Loading...
HomeMy WebLinkAbout67-96 TX/Minor Mod McCauley, AlbertPermit Class Permit Number TRANSFER STATE MINOR MODIFICATIOlbepartment of I X Major Devi pursuant to ttural Resources fission onmental Concern X Excavation and/or filling pursuant to NCGS 113-229 Issued toAlbert O. McCauley, P. O. Box 654, Fayetteville, NC 28302 67-96 authorizing development in Onslow County at White Oak River, off of Water Street, in Swansboro' as requested in the permittee's application dated letter dated 5/28/98, file application dated 1/2/96 and attached work plan dated revised 5/29/98.. This permit, issued on is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification under this transfer authorizes pier reconfiguration and design as per the attached revised plan. Bulkhead Construction 2) The alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This pemiit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires furtherDepaitmental approval. . Ali work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. __�i�Donmkb. Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. Albert O. McCauley- Permit #67-96 Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead must be constructed prior to any backfilling activities. 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, dead -men cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutant, except in trace quantities. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. Pier Construction and Use 8) The pier shall have a minimum setback distance of 15' between any part of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 9) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 10) The pemrittee must install and maintain, at his expense, any signal lights and signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on authorized facilities. 11) This permit authorizes only the piers and uses located in or over the water that are expressly set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this pier without permit modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 12) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. Albert O. McCauley ADDITIONAL CONDITIONS Permit #67-96 Page 3 of 3 13) It is possible the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee will not hold the United States liable for any such damage. 14) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. General 15) All activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the water body is 25 NTUs or less in all saltwater classes are not considered significant. NOTE: The Division of Environmental Management approved this project on April 2, 1996 under General Water Quality Certification No. 3025. NOTE: A Stormwater Management Permit is required by the Division of Environmental Management under NCAC 211.1000. (RE: DEM letter dated 3/28/96). NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -dis- turbing activity. Submit this plan to the Dept. Of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. NOTE: The permittee and/or his contractor is urged to meet with DCM prior to project initiation. NOTE: Future upland development on the permittee's property will require a modification of this permit. Contact a representative of this Division at (252) 808-2808 prior to commencement of any such activity for this determination. NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Permit Class Permit Number TRANSFER MINOR MODIFICATION STATE OFNORTH CAROLINA 67-96 i"r .y epartment of Envirotiment`ancTNatural Resources ' '"Y %� .:an Re Coasfal sources Commission .� X Major Development m an Area of Environmental Concern pursuant to NCGS 113A�118;=.'' X Excavation and/or filling pursuant to NCGS 113-229 Issued toAlbert O. McCauley, P. O. Box 654, Fayetteville, NC 28302 authorizing development in Onslow Cody at White Oak River, off of Water Street, in Swansboro as requested in the permittee's application dated letter dated 5/28/98, file application dated 1/2/96 and attached work plan dated revised 5/29/98. This permit, issued on is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification under this transfer authorizes pier reconfiguration and design as per the attached revised plan. Bulkhead Construction 2) The alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This pemulLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. - All work must cease when the permit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Manaeement Proeram. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Donn. . Moffitt, Director Division of Coastal Management This permit and its conditions are hereby accepted. Albert O. McCauley Permit #67-96 Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead must be constructed prior to any backfilling activities. 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This pemut does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutant, except in trace quantities. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. Pier Construction and Use 8) The pier shall have a minimum setback distance of 15' between any part of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 9) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 10) The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on authorized facilities. 11) This permit authorizes only the piers and uses located in or over the water that are expressly set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this pier without pemut modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 12) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. Albert O. McCauley ADDITIONAL CONDITIONS Permit 967-96 Page 3 of 3 13) It is possible the authorized structure may be damaged by wayewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee will not hold the United States liable for any such damage. 14) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. General 15) All activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the water body is 25 NTUs or less in all saltwater classes are not considered significant. NOTE: The Division of Environmental Management approved this project on April 2, 1996 under General Water Quality Certification No. 3025. NOTE: A Stormwater Management Permit is required by the Division of Environmental Management under NCAC 2H.1000. (RE: DEM letter dated 3/28/96). NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -dis- turbing activity. Submit this plan to the Dept. Of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. NOTE: The permittee and/or his contractor is urged to meet with DCM prior to project initiation. NOTE: Future upland development on the permittee's property will require a modification of this permit. Contact a representative of this Division at (252) 808-2808 prior to commencement of any such activity for this determination. NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Permit Class TRANSFER STATE OF NORTH CAROLINA MINORMODIFICATIO16 epartment of EiiyironinenY:ancINatural Resources Major Development in anArea of Environmental Concern pursuant to NCGS 113A 118; v y< X Excavation and/or filling pursuant to NCGS 113-229 Issued toAlbert O. McCauley, P. O. Box 654, Fayetteville, NC 28302 authorizing development in Onslow Permit Number 67-96 Cody at White Oak River, off of Water Street, in Swansboro as requested in the permittee's application dated letter dated 5/28/98, file application dated 1/2/96 and attached work plan dated revised 5/29/98. This permit, issued on is subject to compliance with the application (when: consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This pernut modification under this transfer authorizes pier reconfiguration and design as per the attached revised plan. Bulkhead Construction 2) The alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This permit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when.the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. QIPQ� Donna . Moffitt, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Albert O. McCauley Permit #67-96 Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead must be constructed prior to any backfilling activities. 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutant, except in trace quantities. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. Pier Construction and Use 8) The pier shall have a minimum setback distance of 15' between any part of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 9) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 10) The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on authorized facilities. 11) This permit authorizes only the piers and uses located in or over the water that are expressly set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this pier without permit modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 12) No attempt will be made by the pernuttee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. Albert O. McCauley ADDITIONAL CONDITIONS Permit #67-96 Page 3 of 3 13) It is possible the authorized structure may be damaged by wayewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee will not hold the United States liable for any such damage. 14) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. General 15) All activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the water body is 25 NTUs or less in all saltwater classes are not considered significant. NOTE: The Division of Environmental Management approved this project on April 2, 1996 under General Water Quality Certification No. 3025. NOTE: A Stormwater Management Permit is required by the Division of Environmental Management under NCAC 211.1000. (RE: DEM letter dated 3/28/96). NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -dis- turbing activity. Submit this plan to the Dept. Of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. NOTE: The permittee and/or his contractor is urged to meet with DCM prior to project initiation. NOTE: Future upland development on the permittee's property will require a modification of this permit. Contact a representative of this Division at (252) 808-2808 prior to commencement of any such activity for this determination. NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Permit Class TRANSFER STATE MINOR MODIFICATIOl6epartment of I X pursuant to Resources in a 6fEnviionmental Concern v". 67-96 - $ X Excavation and/or filling pursuant to NCGS 113-229 Issued toAlbert O. McCauley, P. O. Box 654, Fayetteville, NC 28302 authorizing development in Onslow Cody at White Oak River, off of Water Street, in Swansboro as requested in the permittee's application dated letter dated 5/28/98, file application dated 1/2/96 and attached work plan dated revised 5/29/98. This permit, issued on — — is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This permit modification under this transfer authorizes pier reconfiguration and design as per the attached revised plan. Bulkhead Construction 2) The alignment of the proposed bulkhead must be staked by a representative of the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This pemrit_action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. . All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Donn. . Moffitt, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Albert O. McCauley Permit 967-96 Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead must be constructed prior to any backfilling activities. 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or other suitable materials approved by Department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 6) The fill material will be clean and free of any pollutant, except in trace quantities. 7) All backfill material will be obtained from a highground source and confined behind the permitted bulkhead. Pier Construction and Use 8) The pier shall have a minimum setback distance of 15' between any part of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 9) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 10) The pemrittee must install and maintain, at his expense, any signal lights and signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on authorized facilities. 11) This permit authorizes only the piers and uses located in or over the water that are expressly set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this pier without permit modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 12) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. Albert O. McCauley ADDITIONAL CONDITIONS Permit 967-96 Page 3 of 3 13) It is possible the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee will not hold the United States liable for any such damage. 14) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. General 15) All activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the water body is 25 NTUs or less in all saltwater classes are not considered significant. NOTE: The Division of Environmental Management approved this project on April 2, 1996 under General Water Quality Certification No. 3025. NOTE: A Stormwater Management Permit is required by the Division of Environmental Management under NCAC 2H.1000. (RE: DEM letter dated 3/28/96). NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land -dis- turbing activity. Submit this plan to the Dept. Of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. NOTE: The permittee and/or his contractor is urged to meet with DCM prior to project initiation. NOTE: Future upland development on the pernuttee's property will require a modification of this permit. Contact a representative of this Division at (252) 808-2808 prior to commencement of any such activity for this determination. NOTE: Permanent reflectors should be attached to the structure in order to make it more visible during hours of. darkness or inclement weather. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 W ILMINGTON, NORTH CAROLINA 28402-1890 IN REw]/REFER To August 31, 1998 Regulatory Division Action ID No. 199603014 and State Permit, ,67-96 Mr. Albert McCauley Post Office Bo*,,Wft Fayetteville, North Carolina 28302 Dear Mr. McCauley: Reference the Department of the Army permit issued on May 23, 1996 to Mr. Homer Brooks, and your written request of May 28, 1998, for transfer of this permit to you in addition to a proposed reconfiguration of permitted pier, on the White Oak River, on lots 219 and 220 on Water Street, beside Casper's Marina, in Swansboro, Onslow County, North Carolina. The permit is hereby transferred to you and it is modified to include the work as shown on the enclosed plan. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, at telephone (910) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure Copies Furnished (with encl) Chief, Source Data Unit NOAA/National Ocean Survey Attention: Sharon Tear N/CS261 1315 East-West Hwy, Rm 7316 Silver Spring, Maryland 20910-3282 Copy Furnished (without encl); Mr. John Parker Division of Coastal Management North Carolina Department of Environment and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611 Mr. M. Ted Tyndall, District Manager Morehead City Regional Office North Carolina Division of Coastal Management Hestron Plaza Two 151-B Highway 24 Morehead City, North Carolina 28557 05/29/1998 09:00 JUN 0 8 1998 9103479036 RAGLAND PAGE 02 92.7 LF proposed precast oonorets bulkhead, shown I wide existng shed wood deck and pier, dilapidated pier a deck to be remkwed mean high water m;k Lot A Lot B SIS313 +137 m4 ( N/F WTGeper CeepereManna Casper Marine — Concrete Bulkhead Wayne Rail=41 5/29/9a scale : I" = 20' o w so , ►o SIS = set Iron stake EIP = existing Iron pipe x = exsting spot ale mlw = mean low water mhw = mean high water Casper Nledne , adjacent riparian acmes setback NffE-.werevisions emphasized by underlining existing moorhq ON White flak diver , -8.78' rnlw 1 44' pieta conwerled to floating (jjM ' I 5'5'typ—• !'--a5'tM. 5/29/98Revisionof Bulkhead/ Pier Dimension Plan LAMA Permit Application Exhibit.Map Water Street Lot Recombination Swansboro, NC Sheet 3 of 3 to serve new owner Mr Albert ©McCauley iNe. / NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT July 7, 1998 Mr. Albert O. McCauley P. O. Box 654 Fayetteville, NC 28302 Dear Sir The enclosed permit constitutes authorizadonunderthe Coastal Area ManagementAct, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Ifyou object to the permit or any ofthe conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150D with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permitwithin twenty (20) days, the matter mustbe resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The projectplan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, orproblem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, hn R. Parker, Jr. Major Permits Processing Coordinator JRP:jr/amw Enclosure P.O. BOX 27687, RALEIGH, NC 27611-768712728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE 919-733-2293 FAX 919-733-149S AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - SO ry RECYCLED/I0% POST -CONSUMER PAPER I n L, MEMORANDUM: TO John Parker Division of Coastal Management Application Processing Notes Applicant: Deadline:�' Date/Time: Message: y, S4 F-96, issued to 1A Major Permit to Mr. Albert O. so requesting a pier rather than h floating finger Is as permitted, red gazebo with . The total area I would have no ..._—_ 10 aSG ,Fri 9 3 \ MWGEMEM ALBERT O. McCAULEY P.O. BOX 654 FAYETTEVILLE,NC 28302 May 28, 1998 Mr. Charles Pigott Division of Coastal Management Hestron Plaza #2 151-B Hwy. 24 Morehead City, NC 28557 RE: Permit #67-96 Homer Brooks Dear Mr. Pigott: I have recently acquired the (2) lots located on Water Street in Swansboro, as described in permit #67-96 from Mr. Homer Brooks. I have enclosed herewith $50.00 for the transfer of this permit to my name as described below: Mr. Albert O. McCauley P.O. Box 654 Fayetteville, NC 28302 Telephone # (910) 483-4195 Ext. 222 In addition to the transfer, I would like to make some modifications to the plan. I have included herewith the $50.00 fee as you described as well as a revised CAMA permit application exhibit map. The modifications are as follows: 1. In lieu of there being (2) piers, I wish to have (1) single pier for the (2) lots and the (2) boat slips as shown on the revised map. 2. In lieu of covering the boat slips, I wish to build a Gazebo in the 12 feet between the boat slips (size of Gazebo — 12' X 20') 3. In lieu of the outside finger piers being fixed dock, I wish to make them floating docks. Please review at your most earliest convenience and should you have any questions, please call either rgAOf at the above number or Chris Bailey at (910) 256-8443 (my contractor). McCauley ".. Y........ i • 1 _ .._e. is � r..�.. • .. — � y 1 n V J'ram, ice— —-- 1. mean high water N/]FWTCaeper Caeper'eMarina Casper Marine — Concrete Bulkhead Wayne Ragland 5/29/98 scale : t = 20' 0 le 9e 1 40 SIS = set Iron stake EIP = existing Iron pipe X = existing spot ele mlw = mean low water mhw = mean high water Casper Marina LF proposed precast concrete teed, shown V wide --7,, Lot A SIS i i adjacent riparian ; access setback (typ)---!�-15' shad, wood deck and pier; a ed pier & deck to be rem Doved y� b a Lot I � ----0. w sis f +i.sr mlkI ; �e I 4. 8 miw •6.78' miw EIP i treated wood piers with "U° plaf(onns, 32' by W boat bay with d,a roofed hoist �,4- q' piers converted to fixating piers ; --45'tw-64a-ts'typ— I..45'typ- 5, 29/98 Revision of NOTE1@O fl 1',:eeerevasions Bnllcbead/ PierDimension Plan -.seerlbyunderlining CAMA1PermitApplieationE.xhibitMap empWater StreetLot Recombination Swansboro, NG existing moonng pilingSltoserve.3 , oaerve 1 hfte Oak River new owner Mr Albert 0 McCauley JUL—Ind—'UU IHU 11:10 10: ILL NU: R155 t101 - �•^ McCauley -McDonald Investments, Inc. 155 "C" Street — P.O. Bo: 654 Fayetteville, North Carolina 98502 Telephone 910/485.4195 T0: oha �ARke rZ FROM. sm In It � rt IrY1 � COL". l DATE; S �. l h __. i Q g j PAGES. Q Includee cover page If you need further information■ our fax number is 910/483-8005 JUL—UJ --7U INU 11;11 IV: ICL NU: Rinn r'YJG --- I INO TITLE WORK REQUESTEQI OR MADE " �, NO CLOSING UNDERTAKEN ` �G t.,..r /o /a v. +►'.Jl" BOOK I helm Too :iVVPAGE '7GO This Instrument woo pre ... ..� � pared by PRANK N. ERWIN, ATTOR __,.__..................... arid description for the Index 0, lq and 0.40 Acres water Etr et NORTH CAROLINA GENERAL WARRANTY DUED THIS DEED mad& this _.3.9..... day of .......... April Ill. 9.T, by and hstween GRANTOR s BROOKS ELECTRIC AND CONSTRUCTION, INC• +ReB� GRANTER MCCAULBY AND MCDONALD INVESTMENTS, INC, AM Enter In ppnpfyat, Nock for sock pvtYl namr, add,,", and, If mppreprlate, eharecly of enlny, ea• sopperppen or prinenhlp. Thg eoifnatlon Granter and Grantee es used herein @hall Include male parties, their hairs, sucsesoors, &no aoo,an., shell Include 1I1(ular, plural, masculine, feminlne or neuter &a required by context. WITNESSETH, that the Grantor, for a Valuable consideration geld by the Grantee, the receipt of Which is hereby acknowledged. has and by these presents does grant, bargain, sell and convey unto the Grantee In fee simple, all that SWANSRpRq BWANSeORO_,_„___ Townphlp, certain lot or parcel of land situated In the City of --- ON84GW,,,,, County, North Carolln& and more particularly domerlse4 as fullows, Being hereto Allof that inoorporatedy herein s„byn Suhlibit A, Ch ad this reference AD if fully met forth. JUL-1�G-"yC IHU 11: 1G Ill: IEL NU: iS155 yes BGBK �VVPAGE 762 The property huslnebove described was ••aalnd by Gunter by InaSrYmnt records n ....... .,.„.... .... ...... .......... A map showing the above described property is recorded in plat Hook ..................• Page ...... " TO HAVE AND TO HOLD the aforesaid lot or parcel of lend and all privileges and •p➢ortenanees thereto belonging to the Orontes in fee Dimple. remioe• In fee simple, has the right LD convey And the Inerev mile, ha wilsiatl the Grantee. Chad free an Is Retiedall the D the samedefend the title against the Iawfultela dos of\oil personeawh msoleverorleelpt for eUtheeexceptions hereinafter statted afoot end Title to the property herelnisbove described Is subject to the following stteptione: W WITMR• WIIGtOI, thr Ognlar no. Mewntn .at his .hand and $.1, or If .-IF-F.O not consul Ihlll Ine/ram.hl to to el nee p II O�er W14� . by its Out, .Whe, ofl10 . d.d Ida ..,I le be hn.enls •Ina.\ by eYlnnAly e% Ile e.He al DIIddMl1, Nr duly an i rwI 14•S $ROOKS ELECTRIC AND CONSTRUCTION, IN¢ .............................................. ldFAhl W.........LA ...... / ®-------------reelident . rapA61 Atte ........ ..... .............Fdorotary (c.lpe11114 Flail .......................... .------- (egA{rl t•II� n V g4�1.'rr.l gAM`rtr��,,,,. NORTHCaRaLINA..................: ................cauntri ry •• Ep•'•.;Ne=.. Y, Ir \ pmaq P•bll• al the coin. and It -to .9.... ali, s•rtur out .......................................... Dn.bp . „... !�ir`:.. tl-•�1 nnNn.11r appe•nn brtal• T• Nla erg \fie aeYnoddpa Na o.routbn fit the lonWne Inapumon6 WINm m7 ,R: ''f Ta Fjn '.,,. .. ........................ hand and official rums or 'Full lei- -------- day .1 __ ___ ........., 11-...., :•;: 7glr'ISY'' y .............................o•••-•• _ floHry ruplM - r'Iquil•adpptY MI eaMM4tlen cerise.; ...................... _____ ONSLOW ______mono. _ g/ l dot11/led to be coned Thil Intlrom t or Nu d.0 fast, a,, duly r,11.11led At the data And IIm1 .hit In led so"k and "to ""We an fillr.a 1•e•e•el ........... ...ReD1dTIR Or pa.D. real ......... !IvAg ................. couwry - ----- ---------- ...A— a..n na. ] a 1e16, awlete O Idir-U„�amm.•c..l'.-�.,••..e.uao-. n.eJNM j� JUL-GC--7tl IMU 11:1G 11): ILL NU: 4100 r64 DOUK 1. 3 G G PAGE 7 G L " Exhibit "A" BEING all of Tract I and Tract 2 as shown on that survey entitled, "Lot Regotdbination for BROOR8 ELECTRIC AND CONSTRUCTION, INC., 8wanabord Township, Onslew county, North Carolina, dated March 7, 1996, prepared b4hoar es A I-wls nd Associates, soc t s, and recorded 1n Map Book ]i, page sdP Also bane 62l of that and Back 1218, Proertage 66 , onslow as Phown an a county recorded Book Registry, 1218, Paq a mm' JUL-YJG-"= IHU 11:1J 10: 1 \� STATE OF NORTH CAROLINA COUNTY OF ONSLOW ItL NU: BOOK 1366phn 755 1797 11,V 1 - I P11 3! 04 R155 )'Un EASEMENT AGREEMENT This Deed of Easement made and entered into this the day of May, 1997, by and between Brooks Electric and Construction, Inc., a North Carolina Corporation, party of the first part, and The Town of Swansboro, a municipal corporation, of the State of North Carolina, party of the second part. WITNESSETH WHEREAS, the party of the first part in the owner of Tract 1 and Tract 2 a■ shown on survey plat entitled "Lot Recombination For Brooks Electric and Construction, Inc." prepared by Charles A. Rawls and Associates recorded in Map Book 32, Page 40, onslow county Registry; and WHEREAS, depicted on said recorded plat is a Proposed 141 Drainage & Utility Easement which the party of the first part has agreed to convey to the party of the second part in exchange for the abandonment of an easement in favor of the Town of Swansboro recorded in Book 3351 Page 576, onslow County Registry. NOW THEREFORE, in consideration of the sum of Ten Dollars ($10.00) paid to each party by the other, receipt of which is hereby acknowledged, the party of the first part does hereby give, grant and convey unto said party of the second part, its successors and assigns a perpetual right and easement to construct and maintain across and upon the property hereinafter described an underground storm drain line for the purpose of draining a portion JUL-02-'yd IHU 11:15 ID: TEL NO: #155 Pe6 -2- of Water $treat in the Town of Swanaboro. The description of the said 14 foot drainage and utility easement is as follows: Being all that property designated as "Proposed 141 Drainage and Utility Easement" as shown on survey plat entitled "Lot Recombination For Brooks Electric and Construction, Ina." prepared by Charles A. Rawls and Associates, recorded in Map Book 32, Page 40, Onslow County Registry, to which reference is made for a more full and complete description. To have and to hold said rights and easement (14' drainage) unto the said party of the second part, its successors and assigns in title forever; it being agreed that the right and easement hereby granted is an appurtenance to and runs with the lands now owned by the party of the first part, its successors and assigns. The Town of Swansboro by accepting this deed of easement hereby agrees and does hereby abandon and floes otherwise give, transfer and convey unto the said party of the first part, its successors and assigns, all right, title and interest in and to that certain easement recorded in Book 226 Page 576, onslow county Registry. To have and to hold the said easement described in Book 336, page 576, Onslow County Registry to the said party of the first part, its successors and assigns forever. The party of the first part for itself and its successors and assigns hereby covenants and agrees with the Town of Swaneboro, to maintain the existing storm drain line located on the said property of the party of the first part in a good and reasonable state of repairs. After notice and seven (7) working days, if the property JUL-U2-'ytl IHU 11:14 10: ItL NU: ui�� rer 3 owners have not started necessary repairer the Town has the authority to enter the property and make all necessary repairs and assess the property owner for the reasonable cost thereof. This covenant shall be binding upon the party of th9 first part and all future owners of the said propert y.. of Swansboro shall be held'harmlOBS from any liability. The Town of Swaneborc covenants and agrees that should it ever beoons necessary to construct, repair, or maintain a now underground storm drain line in the said 14 foot easement area, that it will remove all surplus earth, make level the surface above the storm drain line, and interfere as little as reasonably possible with any plants, fences or other improvements upon the lands of the party of the first part. In this event, the Town of Swansboro shall have the right to abandon the existing drainage line. IN TESTIMONY WHEREOF, the parties of the first part and the party of the second part have caused this instrument to be signed in their respective corporate names by their respective authorized officers all with authority duly given, the day and year first above written. BROOKS ELECTRIC AND CONSTRUCTION, INC. �A • r _ 1 _..f... ev (SEAL) ATTEBTi JUJ U JU II IU lL. ICL I`IIJ. M1JJ rCJO BOOK 13 s 6 PAGE rr J —a— (SEAL) ATTEST• C IeKK STATE OF NORTH CAROLINA COUNTY OF ONSLOW TOWN OF SWANSBORO 1, a Not y public of said County and State, do hereby certify that personally appeared before me thi■ day a accnoWle qed Chat (s)he is secretary of BROOKS ELECTRIC AND CONSTRUCTION, INC., a North Carolina corporation, and that by authority duly given and as the act of the corp�Lion, the eaediiinstrument signed in tits Presiaont, slwtits corporate seal ndattestd by is secretary. Witness my hand and seal this the I day of May, 1997. Ny Commission Expires: 3•�l�-ZC JUL-Ue '= INU ii:1J ID: ILL NU: iron F'19y 5 - STATE OF NORTH CAROLINA COUNTY OF ONSLOW I, `P�✓� " ='' a 1,4 Notary in and for said County and State do hereby certify that 'A / (A)- L-�arQ�vJ personally came before me this day and acknowledged that he(she) is aunicip 1 corporation, and that b authority Town ul of en andoro, e Y y y given and as the act of the corporation, the foregoing instrument was signed in its nams'by.it■ Mayor, sealed with its corporate seal and attested by its City Clark. 1997. Witness my hand and official seal this day of May, ary Public My Commission Expires: