HomeMy WebLinkAbout103-96 Renewal 01' Rhodes, EarlPermit Class
2ndRENEWAL
Permit Number
103-96
WECOVED
DEC 2-8 2001
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermt"t
OOASTALMANAGEMEW for
DW-01 pA 504 X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to T. Earl Rhodes, Route 2 Box 199E, Columia, NC 27925
Authorizing development in Tyrrell County at Scuppernong River, end of River Neck Road
(SR 1211) near Columbia as requested in the permittee's application dated letter dated 11/30/O1.
This permit, issued on Ilrrrmhrr 19, 2001 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal must be attached to the original of Permit #103-96, which was issued on 7/3/96, as well
as all subsequent modifications and renewals, and all documents must be readily available on site
when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: Effective 8/1/00, the Coastal Shoreline AEC category was amended to include the Public Trust
Shoreline AEC. The permittee is advised that any future development within 30 feet of the mean
high water line may require additional permit authorization from the Division.
This permit action may be appealed by the permittee or 3 Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered Donna D. Moffitt, Director
hereunder requires further Division approval. Division of Coastal Management
All work must cease when the permit expires on
December 31, 2003
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees �n p
that your project is consistent with the North Carolina Coastal A /✓Y
Management Program. Signature of Permittee
A& r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
December 20, 2001
T. Earl Rhodes
Route 2, Box 199E
Columbia, NC 27925
Dear Sir:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the
State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you
and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and
return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of
appeal described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-
229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative
Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit.
You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty
(20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on
any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out
in accordance with your application. Modifications, time extensions, and future maintenance require additional approval.
Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work
done by a contractor, it would be to your benefit to be sure that be fully understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we request that you
complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit
conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By
working in accordance with the permit, you will be helping to protect our vitally important coastal resources.
DH/csp
Enclosure
Very sincerely,
Douglas V. Huggett
Major Permits/Consistency Manager
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-22931 FAX: 919-733-14951 Intemet: http://dcm2.enr.state.nc.us
An Equal opportunity %Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper
Permit Class Permit Number
ZndRENEWAL 103-96
STATE OF NORTH CAROLINA
Department of Environment and Natural Resotl£cT
and IILWII
Coastal Resources Commission I" ° DEC2727001
Vern�it I COASTAL MANAGEMENT
for MOREHEAD
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to T. Earl Rhodes, Route 2 Box 199E, Columia, NC 27925
Authorizing development in Tyrrell County at Scuppernong River, end of River Neck Road
(SR 1211) near Columbia as requested in the permittee's application dated letter dated 11/30/01,
This permit, issued on 17eremher 19, 2061 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal must be attached to the original of Permit #103-96, which was issued on 7/3/96, as well
as all subsequent modifications and renewals, and A documents must be readily available on site
when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: Effective 8/1/00, the Coastal Shoreline AEC category was amended to include the Public Trust
Shoreline AEC. The permittee is advised that any future development within 30 feet of the mean
high water line may require additional permit authorization from the Division.
ims pertmt action may oe appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2003
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Donna D. Moffitt, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
V
MEMORANDUM
RECEivEG
OEC 13 2001
TO: Doug Huggett D/V OF COASTAL MgNAGEME
THROUGH: Terry Moore R4LEIGH NT
FROM: Steve TroweUS 7
DATE: 11 December 2001
SUBJECT: Renewal of Major CAMA/Dredge and Fill Permit No. 103-96
Permit No. 103-96 was issued to Mr. Earl Rhodes on 3 July 1996 for the construction of two
rock jetties projecting into the Scuppernong River 40' as well as excavation between the jetties and
into an existing manmade basin. The permit was modified on 3 July 1997 to add 60' to each jetty.
The jetties have not been completed. Shoaling around the jetties and into the canal have continued
to be a problem requiring periodic maintenance. I recommend that the permit be renewed as
requested. The $100 check remitted to cover the cost of the renewal has been deposited.
�L.