-section view of the proposed Oyster CatcherTm Table -Pillow sill in the area of a baffled gap. 5 r.► Figure 7. A — view of the tidal range over which oyster reef can develop in the Soundside Park environment. B,C — views looking east and west, respectively, at low tide from the mid -point of the proposed Oyster CatcherT"" sill. Table. Itemized cost estimate for the Soundside CatcherTm Table -Pillow sill. Item Quantity Unit Description Unit Price Total 1 220 each Oyster Catcher" Table $70.00 $15,400.00 2 54 each Oyster Catcher" Pillows (tall) $70.00 $3,780.00 3 1 Delivery $1,110.00 $1,110.00 4 1 Installation $3,340.00 $3,340.00 5 1 DCM CAMA General Permit $200.00 $200.00 6 1 Project Administration (10% of items 1-5) $2,383.00 $2,383.00 Subtotal $26,213.00 Sales Tax (6.75%) $1,769.38 TOTAL $27,982.38 Nominal Project Length (ft) — 200 Cost per Project Linear Ft - $139.91 Features and Benefits of the Oyster CatcherTm Table -Based Sills Figures 8 through 12 show examples of robust oyster community development on Oyster Catcher TM -based reef foundations placed in the OGZ. These exceptional reef development outcomes have been realized in environments ranging from high wave/current energies to more quiescent tidal creeks (see Moore et al. 2020 and Wellman et al. 2021 for projects comparing oyster community development on Oyster CatcherTm vs. shell bag reefs, a long -used standard for sill creation). Figure 8. Examples of oyster growth on stacked Oyster CatcherTm Tables (top; 2 tables each stack); rows of single Oyster CatcherTm Tables (bottom) and close-up of oyster growth on Tables (bottom insert) 18 months after deployment in North Carolina. Figure 9. Oyster CatcherTm reef (185 ft) at the NC Aquarium at Pine Knoll Shores. Sill constructed April 2019; picture date February 10, 2022. Figure 10. Oyster reef development on Oyster Catcher'"' Tables at Wachapreague, Virginia. Project with The Nature Conservancy. Tables deployed June 2020; picture taken January 2022. Figure 11. Oyster reef development on Oyster Catcher'"' Tables vs. bagged oyster shell near Savannah, Georgia. Materials deployed May 2021; pictures December 2021. Features and Benefits of the Oyster Catcher'" Table Sill (cont.) • Oyster Catcher'"" surface roughness is highly attractive to settling oyster larvae and protective of juvenile oysters. • Oyster Catcher TM cm -scale element spacing (i.e. within and among Tables and Pillows) enhances oyster community development by reducing oyster mortality from larger predatory fishes and invertebrates. • The roughness of Oyster Catcher'"" Table legs when buried in sediments ranging from sand to soft mud provide exceptional vertical stability even after substantial oyster community development; thus, no underlayment is needed to prevent potential subsidence of the proposed Oyster Catcher'"" Table -based reefs. Figure 12 shows Tables used in soft sediments in Georgia and Virginia. No underlayment has ever been needed with Oyster Catcher TM -based reefs. Figure 12. Views of Oyster CatcherTm Table deployments in soft, muddy bottoms in Georgia (left) and Virginia (right). • Oyster Catcher'" is a non -carbonate reef foundation material that does not allow colonization by carbonate (oyster shell and limestone rock) boring/eroding oyster pests. • The ability to created elevated Oyster CatcherTm reef scaffolds is proving to be a game - changing innovation that yield reefs of fused and intermingled oysters exceptionally robust to high wave and current disturbances. A central strategy of reef development with Oyster CatcherT"" is creating a scaffold of elements on which oyster settlement and growth is facilitated and over time fills in the void space of the scaffold with layered generations of oysters. • The initial open void spaces of the proposed Oyster CatcherTI sill will allow facile passage of mobile species through the sill structure until such time the void space fills in with oyster growth and/or accumulating sediments. Further, with the height of the Oyster Catcher TM sill being at mean water level, at higher tides, mobile species can move over the top of the sill. • The current and wave energies of the Soundside Park site are likely to move sand into and through the sill and allow it to accumulate behind the structure along with oyster feces and pseudofeces. These sedimentary materials will promote salt marsh expansion up to the backside of the sill. • Oyster Catcher.. is a lightweight material that offers ease of handling, lower transportation costs and contributes to its resistance to sinking in soft sediments. For example, the average weight of a Table is ^25 lbs. Further, the Tables can be stacked in a spiral fashion, which reduces the footprint of truck, trailer and boat deck space needed to transport Tables. Total Cost of the Proposed Oyster CatcherT"' Table Sill (Figures 2-6) - $27,982.38 Included in this bid are: Materials (Oyster CatcherT" Tables and Pillows): $19,180.00 Construction (transport to site and deployment): $4,450.00 Project Design & Administration (10% of materials and construction): $2,383.00 CAMA General Permit Application Fee: $200.00 NC Sales and Use tax (Pender County rate — 6.75%): $1,719.38 Cost per foot based on length of the sill (200 ft)—$139.91 per ft SANDBAR greatly appreciates the opportunity to submit a proposal for this project. For questions related to our proposal, please contact Dr. Niels Lindquist. Sincerely, Niels Lindquist CEO and Co -Founder of Sandbar Oyster Company Cell: (252) 732-4516 Email: niels@sandbaroystercompany.com References Moore, CS, RK Gittman, BJ Puckett, EH Wellman, and AMH Blakeslee. 2020. If you build it, they will come: restoration positively influences free-living and parasite diversity in a restored tidal marsh. Food Webs 25: e00167 Ridge, JT, AB Rodriguez, FJ Fodrie, NL Lindquist, MC Brodeur, SE Coleman, JH Grabowski and EJ Theuerkauf. 2015. Maximizing oyster -reef growth supports green infrastructure with accelerating sea -level rise. Scientific Reports 5; Article number 14785; doi:10.1038/srep14785 Wellman, EH, CJ Baillie, BJ Puckett, SE Donaher, SN Trackenberg and RK Gittman. 2021. Reef design and site hydrodynamics mediate oyster restoration and marsh stabilization outcomes. Ecological Applications 2022;32:e2506; https://doi.orp,/10.1002/eap.2506 Proposal Acceptance Signatures June 30, 2022 Niels Lindquist, Date CEO Sandbar Oyster Company, Inc. Kyle Breuer, Town Manager Town of Surf City 10 Date DocuSign Envelope ID: AD2C4FFE-DF4A-445B-9469-773C1AADF56E N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Address of Property: Laniado Properties LLC 511 Roland Ave., Surf City, North Carolina Mailing Address of Owner: PO Box 1008, North Myrtle Beach, South Carolina 29598 Owner's email: Owner's Phone#: Agent's Name: Joshua Laniado Agent Phone#: (843) 602-5554 Agent's Email: joshualaniado53(a�gmail.com ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions, must be provided with this letter. X I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. DCM representatives can also be contacted at (910) 796-7215. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) Docuftned by: I DO wish to waive some/all of the 15' setback I944F signhere ... Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15' setback requirement (initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Joshua Laniado Mailing Address of ARPO: PO Box 1008, North Myrtle Beach, South Carolina 29 598 josh ualanla o ARPO's email: gmall.com ARPO's Phone#: (843) 602-5554 Date: 7/26/2022 *waiver is valid for up to one year from ARPO's Signature* Revised July 2021 ■ Complete items 1, 2, and 3. A. Signature ■ Print vour name and address on the reverse x so that we can return the card to you. B. Received ■ Attach this card to the back of the mailpiece, or on the front if space permits. He Burkhart 20Ashland Court AL Wiliington, NC 28405 ;.e;,ressee fbyv((Prin d Name} C. Date Of OeJlivery (drew dffwwtt from them 1? 0 Yen . r deNveq Wdrrew lb -1 m Ci NIP _. 3. Service Type III lilil11NI Illll13 OM MWO M`° 9402 fi66610fi0 87 80 31 nC*Kft ° ► WMY ?— tTr rtFari ser Artie Ct l9bttect oh •Det Yay Resbfc Wd DoOmy 7022 0410 0000 4244 �746. Rw t WDeRrerp kr� �S• W„ w"c PA%M +pry z `: ' ♦�x..,,,5 i♦ �i i� �`«`T'ee ar7S i i �`wr , ♦A 1 �mN ♦14L !a ♦ ► -� stl5 ! y.. ::°y9"b -�, L - - r k a Ty NEW u xy 4Y, rW°Yik 1 t � „s fl'w"�. � ° e �` �-. ♦�" '�� s ,t.'x- ;€ '^� 5 { � Ed _v : s Eb f ' .. x ..{ t .1.{J► � .�.'X•iA.3 �_ ,.�rsai.k<� rs 6v � ,.a �—Q n w who nk E{ awp a � 1 n ° a •pis', ,e. � s .���7 *` , ix�{wxs��''a''� r1 : r� y,., . ���a, �f�G fly a� � r t r i t �� � �"�� �• �t i a� �L+Po ��Y ?yE. 9' $ 3 • -.t 1 f r: + . q snGwM S�'��: an 5 t � 5 ` t� 51 � 3d--rx",a4n..,y �V":'. il"F 4 5 I ��♦ �1 :5% 1 r t 5 • j of • F[ Ar -_ � '� *� �. `"6 W,r":'�'i�+ �.ysae� r�"j1C{`r a` { : • P ��i {3 �1 �'� a •. a `+. ° , w {5 , oTm MAR xq 1 On r I a 1 > kk r `�"� a ilto +a» PEv�y . -' �, ° "•-+"t� � "x"� ���k���,a;�� � K i,; Y 3 �s i�+a'✓` � :.`-» _ tw�t h.�,�� w 41, '',i r , `F}x:'hi" !`4�.ixa tr'i 4n f 'Zemmola,, t no tha, T� Y'� ma a 4. - ¢ Rf ,v. 1 � ' 4 r:.♦.* U. N " 5117 Webb Street Morehead City SANDBAR. North Carolina 28557 Niels@SandbarOysterCompany.com 0 Y S T E R( 0 M P A N Y I sheilfishty Motivated'" 25 2.732.4516 To: Jason Dail, Field Representative, NC Division of Coastal Management From: Niels Lindquist, Sandbar Oyster Company Subject: Application Fee for Soundside Park (Surf City) living shoreline GP Date: July 26, 2022 Jason, Enclosed is the $200 fee for the marsh sill GP for the Surf City Soundside Park living shoreline project. Cheers, Niels Lindquist, CEO Sandbar Oyster Company, Inc. 1 Date Received Date Deposited Check From Name Nome of Permit Holler Vendor Check number Check amount Permit Numbeo'Comments Receipt or Relund/Reelloceted Columnl Column2 Cdumn7 Column) Ca1umn5 Columns Column? Columns Columns 8/3/2022 8/4/2022 Pippin Marine Construction LLC same Wells Fargo 6087 $ 200.00 GP #87772D JD rct. 18109 8/3/2022 8/4/2022 James North Crowder Wells Faro 24505 $ 200.00 GP #87656D JD rct. 18117 8/3/2022 8/4/2022 Sandbar Oyster Company Inc._ Town of Surf City Wells Fargo 2087 $ 200.00 GP #87657D JD rct. 18119 8/3/2022 8/4/2022 Stanley West same PNC Bank 2649 $ 200.00 1 GP #87794D BB rct. 18083 8/3/2022 8/4/2022 __ Southern NC Marine LLC Bryan First Bank 1538 $ 200.00 GP #87669D JD rct. 18121 8/3/2022 8/4/2022 AMW Docks & Marine Construction Tolson Truist 7249 $ 200.00 GP #87618D BB rct. 18087 8/3/2022 8/4/2022 Lighthouse Marine Construction Inc Rhodes Coastal Bank and Trust 4355 $ 200.00 GP #87777D JD rct. 17687 8/3/2022 8/4/2022 Carolina Bluewater Construction, Inc. Miller BB&T 25192 $ 200.00 GP #87624D BB rct. 18086 8/3/2022 8/4/2022 NoMac Investments LLC same First Citizens 1989 $ 400.00 GP #87622D BB rct. 18085