Loading...
HomeMy WebLinkAbout92-14 EMERGENCY Town of North Topsail Beach................... - Permit Class Permit Number EMERGENCY 92-14 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit �oPY for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of North Topsail Beach, 2008 Loggerhead Court, North Topsail Beach, NC 28460 Authorizing development in Onslow County at Atlantic Ocean from 2276 to 2382 New River Inlet Road , as requested in the permittee's application dated 9/26/14, including the attached workulan drawings (3), Figures 1-3 of 3 all dated received in the MHC office on 10/7/14 and AEC Hazard Notice dated 10/2/14. This permit, issued on October 24, 2014 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to Imes, imprisonment or civil action; or may cause the permit to be null ana vota. 1) In keeping with 15A NCAC 07H.0308(a)(2)(K) of the rules of the Coastal Resources Commission, the base width of the authorized temporary erosion control structure shall not exceed 20 feet, and the height shall not exceed six feet. 2) No portion of the authorized temporary erosion control structure shall be located more than 20 feet waterward of the imminently threatened structure. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2017 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. RECEIVED OCT 31 2014 DCM-MHD CITY Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxto . Davis, Director l/ Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Town of North Topsail Beach • Permit #92-14 Page 2 of 2 ADDITIONAL CONDITIONS 3) Fiwit s used to construct the temporary erosion control structures shall be tan in color and three to wide and seven to 15 feet long when measured flat. NOTE: The configuration of the individual sandbags may vary from that shown on the attached workplan drawings, so long as the dimensions, alignment, and size requirements of Conditions 2, 3, and 4 of this permit are not exceeded. 4) Soldier pilings and other types of devices to anchor the sandbags shall not be allowed. 5) Sand used to backfill the sandbags shall be of the same general characteristics as the sand in the area in which the material is to be placed. In order to ensure compliance with this requirement, the permittee shall coordinate the location of the backfill borrow source with a representative of the Division of Coastal Management prior to initiation of any backfilling activities. 6) The temporary erosion control structures may remain in place for up to eight years from October 24, 2014. 7) Once the temporary erosion control structure is determined to be unnecessary due to relocation or removal of the threatened structure, a storm protection project, a beach nourishment project or an inlet relocation project, it shall be removed by the permittee within 30 days of official notification by the Division of Coastal Management regardless of the time limit placed on the temporary erosion control structure. However, removal of the authorized temporary erosion control structures shall not be required if they are covered by dunes with stable and natural vegetation. 8) If the temporary erosion control structure becomes damaged, the permittee shall be responsible for the removal of remnants of all portions of the structure(s). 9) There is the potential that work may occur during the sea turtle nesting window which runs from 01 May to 15 November, or until the last known nest has hatched. To reduce the potential for any unintended impacts to nesting sea turtles and their nests, should any work take place during the sea turtle nesting window, the NC Wildlife Resources Commission requests that the work be expedited. to the greatest extent possible. All work should be conducted during the daytime only and only begin after qualified sea turtle monitors have evaluated the project area for any potential sea turtle nesting activities. 10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited a permit from the US Army Corps of Engineers. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination.