HomeMy WebLinkAbout121-15 Renewal 2022 NCDNCRPermit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
121-15
Issued to NC Dept. of Natural and Cultural Resources, 8884 St. Philips Road, Winnabow, NC 27479
Authorizing development in Brunswick County at Cape Fear River at 8884 St. Phillips Rd.,
Winnabow , as requested in the permittee's application dated letter dated 11/28/22
This permit, issued on December 21, 2022 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
)e suDlecr ro times, tmpnsonmem or civu action; or may cause Lue pcmiu w ee uuu auu vU,u.
1) This renewal shall be attached to Permit No. 121-15, which was issued to the permittee on 10/16/15,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
15-0672.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2012-0039.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2024
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
��
// For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District
Major Permit Staff.Applicant
Information
Applicant/
Name:
N 1 J/ lV
1 � (� "SWr (IV
/
1 it
Request Date:
V@ (�
I
Last First
t ISO �2 2
Received in Office:
Project
W n aibzw
Soret.address Iz
City
Z(P Code
CA.Permit IXi —15 ��t/3 .2%. �o.: / *Permit Expiration Date: Payment S
Agent's Name:
YES/ NO
District Manager.' field Re Approve? (Initial Appropriate Box) 1 0
DWR Project USACE Action
No: - 0 4 TI, ID No.: 2012
Has substantial yE NO If Yes,
development occurred? ❑ Explain: hit RJ '�1't7�.(iCi1 {/Qd% 01-4dfkG
-fvfz - *4ces (a vtIN&
YE$� No
Recommend to Renew?
If Not Approved, provide
Justification:
Staff
Signature:
�yL ►I�P7,
Narih Cwd Departm mofEnvhonmenmtQ Oty IXvWanof Coastal Managemrnt.
Washm4tuoMM ! 443WadikVmSWu Matt I Wash K$GkN"thCaz &U2TaM4 j =946.6481
4Nltala�at4k11Ft2 f t2 Qr&ettrrtae E> F Nuw aaroaoa 2"W (91D29d=
Mm�avlrr$Crl®o' r eew n ow ".....— 13lmahead OCtNarthCazaPnazas z r 252$067Los
North State
E N V I R O N M E N T A L
2889 Lowery St., Winston-Salem, NC 27101 1 p.336.725.2010 I f.336.725.2405
November 28, 2022
NC Division of Coastal Management
c/o Patrick Amico
127 Cardinal Drive Ext
Wilmington, NC 28405
RE: CAMA State Permit 9121-15 — permit extension
On behalf of the North Carolina Department of Natural and Cultural Resources (NCDNCR), we are requesting an
extension of State Permit #121-15. This permit was originally issued on 10/26/2015 for shoreline stabilization at
Brunswick Town/ Fort Anderson State Historic Site (BTFA). The property is located at 8884 St Philip's Rd SE
Winnabow, North Carolina. The property is adjacent the Cape River in Brunswick County. Project implementation has
occurred in a phased approach as it has been dependent upon the funding availability.
Permit History. Permit #121-15 was renewed on 12/10/2020 with an expiration date of 1213112022. There have been
several refinements/ modifications related to the NCDNCR's efforts to stabilize the shoreline at BTFA. These
refinements/ modifications include May 1, 20217, May 21, 2018, June 14, 2021, May 18, 2022 and November 10,
2022,
There have not been any changes to the ownership of the adjacent properties.
The project is in compliance With all conditions of the current permit.
Please feel free contact me with any questions or if you need additional information: I can be reached at 919-971-
5641 (direct) or via email at p.toddOnsenv.com.
Respectfully submitted,
4
Phillip Todd, Agent
Enclosures
RECEIVED
Nov 3 0 2022
®CM WILMINGTON, NC
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: Jim McKee
Mailing Address: 8884 St. Philip's Rd, SE
Winnabow, NC 28479
Phone Number: 910-371-6613
Email Address: jim.mckee@ncdcr.gov
I certify that I have authorized Phillip Todd, Agent
Agent! Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: Shoreline Stabilization
at my property located at Brunswick Town/ Fort Anderson
in Brunswick County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands In connection with evaluating information related to this
permit application.
Property Ov✓tter Information:
Jim McKee
Print or Type Name
Site Manager
Title
10 l 11 l 2022
Date
This certification is valid through
�
NOV 3 ® 2022
®CM W 1WINGTON, ►NC
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
it
for
X Major Development in an Area of Environmental Concern
pursuant to NCCrS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
121-15
Issued to NC Dept of Natural and Cultural Resources 8884 St Phillips Road, Winnabow NC 27479
Authorizing development is Brunswick County at Cabe Fear River at 8884 St. Phillius Rd..
Winnabow , as requested in the pennittee's application dated 6/8/15 including a tached
workplan drawings (34) 1 34 of 34 all dated 6/8/15
This permit, issued on October 26, 2015 , is subject lb -compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any viplation of these terns may
3fw cnhiect tri fines_ imnriaonmenf necivil action: or may cause the permit to be null and void.
Brunswick Town Historic Site Shoreline Stabilization Proiect
1) Unless specifically.altered herein, the offshore living sill, riprap placement and marine mattress
relocation shall be constructed in the accordance with the designs and alignments depicted on the
attached workplan drawings.
2) The aligtlment of the authorized living sill, riprap placement and relocated marine mattress shall be
staked by a representative of the Division of Coastal Management within a maximum of 30 days prior
to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline
by adverse weather conditions; shall require the alignment to be restaked by DCM within a maximum
of 30 days prior to the new expected statt'of construction. '
(See attached sheets for Additional Conditions)
This permit action maybe appealed by the pemtittee or other
4ualified persons within twenty (20) days of the issuing date,
This permit must be accessible o"te to Department
personnel when the project Is inspected for compllauca.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
AD work must cease when the permit expires on . •
December 31, 2018
In issuing tbis.permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management l?rogram.
Signed by the authoriq, of, the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Buxton C. DM , Director
vision of Coastal Managemqnt
This permit and its conditions are hereby accepted.
Signature ofPermittee
NC Dept. of Naturaf& Cultural Resources Permit No.121-15
Page 2 of 3
AbDYTIONAL CONDITIONS
2) This permit does not authorize the backlilling of any of the authorized shoreline stabilization structures:
3) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
4) The riprap material shall be free from loose dirt or any pollutant., It shall be of a size sufficient to prevent
its movement from the approved alignment by. wave or curienf action.
5) The riprap material shall consist of clean• rock or masonry materials such as but not limited to granite or
broken concrete.
6) . Each individual offshore sill section shall be marked with a minimum of three yellow reflectors (one at
each end of the section and one in the middle). The reflectors shall extend at least three feet above normal
high water level.
Sedimentation and Erosion Control
5) In order to protect water quality, runoff from construction shall not visibly increise'the amount of
suspended "sediments in adjacent waters: -
6) A ground' cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase'. -of grading on cut or tilled slopes. At a minimum, a- silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
General
7). In order to protect anadromous fisheries resources in the project area, no in water work shall be permitted
between. July 1 anti October 31 of any year without the prior approval of the Division of Coastal
Management, in consultation with appropriate resource agetieles.
8) No vegetated wetlands shall be excavated or filled, even -temporarily, without additional authorization
from the Division.
9) . The permittee understands and agrees that, if future operations by the United States requires the removal,
relocation, or:other alteration of the structure or -work authoriz6d.l* this permit, or if in the opinion of the
Secretary of.the_Anny or his authorized representative, said strccture or work shall cause unreasonable
obstntction to free navigation of the navigable waters, the permittee shall be required, upon due notice from
the Corps of Engineers, to remove• relocate or. alter the structural work or obstructions caused thereby,
without expense to the United. States.
10) Apprdval of the structure was based on a determination that there would be no. obstruction to navigation.
Under conditions existing within the AIWR;_a possibility exists* that the authorized structures may be
damaged by wave wash from passing vessels. Issuance of this permit should not be. construed as relieving
the permittee of taking proper steps to ensure the structure will not be damaged by wave wash.
NC Dept. of Natural & CuItural Resources Permit No.12145
Page 3 of 3
ADDITIONAL CONDITIONS
11) No attempt shall be made by the permittee to prevent the full and free use by the public.of all navigable
waters at or adjacent to the authorized work.
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) The pemuttee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this. determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project
No. 15-0672.
NOTE: The U.S. Army Corps of Engineers assigned the authorized project Action ID No. SAW-2012-
00739.
NOTE: An. application processing fee of $400 was received by DCM for this project. This feealso
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
Date
Received
Date
Deposited
Check Prom
Name of
Permit Holder
Check
Number
Check
amount
Permit
Number/Comments
Rct. #
12/7/2022
North State
Environmental
NCDNCR Brunswick43884
Town
FBank
$100.00
major renewal fee #121-16 BrCo
PA rct.
18632