Loading...
HomeMy WebLinkAbout70-14 Town of HertfordPermit Class NEW ' Permit Number 70-14 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and or X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Hertford, PO Box 32, Hertford, NC 27944 Authorizing development in Perguimans County adi. the Perguimans River, Punch Alley, adjacent the public boat ramp Hertford, as requested in the permittee's application dated 4/27/14 includingthe he attached worlmlan drawings (4). all dated revised 4/12/14. This permit, issued on _August 5, 2014 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Prior to the occupancy of any new slips authorized under this permit, the on -site pump -out shall be operable and maintained for the life of the facility. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the facility. (See attached sheets for Additional Conditions) rnts permit action may oe appeaiea oy me perminee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. . This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2017 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. the Chairman of the Coastal Resources Commission. { %'L•Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Town of Hertford Permit # 70-14' Page 2 of 3 ADDITIONAL, CONDITIONS 3) Unless specifically altered herein, this permit authorizes only the docking facility, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) This permit authorizes a maximum of.nine formalized boat slips Upland Development 8) Unless specifically altered herein, this permit. authorizes the land disturbing activities associated with the development of the above referenced property, all as expressly and specifically set forth in the attached permit application and workplan drawing. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901 for this determination. General 9) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 10) No open water areas shall be excavated or filled, even temporarily. 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 12)' The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation. Town of Hertford Permit # 70-14 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 201401029. a. A project narrative. Chartered in 1758, Hertford has a rich colonial and maritime history tied to the Perquimans River and Albemarle Sound. Hertford is the seventh oldest town in North Carolina. It is also the Seat of Perquimans County. In 2010 Hertford was accepted into the NC Rural Center STEP (Small Town Economic Prosperity) grant program, which helps the town to identify and prioritize economic development and revitalization. The strategic planning portion of the STEP process has identified waterfront development as a priority, specifically the construction of slips for boaters who wish to visit the town. Currently, visiting boaters do not have a place to dock their boats, many in the forty feet range, at a public facility. These visitors must anchor away from the town boat ramps and use their tenders or dinghies to access the small dock that is adjacent to the ramps. During the week and especially on weekends, the town boat ramps are crowded with fisherman, which can make access difficult for visiting boaters. Prior to being selected for STEP, the town participated in the Creative Communities Initiative with the UNC School of Business to develop a waterfront development plan. Over a three-year period, graduate students in the business school at UNC worked with the town to develop a waterfront revitalization plan, which includes boat slips and a public/private partnership for a mixed use waterfront development that includes outfitters, a hotel, fuel service, and other amenities on the water. The waterfront plan uses the attraction of the Perquimans River to help spur economic development and re-establish Hertford as a vibrant waterfront town. The town dock and boat slips are the critical fast step in the town's long -tern plan for revitalizing Hertford's historic waterfront. Project Objectives The Town of Hertford, Waterfront Access Improvement Project seeks to accomplish the following objectives: • Provide safe harbor dock space for transient boaters, recreational boaters and visitors with the construction of nine slips. • Increase transient boater and visitor traffic to help spur economic development and revitalization of the Historic Waterfront. Expected Results and Benefits The addition of the town dock to the Municipal Park will be the critical first step in implementing the town's Waterfront Development Plan. The new town dock will help reconnect the town's 63 historic points of interest to the water, which will help attract boaters looking for a charming, southern waterfront town. The town is able to offer a rich history and many amenities within a 20-block area around the town dock. Locations of amenities close to the town dock include the Post Office, Missing Mill Park and Restrooms, Convenience Mart, Restaurant, and Gas Station, Senior Center and Tennis Courts, Hardware Store, Public Library, Internet Cafd, RECMM Pagel of 2 JUN 0 8 2014 x• DCM•.NaM CITY Deli and Diner, Soda Fountain and Drug Store, Police Station, Bank, Municipal Building, Historic Hertford Visitors Center, and County Government Building The layout of the town dock and water depths behind Municipal Park is shown on the attached Site Plan Detail. The town dock will extend 170 feet due north from the Municipal Park boardwalk. The main walkway and T pier on the end of the walkway will be six feet wide. The four forger piers for boat slips will be four feet wide. The T walkway will be able to accommodate an 80 foot boat. The four adjacent berths will be 36 feet long and 13 feet wide with a mooring pile at the entrance of the berths. The T pier and four adjacent berths are in six feet of water. The four berths closest to shore will be 30 feet long and 10 feet wide, with a mooring pile at the entrance. These four berths are in five to six feet of water. Water, electric service and pump -out lines will be provided along the main six foot wide walkway. Construction details are shown in the attached engineer's plans, Sheets 14. An information kiosk with maps and brochures will be installed at the entrance to Municipal Park from the town dock to provide information on amenities and points of interest. For safety, the town dock will be located directly behind the town police station. 7. Compliance with N.C. Environmental Policy Act (N.C.G.S.113A 1-10) The Town of Hertford is using public grant funds and its own funds to construct the town dock and boat slips. It is aware of and will comply with the N.C. Environmental Policy Act as it implements the project. Page 2 of 2 uuauna�n�ns>,t r _ p M AY 12 2014 North Carolina DIVISION OF COASTAL MANAGEMENT 1. Prlmary Applicant/ LandbwnerInformation Business Name Project Name (if applicable) 10w� o� 1AerC}orck Rio-rir^�� W1i'v �ro�� iR cctSz Applicant t: Rrst Name MI Last Name ra nA-- S Slno q F Applicant2: First Name MI Last Name /f additional applicants, please attach an additional pageta) wM names listed. Mailing Address PO Box City Smie 'Te 3.X 32 1 32 N e.t-foe k N e ZIP Country Phone No. FAX No. '1 -1 ItLfq I lay 2s1 -1126-19v; ext 2S-1 426-'lo6a Street Address (if different from above) City Stab ZIP 11L1 v• 6, -l.6 S} 2-7-jqy Email C(' I ry G.�H Qr � 7., r- O C Li a,I, orA G. G6M 2. AgentiContractorinfbrmatfon Business Name low 01• 14 Cr�Fo rcl Agent/ Contractor is First Name MI Last Name Agerttl Contractor 2: First Name MI Last Name Maifrg Address PO Box city - Sbia ok NC - ZIP Phone No. t Phone No. 2 'Lit 252 -q26 - 1 q(5 exit exit FAX No. CorftciorM rLS1- �126 - 10 t, o Street Address(fof/fe&bow) City Sta biainii ZIP It�1 Cl) • Cyr Alelo S}. r �erkkoT\ Nc 2Zel'4-1 Email Mans. a/��ON^Ot1..«Yterr�.�.. Cot <Form continues on back> JUN 0 9 2014 55 5 t 55 5 i 5 iii5M H I I "r 5 5 57,115555 5 i 54 : as i i - 11 f ii 15❑ DCMMHDCffY Form DCM MP-1 (Page 2 of4) APPLICATION for Major Development Permito 3. Project Location County (can be multiple) Street Address State Rd. # �2r UI hG�5 IIL' / Subdivision Name City State . Zip rl Fjer(}orC^ N(_ 279 Li-1 Phone No. Lot No.(s) (if many, attach addi6'onal page oath list) 25 ? Ll Tb I e7 1. ext a. In which NC river is the project located? b. Name of body of water nearestto proposed project IIbasin �AS uo t':i4 e-r S J�,v ter• c. Is the water body identified In (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown --R.v To r ',M 4n$ 4r e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planrtlng jurisdiction or city limit the proposed UYes ❑No work falls vdthin, ff 1 ( 1 TOW, OY N �rT-ForO�, 4. Site Desciiption a. Total length of shoreline on the tract (it) b. Size of entire tract (sq.ft.) `."o Fit. 2a, el c. Size of individual lot(s) 'Z r) , 8 / g17 P1 . d. Approbmate elevation of tract above NHW (nomral high ureter) or NWL (normat otaterlevel) (ifmanylot sizes, please attach additionalpage wth a list) for ❑NHW or gNWL e. Vegetation on tract �jrc,-)5 f. Man-made features and uses now ontmct 11 !AA0 ni Lr-?,I 7--L �a5 �ogrr�tw4, r4ii�.. C�. o- 4II g. Identify and describe the existing land uses adlacentlto the proposed projectsite. �cSIots�A( ih nc,+vr.-. tnw,. Strttk5t �4rki Ck0 G14S 9- )po �lr h. Flow does local government zone the tact? I. Is the proposed project consistent with the applicable zoning? L ( (Attach zoning compliance certificate, if applicable) WYes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes KNo k. Has a professional archaeological assessment been done for the tract? Ifyes, attach a copy. ❑Yes %M DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it invohre a E2Yes ❑Nb ❑NA' National Register listed or eligible property? <Fon n continues on next pagea G e 6 U 5 u 95 i e 0 ii2trilo 661 LAil 6 n t 0 0 6 ii9ilr66 11 0 io i t E 5 e 10 05 B B 6 B B 9 6 0 iH 5 50 Form DCM MP-1 (Page 3 of4) APPLICATION for MAY 12 2014 Major Development Permil0 m. (i) Are there wetlands on the site? r.-: ,;,-.N ❑Yes XNo (I) Are there coastal wetlands on the site? --- ""-""-❑Ves ESQ No (II) M yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Descdbeexistrigwastewatertreatmentfacilites. 1e Wr ewn�r%\ A o. Describe existing ddnNrg water supply source. -roW. I , �a..+<, <� po►Rb�� wR4�r. rpDeacribe existing storm water management or treatment systems. -Vo.,+ 0w.. A 4 r Z. - lea "..<k II 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial Public/Government ❑Prlvate/Communiy b. Give a brief description of purpose, use, and daily operations ofthe project when complete. j \n.a JroP oS cr� SI•�5 u�r ll pro�rA..1-rRnS�—n} \o satr5 c� Y\qC�- %O dla�-k �-•1n,\,., v;s44, C.n5 �(..� (n'�54cr; t. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and 11 where it is to be stored. a- d. List all development 1activities1 you propose. ( f0 A. �\cac�a- }(�/ �f 5n$1 !�� �p4A1 j !rS S�Wv P,.-vM �o..i (' �\a�\•rr c. a wa.4-�/ Lo nn.�c�. o�S. e. Are the proposed activities maintenance of an eAs1t�'rg project, newwork, or both? -c V prF f. What is the apprmdmate total disturbed land area resulting from the proposed project? %Sq.Ft or ❑Acres (oOD g. Will the proposed project encroach on arty public easement pubic accessway or other area WYes ❑No ❑NA thatthe public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. 1JO) c rroF vs¢J i. W ll wastewakr orstDmwmberbe diwharged into a mtland? ❑Yes ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yea [RNo ❑NA j. Is there any mitigation proposed? ❑Yea RNo ❑NA If yes, attach a mitigation proposal. meow <Form continues on back> rJUN 0 9 2014 c n r tf l 5 oil a tD DC.q-IVMCnV Form DCM MP-1 (Page 4 of4) APPLICATION for Major Development Permito 6. Additional Information In addition to this completed application form, (MP-1) the following items befQW if applicable, must be submitted in order for the application package to be complete. Items (a)— it) are almys applicable to any major development application. Please consult the application instruction booklet on howto properly prepare the required items below. a. A project narrative. [2 Nlv' b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project is any porBpn aheady con leis? IFprevioysyaufhodzed work, clearyindica on maps, plats, drawings to distinguish between work completed and proposed. r - j'-- �� . r ; ,, c. A site or Iocatlon map that is sufficiently d dtai led to guide agency personnel unfamiliar Wth the area to the site. /,.. f /! 1 d. A copy of the deed (with state application only) or other instrument under Which the applicant claims title to the affected properties. !� e. The appropriate application fee. Check or money order made payable to DENR. f. A fist othe names and complete addresses of the adjacentwaterrront (riparian) hndowners and signed returns receipts as proofthat such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the DhAslon of Coastal Management Name �y%r��9 t�, NC�1=, 4- N �t"'I}'P " 1 [� Phone No. Address Name r'e.' 'A'-'r/✓ 1744&40 Wes$' Phone /No. Address /:.^� 7 W / �, f �'J' .mil! ,,, !�' <.>' ,`%.'�G.ii ✓ C,. ,.� / —%�% 7 Name 'Phofie No. Address g. A list of previous state or federal permits issued for work on the project tract Include permit numbers, penmittee, and issuing dates. h. Signed consultant or agent authorization form, if appicable... i. Wetland delineation, if necessary. A/f j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. AstatementofoompliancewiththeN.C. Environmental PoficyAct(N.C.G.S. 113A 1-10), ifnecessary. Ifffre project}nvolses expenditure of public funds or use of pubic lands, attach a statementdocumenting compliance with the North Carolina Environme I licy 't 7. Certification and Permission to Enter on Land 1 understand that any permit issued in response to this application will allow only the development described in the application. The projectwill be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further ce illy that the information provided in this application- 'i7s truthful to the best of my knowledge. Date L �'�' Print Name �S ry^J`o(y�., S. S�oci.t Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ODCM MP-3 Upland Development CKDCM MP-4 Structures Information r 9 j E Ed 5 E i1E d ii 5 noHHE H E E.Eii E E E E o 6 Ei HH9 u 1 EE a E 6 1 ii 51 Ili 5 9 n u E E E !i jH 5 E❑ I .............................. .............................................................. ................................................................ .......................................................... 0 50 100 200 Feet ::::::::::::::::::::::...................... tt t ..............I............ ................................................. 1 inch = 87 feet New Nine Slip Marina 86' En d Wdth 14 Channel Digitized from NOAA Nautical Chart 1220 r 4, 36' x 13' Slips 4, 30' x 10' Slips 6' Wide Walkways, 170' Total Length See Engineer's Drawings for Detail Sheets 1-4 1 \\ ................ Riparian Line � to r—_�— 6 Depth —� ----------------�— _--- i— — �� Depth Finder— & Gannin GPS 1 — — 5' Depth — — Depth Finder Perquimans River & Garmin GPS JCrafton MatthewI _ i 11 Underground Sewer Line C7 Holding Tank (Upland) Town of Hertford Marina Project Site Plan Detail uimans Rivers I ♦ I ♦ I ♦ t I Power& Water Pedastal I Pump Out Station Sheets 1-4 i ♦ � i ♦ i Riparian Line ♦♦�i Town Boat Ramps (3) ♦ Rachel & Stephen Gunther Normal High Water 30 ft AEC Underground Power to Existing Pole ?5r Underground Water Line to z Connection Town of Hertford Man pant Town of Her Parking Hertford Marina Project Location Map 0 0.05 0.1 0.2 Miles III I I 1 inch = 500 feet �Q Ok m MAY 12 2014 Perquimans River w o DOBBS x C) m Project Location KING MARKET r�lU'�iiFTiC�^1�T7 N A n� U W Hertford Marina Project^� Regional Location Map !! N s� r I MAY 2014 -IEE TFORD'� PASQ River Project Location Town of Hertford WAN US 17 B E Rrf I E Chowan River UIMANS TA RRITU m / Albemarle Sound N _. A- 0 3 6 12 Miles I i I i I Photos of Project Site Hertford safe harbor. Arrow shows location of new town dock. Transient boaters have to anchor away from town ramps and use a tender. View from the Perquimans River looking at the town boat ramps, dock and Municipal Building. New town dock will be to the right of the town boat ramps. View of Town Park. New town dock will connect to existing boardwalk along waterfront. rJURECEIVEDRECEIVEDN 0 9 2014 DMI-NIOCITY FG.li& rnFbfitr�lPtul3f'u��14utci�aam7c5c�dct�''d1mWa:N;G'1� 7. GENERAL a. Proximity ofstructure(s) to adjacent riparian property lines 20 , o � IJ E Cerra cr Note: For buoy ormoonng piling, use arc of svringincluding length of vessel. - c. Width of water body G2o' e. (i) Will navigational aids be required as a resuttof the project? ❑Yes 1)�No ❑NA (ii) If yes, explain what tyge and how they will be implemented. b. Proximity of structure(s) to adjacentdocking facilities. d. Water depth atwaterward end ofstructure at NLW or NWL 18. OTHER[]This section not applicable a. Givecompletedescripton: 1 Sam qA�c.c�ec�, .... Date aArk TJ"� (J ,�1,Gon4 A.. cc A-55 Project Name 1 1 iyrc..I S. 5�104Jr Applicant me In� ^1 —� - _ d� ApplicantSignature t1AY 1 2 2014 ddcdvi^.'I�•iutle,.^ua�c�cic'3MdIldiidd4d d1d d dd, CLAIM d7 Cl CHIN 3v4¢<ari90 dda$Jdiad dddl•NddCE" ��" �„T.�i���i'S�1'�1;✓.v'.�"G'Y'r�fSu, duir?+t"l+��i!�°r�u',�rCdlaa.�,7e? 1"3:�failelrc�£�a9 �`Cti)ttT"� G�iJ dG �l1"�t�1.4'i''.�i�,lia^9r,Y`.'I1➢rSltc�eu-°tit�J�.;zrtt,rin1:w,+wf: 9, m. Is the madnWdocking facility proposed within a primary or secondary nursery area? ❑Yes 9w n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes 1gNo o. Is the marinaidocldrg facility proposed within or adjacentto coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑cW ❑sw ❑SB ❑WL Xbne p. Is the proposed marina/docking facility located wiiNn or within close proximity to any shellfish leases? ❑Yes XNo tf yes, give the name and address of the leasehokterel, and give the probmityto the lease. 3. BOATHOUSE (including covered lifts) XThis section not applicable a. (I) is the boathouse stnxiure(s): ❑Commercial ❑Public/Govemment ❑Private/Community - (n) Number (iii) Length (Iv) Width Note: Roofed areas are calculated from ddpline dimensions. 4. GROIN (e.g., twod, sheetpile, etc. tFe rook groin, use MP-2, Excavation end Fill.) XThis section not applicable a. (1) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., mod, sheetpile, etc.) XThis section not applicable a. Length _ b. Average distance from NFPN, NWL, or wetlands c. Maximum distance beyord NM, NWL or wetlands 8. MOORING PILINGS and BUOYS X Tto section not applicable a. Is the st ucture(s): ❑Commercial PublidGovernment ❑Private/Community C. Distance to be placed beyond shoreline Note: TNs should be measured from marsh edge, if present. e. Arc of the swirg _ b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECMVED r, x JUN 0 9 2014 a��r�rer cYr]u3.�21�a3�aY2dIJIc7�u2'41Po1ag1�7�m77.d ti .tl :dr�7uJm13'SG'I :d �9 ;ut7�Jad.i ,,;r Yiu\w;ii�,�JuLti�tL2rt,'ter,R'1r53?;lli7,'Nh31Ciiffi.+11td'+4i��7�t7C;I4k*Jw'I�ra���fltml�/di,wsJ FdeA' �U1 0111 2. DOCKING FACILITYAWARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitaryfacilities that wi I be included in the proposed project ❑ Office Toilet ❑ Toilets for patrons; Number._; Location ❑ Showers Boatholding tank punpout; Give type and location: �,on e..,cll�r- b. Describe treatment type and disposal location for all sanitary wastewater. Can��c'E'�o.. �'�" �o�u1 ,..c -i�,•�: �.y�(c�cl1 C()r1 ��i'•o.. -%n C. Describe the disposal of solid waste, fish ,offal and bash. 11 11 11 A�� So�•� W�SYe nn�5 t 6, P4nCc� P e f Tc r yT k, �. 1, 111-- L, �l e t d. How will overboard discharge of sewage from boats be controlled? I �V TOWn f�k{G't10. 4' Q,��b�G2r�ti2�Y e. () Give the location and number of 'No Sewage Discharge" signs proposed. 1 Si Sn /�cc.r p•+n�a•.. 1- �^ �1,.s_. E.. c\ '�� �YK pi¢r- (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum product. g. Wherewill residue from vessel maintenance be disposed of? No It- ��dl k�-",s s'rk— h. Give the number of channel markers and "No Wake" signs proposed. t.) o , e. i. Give the location of fuel -handling facilities, and describe the safety` measures planned to protect area water qualityy, tlo tv e,,nra ��Lr�i Tr eS �ropoSA� j. Whatwitl be the manna policyon overnight and live -aboard dockage? 0M1� k. Describe design measures that promote boat basin flushing? M I. if this project Is an e)ipanslon of an skating marina, whattypes of services are curentlyprovided? r1 G ddeldial7.6d,T]0zl'E?L79oddl.7ld.dd u•Im7s7LN11 ,r7 e,11a3x7t8s19 .7aL7 47s3.0]ddcd m7&1WcisfuMWM11;L�?^72'�'P 't7n..u�:%h` 7 v ;6"u't",u'L'wL1e*'n^ r54v^r'rFly �s9 m'(ol�/t75efi -D C-M rn P-Y Fddd cDd MdVIPdid dddUddUdEdd (dddddiidcillddl dhdlrPubdNdldtddtldddd)d Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to cc Application that relate to this proposed project Please include all supplemental information. f. DOCKING FACILITYAWIARINA CHARACTERISTICS M AY 12 2014 ete all other sections of the Joint ❑This section not applicable a. (i) Is the docking fecility4marina: b. (i) Will the facility be open to the general public? ❑Commercial CRPublic/Government ❑Pnvate/Communty NYes ❑w c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Rem included? N(Yee ❑No (i) Number I IF yes: (ii)Length 1-7Dr (i)Number b (v)Width br (ii)Lergth 2Lct°) 2 C.36r) 2 CJOr (v) Floating ❑Yes kNo (iv) Width 2 W) N C(4' ) (v) Floating ❑Yes CRfb � " re e. () APlaffomis included? ❑Yes CG No f. () Are Boatlifts included? ❑Yes NNo If yes: r yes: (ii) Number (i) Number (N) Length _ Oil) Length (iv) Wridth (Iv) Width (v) Floating ores ❑No Note: Roofed areas am calculated from dnoine dimensions. g. (i) Number of slips proposed 1) (i) Number of slips existing O i. Check the proposed type of siting: ❑ Land cut and access channel ❑open water, dredging for basin and/or channel open water, no dredging required ❑OTher; please describe: k. Typicalboatlength: 20 t in. () WAIT the facility have tie pilings? 19Yes ❑No (ii) If yes number of to pilings? h. Check all the types of services tr be provided. ❑ Full service, including travel fift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies Q9 Dockage ("wet slips') only, number of slips: 'r7 ❑ Dry storage', number of boats: _ ❑ Boat ramp(s); number of boat ramps: other, please describe: , ). Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). M;x-mil I. () W 11 fie facility be open to the general public? ®Yes ❑No MCEMI) rJUN 0 9 2014 DCV-N1.gD CITY ddds& d6g,lddo� &9r,.8, ,fQ;lddddeSdCVtL e, d iNdc- 4&HicH Gud ddudd +.�' ,Lk,�ied�: :i{_ ri ii'<`: a•.•' ` t7, r, `r ;v_Sf. ,i$i 1t:'flisk.3�itl�°Pdl."..7i4z'_:d LLI_L LL L L. LL L(_LIJMORIClUD000pf_ OU 0007IIMOCI0000fLLILL m. Describe proposed drinking water supply source (e.g., well, n. () Will water be Impounded? ❑Yes JoNo ❑NA community, public system, etc.) (I) If yes, Crow many acres? C. o. When was the lot(s) platted and recorded? Q-/ A Date C 0c'Vi.'C/k \-J hj ,h,-7 ALC¢_SS Project Name 3rU�a0,_ Applic�an�q / J ApplicantSignatruree v p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes XfNo ❑NA MAY 1 2 2014 L-_ i]❑CJWCICII]OOL1C1[711NI�uCILl000f117[] CIC1Cll7M117 Ll0 L1017E)L7i7C]CLluu counCICI OCICII[1CCIMDOr1lmIINN11�I1111NIII1010111NIlIDIIIIIIIIIMI011MNIIIIINIIIINIONINIOWIINI111M11111(DL7CIOIaOmIClLlfillClfR10CJ v <-en M P-3 LLLL LLLL LL LH L 111 ....I minim l■IIIa■Ill arlllla■111r11aIII arll ■rllaalll111111■111. ❑ 1 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sureto � Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of bindings, facilities, urns or structures b. Number of lots or parcels. proposed. v c. Density (give the number of residential units and the units per acre). e. IF the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (t) tiapplicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes CQNo ❑NA (i) Myes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or park! rig. eX,S� �ci na GI�c�Cs , L( tl CA L�cl1' 1. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement; building, rooftops, or to be used for vehicular driveways or parking. j. Describe proposed method of sewage disposal. �n 5��, �tirJ Sew e.r I. Describe location and type of proposed discharges to waters of the state (e.g., surface nuuo$ sanitary wastewater, industrlaV commercial effluent "wash down" and residential discharges). iJa ne- DIVIIIICIDIPII it III [IfN16.11111 IIIIIIt IIILI d. Size of area to be graded, filled, or disbrbed including roads, ditches, etc. I000 sci►, f. List the materials (such as mad, paver sbne, asphalt, or corcrets) to be used for impervious surfaces. tJ / A h. Projects that require a CAMA Major Development Permit may also require a Stomuwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes 1XI'41c, DNA (ii) Vyei list the date submitted: k. Have the facilities described in llom (i) received state or local approval? ❑Yes 19No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑�,rW Yes I[ ❑NA V yes, attach appropriate documentation. RECEIVED JUN 0 9 2014 N � aF p w L\r EVE � l- Ci'. 'ftrvsS' Eg c I� C +4 vC-n_ _I UrAS �.��, F6.ss%'•'y1 �� f SEAL, I I s apse ? c' i�f •• F'}'olnE�` ' '�• i 'FA49.•Iz 1N Td NAZI APaJ_J6 w T r-t2, vv.aY M AY 12 2014 F�f R L AYpo r — --- - \4t i +44 6019-tr r=Y, �INA LAUNCH FLO71 AT ( En►ST.� \ �r y \ crjUN 0 9 ilo i ` ov I, -$/silt Ra of« �o�•1zK.t N4 -rcwt-A C'lAtoumk _ ' 5SI TE T-LAAA cAT>Xq-FgA1axr, ItFF- g W I -x oko1 1 E 1� gaia,T-O L-AY-C>L-NT- 7'o gyp- c�oT �LYy Is 3, IAy 12 'LIM4 M 10 ' c ` c Y2ECEIVED ®F _FtiijURC PLLtAIC UN 0 9 2014 DCM-MHDCITY i To Ll-x DCD tJ4 1� To'ELmr-T. 14A �► w fa�4c �.�/ 4Y ! P��ciFSz L°oi1NF/�. U-�nie rd ��SEAL 9 • 3266 %1 RE�I I �/sli3 -C-c�w ►mot �� ���-�,c.�� 4��.,��.irt� L�1lAT10N �Ea� Jo 1 3�rz��.es ���� 3`M►'�,pS�T�k€ue_�Jss ,` >Ci'LuT�Es O.N !/vAAN DLlCItlCL 'LX (c¢S6 iS2F n� ► MAY 1 2 2014. q� ` DR(VVeR I`t� 6N - G ._i D' N' - -- X L�EV;cam ca y. 3 � , wtTN'Cou�sOR aiz.l' l-', Y 31AaoV t� K, SG ctZT Ar KST ��r,y I IE aF•t'.�a•rerF; kSii F;S ', n 2 sc' 2, ► E C 4�4j .VV CAR SEAL Nt Tv cuq oF+lT�oD N`,�R IRA. MCA NR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 5, 2014 Town of Hertford P.O. Box 32 Hertford, N.C. 27944 G - Dear Sir or Madam: John E. Skvarla, III Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work'must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits and Consistency Manager 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX 252-247.3330 \ Internet: www.nccoastalmanagement.net . An Equal Opportunity 1 Affirmative Action Employer IlDCM Coordinator: 2- �- ,.yam Permit #: '`%(/L/°/ MAILING DIIST[iIIBIIJTIION SHEET Agents: IDCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOIE Offices: Washington: Raleigh Bland Wilmington: Ronnie Smith Cultural Resources: Renee Gledhill -Early or (environmental.review@ncdor.gov) Public Water Supply: Diane Williams (WIRO) NC DOT: Shellfish Sanitation: State Property: Water Resources: Washington: Wilmington: Wiidliffe Resources LIFO: Joey White (WARD) Ken Pace -11-� _ Patti Fowler Tim Walton f Karen Higgins (Raleigh) r John Hennessy (NC DOT) Anthony Scarborough - / Joanne Steenhuis - 401 Chad Coburn - 401 Linda Lewis - Stormwater / Maria Dunn (WARD) Fax Distribution: Permitee #: / Agent #: DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: Town of Hertford County: Perquimans LOCATION OF PROJECT: Punch Alley in Hertford, adjacent Perquimans River & west of"S" Bridge DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 05/23/14 FIELD RECOMMENDATION: Attached: YES To Be Forwarded: NO CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Lynn Mathis DI CT OFFICE: Elizabeth Citv DISTRICT MANAGER REVIEW: Date: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400 (100%) PUBLIC NOTICE REC'D: Advertise: 06/06/14 END OF NOTICE DATE: Comments due: 06/26/14 ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: O'4�ooz-, ON: 0 C) 75 DAY DEADLINE: 08/06/14 150 DAY DEADLINE: MAIL OUT DATE: Circulation: L �`�/�y STATE DUE DATE: Comments due: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section Cp (( Division of Water Quality Storm Water Management (DWQ) State Property Office Division of Archives & History Division of Environmental Health & A / �! Division of Highways Wildlife Resources Commission _ Local Permit Office Division of Marine Fisheries Corps of Engineers p JUN 0 9 2014 DC'M-MHD CrrY FCDEE R North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 4, 2014 MEMORANDUM TO: Tim Walton, Manager State Property Office FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: Applicant: Project Location: Proposed Project: CAMA Permit Application Review Town of Hertford John E. Skvarla, III Secretary RECEIVED JUN 0 5 2014 DOA STATE PROPERTY OFFICE RECEIVED JUN 2 3 2014 DCM-mmcrry Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: Thi ffice has no objection to the project as proposed. This office has no comment on the proposed project. J �1A This office approves of the project only if the recommended changes are a0 incorporated. See attached. This office objects to the project for reasons described in the attached comments. ►�►��wrr1�� 1 1367 US 17 RYA, Elizabeth City, NC 27909 Phone: 252-2609011 FAX: 252-264-3723 ; Internet: www.nocoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Town of Hertford - C/o Town Manager Brandon Shoaf 2. LOCATION OF PROJECT SITE: Site is located adjacent to the Perquimans River within the Hertford Town limits on Punch Alley west of the "S" Bridge and adjacent to the public boat ramp. Photo Index: 2006: 236-6799 16 & 17 2000: 236-1784 N19 1995: 458-1630 X12 & X13 1989:1 17-21 P4 & P5 1984: Not Available 1979:127-1586 T14 State Plane Coordinates: X: 3200 2747445.081ft US E Y: 898031.174ft US N 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: 03/19/2014 and 05/15/2014 Was Applicant Present: Yes 5. PROCESSING PROCEDURE: Application Received Complete: Accepted on May4,d 2014 Office: Elizabeth City 6. SITE DESCRIPTION: RECEIVED (A) Local Land Use Plan: Town of Hertford LUP Land Classification: Hertford ETJ — Public/Semi-public/religious/institutional (B) AEC(s) Involved: PTA and PTW r N 2 3 2014 (C) Water Dependent: Ye (D) Intended is docking facility with pump -out (E) Wastewa atrr—���x�s,� ea one -- DCM-MHDCITY Planned: Pump -out Facility to an Existing Sanitary Sewer System (F) Type of Structures: Existing: None Planned: Public docking Facility with 9 Formal Slips and a Pump -Out (G) Estimated Annual Rate of Erosion: RTA---- --__ HABITAT DESCRIPTION: [AREA] DREDGED DISTURBED SHADED (A) Vegetated Wetlands: (B) Non -Vegetated Wetlands: (Open Water) — — — -- —> ---------------------- > ---------------------_----> Piers/ Finger Piers Platforms: 2,028sf (C) Other: Installation of pipe from (High Disturbance Ground) -----> ------------------------> the Pump -Out Facility to the City Sewer System: 1,000sf (D) Total Area Disturbed: Within an AEC = 3,028sf (.069 acres) (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The project includes a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, four tie pilings, one electric/water pedestal, and one pump -outstation located at the end of the pier. The pump - out and electrical installation will involve minor high ground disturbance and connect to existing service facilities. A holding tank will be installed in association with the pump -out, and will be located greater than 75' from normal water level. T Town of Hertford Field Investigation Report Page 2 Project Setting The property in question is located in the Town of Hertford behind the Police Department and the Town Managers Office, adjacent to Punch Alley and the Perquimans River, Perquimans County, North Carolina. The project site abuts a public boat ramp to the west along Punch Alley; the Police Department to the south, a residential lot to the west and the Perquimans River to the north. Located at the adjacent access boat ramp is a dock used to moor the Periauger, a reconstructed colonial boat work boat used for historical reenactments. Adjacent to the Periauger are two floating drive on personal water craft docks placed by the Town of Hertford as a kayak launch. The property is approximately .48 acres, with 105' fronting on the Perquimans River. There is an existing 12' x 105' boardwalk paralleling the shoreline, with an 8' access walkway leading from a parking lot located 1 00'from normal water level. While there are no identified archeological sites on the property is located within the Hertford Historic District. There is a small variety of vegetation on the property and it includes, but is not limited to bald cypress (Taxodium distichum),,a domestic grasses and a dense population of water lily (Nymphaea odorata) extending from the existing boardwalk to a distance of approximately 40' into the Perquimans River. Average elevation of the property is approximately 4' above normal water level. Flood designation for the property is AE, which indicates a susceptibility to flooding. Shoreline stabilization consists of riprap that is located under the existing boardwalk. Water depths extend from 1.5' at the watenvard side of the boardwalk to 6.5' at the distance of 176' waterward of normal water level (NWL). The property is located in the Public Trust Shoreline Area of Environmental Concern (AEC) and the waters immediately adjacent to the property are within Public Trust Waters. Currently there is only one marina operating in Perquimans County located at Albemarle Plantation, approximately 23 miles from the Town of Hertford by boat. Albemarle Plantation has a 158 slip marina exclusively for the residents of the subdivision. Fuel and pump -out facilities are available to the public for a fee. Development Proposal The Town of Hertford is requesting a CAMA Major Permit to construct a nine slip docking facility including a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, one electric/water pedestal and one pump - out station located at the end of the pier. The ninth mooring will be on the outside of "T" created by the two 40' finger piers and the end of the main access pier. High Ground Disturbance: The installation of the lines for water, electrical and sewer are estimated to be 1,OOOsf Open Water Shading: Main Access Pier: 6' x 170'=1,028sf 40' Finger Piers: 2(6' x 40') = 480sf 36' Finger Piers: 2(4' x 36') = 288sf 30' Finger Piers: 2(4' x 30') = 240sf Total = 2,028sf l� P 4 Town of Hertford Field Investigation Report Page 3 In addition to the pier and finger piers, the Town proposes to install four tie pilings as depicted on the enclosed site plan drawings. A pump -out will be located at the end of the main pier along with an electric and water pedestal. Effluent from the pump -out facility will be piped to the Town's existing sewer system_ As proposed, all slips within the proposed docking facility will be for transient dockage by boaters visiting the of Hertford. Anticipated Impacts 1) Shading of 2,028sf of water bottom from docking facility. 2) Temporary disturbance of approximately 1,000sf of high ground. 3) Construction impacts may result in a small reduction in water lily density between the finger piers and the existing boardwalk. 4) An anticipated increase in boating traffic may in increased wave action along adjacent shoreline, and may increase the risk for shoreline erosion along adjacent properties. 5) Jetting pilings for the marina will result in temporally suspending sediments in the water. 6) Along the shallower waters within the proposed docking facility, prop wash may cause resuspension of sediments within the water column. Submitted by: Lynn W. Mathis Date: May 29, 2014 a. A project narrative. LMAY 12 2014 . 1 Chartered in 1758, Hertford has a rich colonial and maritime history tied to the Perquimans River and Albemarle Sound. Hertford is the seventh oldest town in North Carolina. It is also the Seat of Perquimans County. In 2010 Hertford was accepted into the NC Rural Center STEP (Small Town Economic Prosperity) grant program, which helps the town to identify and prioritize economic development and revitalization. The strategic planning portion of the STEP process has identified waterfront development as a priority, specifically the construction of slips for boaters who wish to visit the town. Currently, visiting boaters do not have a place to dock their boats, many in the forty feet range, at a public facility. These visitors must anchor away from the town boat ramps and use their tenders or dinghies to access the small dock that is adjacent to the ramps. During the week and especially on weekends, the town boat ramps are crowded with fisherman, which can make access difficult for visiting boaters. Prior to being selected for STEP, the town participated in the Creative Communities Initiative with the UNC School of Business to develop a waterfront development plan. Over a three-year period, graduate students in the business school at UNC worked with the town to develop a waterfront revitalization plan, which includes boat slips and a public/private partnership for a mixed use waterfront development that includes outfitters, a hotel, fuel service, and other amenities on the water. The waterfront plan uses the attraction of the Perquimans River to help spur economic development and re-establish Hertford as a vibrant waterfront town. The town dock and boat slips are the critical first step in the town's long-term plan for revitalizing Hertford's historic waterfront. Project Objectives The Town of Hertford, Waterfront Access Improvement Project seeks to accomplish the following objectives: • Provide safe harbor dock space for transient boaters, recreational boaters and visitors with the construction of nine slips. • Increase transient boater and visitor traffic to help spur economic development and revitalization of the Historic Waterfront. Expected Results and Benefits The addition of the town dock to the Municipal Park will be the critical first step in implementing the town's Waterfront Development Plan. The new town dock will help reconnect the town's 63 historic points of interest to the water, which will help attract boaters looking for a charming, southern waterfront town. The town is able to offer a rich history and many amenities within a 20-block area around the town dock. Locations of amenities close to the town dock include the Post Office, Missing Mill Park and Restrooms, Convenience Mart, Restaurant, and Gas Station, Senior Center and Tennis Courts, Hardware Store, Public Library, Internet Cafd, RECEIVED Page 1of2 11 JUN 23 2014 DCM-MHD CITY Deli and Diner, Soda Fountain and Drug Store, Police Station, Bank, Municipal Building, Historic Hertford Visitors Center, and County Government Building The layout of the town dock and water depths behind Municipal Park is shown on the attached Site Plan Detail. The town dock will extend 170 feet due north from the Municipal Park boardwalk. The main walkway and T pier on the end of the walkway will be six feet wide. The four finger piers for boat slips will be four feet wide. The T walkway will be able to accommodate an 80 foot boat. The four adjacent berths will be 36 feet long and 13 feet wide with a mooring pile at the entrance of the berths. The T pier and four adjacent berths are in six feet of water. The four berths closest to shore will be 30 feet long and 10 feet wide, with a mooring pile at the entrance. These four berths are in five to six feet of water. Water, electric service and pump -out lines will be provided along the main six foot wide walkway. Construction details are shown in the attached engineer's plans, Sheets 14. An information kiosk with maps and brochures will be installed at the entrance to Municipal Park from the town dock to provide information on amenities and points of interest. For safety, the town dock will be located directly behind the town police station. 7. Compliance with N.C. Environmental Policy Act (N.C.G.S.113A 1-10) The Town of Hertford is using public grant funds and its own funds to construct the town dock and boat slips. It is aware of and will comply with the N.C. Environmental Policy Act as it implements the project. y: iMAY 12 2014 Page 2 of 2 ■■■�IIII ■■111 ■ IIli�llll ■ ■111�II11■■■111■■ ■■1111■�I III 111111111 dill ) Il 71111 6)l MAY 12 2014 � �.1Wz. North Carolina DIVISION OF COASTAL MANAGEMENT 1. Pn`metyApplkantlLandownerinfomtatlon Business Nana ,( Project Wme (if applicable) (OWN OF I4erV�or� (}Q4�- rA 1 i�wrer Yro RCCiJS Applicant l: Ffrst Name MI Last Name ran�o.. � SLlo4C Applicarrt2: First Name MI Last Name Hadditional applicants, please aftech an additional page(s) wfh names listed. Meiling Address PO Box city State �6 six 32 3`Z N r4'fbr% 11 N L ZIP country Phone No. FAX No. 2'letgq lay 2S'L-y26-Ici4A ext �52 426 lobo Street Address(Idfle/rentfrom above) city State ZIP • i(� L,I. �rN�b S} /' ly lr;'t'6 rr�l I..iL 2-f �l`-14 Email (( rr Maya ¢r&—Tc,,r0 r:n a.}to.ri... G. Ga An 2. AgenUContractorinthanation Business Name OW Of •�crk prA Agent/Contractor l: First Name MI Last Name � fr SNoq} V fan�o� Agent) contractor 2: First Name MI Last Name Maiing Address PO Box city State -7 ?o ok 32 32 /' �i�ri to� )J c- ap Phone No. 1 Phone No. 2 2'2 a+y 1 25-2 -q z(. o (el ext. ext. FAX No. Corftractor # SbeetAddress QfciDerear/rom &bow) city Shia ZIP ItN W GrUb�o S�. t-ixr�ia� Nc 2Z5LI -A Email co,- RECEIM <Form continues on back> JUN 2 8 2014 ii e u U n n ni ii i i AoMn r, , i I: a .. i5 tAIAAAH) DCM•MOMY Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permito 3. Project Location County (can be multlple) Street Address State Rd. # S IILI - `S. Lo. Subdivision Name ity,, State Zip T r� 1 '-V }Qlck I )J L 2-79 y -4 Phone No. Lot No.(s) (if many, attach additional page WM list) 251 -y26 ICIL4 ext a. In wNch NC river is the project located? b. Name of body of water nearestto proposed project IIbasin �AS l.o t'P114 �2r In iM unS Yr c. Isthe water body identified in (b) above, natural ormanmade? d. Name the closest major water body to the proposed project site. NNatural ❑Manmade ❑Unknown e. Is proposed work within city limits or planning jurisdiction? f. ifapplicable, list the planning jurisdiction or city 6mitthe proposed WYes []No work falls within. OW n OY f-I Q-�'T i'or0� 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fL) ';10 Fk. Zvi Ci tSI c. Size of individual lot(s) d. ApproAmate elevation of tract above NHW (normal high raster) or NWL (normal Hater level) (if many lot sizes, please attach additional page rvth a list) I O ❑NHW or kNWL e. Vegetation on tract - .. . Gra�S �- irE.�S f. Man-made features and uses now on tract ✓t n, Li �GI ?c.r� 04s 60�i�W4�Yr r4,��..0 9- �i1Gr. iS II� 4 A�JaGe ea Lrei we(I ^� S g. Identityand describe the erustirg land uses adiacenttr the proposed project site. �1cS11�1.z��� oi� I. n4 �.vr�- I I tow,. StrtcTs <r�Zr n5 r �C`'-7 'S pO Gh�i 4 �[JO 4` rL� tr?rJ _ ` r h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? C - ( (Attach zoning compliance certificate, if applicable) (CgYes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes KNo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes'INo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a 14Yes ❑No [IRA National Register listed or eligible propeV <Fonn continues on next pagea b e e a ti e 6i a n ti 6666666 66'6 a 06 6 6 a 5 6 s 6666666 0 6 5b @ t I il 6 66 5n 6 6 6 5 6 5 6 i, 566 i i0 Form DCM MP-1 (Page 3 of 4) i M AY 12 2014 APPLICATION for Major Development Permil0 m. (i) Are there wetlands on the site? ;-�_-., - -,,-� ❑Yes XNo I j❑Yes (ii) Are there coastal wetlands on the site? -- """- NNo oil) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Descdbe�e`xistirgwaslewatertwtmentfacilites. IO Wr oW I\�rr,` Oje r k¢A, 11 o. Describe existing ddnbng water supply source. 11 11 11 TOW.. OW nark t O�¢r0.t �K \ � r—,:, 2t\� 1 ,k pol1 ar 6k .- 4 kr. p. Describe existing storm water management or treatment systems. tt Tow.. oy,'. A 4 r.. a.,.ta ...<� Siorr, 1 1 wc.t �r $ st 5. Aedvides and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial Public/Government ❑PrivatefCommunity to. Give a brief description of purpose, use, and daily operations oft he project when complete. 1�e- �raQo11S�r�. �l11''51.�15 urj� pr1ov�rii�1 .kr�1.1..5,�n4 1oac.}ar5 c\ Ya �ac.K �N.\t V 1 S44\ i\n5 �\�� N1 S FOir L 11Y`HC� c. Describe the proposed constuction methodology, types of construction equipment ib be used during construction, the number of each type of equipment and wherer, it is to be stored. 1 `(rc. 4- 8«4'1A '\n9. w-�cfR ��,It-cjr L��.\.,�M¢..� - �, `2 dry\v �r d- b..ryt , �4n.ri. a- pa\,.\tr too1S d. Dst all development activities you propose. f 1 e. Are the proposed activities maintenance of an Blasting project, new work, or both? f. What is the approdmate total disturbed land area resulting from the proposed project? NfSq.R or ❑Acres (oOeJ g. Wilt the proposed project encroach on arrypublic easement, public accesswayor othsrarea JOYes ❑No DNA that the public has established use of! h. Describe location and type of exalting and proposed discharges to waters of the state. No_ � rro o5¢a i. Will wastewater or stormwater be discharged into a wetland? ❑Yes DNA If yes, will this discharged water be of the same salinity as the receiving water) ❑Yes DiNo DNA j. Is there any mitigation proposed? ❑Yes 5 JNo DNA If yes, attach a mitigation proposal. <Folm continues on back> RECEIVED II L fl 1p E L �C L' ! li Ill'JttU6� FII Il B Ol 9 P b 6 L i liil!:1 9 C[ a .L G AVYPRAY $I�U14 u Form DCM MP-1 (Page 4 of4) APPLICATION for Major Development Permito 6. Additional Information In addition to this completed application form, (MP-1) the felloWng items below ifapplicable, must be submitted in order for the application package to be complete. Items (a)— (Q are alvwys applicable to any major development application. Please consult the application instruction booklet on howto properly prepare the required items below. a. A project narrative. %f,Aµl,t2 Pln' ' b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the presentstatus of the proposed project is any portion already complete? Ifprevfoysfy auftmrrzed wodc, clearly rrdrea an maps, plats, drawings to distinguish between work completed and proposed. �'/-f L ,��, ^,N:. - ,, � zi '.L'L-ti c_ b c. A site or location map that Is sufficiently d tailed to guide agency personnel unfamiliar Wththe area in the site. / a ; ' d. A copyof the deed (with state application only) or other instrument under which the applicantclaims title to the affected properties. A, e. The appropriate application fee. Check or money order made payable toDENR. ��¢�c=(L T f. A Est of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name sl/�)t°✓!L'.V/�, +6=A) 7VI'P r �Phone No. Address ,_R4 /U ��.J,nL��/1,Gc�[. Name �'rt.:.F'°r/rYr�y✓"E%W,S' Phone No. Address /:.'iy Gf/� �, f �!i Cl .�1': i N c`�l %�rG�� ✓ li ..� �/ ! 7 Name - - r a No. Address g. A list of previous state or federal permits issued for work on the pmjecttract Include permit numbers, pennittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. .t .. I. Wetland delineation, if necessary. AlW . j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed byproperty ovmer) l L' k. A statementofcompfiance with the N.C. Envfrormenlal PoNcy Act (N.C.G.S. 113A 1-10). if necessary. IPtheprojectinvolvesexpenditure of public funds or use of pub Gc lards, attach a statement documenting compliance with the North Carolina Environmen I licy t 1 7. Certification and Permission to Enter on Land 1 unaerstana that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that 1 am authorized to grant, and do insect grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. further ce ify that the information provided in this application �is truthful to the best of my knowledge. Data Vd Print Name Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts %DCM MP-3 Upland Development f�JDCM MP4 Structures Information n u n ufi n n nit n u o .a iinondu 5u fl o nn n n ae I d uGGuunn n u n4 6 4 n e 1 uo nu B n 5 ii n n d ii una S u❑ T>c ✓►'1 M P-3 LLLL LLLL LL LH L ®❑❑0®❑®❑®❑❑®®❑❑®®tom®❑MO DOO Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to & Application that relate to this proposed project. Please include all supplemental information. I GENERAL UPLAND DEVELOPMENT a. Type and number of buldings, facilities, urns or structures proposed. v �. nS lrakk K{ 1a, 4 9l oe c. Density (give the number of residential units aril the units per acre). e. If the proposed project will disturb more then one acre of land, the Division of Land Resources must receive an erosion and sedimenldtion control plan at least 30 days before land -disturbing activity begins. (i) Mapplicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes IXNo ❑NA (ii) ?yes, fist the date submitted: b. Number of Iota or parcels. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. (JOO S�'�i, f. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. N/A g. Give the percentage of the tract within the coastal shorefine AEC to In be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 11 rr e-Xh S'���e, no If- 5CA�lk I. Give the percentage of the entire tract to be covered by impermouls arid/or built -upon surfaces, such as pavement building, rooftops, or to be used for vehicular driveways or parking. j. Describe proposed method of sewage disposal. L Describe locat'on and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent: "wash down" ant residential discharges). w o � e- Projects that require a CAMA Major Development Permit may also require a Stomhwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes [XNo ❑NA (ill If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? []Yes WNo ❑NA if yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design?,ar' ❑pr ' Yes vo ❑NA If yes, attach appropriate documentation. ., ItECE1VED JUN 2 3 ?014 LII 11 IIIIIHIAffilUt JUVRII11H11fl1111liAlf.IIJ❑1.11II0IILIIJ❑3I111 IilfXK LMI LILI❑LIDOOLRRIC InE1111loimOD LL.LL. u_LI_ LL 1—l_LUMOU00Il1➢OO!]®f_in onC11i1310011MOOFIEULL m, Describe proposed drinking water supply source (e.g., well, n. (I) Will water be impounded? [--]Yes ONo ❑NA community, public system, etc.) (i) If yes, how many acres? '?,LV. c. o. When was the lot(s) platted and recorded? Date Uc,Y" .,ck A «Lss Project Name 3/'c. C'k 0, S. S�oc Y Applica a Applicant Signature p. If proposed developmentis a subdivision, will additional utilities be Installed cf,o!r this upland development? ❑Yes rdNo ❑NA M AY 12 2014 r. ❑[1011110D1M1111LIUIILITII1000nlal7 ❑ourilullLII I nI I ODUI[L1❑❑OrII�0010N0111M111�MI�0�IN011111MI1IDI11111MMf�IIMNWIm[IIINmIIImMmIMlWmU1m111CLIC10Cluorlll[lo[NOMoo -DCm, rnA-Y Fddi did MCMPCUd dddUddUdEdd (d ddddlalddllddl dhdfcPubdBdldrddNdldd)d Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYAWARINA CHARACTERISTICS a. (i) Is the docking facility4marina: ❑Commercial RPublidGovemment ❑Private/Community ❑This section not applicable b. () W II the facility be open to the general public? NYes ❑No c. (1) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? NYes ❑W (ii)Number I If yes: (ill) Length 1-1 a r (ii) Number to (iv)Width br (ill) Length 22L3V) 2L70/ (v) Floating ❑Yes kNo (iv) Width 2 N (-4 ' ) (v) Floating ❑Yes �/ e. (i) ArePlatfomrs included? []Yes,&b f. (i) Are Boatlifts included? ❑Yes 19W If yes: 6 yes: (ii) Number (ill Number (ill) Length (II) Length (iv) Width (rv) Width (vl Ekratinc ❑i s ❑ No ote: Roofed are s alculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 01 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service O ❑ Dockage, fuel, and manure supplies 29 Dockage ('wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: �( Otlier, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel Open water, m dredging required ❑Cther; please describe: k. Typicalboatlergh: 'I— t m. (1) Will the facility have tie pilings? tgYes ❑No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout charter boats, sail boats, mixed types). AA;x-a I. (1) N4ll the facility be open to the general public? r4Yes ❑No #tt" JUN 2 3 2014 :eeAuPulda^cc;c9cuc��ta�'du,vu�r�rdddw�Uu+.�rcffi a` t.�i eb?a:latc7dlsu�sd �tiYd�3eie8s9 d�a&ifaide'ni4k4+%u.tt_,�,rug±i2,�+?G;§t:��">�9S,iitit?a;'o^Rwridv7.u�r91:a'a"/c{,'vd Fdult4 MIAG?.$ijs.`:��(';'GaiuC+r�Ot�i'f^ac lc>G,rn sL"'t�'eBdlv�fl i<dGw1D 2. DOCKING FACILITYAWARINA OPERATIONS ❑This section not applicable a. Check each of the following sardtaryfacllities that W11 be included In the proposed project ❑ Office Toilets ❑ Toilets for patrons; Number. _; Location: ❑ Showers IN Boatholdirg tank pumpouk Give type and location; b. Describetreatmenttype and disposal location for all saNtarywastewater. LNoir�l�r_i4�1G c. Describe the disposal of solid waste, fish offal and task A0 5�\,� <HLS�G rti S bL el,c.c- N GhS T< n Valcn% T r GA S t+ 11L d. How will overboard discharge of sewage from boats be controlled? Tow.. ra-Gl,.�a-tro— Or e..i-b.G¢.rv�e.�.-F e. () Give the location and number of"No Sewage Discharge" signs proposed. 1 St Sri All, Sao i a -YL-<- (11) Give the location and number of "Pumpout Available" signs proposed. 1 Sic,, n�tir Q". t� 2n'A 0i 4[..r �,I Yr f. Describe the special design, if applicable, for containing industrial type�Y pollutants, such as paint, sandblaasting waste and petroleum products. No MA', �VC_�Q C-. C.LI -w,d, � am.S S- t� g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. 0 ar, 1 e 1. Give the location of fuel -handling facilities, and describe the safety, measures planned to protect area water quality. rJb }v.¢\,n4` i"�^G1C.5 �r'oaDSAa. j. Whatvdll be the manna policyon overnight and five -aboard dockage? O / e_ 0 k. Describe design measures that promote boat basin flushing? MI A .(' nZ) (r Lg,%� I. If this prdject Is an expansion of an e)dsting marina, whattypes of services are currently provided? e7mi a]a?�Ba2a]a?d62L"➢ 9r9d1 :9Nr✓),� de"dcmx LA J dlc9¢7JaJn Aar i9 dJcoMeJel dl¢8a�i7u�'�5`t�r 3�'fG4iLTtl`uJ�"7,'".§t}:?Lh?1J[J.t'!u?PL�ili7itiHtlw"r.3YEtlMPM71n4MtMra&J�I' diffld/CUla66 m. Is the mari .-na./docking facility proposed within a primary or secondary nursery area? ❑Yes NfNo in. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Ym 19No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation(SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL X%ne p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes XNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) $jThis section not applicable a. () bthe boathouse strixture(s): ❑Commercial ❑Public/Govemment ❑Pdvaienommurity (ii) Number _ (iii) Length (iv) Width Note: Roofed areas are calculated from dripllne dimensions. 4. GROIN (e.g., uwod, sheetpile, etc. If rock groin, use MP-2, Excavation and Fill.) (This section;;;applicable a. (1) Number PD Length (iii) Wdth 5. BREAKWATER (e.g., twod, sheetpile, etc.) XThis section not applicable a. Length b. Average distance from NHW, NWL, orwedends c. Maximum distance beyord NFW, NWL or wetands 6. MOORING PILINGS and BUOYS , KI This section not applicable a. Is the slntcbrre(s): ❑Commercial PublicrG vemmeri ❑Private/Commur>ity c. Distance to be placed beyond shoreline Note: This should be measured fmm marsh edge, if present e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) JUN 2 3 2014 SUa0s3tt39;atrt3��'lulslai;tli.�lri.ifie9sJuF1il rl,;l rdxAr.Ya`�,Y�I :.7 ,il zrJeB:ri+uJt7uJvPdli.s9 u;s!viml�fi;a �1r7ae]�Jr,�riy'hk}.HHw'S�uGP15�Jr7�rPifditiArN.'3ftL°vk>kie3rsu"ykd'�3:7�i5;N8�'1�3'0rd�'e7¢IIir7m1�69d(a9i/e8Ta9 Fd uEfJ�9� �;C�G u1 dlfi]edo"v % 9 a;�"e�s£nG a � 7. GENERAL a. Proximityofstnxture(s) to adjacent riparian properly lines Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 62a' e. (i) Will navig�a/tional aids be required as a result of the project? ❑Yes CR(W ❑NA (1I) If yes, explain what tyge and how they will be implemented. b. Proximity of structure(s) to adjacent doclang facilities. -Town 0W'eA ddc%S �/ � too' d. Water depth atwaterward end of structure at NLW or NWL 8. OTHER El This section not applicable a. Give complete description: Ss� aq-Ir to ckn eA ('1 St�QS 1` ^o i'lM� ��//n.�� ` }-rti •.SrQ„� r ��n..p c,.. a- � we_�C/' 6t ` / Dad Nor-}}a�o� Wd}zr Fro .�F Acc�55 ProjectName 1 Applicant meee C' - • A Applicant Signature dldiddalaAw.ea:;eiaaeJcYi%ri@Nc ar9m7d'tct uddldxluQurlJyrll d d TNcid4ddd 6-I' ddddidd d'cdo7:.a9a rl;Svc? I'MCrC�'.`2M' I z7+" "iEfao- ffBfPn3xE.yT3igul 711dda?243d6l,sdid7l 6d Photos of Project Site Hertford safe harbor. Arrow shows location of new town dock. Transient boaters have to anchor away from town ramps and use a tender. View from the Perquimans River looking at the town boat ramps, dock and Municipal Building. New town dock will be to the right of the town boat ramps. View of Town Park. New town dock will connect to existing boardwalk along waterfront. RECEIVED JUN Z 3 2014 DCMMHDCn Y Hertford Marina Project Regional Location Map MAY 12 2014 n. AC, [ r ;,; ra F, E1RTFORD,� " . PASQU / TA River Project Location Town of Hertford WAN US 17 B E RjT I E Chowari River I"rTI r_<km, Albemarle Sound 0 3 6 12 Miles I i I i I RRITU MD A 0 50 100 200 Feet ........................................... 1 inch = 87 feet .............. 14' Channel Digitized from NOAA Nautical Chart 1220 New Nine Slip Marina 86' End Width 4, 36' x 13' Slips 4, 30' x 10' Slips 6' Wide Walkways 170' Total Length See Engineer's Drawings for Detail Sheets 1-4 1 \\ ....................... Riparian Line � 1 � ---------------►— •�_ 6' Depth Depth Finder W Gannin GPS FCra:natthe I _ Perquimans River Town of Hertford Marina Project Site Plan Detail s uimans Rive` I ♦ ♦ � I ♦ I ♦ I I Power & Water Pedestal I Pump Out Station Sheets 1- ♦ ♦ i Riparian Line ♦ ' - Town Boat Ramps (3) ♦ Rachel & Stephen Gurithel � r Normal High Water 30 ft AEC Underground r l Underground Power Sewer Line r I to Exist ng Pole W Underground Holding Tank Water Line to (Upland) Connection E:K- Town of Hertford Town of Her Manhole Park Parking -Cow 1�-t MAY 12 2014 � Er � - %.SR1-AYOUT " tie wo hl !{ ia AST .. i�o4pry� iPk�. al iy% I i 01-1 8 2 3 2w, CA/7p�''4, DC.�t:•N!T CITY N of ,lAl*,l rAA, t 5`tTE T� 3266- %��p� } G�/ I Erb 1 q ''ry,,4', DAV 011%,% l Df i MAY 12 2014 a .•`� 'tH CARPOO Q a, 3 �, BEAL Toter ri c)F nAFt tsAv �+iz-i ftE t�iv� IRtG ��i v�E ��lz+TfFS 1 i 54uo _ To`x rpytt�-=TJ AL-ow-1 t— To•e.Lr`r-T. i t�4 w fit -lc .r AY r 'Pow y-,elcbu f%T'. �1~�/�R LINE To M A tvti! ot_r� RECE1VW JUN 2 3 2014 DCM•'t`IM MY 3. �A et. i . Z,0Lpl. 2 14112i1 I"=zn� 25 TAm J_ Tc�`�r rt 217r ,,trek 3�MV-- S ir ;r �._;y.,:"2.mr.1Sk'3,. i A'i 'mil F h'Ac &12 2014. u 2 �� R4 sb 1 I ? r � ' • i G ;wtTN Colts D} f c, 1 5 A ' � rl V, E 1 erect ER lip m.. v . ,{� � Xn �l" rl 'Yl '}'aV ki�Y •i `VS:V i 1 f 1 ,,//jj� t� r 1 ffE SEAL .mi f . (Sti�S.T 3, i i 1 Re/: Z `{(la[ty FZEv 1 T WOUN1 f 0 ..., —A , R YARDS S EDWARDS TTORNIw AT LAN NORTH CAROLINA PERQUIMANS COUNTY 388K 139F&GE 512 QUITCLAIM DEED 1 M A-Y THIS QUITCLAIM DEED, made and entered into this 24th day of May, 1991 by ONEITA H. HOLLOWELL, widow, Grantor to the TOWN OF HERTFORD, a municipal corporation organized and existing under the laws of the State of North Carolina, Grantee; W I T N R 8 S E T H: THAT WHEREAS, by Lease with Option to Purchase dated 1 December 1978. Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell leased the hereinafter described property to the Grantee with an option to purchase; and whereas, said lease was assigned by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to Bank of North Carolina, N.A. (now NCNB, National Bank of North Carolina); and whereas, said Bank of North Carolina, N.A. had a deed of trust lien against said property; and whereas, the Grantee herein agreed to make payments on the note secured thereby to Bank of North Carolina, N.A. and that when same was satisfied the property hereinafter described would be deeded by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to the Grantee herein; and whereas, said loan was paid in full and the note and deed of trust were marked paid and satisfied in full and the deed of trust was cancelled of record; and whereas, no deed was ever given by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to the Grantee. NOW, THEREFORE, the said Grantor in consideration of ten dollars and other valuable consideration to her in hand paid by the said Grantee, the receipt of which is hereby acknowledged, has remised and released and by these presents does remise, release and forever quitclaim unto the Grantee and its successors and assigns, all her right, title, claim and interest in those certain lots or parcels of land lying and being in the Town of Hertford, Hertford Township, Perquimans County, North Carolina, and further described as follows: V, AECEnD JUN 2 3 2014 DCM•MED CITY 'r 2 2014 aaoK 139eace 513 Tract I: BEGINNING at an iron pipe on the east side of a 20 foot alley between now or formerly Amos W. Roughton and now or formerly Growers Peanut Company, 229.5 feet northwardly from the center of Grubb Street; thence S 830 E 104 feet to an iron pipe in the G.N. Harrow, now Town of Hertford line; thence along the Town of Hertford line N So SO' E 201.8 feet to the Perquimans River; thence along the shoreline of the Perquimans River N 830 W 107.2 feet to an iron pipe on the side of said alley; thence S 70 W 201.2 feet along the said alley to an iron pipe, the point of BEGINNING. Tract II: Bounded on the south by lot of E. Leigh Winslow (now or formerly George L. Sutton), on the west by an alley leading from Grubb Street to the property of now or formerly Sinclair Refining Company (first tract described above), and on the north by above said First Tract, bounded on the east by the property of the Town of Hertford. For reference and chain of title see Estate of Joel F. Hollowell, Jr. of record at 88-E-34 in the Office of the Clerk of Superior Court of Perquimans County, North Carolina and deeds recorded in Deed Book 72, page 2S and Deed Book 73, page 142, Perquimans County Public Registry. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereunto belonging to it the said Grantee, its successors and assigns, free and discharged from all right, title, claim or interest of the said Grantor or anyone claiming by, through or under her. IN TESTIMONY WHEREOF, the said Grantor has hereunto set her hands and .seals the day and year first above written. /2_ r f.�m•w-ee�+ (SEAL) ONi ITA H. HOLLOWELL NORTH CAROLINA PERQUIMANS COUNTY I, the undersigned Notary Public, de hereby certify that ONEITA H. HOGLOWELL,,widOW, personally appeared before me this day and acknowledged the due execution of the foregoing Instrument. V itness my hand and off cis seal this the day of . L!j ��ty N ery Public My cbmmjsgj6—ixpires: {g lzz.IQ3 YARDS A EDWARDS •'�'lI R 1,1" �`"- AIfORMFYF AT FAR ter• ......... � `�.� HERTFORD. F.G 'fi p` ^,o Mpy, 133R1GF 5H IN TESTIMONY WHEREOF, the said party of the first pert has executed this Instrument the day and year first above written. VERNON R. BUSH STATE OF VIRGINIA CITY/COUNTY OF 1, the undersigned Notary Public, do hereby certify that VERNON R. BUSH, divorced, personally appeared before me this day and acknowledged the due execution of the foregoing Instrument. �^,,..,,t��'�/� „Ayff1Jp, 4py hand and ofris1ehxeat-tbjs the,99jtday of February, 1991. ytOiARY r� � efe F Notary AryLI Is 'YIIB Mans c•n;,. NORTiL.I•N. A, PERQUIMANS COUNTY The foregoing or annexed certificate of a as' s. tbtlh . a Notary,s E gtxiwm M.. K Is certified to he correct. This Instrument was presented for registration this day and hour and duly recorded In the Office of the Register of feeds of Perquimans County, North Carolina, In Book 138 , page 513 This the 3811E day of A.D., 1991 at u.o3 o'clock P. M. Register of Deeds Assistant Register of Deeds EDMADS A EDWARDS ATTORNM Ar LAW NERifORO, N. C. liC7D UN23� DC:t:•MM CTTY d NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 4, 2014 MEMORANDUM TO: SUBJECT: Applicant: Project Location: John E. Skvarla, III Secretary Charlan Owens, District Planner Division of Coastal Management Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management CAMA Permit Application Review Town of Hertford Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Proposed Project: Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached [i]rCEIVED 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-2609011FAX: 252-264-3723;Internet: www.nccoastalmanagement.net JUN 23 2014 An Equal Opportunity 1 Affirmative Action Employer DC'k".-1!UD Crry NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM TO: Daniel Govoni, DCM Assistant Major Permits Coordinator Division of Coastal Management FROM: Charlan Owenz41CP, NE DCM District Planner Division of Coastal Management John E. Skvarla, III Secretary SUBJECT: Major Permit Request by the Town of Hertford to install a nine (9)-slip boat docking facility consisting of a 6 foot wide by 170 foot long pier with two (2) 6 foot by 40 foot finger piers, two (2) 4 foot by 36 foot finger piers, two (2) 4 foot by 30 foot finger piers, four (4) tie pilings, an electric/water pedestal and a pump -out station on the Perquimans River, at 208 Perquimans Street, in the Town of Hertford. Date: June 18, 2014 Consistency Determination: The request is Hertford 1991 27, 1992. consistent with/not in conflict with the Town of Land Use Plan certified by the CRC on March Overview: The .48 acre subject property has approximately 105 linear feet of shoreline along the Perquimans River. Water depths extend from 1.5 feet at the shoreline to 6.5 feet a distance of 176 feet waterward of Normal Water Level (NWL). Average elevation of the property is 4 feet above NWL. The property is within the AE floodzone. Existing site improvements consist of paved parking on the southern half of the property with an 8 foot wide by 90 foot long concrete walkway extending from the parking area, through a grassed lawn, to the shoreline. Existing shoreline improvements consist of riprap shoreline stabilization covered by a 12 foot wide boardwalk that runs parallel to the entire shoreline. Installation of a nine (9)-slip boat docking facility consisting of a 6 foot wide by 170 foot long pier with two (2) 6 foot by 40 foot finger piers, two (2) 4 foot by 36 foot finger piers, two (2) 4 foot by 30 foot finger piers, four (4) tie pilings, an electric/water pedestal and a pump -out station is proposed. The pump -out will be located at the end of the main pier along with the electric and water pedestal. Effluent from the pump -out will be piped to the Town's existing sewer system. Installation of water, electrical and sewer lines and a holding tank associated with the pump -out will result in upland disturbance. Slips within the docking facility will be for transient dockage. The waters of the Perquimans River in this area are classified as SC and are closed to shellfish taking. A dense population of water lily extends from the existing boardwalk to a RECMW 1367 US 17 South, Elizabeth City, NC 27909 ° J U N 2 s Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.nccoastalmanagement.net- 2014 An Equal Opportunity 1 Affinnafive Aolion Employer- Made in part by recycled paper bCM•MHD C11'Y North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM Page 2 of 5 distance of approximately 40 feet into the river. There are no archaeological sites identified. The property is located within the historic district. The Town is using public grant funds and its own funds to construct the town dock and boat slips. Anticipated impacts resulting from this project are expected to include: the shading of 2,028 sq. ft. of Public Trust Area of Environmental Concern (AEC) and the disturbance of 1,000 sq. ft. of Highground. Basis for Determination: The Town of Hertford Land Classification Map identifies the site area as "Developed". The following policies from the Town of Hertford 1991 Land Use Plan certified by the CRC on March 27, 1992 may be applicable to this request: Areas of Environmental Concern (AEC) and Appropriate Land Uses in AECs: Policy, Page 31. "The Town of Hertford contains four types of AEC's which are Estuarine Waters, Estuarine Shorelines, Public Trust Waters, and Coastal Wetlands. Each of these AEC's is currently regulated either by the local CAMA Permit Office for minor developments or by the State CAMA Office for Major Permits. Local officials will continue to have a policy of allowing those developments that meet current zoning regulations and all other applicable local, State or federal regulations affecting the AEC area." Other Hazardous or Fragile Land Areas: Policy, Page 33. Land uses near man-made hazards and cultural/historic resources shall be permitted based on the Hertford Zoning Ordinance." Protection of Potable Water Supply: Policy, Page 34. "Town policy will be to guide development in a manner which minimizes any adverse impact on the Town's water supply." RECEIVED JUN 2 3 2014 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.ncroastalmanagement.net An Equal Opportunity 1 Afiimative Action Employer - Made in part by recycled paper DC',".•:vim CPI'S' North Carolina Department of Environment and Natural Resources MEMORANDUM Division of Coastal Management Page 3 of 5 Use of Package Treatment Plants: Policy, Page 34. "Connection to the Town's sewer system is mandatory inside the Town's corporate limits. Package treatment plants and septic tanks are permitted in the ETJ area." Marina and Floating Home Development and Dry Stack Facilities: Policy, Page 35. "Floating homes shall not be permitted inside the Town's area of responsibility. The Town's Zoning Ordinance shall be amended to not permit floating homes on any water bodies in Hertford's planning jurisdiction. Town officials wish to establish a marina along the Perquimans River as part of the Town's Waterfront Access Plan. As in the 1986 Plan, Town officials shall continue to have a policy to allow marinas which are developed in accordance with the Division of Coastal Management standards and guidelines. Restriction of Development in Areas Up to Five Feet Above Mean High Water: Policy, Page 36. "Hertford policy shall be to not restrict development in areas up to five feet above mean high water (the potential area of impact from rising sea level) other than as currently regulated by CAMA, zoning or the Flood Insurance Program." Commercial and Recreational Fisheries: Policy, Page 37. "To protect the river's aesthetic and water quality and fisheries found in the area, Hertford policy shall be to do everything in its power to work with State, federal and local agencies to maintain and improve water quality in the River to insure the river's continued use as a spawning and nursery area." �,. t2I;C131VED JUN 2 3 2014 1367 US 17 South, Elizabeth City, NC 27909 DCN--MHD CITY Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Alrirmebve Action Employer- Made in pan by recycled paper North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM Page 4 of 5 Local Commitment to Provide Services: Policy, Page 40. "Local officials will continue to work to provide the needed infrastructure to accommodate existing and future development." Urban Growth Patterns Desired: Policy, Page 40. "Town officials will continue to work with downtown property owners, downtown businesses and the Chamber of Commerce to implement the Hertford Horizons Plan recommendations and the 1989 Waterfront Access Plan recommendations. Town officials will continue to use the Zoning Ordinance and Subdivision Regulations to create the urban growth patterns desired." Policy, Page 43. Estuarine access has been and continues to be of great importance to local officials. Town officials will continue efforts to secure additional public funds to development and improve access for public use and enjoyment..." Tourism: Policy, Page 44. "Hertford policy on tourism shall be to continue efforts to promote Hertford as a small historic waterfront community." RECEIVED JUN 2 3 2014 1367 US 17 South, Elizabeth City, NC 27909 DCM-MUD C1TV Phone: 252-264-3901 1 FAX: 252-264-3723 ; Internet: www.nocoastalmanagement.net An Equal Opporluni y l Afiratve Acton Employer - Made in part by recycled paper North Carolina Department of Environment and Natural Resources MEMORANDUM Division of Coastal Management Page 5 of 5 Coastal and Estuarine Water Access: Policy, Page 45. "Hertford policy shall continue to be to make every effort to improve existing waterfront access and to provide as much additional waterfront access as financially feasible while being sensitive to the impact such access has on the water quality of the Perquimans River and Castleton Creek." Storm Hazard Mitigation and Post -Disaster Reconstruction Policies with Composite Hazard MaD: Policy, Page 50. "The Town will continue to control development in the AEC's and floodprone areas to protect the health, safety, and welfare of the citizens of Hertford." RECEIVED JUN 2 3 2014 DCM-MHD M 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 4, 2014 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: John E. Skvarla, III Secretary Maria Tripp Dunn NC Wildlife Resources Commission yg51 78 Daniel Govoni Assistant Major Permits Coordinator ]UN 2014 Division of Coastal Management RECOVER CAMA Permit Application Review m `9^ ihbilNt Town of Hertford Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: /This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. k RECEIVE SIGNED DATE 6'11-1 q 1367 us 17 south. Elizabeth city, NC 27909 J U N 18 2014 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.nocDastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer nCM- MUD CITY 06/17/2014 15:11 2523314739 NCDOT PAGE 01/01 .. NCfDENR ment and Natural ces North Carolina Department of Environl ResourJohn E. Swria, III secretary pat McCrory Governor D Tune 4, 201.4 jug t 2 26t4 MEMoRANIDUM DISTRICT OFFICE Ken Pace, P�; Environmental operations 8c Rest Area TO' Department of Transportation FROM.. Daniel GOVnni Assistant Major Permits Coordinator l7ivision of Coastal Management SUBJECT: LAMA Permit Application Review Applicant: Town of Hertford < > inch Alloy, Hertford, adj. perquimans River &west of. S Bridge Project Location: � fln eL piers, pump -out station Proposed Project: Nine -slip docking facility with p ier, . g enc 's osition or viewpoint on the proposed project and return this Please indicate below your ag Y P lease contact l-yiin Maus at (252) _form by aG125/la to 400 Commerce Avenue MoreheadtCp NC 28557 fax: 252-2�7-3 questions regarding the proposed orting data are requested. if you have any q ro riate, in-depth comments with supP 264-3901- p,1}ienapp P )tiRPLX: Tl yus office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. t for reasons described in the attached This office objects to the projec comments. 1357 US 17 Sout zabeth Cly, NC Z1903 • phone: 252-2543901 V FAX: 252-2"04 ; Internet: www.nccoastaimanagement.nef An Equal Opportunity l Affirmative Action Employer Asir. NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor John E. Skvarla, III Secretary June 4, 2014 MEMORANDUM: To: Daniel Govoni Major Permits Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 From: Dyk Luben, P.E., Acting Regional Engineer, PWSS/WaRO Subject: CAMA Permit Application Review Applicant: Town of Hertford Project Location: Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Proposed Project: Nine -slip docking facility with pier, finger piers, pump -out station REPLY: X This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. Comments: Engineers and Contractors should be aware of utility location within the project area. Please contact the local water utility to assist with the location of existing water mains in or near the project area. SIGNED I Z ".4 Public Water Supply Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27869 Phone: 252-94664811FAX: 252-948-00401Internet: www.ncwater.org/pws/ An Equal Opportunity t Affirmative Action Employer DATE r�C�IVEp UN 17 2014 DCM-MfiD CITY DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANTS NAME: Town of Hertford - C/o Town Manager Brandon Shoaf 2. LOCATION OF PROJECT SITE: Site is located adjacent to the Perquimans River within the Hertford Town limits on Punch Alley west of the "S" Bridge and adjacent to the public boat ramp. Photo Index: 2006: 236-6799 16 & 17 2000: 236-1784 N19 199�: 458-1630 X12 & X13 1989: 1 17-21 P4 & P5 1984: Not Available 1979:127-1586 T14 State Plane Coordinates: X: 3200 2747445.081ft US E Y: 898031.174ft US N 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: 03/19/2014 and 05/15/2014 Was Applicant Present: Yes 5. PROCESSING PROCEDURE: Application Received Complete: Accepted on May+2'3i 2014 6. SITE DESCRIPTION: Office: Elizabeth City (A) Local Land Use Plan: Town of Hertford LUP Land Classification: Hertford ETJ — Public/Semi-public/religious/institutional (B) AEC(s) Involved: PTA and PTW (C) Water Dependent: Yes (D) Intended Use: Public docking facility with pump -out (E) Wastewater Treatment: Existing: None Planned: Pump -out Facility to an Existing Sanitary Sewer System (F) Type of Structures: Existing: None Planned: Public docking Facility with 9 Formal Slips and a Pump -Out (G) Estimated Annual Rate of Erosion: N/A HABITAT DESCRIPTION: (AREA) DREDGED DISTURBED SHADED (A) Vegetated Wetlands: (B) Non -Vegetated Wetlands: (Open Water) —> ----------------> -- — --- — —> Piers/ Finger Piers Platforms: 2,028sf (C) Other: Installation of pipe from (High Disturbance Ground) --> ______________> the Pump -Out Facility to the City Sewer System: 1,000sf (D) Total Area Disturbed: Within an AEC = 3,028sf (.069 acres) (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The project includes a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, four be pilings, one electric/water pedestal, and one pump -out station located at the end of the pier. The pump - out and electrical installation will involve minor high ground disturbance and connect to existing service facilities. A holding tank will be installed in association with the pump -out, and will be located greater than 75' fro orrilWo"Ovel. >r UN 17 2014 DOMW?D C!TY Town of Hertford Field Investigation Report Page 2 Proiect Setting The property in question is located in the Town of Hertford behind the Police Department and the Town Managers Office, adjacent to Punch Alley and the Perquimans River, Perquimans County, North Carolina. The project site abuts a .public boat ramp to the west along Punch Alley; the Police Department to the south, a residential lot to the west and the Perquimans River to the north. Located at the adjacent access boat ramp is a dock used to moor the Periauger, a reconstructed colonial boat work boat used for historical reenactments. Adjacent to the Periauger are two floating drive on personal water craft docks placed by the Town of Hertford as a kayak launch. The property is approximately .48 acres, with 105' fronting on the Perquimans River. There is an existing 12' x 105' boardwalk paralleling the shoreline, with an 8' access walkway leading from a parking lot located 100' from normal water level. While there are no identified archeological sites on the property is located within the Hertford Historic District. There is a small variety of vegetation on the property and it includes, but is not limited to bald cypress (Taxodium distichum), a domestic grasses and a dense population of water lily (Nymphaea odorata) extending from the existing boardwalk to a distance of approximately 40' into the Perquimans River. Average elevation of the property is approximately 4' above normal water level. Flood designation for the property is AE, which indicates a susceptibility to flooding. Shoreline stabilization consists of riprap that is located underthe existing boardwalk. Water depths extend from 1.5' at the waterward side of the boardwalk to 6.5' at the distance of 176' waterward of normal water level (NWL). The property is located in the Public Trust Shoreline Area of Environmental Concern (AEC) and the waters immediately adjacent to the property are within Public Trust Waters. Currently there is only one marina operating in Perquimans County located at Albemarle Plantation, approximately 23 miles from the Town of Hertford by boat. Albemarle Plantation has a 158 slip marina exclusively for the residents of the subdivision. Fuel and pump -out facilities are available to the public for a fee. Development Proposal The Town of Hertford is requesting a CAMA Major Permit to construct a nine slip docking facility including a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, one electriclwater pedestal and one pump - out station located at the end of the pier. The ninth mooring will be on the outside of "T" created by the two 40' finger piers and the end of the main access pier. High Ground Disturbance: The installation of the lines for water, electrical and sewer are estimated to be 1,OOOsf Open Water Shading: Main Access Pier: 6' x 170'=1,028sf 40' Finger Piers: 2(6' x 40') = 480sf 36' Finger Piers: 2(4' x 36') = 288sf 30' Finger Piers: 2(4' x 30') = 240sf Total = 2,028sf aloe � t Nnr �, . a. A project narrative. Chartered in 1758, Hertford has a rich colonial and maritime history tied to the Perquimans River and Albemarle Sound. Hertford is the seventh oldest town in North Carolina. It is also the Seat of Perquimans County. In 2010 Hertford was accepted into the NC Rural Center STEP (Small Town Economic Prosperity) grant program, which helps the town to identify and prioritize economic development and revitalization. The strategic planning portion of the STEP process has identified waterfront development as a priority, specifically the construction of slips for boaters who wish to visit the town. Currently, visiting boaters do not have a place to dock their boats, many in the forty feet range, at a public facility. These visitors must anchor away from the town boat ramps and use their tenders or dinghies to access the small dock that is adjacent to the ramps. During the week and especially on weekends, the town boat ramps are crowded with fisherman, which can make access difficult for visiting boaters. Prior to being selected for STEP, the town participated in the Creative Communities Initiative with the UNC School of Business to develop a waterfront development plan. Over a three-year period, graduate students in the business school at UNC worked with the town to develop a waterfront revitalization plan, which includes boat slips and a public/private partnership for a mixed use waterfront development that includes outfitters, a hotel, fuel service, and other amenities on the water. The waterfront plan uses the attraction of the Perquimans River to help spur economic development and re-establish Hertford as a vibrant waterfront town. The town dock and boat slips are the critical first step in the town's long-term plan for revitalizing Hertford's historic waterfront. Project Objectives The Town of Hertford, Waterfront Access Improvement Project seeks to accomplish the following objectives: • Provide safe harbor dock space for transient boaters, recreational boaters and visitors with the construction of nine slips. • Increase transient boater and visitor traffic to help spur economic development and revitalization of the Historic Waterfront. Expected Results and Benefits The addition of the town dock to the Municipal Park will be the critical first step in implementing the town's Waterfront Development Plan. The new town dock will help reconnect the town's 63 historic points of interest to the water, which will help attract boaters looking for a charming, southern waterfront town. The town is able to offer a rich history and many amenities within a 20-block area around the town dock. Locations of amenities close to the town dock include the Post Office, Missing Mill Park and Restrooms, Convenience Mart, Restaurant, and Gas Station, Senior Center and Tennis Courts, Hardware Store, Public Library, Internet Cafe, Acbc�rc++ Page 1 of 2 JUN 17 2014 DCM-` UD C'.TY Deli and Diner, Soda Fountain and Drug Store, Police Station, Bank, Municipal Building, Historic Hertford Visitors Center, and County Government Building The layout of the town dock and water depths behind Municipal Park is shown on the attached Site Plan Detail. The town dock will extend 170 feet due north from the Municipal Park boardwalk. The main walkway and T pier on the end of the walkway will be six feet wide. The four finger piers for boat slips will be four feet wide. The T walkway will be able to accommodate an 80 foot boat. The four adjacent berths will be 36 feet long and 13 feet wide with a mooring pile at the entrance of the berths. The T pier and four adjacent berths are in six feet of water: The four berths closest to shore will be 30 feet long and 10 feet wide, with a mooring pile at the entrance. These four berths are in five to six feet of water. Water, electric service and pump -out lines will be provided along the main six foot wide walkway. Construction details are shown in the attached engineer's plans, Sheets 14. An information kiosk with maps and brochures will be installed at the entrance to Municipal Park from the town dock to provide information on amenities and points of interest. For safety, the town dock will be located directly behind the town police station. 7. Compliance with N.C. Environmental Policy Act (N.C.G.S.113A 1-10) The Town of Hertford is using public grant funds and its own funds to construct the town dock and boat slips. It is aware of and will comply with the N.C. Environmental Policy Act as it implements the project. h9AY 12 2014 Page 2 of 2 ®®® D C m Ih P- ■■■■IIII ■■111 ■ IIII1111 ■ ■11111111■■■111■■ is" rrlrenera IRTA p 2 MAY 12 2014 .� North Carolina DIVISION OF COASTAL MANAGEMENT 1. PrlmetyAppllcent/Landownerinthrmadon Business Name Project (if applicable) 1ovil 01' 4e.4�01cx 1Name ((�� Applicantl: FirstName MI Last Name rG/rCTo.. S St�.O 0. F Applicant2: First Name MI Last Name Ifadditionalapplicants, pease attach an additional page(s) will names listed. Mailing Address PO Box City Stele 16 ok .37, 1 32 14 "1-forok N L ZIP Country Phone No. FAX No. 2 t�y�( lay 252 -q 19CA, ext. *75Z -H26-11066 Street Address Of different from above) City State ZIP Ill tr• 14Qr��br�l ►.iC 2���iV Email f H ¢r Ca %bw.-o rL, ar}�p,.�n G. Gant 2. AgentlContreotorintbrmatlon Business Name (' 1 Tow, of 14 crkt'o rcl Agent//Cortacior 1: Fist Name MI Last Name A0_ S 5(�GG�.} V CC, Agent/ Contactor 2: Frst Name MI Last Name Mailirg Address PO Box City S ffie ?o ox 3-1-32 /• �i«itoro� Nc- ZIP Phone No. 1 Phone No. 2 2 t°ri i 252 -q26 -l'i(5 ext ext. FAX No. Contractor # 25'L- y26- IdLo SbeetAddrees Qldille+avlbom above) C''itlyI State ZIP Itti W • lJrwbb S�. t{ar�Gord Nc 2T6iL4 Email kOV.�O tU.L/V(6 lc�, C.. LDh <Form continues on back> RECavo JUN 17 2014 fi A 6 6u t o nu 1 5 u no0nHu9 90 5 u 9U I o S i 1i.0 i ..I in jB 0 6 d 5 e 6 l@ 1 i I I n0 Form DCM MP-1 (Page 2 of4) APPLICATION for Major Development Permito 3. Project Location County (can be multiple) Street Address - State Rd. # TQr Uih ,5S IILI -i3. W Gr_W. S}. Subdivision Name city'' State . Zip _ II rt� H"VV -Ick N L I 2%5 y _l Phone No. Lot No.(s) (if many, attach additional page Wit; list). 2S ? - N 26 I e? 6S ext a. In which NC river is the project located? b. Name of body of water newest'tD proposed project (Ibasin �G1S lw0 e,r u1MGn5 (\MVP c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. NNatural ❑Manmade ❑Unknown �er �, r„r 5 It a� e. Is proposed workwithin city limits or plannirgjurisdiction? f. Ifapplicable, listthe planning jurisdiction orcity limitthe proposed UYes ❑No work falls within. To— / 1 i'( I wOY He-17 orv' 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft) ;O Fk. 20,�,SI c. Size of individual lot(s) 11 .2 a , �) 8 I sci Py. d. Approbmate elevation of tract above NFW (normal high meter) or NWL (normal meterlevel) (If many lot sizes, please attach additional page Wth a list) IOr ❑NHW �( or �INWL e. Vegetation on tract 6ra>5 0- Trrz�S f. Man-made features and was now on tract A/(,nni li 4 Gr��eGe en ere: w44�'w4� g. Identify and describe the existing land uses adiacentto the proposed project site. h. Flow does local government zone the tract) i. Is the proposed project consistent with the applicable zoNrg? L - ( (Attach zoning compliance certificate, if applicable) - yy Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes KNo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes '%No ❑NA Hyes, bywhom? I. Is the proposed project located in a National Registered Historic District or does it involve a 1IYes ❑No ❑NA National Register listed or eligible property? . <Fonn continues on next page> g n g ng g g H o o g @gggngg 091 1 fig 9 g g 0 g g ngggncu i1 5 ng g 5 9 1 d 55 tig b 0 g 0 9 9 1 5 figs 1 TO Form DCM MP-1 (Page 3 of4) r ) M AY 12 2014 APPLICATION for Major Development Permilo m. (I) Are there wetlands on the site?--,h;-.I ... - -- oyes, XNo (1i) Are there coastal wetlands on the site? "—"--'�❑Yes KNo Qil) If yes to either (!)or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Descdbe�je`mstirgwastewatertreatmeritfacilibm. 1 Ie Wn nWnc�� o�crc.}Cc/�, t Mr�.�cA✓�GG�,, l 54n. ��r�/ 5 ¢wen, o. Describe existing dnnlgrhg water suppysource. 11 Tow., own ,I o?vwk Kh 4 Mom,..}t�.. 1 �A poiab\i... 1 wACar. P. Describe existing storm water management or treatment systems. 1 lo.., .. 0w�:A 4 r..c..-ta ...<k 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Comm mial Phblic/Govem nerrt ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. ��Q, JroP oS ter.\. a 51.�5 vr 111 prov �r�� �rwr 5'��n} 10 a4}a r5 c. Describe the proposed construction methodology, types of constructon equipmentto be used during construction, the rhhmberof each type of equipment andI where it is to be stored. 1- irLa{Gt Y�,1�-Ss a- L-IG41,n5 j�)e.-11-��ac.%.i..9 I d- IO4rJGL , t�AtiU 4 POL}(! TO D(5 d. List all development actvities1you propose. / Tro-I 6L• Oo 4,c.c)L. tO/ Jl-r•SnSr c-} ioo ¢rS 4 C, Se - P,.-w.�ow� . r-,s_e.4rw - o wc..)-er Lo,o,5. e. Are the proposed activities maintenance of an existing project, new work, or both? n<w Nork t What is the approximate total disturbed land area resulting from the proposed project? EfSq.Ft or ❑Acres (ep ;> g. Will the proposed project encroach on arty public easern pubNc accessway or other area WYes ❑Noy ❑N4 that the public has established use of? h. Describe location and type of existing and proposed discharges to watts of the state. rJo.. c crof c$¢a i. W II wastewater or stomsvater be discharged into a wetland? ❑Yes ❑NA if yes, will this discharged water be ofthe same salinity as the receivi rig water? []Yes ($No ❑NA j. Is there any mitigation proposed? []Yes RNo ❑NA if yes, attach a mitigation proposal. <Form continues on bacj > JUN 17 2014 III eil 7 16t I I I rem�lit u r 6 I h id-.nur I I III I I❑ DCSr..a-"-V)C:TY Form DCM MP-1 (Page 4 of4) APPLICATION ,for Major Development Permito 6. Additional Information In addition to this completed application form, (MP-1) the following items below If applicable, must be submitted in order forthe application package to be complete. Items (a) — (g are almys applicable to any major development application. Please consult the application instruction booklet on howto property prepare the required items below a. Apr ✓/ HC. v1 �Gi' ' b. An accurate, dated work plat [including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion alreadycomplete? Ifpreviouslyaufhadzed wodc, clearly irdrce on maps, plats, drawings ro distinguish between work completed and proposed. !!-1 ��r „C-v r r:d _ y Grl.-1 • '' �r c. A site or location map that is sufficiently citailed to guide agency personnel unfamiliar Wth the area to the site. d. A copy of tlx: deed (with state application only) or other instrument under which the applicant claims title to the affected properties. !/ e. The appropriate application fee. Check or money order made payable to DENR 47 / f. A Est ofthe names and complete addresses ofthe adjacerrtwaterBont (riparian) landowners and signed return receipts as proofthat such owners have received a copy ofthe application and plats by certified mail. Such landowners must be advised that they have 30 days In wNchto submit comments on the proposed project to the Division of Coastal Management ' Name sl/r•�,��G'.•v(6_ rd r/1'P r CPhone No. Address J(.-tJ �V. L�.�1�G/�:l sff lV i9 /`)�=/'CrrJV� Tl�y7 Name C re.; -- /F'Aerl r yt C, #4 e./i.JS' / Phone No. Address /y �, f ���7 .�✓I`, r F�`'t.%irr-L"�.yt� YL/ Name Phohe No. Address g. A Est of previou��ss9 state or federal permits issued for work on the projecttract Include permit numbers, perrnittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. X% . i. Wetland delineation, if necessary /V) . j. A signed AEC hazard notice for projects In oceanfront and inletareas. (Mustbe signed by property owner) r.�-- k. A statement of compliance with the N.C. Emhronmental PolicyAct(N.C.G.S. 113A 1-10), ifnecessary. Ifthe pmjectirwohes expenditure of public furls or use of public lards, attach a statement documenting compliance with the North Carolina Environme I ECy t 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The projectwill be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permitapplication and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name 17 ry ^Dr%o(xy^ S. S�o4t Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ODCM MP-3 Upland Development ,DCM MP4 Structures Information 5 n E 5U E 6 En R a i 55555EE 51 0 5 EE E 1 0 "a 6 i EEa EEEE E 5 59 9 5 E E E 96 90 a e i e n 6 5 E HE E ED vcm ✓n P-3 LLLL LLLL LL LLLL I■lNlN�■t■I■ 111 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ®000®o®o®oo®®oo®®mm®o®o®o® Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-t. Be sure to & Application that relate to this proposed project. Please include all supplemental information. I GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 1 ` -Xrr nS Fr^`�t�lan C. k4-k 4 c. Density (give the number of residential units and the units per acre). e. If the proposed project wi II disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least30 days before land -disturbing activity begins. (i) Ifapplicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes [XNo [IRA (ii) 7 yes, fist the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rootops, or to be used for vehicular driveways or parking. e.vch S�h Ica na CL,\,v 6,z l{ }. SCA -�.lv i. Give the percentage of the entire tract to be covered by impervious and%or built -upon surfaces, such as pavement building, rooftops, or to be used for vehicular driveways or parking. j. Describe proposed method of sewage disposal. in i1nrTHfJ SCW er b. Number cf lots or parcels. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. jo00 S� , f. List the materials (such as marl, paver alone, asphalt, or cennlefle) to be used for impervious surfaces. �J/A h. Projects that require a CAMA Major Development Permit may also require a Storriwater Certification. (i) Has a site development plan been submitted to the Division of Water yQuality for review? ❑Yes [p(W ❑NA (ii) If yes, list the date submitted: k. Have the facilities described in Item ti) received state or local approval? ❑Yes JEW ❑NA If yes, attach appropriate documentation. I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater state (e.g., surface runoff, sanitary wastewater, industriag design??. commercial effluent, "wash down" and residential discharges). ❑Yes *Jo ❑NA NJ a v_ M yes, attach appropriate documentation. LECEIVED JUN 17 2014 LILIOIIOOLA911JUI 11 [1 N1111DI 1111l11u - '''I I11ID.FL] ❑ III It WUOL1LIJI11 ULILILILILI J01IIII. Iiiiiii uiiiiLIDD LLLL H- L L LL. LLL.011EID BOOLIOUD MO0 OOOIDOOOOLT10TIOLL m. Describe proposed drinking water supply source (e.g., well, n. @ Will water be Impounded? ❑Yes gNo ❑NA community, public system, etc.) (I) byes, how many acres? o. When was the lot(s) platted and recorded? Date 11 (('' 11 rr 11 r,Cr}jolC./� Wh�2lhr4J r,T AC,ss Project Name Applica a Applicant Signature p. IF proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes gNo ❑NA MAY 1 2 2014 ❑CICI�DOD11DDL717m047lIDDDll�Cl Lll]L"IODLImIIN LI D LNODDOCQfIOrl ❑DI]OCIO OOfSIODCUNNOm9116�01NMNMII1MM010POWN®Ilif®MYl®mMM10MWM01110,91MmC1[ICDDOWDfIDDINDfJ -Dcm rt P-Y Fddd cDd MtMPdJd dddUddUdEdd (d ddddhddtlddl dhdkPubdtldldiddtldddd)d Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to a Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYAWARINA CHARACTERISTICS a. () Is thedockingfacility4marina: ❑Commercial XPublic/Govemment ❑Private/Communty, a (i) Dock(s) andlor pier(s) (i) N fiber I Oil)Lergh 1-1 Dr (v) Width b r � (v) Floating ❑Yes )dNlo MAY 1 2 2014 IOFlcrpl f. all othersectionsofthe loont ❑ This section not applicable b- O W ll the facility be open to the general public? NYes ❑No d. (i) Are Finger Piers included? XYes ❑No If yes: pi) Number b (ii)Lergth ICLI°) 2 (3V) 2 UP (Iv) Wdth zTr) N CLl (v) Floating ❑Yes W%lo e. () Are Platforms included? ❑Yes IGNvo f. () Are Boatifls included? []Yet NNo If yes: If yes: (ii) Number (ii) Number (111) Length (li) Length (iv) W/dth (1v)Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. () N mber of slips proposed h. Check all the types of services m be provided. ElFull service, including travel lift andlor rail, repair or Number of slips existing (ii) Num maintenance service O ❑ Dockage, fuel, and marine supplies 29 Dockage (Wet slips") only, number of slips: 5 ❑ Dry storage, number of boats: ❑ Boat ramp(s); number of boat ramps: bd Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel %open water, no dredging required ❑Other; please describe: k. Typical boat length: 20 1" m. (i) Wlll the facility have tie pilings? (gYes ❑No (ii) Ifyes number of be pilings? j. Describe the typical boats to be served (e.g., open runabout charter boats, sail boats, mixed types). AA; x-a I. (i) Will the facility be open to the general public? ®Yes []NO REEVED JUN 17 2014 ^CM!ATDarY Few, ge�dlGfi 4o7C�9da2um7Me��,d°v4cBe7m�fua�� 2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitaryfacilitles that will be included in the proposed project ❑ Office Toilets ❑ Toilets for patrons; Number. _; Location: ❑ Showers Boalholding tank punpout Give type and location: 1 ' b. Describe treatmenttype and disposal location for all sanitary wastewater. Cann�cT.o,. �'� �o1u •..c i4n 1: L y����c%1 COJ.�cc7•a.� -tn c. Describe the disposal of solid waste, fish offal and trash A`` $a\•� WGSt M�St 6z �1aC��l P GnS.it uo�c �� T d. How will overboard discharge of sewage from boats be controlled? I e. QGive the location and number of"No Sewage Discharge" signs proposed. (iii) Give the location and number of"Pumpou t Available" signs proposed. 1 $rSn niAr f. Describe the special design, if applicable, for containing Industrial type pollutants, such as paint, sandblasting waste and petroleum products. NO /... o•.•n Ye-�GnLc, 0.��ow c� � 'l "�i5 5��� g. Where will residue from vessel maintenance be disposed of? No srr�� h. Give the number of channel markers and "No Wake" signs proposed. rJ e + z I. Give the location offuel-handling facilities, and describe the safety measures planned to protect area water quality. tJ } e `, n� � 2 G r� r Vies � ro a o S Ac. J J . j. Whatwill be the madna policyon overnight and live -aboard dockage? NOM1t (� TM . S V% e,,o- k. Describe design measures that promote boatbasin flushing? ht7 b vs'% I. If this project is an expansion of an existing manna, what types of services are currently provided? dddr2ieldefflda9slm'h1tICTMdr1d dd 0dd0-0 el:d TMaM.,d0fti. IsXIddel de9al;]di"w:ALr���'��t ^�rlarn+t rv`:it^��`ftcMM7r:7;a"^�r-�tnk'h^!h5r,"'of'addfld1d71dGd in. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ONO n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yw hNo MAY 1 2 2014 o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (INQ? harry boxes are checked, provide the number of square feet affected. ❑CW ❑SAV 0S8 OWL XMM p. Is the proposed marina/docking facility located within or within close proximity to arry shellfish leases? ❑Yes RNo If yes, give the name and address of the leaseholder(s), and give the proximityio the lease. 3. BOATHOUSE (including covered lifts) XI This section not applicable a. () Is the boathouse struchne(s): ❑Commercial ❑Public/Govemment ❑Prlvatenomnurrty (i) Number (Ili) Length IN) Width Note: Roofed areas are calculated from dnpline dimensions. 4. GRO1N (e.g., "Cod, sheelpile, etc. If rock groin, use MP-2, Excavation and Fill) XThis section not appliceb/a a. () Number (JD Length (III) Wdth 5. BREAKWATER (e.g., mood, sheeWe, etc.) XThis section not applicable a. Length _ b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NM, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the st ructure(s): ❑Commercial PrbliclGoverrmert ❑Privata/Commurdty c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, it present. e. Arc of the swing , XThis section not applicable b. Number d. Description of buoy (color, inscription, size, anchor, etc.) JUN 17 2014 yilJ,37uildnb7djeA,1,:7r,1,LMA.1els;hl JAdtub P11144dddd r]d'A'elvc1m31�^w2.P�.',.;�.�:�lLk�3�iti5!20itfirl}.ar�7°S2�1h7titU89��5� 8"i�3�iladltil��760d/d71d5d DCM-Nm CITY FdcNmel zFveu) 7. GENERAL a. Proxintlty ofstmcture(s) to adjacent riparian property lines 2a , o E )Q t C- rn �r Note: For buoy or mooring piling, use arc ofsWng including length of vessel. - c. Width ofwater body b2a' e. (i) Will navigational aids be required as a resultof the project? ❑Yes %No ❑NA (i) If yes, explain what tyge and how they will be implemented. b. Proximityofstructure(s)toadjamntdocldngfacilites. d. Water depth atwaterward end of structure at NLW or NNL b'--7 ' too, 8. OTHER ❑This section not applicable a. Give complete descriptlon: 11 Gl St�pS t rto Ir-tti. ��;...�� t }ra. �5re..� r �UM�o. a- y wrier a, A'`l F Date Project Name Applicant me In,^ 1 ' �- _ d� Applicant Signature a._-_._ MAY 1 2 2014 ddI402'ImldC-AddIr✓eirlro9001dad dlcl Elslat(Mil d d ei)dd: gC2d!I 7 dd€,;edd an m Q7 "a'MS..' ' �L"hfi 'L�?LS m .tip r3'2 ;u? �;icl"�i.^rtCcta?Ea9e.^'3," a3ldi/d�c9 Photos of Project Site Hertford safe harbor. Arrow shows location of new town dock. View from the Perquimans River looking at the town boat ramps, dock and Municipal Building. New town dock will be to the right of the town boat ramps. Transient boaters have to anchor away from town View of Town Park. New town dock will connect ramps and use a tender. to existing boardwalk along waterfront. p MCEIVED JUN 17 2014 DC.M..! !'D C!TY RRITU Hertford Marina Project_' MID Regional Location Map MAY 12 2014 S gncT; Pas up, nkAiver HE TFORD PASQU TAN erquimans River P QUIMANS Project Location Town of Hertford H WAN Us 17 B E R I E Chowan River Albemarle Sound N 0 3 6 12 Miles I i I i I T LL ................................................................ ::::::::::::::::::............................................................................... 0 50 100 200 Feet........................................ 1 inch = 87 feet ................... New Nine Slip Marina Town of Hertford Marina Project Site Plan Detail uimans River\ I \\ I I ♦ i I ♦ � I ♦ 1 I Power & Water Pedestal I Pump Out Station Sheets 1-4 I ♦ i ♦ i Riparian Line Town Boat Ramps (3) ♦ Rachel & Stephen Gunther Normal High Water 30 ft AEC Underground Sewer Line Underground Power to Ex sting Pole Underground I_ Holding Tank Water Line to 1 i (Upland) Connection a Town of Hertford Town of Hertfor� Manhole I Park Parking N N aF- ■ _ lti'_ t W AT Ft} �L ��iTiES' 1 '1N W AT r-t2, v/N AY �i jAy 12 2014 K� zzof MA,"e7 T-Me-Z JI o XFL AD +� (�nt5r.) La at Ext S� �t4 1 8 GC ot+C.: WA JU 17 0�4 �CITY CA;?o _ TdWqN OF �ED C tA�IryA S AL - F- N ���h 4• DAVEe���`� 1, z 9 lo(t� �IXIR A Tow N ,oF 'C Agi NA c �9 �C �t Yi✓E Mauro L-A'r-aur .�P 3. r; AY 1 2 2014 44 T `+'[Tyra i­ . f�A TL4 vAoz(ur_q14 T? 0 11 W �T �� � €l..�Y'.Y • �J�t� � � r �EWLR LINE Tc � MAYVRECMW JUN 17 2014 �tH !A!04 SEAL p yp : 3266 : ¢ JU t , 4 .. DCMIvIHDCTfY �F� LAYoor Tnw tit 71ON -f'o: CASs 1 ��ct��s ��� 3`� �iivf-,sTk_€E<r_ss ;£R iea' + a�T 3�rr SPc teFS _ •�•�•.• �..• .._� >K S lA4��'Ij� 'pP 'SY ifv' a• vx 5➢ L^j ,yF t Jf'iWX �xz �` s r MAY 1 2 2014- � - A '� ✓ ra_a-T Lk i r YF kf 'n«�, .. . 42, ry rt 1 0, tA' rt v . TS W%TH :CouEs_of� Z�e� l � Y c- ` 3��1P�oV .T3' <, `J'V+�'t c Ar T-ys- t_A i �: ,x � yi ,` � �^ r . • - `.� max-.; tL s Bi 2 sC'�, P � t_E C:,4� �; tt► CARP � Pam, �, - — _ �.�`� FfS8i Aix spat ''.,�f,.�DAVEN�`'�, NT5 . Rom/. Z ti(041(q REV, f (�,� tJAJ�1[Poszi.dt� f SAoc, f2 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 4, 2014 MEMORANDUM TO: Lee Padrick Division of Community Assistance FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application Review Applicant: Town of Hertford John E. Skvarla, III Secretary Project Location: Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Proposed Project: Nine -slip docking facility with pier, forger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. Ts agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 US 17 South, Elizabeth City, NC 27909 i�ECBIVED Phone: 252-264-39011 FAX: 252-264-3723 ; Intemet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer JUN 13 2014 DCM-MHD CITY kXVIWA �m- NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 4, 2014 TO: FROM: SUBJECT: Applicant: Project Location: John E. Skvaria, III Secretary Richard Peed, Erosion & Sedimentation Control Division of Energy, Minerals & Land Resources, WaRO Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management CAMA Permit Application Review Town of Hertford Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Proposed Project: Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. �/This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED AIL/ DATE RECEIVED 1367 US 17 South, Elizabeth City, INC 27909 JUN 1 1 2014 Phone: 252-264-3901 1 FAX: 252-264-3723 ; Internet: www.ncooastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DCM-MAD CITY �r NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Elt C Secretary 2014June 4, 2014 '7ecreational MEMORANDUM ecrion TO: Patti Fowler, Section Chief Marine Fisheries — Shellfish Sanitation & Recreational Water Quality FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application Review Applicant: Town of Hertford Project Location: Punch Alley, Hertford, adj. Perquimans River & west of"S" Bridge Proposed Project: Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED 10� P DATE �fIO�I4 RECEN,?;D , 1367 US 17 South, Elizabeth City, NC 27909 JUN 1 1 2014 Phone: 252-264-39011 FAX: 252-264.3723 ; Internet: www.ncooastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DCKMMCffy Pat McCrory Governor ®�f*' NCDETdR North Carolina Department of Environment and Natural Resources MEMORANDUM TO: Daniel Govoni, Assistant Major Permit Coordinator THROUGH: Frank Jennings, District Manager FROM: Lynn Mathis, Field Specialist V DATE: May 29, 2014 SUBJECT: Town of Hertford CAMA Major Permit Application John E. Skvada, III Secretary The Town of Hertford is proposing to construct a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, four tie pilings, one electric/water pedestal, and one pump -out station located at the end of the pier. Pump -out and electrical installation will involve minor high ground disturbance to connect to existing land based services. The number of proposed slips will be nine, with four along finger piers and one located on the outside of the docking facility adjacent to the electric/water pedestal and the pump -out. See site plan provided. I have reviewed the rules as they pertain to Piers and Docking Facilities and would like to offer the following: 15 NCAC 07H .0208 Use Standards (b)Special Use Standards (6) Piers and Docking Facilities. (A) Piers shall not exceed six feet in width. Piers greater than six feet in width shall be permitted only if the greater width is necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur; Consistent: Proposed pier is six feet in width and the finger piers are 6' and 4' in width. (B) The total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be eight square feet per linear foot of shoreline with a maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips shall not be counted in the total. Projects requiring dimensions greater than those stated in this Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur. Size restrictions shall not apply to marinas; Consistent: The total area of shading by the proposed finger pier will be 1,008sf. (C) Piers and docking facilities over coastal wetlands shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking; RECEM Consistent: NIA rJUN 0 9 2014 1367 US 17 South, Elizabeth City, NC 27909 DCM•MIflClTY Phone: 252-264-3901 \ FAX: 252-264-3723 Internet: www nc ooastalmanaaement.net An Equal opportunity I Affirmative Action Employer Recommendations Town of Hertford May 29, 2014 Page 2 (D) A boathouse shall not exceed 400 square feet except to accommodate a documented need for a larger boathouse and shall have sides extending no farther than one-half the height of the walls and covering only the top half of the walls. Measurements of square footage shall be taken of the greatest exterior dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline. Size restrictions do not apply to marinas; Consistent: No boat house proposed. (E) The total area enclosed by an individual boatlift shall not exceed 400 square feet except to accommodate a documented need for a larger boat lift; Consistent: No boatlifts proposed. (F) Piers and docking facilities shall be single story. They may be roofed but shall not be designed to allow second story use; Consistent: Single story proposed. (G) Pier and docking facility length shall be limited. Consistent: The length has been limited to minimum necessary to grant funding to the Town to facilitate large boat mooring. (H) Piers or docking facilities longer than 400 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at least 1 foot each 100 foot increment of length longer than 400 feet, or, if the additional length is necessary to span some obstruction to navigation. Consistent: The pier will be less than 400'. (1) Piers and docking facilities shall not interfere with the access to any riparian property and shall have a minimum setback of 15 feet between any part of the pier or docking facility and the adjacent property owner's areas of riparian access. Consistent: The docking facility will be set back greater than the minimum 15' requirement. (J) Applicants for authorization to construct a pier or docking facility shall provide notice of the permit application to the owner of any part of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow the lease holder the opportunity to mark a navigation route from the pier to the edge of the lease. Consistent: The pier location does not involve any shellfishing franchise. Land based development associated with this project is to connect electric, water and waste to existing services and will include a small holding tank. The proposed tank will be located 75' landward of normal water level. Consistent with the Division's rules. Based on the above review I would like to recommend that the request be approved subject to the standard applicable conditions. Govoni, Daniel From: Hart, Kevin Sent: Tuesday, June 10, 2014 9:44 AM To: Govoni, Daniel Cc: Huggett, Doug Subject: Town of Hertford Docks Daniel, I have no comment regarding the Town of Hertford docks. Kevin Kevin Hart North Carolina Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 252-948-3950 PLEASE NOTE NEW PHONE NUMBER. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Please visit w .nccoastalmananement.net to subscribe to Coastal Management's quarterly newsletter, the CAMAgram. Govoni, Daniel From: Bland, Raleigh W SAW [Raleigh.W.Bland@usace.army.mil] Sent: Thursday, July 31, 2014 8:28 AM To: Govoni, Daniel Subject: RE: Town of Hertford (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE SAW 201401029 PGP 198000291 Tier II Your Date Tx! -----Original Message ----- From: Govoni, Daniel [mailto:daniel.govoni@ncdenr.gov] Sent: Wednesday, July 30, 2014 11:16 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Subject: [EXTERNAL] Town of Hertford Comments, nine slip docking facility at Punch Alley, Hertford. Thanks! Daniel M. Govoni Asst. Major Permits Coordinator NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.eovoni(@ncdenr.eov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Classification: UNCLASSIFIED Caveats: NONE � NCDENR North Carolina Department of'Environment and Natural Resources Pat McCrory do hh E. Skvada, III Governor y _E_ Secretary 6a� June 4, 2014 UUN - 5 2014 . MEMORANDUM ;- a V, 'j TO: Robert Tankard, Environmental Engineer DWR - Water Quality, Aquifer Protection Section, WaRO FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application, Review Applicant: Town of Hertford Project Location: Punch Alley, Hertford, adj. Perquimans River & west of "S" Bridge Proposed Project: Nine -slip docking facility with pier, finger piers, pump -out station Please indicate below your agency's position or viewpoint on -the proposed project and return this form by 06/25/14 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: �This agency has no objection to the project as proposed. C - This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated., See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE —7 1367 US 17 South, Elizabeth City. NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www,nccoastalmanagement.net An Equal Opportunity (Affirmative Action Employer North Carolina Department of Environment and Natural Resources Pat McCrory John E. SI<varla, III Governor Secretary July 9, 2014 Town of Hertford Mr. Brandon Shoaf Post Office Box 32 Hertford, NC 27944 DWQ Project # 14-0571 Perquimans County Subject Property: Perquimans River, Hertford, west of S Bridge Perquimans River Basin, Perquimans River [PAS 52, 30-6-(3); SCj Approval of 401 Water, Quality Certification (GC3900) with Additional Conditions Dear Mr. Shoaf. You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 2,028 square feet (0.046 acres) of open water by shading for the purpose of constructing a nine (9)'slip docking facility including a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, one electric/water pedestal and one pump out station located at end of pier. The proposed project is as described within your CAMA Major.. application dated June 4, 2014and received, by the. N.C. :Division of.Water Resources (DWR) on. June 5, 2014. The impacts described in your application are covered by General Water Quality Certification Number(s) 3900 (GC3900).. This Certification(s) is issued in conjunction with the CAMA Major Permit and General Permit(s) 198b00291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit This approval -is for the purpose and design that you described in your application: Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. If you change your project, you must notify us and you may be requiredto send us a new application. If the, property is sold, the new, owner must be given a copy of this, Certification and approval letter and is thereby responsible for complying withal[ conditions. If total fills for this ,project ,(now or in the future), exceed one acre of wetland or 150.linear feet of Division of Water Resources —Water Quality Regional Operations section —Washington Regional Office 943 Washington square Mall, Washington, NC 27889 Phone; 252-946-6481 \ Fax: 252.975-3716\ rntemet•, w .nedenr.gov Town of Hertford Mr. Brandon Shoaf July 9, 2014 Page 2 of 3 stream, compensatory mitigation maybe required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached. certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan' Location or Reference Stream feet 404/CAMA Wetlands acres Waters 0.046 acres shading Application Plan Sheets Buffers (square ft. 2. Water Quality, Certification The proposed project must comply with all of the conditions. of General Water Quality Certification (GC) 3900. 3. Certificate of Completion Upon completion. of all work approved within the 40.1 Water Quality Certification or, applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the'attached certificate of completion to the 401 Oversight/Express,Review Permitting 'Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,NC, 27699-1650. 4. Washing of boats within docking facility is prohibited. as the wash water.is considered to be a wast@water.and must be collected and disposed of properly. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed - impacts or conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 brCAMA Permit. If you do not accept any of the conditions of this. Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition,, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask fora hearing. Town of Hertford Mr. Brandon Shoaf July 9, 2014 Page 3 of 3 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have anyquestions, please telephone Roberto Schaller of the Washington Regional Office at 252-948-3940 or Karen Higgins of the Wetlands, Buffers, Stormwater, Compliance and Permitting (Webscape) Unit at 919-807-6364. Sincerely, Robert. Tankard Assistant Regional Supervisor Division of Water Resources Enclosures: Certificate of Completion GC 3900 cc: Raleigh Bland; Corps of Engineers, Washington Field Office DWR Webscape Unit DCM, Doug Huggett, Morehead Office DCM, Lynn Mathis, Elizabeth City Office. Pile copy i DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Town of Hertford - C/o Town Manager Brandon Shoaf 2. LOCATION OF PROJECT SITE: Site is located adjacent to the Perquimans River within the Hertford Town limits on Punch Alley west of the "S" Bridge and adjacent to the public boat ramp. Photo Index: 2006: 236-6799 16 & 17 2000: 236-1784 N19 1995: 458-1630 X12 & X13 1989:1 17-21 P4 & P5 1984: Not Available 1979: 127-1586 T14 State Plane Coordinates: X: 3200 2747445.081ft US E Y: 898031.174ft US N 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: 03/19/2014 and 05/15/2014 Was Applicant Present: Yes 5. PROCESSING PROCEDURE: Application Received Complete: Accepted on MayQ3' 2014 Office: Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan: Town of Hertford LUP Land Classification: Hertford ETJ — Public/Semi-public/religious/institutional (B) AEC(s) Involved: PTA and PTW (C) Water Dependent: Yes (D) Intended Use: Public docking facility with pump -out (E) Wastewater Treatment: Existing: None Planned: Pump -out Facility to an Existing Sanitary Sewer System (F) Type of Structures: Existing: None Planned: Public docking Facility with 9 Formal Slips and a Pump -Out (G) Estimated Annual Rate of Erosion: N/A HABITAT DESCRIPTION: [AREA] DREDGED DISTURBED SHADED (A) Vegetated Wetlands: (B) Non -Vegetated Wetlands: (Open Water) -------------------------> ------------------------> ----------------------------> Piers/ Finger Piers 9 Platforms: 2,028sf (C) Other: Installation of pipe from 32HCENID (High Disturbance Ground) -------> -----------------------> the Pump -Out Facility to the City Sewer System: 1,000sf JUN 0 9 2014 (D) Total Area Disturbed: Within an AEC = 3,028sf (.069 acres) (E) Primary Nursery Area: No (F) Water Classification: SC Open: No DCM•MHDCTfY 8. PROJECT SUMMARY: The project includes a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, four tie pilings, one electric/water pedestal, and one pump -out station located at the end of the pier. The pump - out and electrical installation will involve minor high ground disturbance and connect to existing service facilities. A holding tank will be installed in association with the pump -out, and will be located greater than 75' from normal water level. Town of Hertford Field Investigation Report Page 2 Project Setting The property in question is located in the Town of Hertford behind the Police Department and the Town Managers Office, adjacent to Punch Alley and the Perquimans River, Perquimans County, North Carolina. The project site abuts a public boat ramp to the west along Punch Alley; the Police Department to the.south, a residential lot to the west and the Perquimans River to the north. Located at the adjacent access boat ramp is a dock used to moor the Periauger, a reconstructed colonial boat work boat used for historical reenactments. Adjacent to the Periauger are two floating drive on personal water craft docks placed by the Town of Hertford as a kayak launch. The property is approximately .48 acres, with 105' fronting on the Perquimans River. There is an existing 12' x 105' boardwalk paralleling the shoreline, with an 8' access walkway leading from a parking lot located 100' from normal water level. While there are no identified archeological sites on the property is located within the Hertford Historic District. There is a small variety of vegetation on the property and it includes, but is not limited to bald cypress (Taxodium distichum), a domestic grasses and a dense population of water lily`(Nymphaea odorata) extending from the existing boardwalk to a distance of approximately 40' into the Perquimans River. Average elevation of the property is approximately 4' above normal water level. Flood designation for the property is AE, which indicates a susceptibility to flooding. Shoreline stabilization consists of riprap that is located under the existing boardwalk. Water depths extend from 1.5' at the waterward side of the boardwalk to 6.5' at the distance of 176' waterward of normal water level (NWL). The property is located in the Public Trust Shoreline Area of Environmental Concern (AEC) and the waters immediately adjacent to the property are within Public Trust Waters. Currently there is only one marina operating in Perquimans County located at Albemarle Plantation, approximately 23 miles from the Town of Hertford by boat. Albemarle Plantation has a 158 slip marina exclusively for the residents of the subdivision. Fuel and pump -out facilities are available to the public for a fee. Development Proposal The Town of Hertford is requesting a CAMA Major Permit to construct a nine slip docking facility including a 6' x 170' pier with (2) 40' x 6' finger piers, (2) 4' x 36' finger piers, (2) 4' x 30' finger piers, one electriciwater pedestal and one pump - out station located at the end of the pier. The ninth mooring will be on the outside of "T" created by the two 40' finger piers and the end of the main access pier. High Ground Disturbance: The; installation of the lines for water, electrical and sewer are estimated to be 1,OOOsf Open Water Shading: Main Access Pier: 6' x 170'=1,028sf 40' Finger Piers: 2(6' x 40') = 480sf 36' Finger Piers: 2(4' x 36') = 288sf 30' Finger Piers: 2(4' x 30') = 240sf Total = 2,028sf t t Town of Hertford Field Investigation Report Page 3 In addition to the pier and finger piers, the Town proposes to install four tie pilings as depicted on the enclosed site plan drawings. A pump -out will be located at the end of the main pier along with an electric and water pedestal. Effluent from the pump -out facility will be piped to the Town's existing sewer system. As proposed, all slips within the proposed docking facility will be for transient dockage by boaters visiting the Town of Hertford. Anticipated Impacts 1) Shading of 2,028sf of water bottom from docking facility. 2) Temporary disturbance of approximately 1,000sf of high ground. 3) Construction impacts may result in a small reduction in water lily density between the finger piers and the existing boardwalk. 4) An anticipated increase in boating traffic may in increased wave action along adjacent shoreline, and may increase the risk for shoreline erosion along adjacent properties. 5) Jetting pilings for the marina will result in temporally suspending sediments in the water. 6) Along the shallower waters within the proposed docking facility, prop wash may cause resuspension of sediments within the water column. Submitted by: Lynn W. Mathis Date: May 29, 2014 RECENM JUN 0 9 2014 T)CM-Mica crrY 4 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor EMAIL MEMORANDUM TO: The Daily Advance Legal Advertisement Section edalegalsgdailvadvance.com FROM: Yvonne Carver for Lynn Mathis DATE: June 2,2014 y4 c./y/iyQ_ SUBJECT: Public Notice —Town of Hertford ACCOUNT: #2119219, NCDENR/Stadiem John E. Skvarla, III Secretary Please publish the attached Notice in the Friday, June 6, 2014 issue of The Daily Advance. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Daniel Govoni, Assistant Major Permits Coordinator, DCM, Morehead City Michele Walker, Public Information Office, DCM, Raleigh Melissa Sebastian, Accounts Payable, DCM, Morehead City RECMW File UN 0 9 2014 1367 US 17 South, Elizabeth City, NC 27909 D . fava—M C'ry Phone: 252-264-39011 FAX: 252-264-3723; Internet: www.necoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT NCDENR hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 05123/14. The Town of Hertford proposes to construct a nine -slip docking facility, with a pier, finger piers, and a pump -out station adjacent Punch Alley in Hertford, Perquimans County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 1367 US 17 South, Elizabeth City, NC, 252-264-3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 06/26/14, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Friday, June 6, 2014 w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary June 2, 2014 Mr. Brandon S. Shoaf TOWN OF HERTFORD P.O. Box 32 Hertford, NC 27944 Dear Mr. Shoaf: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of the Town's property located adjacent Punch Alley in Hertford, Perquimans County. It was received complete on May 23, 2014, and appears to be adequate for processing at this time. The projected deadline for making a decision is August 6, 2014. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from May 23, 2014, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at ttie location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right- of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252.264-3901 1 FAX: 252-264-3723 ; Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer or June 2, 2014 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Lynn Mathis, Field Specialist, if you have any questions and or if you wish to receive a copy of her field report. Sincerely, iinftgs -SFrank Je District Manager, Northeastern District NC Division of Coastal Management FJ/yc Enclosure cc: -Daniel Govoni, Assistant Major Permits Coordinator, DCM, Morehead City, NC Lynn Mathis Field Specialist, DCM, Elizabeth City, NC 5 CAMA, PERMIT APPLIES FOR o PROJECT: C', NSTRt�CT A J - SLIP 'DOCKING FAGL/Ty, gT-N«-upl Nv A /70' ,c c.' P/ €R Lair# CZ) y o',e (.' F/NG! Y' 4cING6R P/6RS. COMMENTS ACCEPTED THROUGH o(ajr.(ob i APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: TOWN o F qfK :ft%lt' � VIM- of ca/}srAL. YKAA#*%er 4rf4T' 17 o. $orC 3 L / i v'� K 1 fl WY t'l S HEarF•tt fl, lu c 2-'7 7 Y y E�izat e�r� c,rrY� N z� 409 / TTA: a AAd p.&J SHoR F Arrni: t-YNOJ of *7 f /s ZSZ- /q(.j 2.1r2- 24y- S9o/, Etcr. 2S3 Wff1Y ttt111 LI:1107I.N+�" !'TAX . ..T- NOBTN CAROLINA PERQUIMANS COUNTY WARDS D EDWARDS RCCR1n AT LAW REBt,RR4. R. C. 300I 139f1ee 512 QUITCLAIM DEED �11AY -2 2014 THIS QUITCLAIM DEED, made and entered into this 2i-t dar of May, 1991 by ONEITA H. HOLLOWELL, widow, Grantor to the TOWN OF HERTFORD, a municipal corporation organized and existing under the laws of the State of North Carolina, Grantee; W I T N E S S E T H: THAT WHEREAS, by Lease with Option to Purchase dated 1 December 1978, Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell leased the hereinafter described property to the Grantee with an option to purchase; and whereas, said lease swag assigned by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to Bank of North Carolina, N.A. (now NCNB, National Hank of North Carolina); and whereas, said Bank of North Carolina, N.A. had a deed of trust lien against said property; and whereas, the Grantee herein agreed to make payments on the note secured thereby to Bank of North Carolina, N.A. and that when acme was satisfied the property hereinafter described would be deeded by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to the Grantee herein; and whereas, said loan was paid in full and the note and deed of trust were marked paid and satisfied in full and the deed of trust was cancelled of record; and whereas, no deed was ever given by Joel F. Hollowell, Jr. and wife, Oneita H. Hollowell to the Grantee. NOW, THEREFORE, the said Grantor in consideration of ten dollars .and other valuable consideration to her in hand paid by the said Grantee, the receipt of which is hereby acknowledged,, has remised and released and by these presents does remise, release and forever quitclaim unto the Grantee and its successors and assigns, all her right, title, claim and interest in those certain lots or parcels of land lying and being in the Town of Hertford, Hertford Township, Perquimans County, North Carolina, and further described as follows: 000I Mpacf 5D Tract I: BEGINNING at an iron pipe on the east side of a 20 foot alley between now or formerly Amos W. Roughton and now or formerly Growers Peanut Company, 229.5 feet northwardly from the center of Grubb Street; thence S 830 E 104 feet to an iron pipe in the G.W. Barrow, now Town of Hertford line; thence along the Town of Hertford line N 5" 50' E 201.8 feet to the Perquimans River; thence along the shoreline of the Perquimans River N 830 W 107.2 feet to an iron pipe on the side of said alley; thence B 70 W 201.2 feet along the maid alley to an iron pipe, the point of BEGINNING. Tract II: Bounded on the south by lot of E. Leigh Winslow (new or formerly George L. Button), on the west by an alley leading from Grubb Street to the property of now or formerly Sinclair Refining Company (first tract described above), and on the north by above said First Tract, bounded on the east by the property of the Town of Hertford. For reference and chain of title see Estate of Joel F. Hollowell, Jr. of record at SS-E-34 in the office of the Clerk of Superior Court of Perquimans County, North Carolina and deeds recorded in Deed Book 72, page 25 and Deed Book 73, page 142, Perquimans County Public Registry. TO HAVE.. AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereunto belonging to it the said Grantee, its successors and assigns, free and discharged from all right, title, claim or interest of the said Grantor or anyone claiming by, through or under her. IN TESTIMONY WHEREOF, the said Grantor ham hereunto set her hands and seals the day and year first above written. (SEAL) O Il�' TA H. �HOLLOWELL NORTH CAROLINA PERQUIHANS COUNTY I, the undersigned Notary Public, do hereby certify tk ONEITA H. HOLLOWELL, widow, personally appeared before me this C and acknowledged the due execution of the foregoing instrument. Vjitnees my hand and off cia seal this the L4day Vu1 the 19 1 My cohi4135a�n expires: lg lzz-IQ3 e c YARDS a EDWARDS AnaRnu A. uw HmeRRD,a r OF Esasaot s EDWARDS •T10A. M Al L. xEMM, v. t. \fIOK 138p,Gf 514 IN TESTIMONY WHEREOF, the sold party of the first part has executed this Instrument the day and year first above witten. VERNON R. BUSH I STATE OF VIRGINIA CITY/COUNTY OF 1, the undersigned Notary Public, do hereby certify that VERNON R. BUSH, divorced, personally appeared before me this day and acknowledged the due execution Of the foregoing Instrument. ,vWrgj7ft,4py hand and off[ s the oC day of February, 1991. ff ¢�" ytOURY r � ••• Notary Nblic �t Pli9uc r �s des: ros rk) ",,. NORTYf-T-WA jLINA, PERQUIMANS COUNTY The foregoing or annexed certificate of saaa• S. Mtulaa, a ootary of I glhara co., sc Is certified to he correct. This Instrument was presented for registration this day and hour and duly recorded In the Office of the Register of Deeds of Perquimams County, North Carolina, in Book 138 , page 513 . This the 28t11 day o[ _ St,.._ A.D.. 1991 at 12.02 o'clock P, M. Register of Deeds Assistant Register of Deeds i! &V as.E7wwrry JUN 0 8 2014 ecm,I,!:DC.Ty ai ■ Complete items 1, 2, and 3. Also complete Item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse; -� so that we can r@.loFri the card toy d' ■ Attach this card to the back of th ,ilpiece, or on the front if space permits. c 1. Article Addressed to: _ 2 ti.e�pr.s��j� wiirte� 303 Al N'a'(r'lk 5 Agent - nw FAF oy rrnnteaj,& ae) C. Data of Delivery aMel S �Uv1#buv 9130� 1q- D. is tle0vepr address different from Rem 17 ❑ Yes If YES; 8hter delivery address below: W No i r A >•- IV3. Servi ype ' V ed Mail® ❑ Priority Mail Express'" y-' ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4 2. Article Number IS Form 1, July 2013 . Restricted Delivery? (Extra Fee) • ❑ yes 7013 3020 0000 5501 2889 Domestic Return Receipt 71 ■ Complete items 1, 2, and 3. Also complete A. Item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. B. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: D. Cc4,�74a r /yla M C. Is delivery address different from Rem 17 O Yes If YES, enter delivery address below: $946 3. S�ervic4pe rliRed Mail* Q Priority Mall FxpreW CI Registered 17 Return Receipt for Mmhendlse "'Ms "Mail ❑ Collect on Delivery 4. Restricted Delivery? (Odra Fee) ❑ Yes 2. ArticleNumAer 01 28720 0000 5 302 7013 3025 mmnoerfrom service fabeo — _-- 3 5 IS Form 3811, July 2013 Domestic Return Receipt JUN 0 9 201� DC.1, IN'�jC.jy MAJOR PERMIT FEE MATRIX t Li Applicant: TOWN OF HERTFORD Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (243001602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas:. II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C or D below a lies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3490 (See attached) can be applied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3490 (see attached[) cannot be applied: IV. For development that El involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: el 7Ys? G k *- ,2, 7 54 3 53// y � RECEIVED JUN 0 9 2014 %7CM•MHD CITY Town of Hertford Field Investigation Report Page 3 In addition to the pier and finger piers, the Town proposes to install four tie pilings as depicted on the enclosed site plan drawings. A pump -out will be located at the end of the main pier along with an electric and water pedestal. Effluent from the pump -out facility will be piped to the Town's existing sewer system. As proposed, all slips within the proposed docking facility will be for transient dockage by boaters visiting the Town of Hertford. Anticipated Impacts 1) Shading of 2,028sf of water bottom from docking facility. 2) Temporary disturbance of approximately 1,000sf of high ground. 3) Construction impacts may result in a small reduction in water lily density between the finger piers and the existing boardwalk. 4) An anticipated increase in boating traffic may in increased wave action along adjacent shoreline, and may increase the risk for shoreline erosion along adjacent properties. 5) Jetting pilings for the marina will result in temporally suspending sediments in the water. 6) Along the shallower waters within the proposed docking facility, prop wash may cause resuspension of sediments within the water column. Submitted by: Lynn W. Mathis Date: May 29, 2014 RECEIVED JUN 17 2M DCM•srrM Carr