Loading...
HomeMy WebLinkAbout103-96 Renewal 04' Rhodes, EarlPermit Class 3rd RENEWAL/MAINTENANCE 5 RECEIVED SEP 2 :1 2004 OIV. OF COASTAL MAIJAGEMENT RALEIGH STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vern't COPY Permit Number 103-96 for _ X Major Development in an Area of Environme � ,�,. pursuant to NCGS 113A-118 �7 X Excavation and/or filling pursuant to NCGS 113-229 S E P 2 2 2004 Issued to T. Earl Rhodes Route 2 Box 199E, Columbia, NC 27925 MorehPad ri+ts f)GM Authorizing development in Tyrrell County at Scuppernong River, end of River Neck Rd. (SR,_ 1211) near Columbia , as requested in the permittee's request dated 06/21/04. This permit, issued on Cep temher 0292604 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) The Division of Coastal Management has determined that no work on the previously permitted jetties has taken place since the time of the last permit renewal. Therefore, in accordance with 15A NCAC 07J.0404(b), which requires that permit extensions for previously authorized activities only be gianted if substantial development on the permitted activity has begun and is ongoing, no additional work on the jetties may be undertaken without first obtaining a new Coastal Area Management Act Major Permit. 2) This renewal must be attached to the original Permit 4103-96, which was issued on 07/03/96, as well as all subsequent modifications and renewals, and all documents must be readily available on site when Division personnel inspect the project for compliance. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2009 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Charles S. Jones, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature ofPermittee T. Earl Rhodes ADDITIONAL CONDITIONS Permit #103-96 Page 2 of 2 Maintenance Clause '3 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks prior to any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site must be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. 4) All conditions and stipulations of the active permit remain in force under this renewal unless modified herein North Michael F. Easley, Governor T. Earl Rhodes Route 2 Box 199E Columbia, NC 27925 Dear Mr. Rhodes: A NCDENR Carolina Department of Environment and Natural Resources Division of Coastal Management Charles S. Jones, Director William G. Ross Jr., Secretary September 3, 2004 The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff - colored form) and the copy. Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original, as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, P/TWryGvl— i�i 17 Doughlas V. Huggett Z Major Permits and Consistency Manager 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr,state.nc.us An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper (- Permit Class 3rd RENEWAL/MAINTENANCE 5 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 103-96 Number Issued to T. Earl Rhodes, Route 2 Box 199E, Columbia, NC 27925 Authorizing development in Tyrrell County at Scuppernong River, end of River Neck Rd. (SR 1211) near Columbia , as requested in the permittee's request dated 06/21/04. This permit, issued on September 02, 2004 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to nnes, imprisonment or civu action; or may cause me permit to oe nuu ana voia. 1) The Division of Coastal Management has determined that no work on the previously permitted jetties has taken place since the time of the last permit renewal. Therefore, in accordance with 15A NCAC 07J.0404(b), which requires that permit extensions for previously authorized activities only be granted if substantial development on the permitted activity has begun and is ongoing, no additional work on the jetties may be undertaken without first obtaining a new Coastal Area Management Act Major Permit. 2) This renewal must be attached to the original Permit #103-96, which was issued on 07/03/96, as well as all subsequent modifications and renewals, and all documents must be readily available on site when Division personnel inspect the project for compliance. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2009 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. ;1 " C%arles S. Jones, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee 1 T. Earl Rhodes ADDITIONAL CONDITIONS Maintenance Clause Permit #103-96 Page 2 of 2 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks prior to any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site must be approved by a representative of the Division prior -to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. 4) All conditions and stipulations of the active permit remain in force under this renewal unless modified herein MEMORANDUM E to TO: Doug Huggett JUL 0 2 2004 THROUGH: Terry Moore 07M FROM: Kelly Spivey AP/S Morehead City DCM DATE: 28 June 2004 SUBJECT: Renewal and Modification of CAMA Permit No. 103-96 T. Earl Rhodes Tyrrell County Scuppernong River Permit number 103-96 was issued to the Mr. T. Earl Rhodes on 3 July 1996 for the construction of two rock jetties projecting into the Scuppernong River 40' as well as excavation between the jetties and into an existing man-made basin. The permit was modified on 3 July 1997 to add 60' to each jetty. The extension of the jetties has not been completed. Mrs. Rhodes has requested that Permit 103-96 be renewed and also that a 5 year maintenance clause be included with the renewal. I recommend we renew Permit No. 103-96 as requested with a 5 year maintenance clause and include the condition requiring notification to the Division prior to any work taking place. ATTACHMENTS ccTed Tyndall, Assistant Director, DCA4 Raleigh Bland, USACOE DIVISION OF COASTAL MANAGEMENT NCDENR NarsNM G mo N o AAL R S R ENNRONNENi M10 NfRIRAL RESIXIROES 151-B HWY. 24, HESTRON BUILDING MOREHEAD CITY, NC 28557 TELEPHONE: (252) 808-2808 FAX: (252) 247-3330 TO: OFFICE: TELEPHONE #: [ I FAX N: FROM: OFFICE: DIVISION OF COkS TAL NfANAGEL(ENT fI DATE SENT:_ TOTAL NUMBER OF PAGES INCLUDING COVER SHEET: 3 DIVISION OF COASTAL MANAGEMENT Arim ea . NCDENR NORM r. ROU. ofPY1THPM OF ENNRONMEIR mo Nf RAC RESOURCES 151-B HWY. 24, HESTRON BUILDING MOREHEAD CITY, NC 28557 TELEPHONE: (252) 808-2808 FAX: (252) 247-3330 TO: OFFICE: V TELEPHONE 11: [ ] FAX N: ra� 141 FROM: / . 9M7 OFFICE: DIVISION OF COASTAL NiANAGEMENT I911:4 DATE SENT: �� TOTAL NUMBER OF PAGES INCLUDING COVER SHEET: R'ffi n ^/i /0 `� MEMORANDUM TO: Doug Huggett THROUGH: Terry Moore' FROM: Kelly SpiveyS DATE: 28 June 2004 SUBJECT: Renewal and Modification of CAMA Permit No. 103-96 T. Earl Rhodes Tyrrell County Scuppernong River JUL 0 1 2004 19 COASTnI R A!,p.nes"rD JUL 0 8 2004 "Oreheaa....Illy oC i Permit number 103-96 was issued to the Mr. T. Earl Rhodes on 3 July 1996 for the construction of two rock jetties projecting into the Scuppernong River 40' as well as excavation between the jetties and into an existing man-made basin. The permit was modified on 3 July 1997 to add 60' to each jetty. The extension of the jetties has not been completed. Mrs. Rhodes has requested that Permit 103-96 be renewed and also that a 5 year maintenance clause be included with the renewal. I recommend we renew Permit No. 103-96 as requested with a 5 year maintenance clause and include the condition requiring notification to the Division prior to any work taking place. ATTACHMENTS cc; Ted Tyndall, Assistant Director, DCM Raleigh Bland, USACOE r ter' C? / r-)• ��.-°P.:•: J �(% �j( ZO 'd 9LVOOPH921 'ON XHd ,LN3NMMA lulsv00 Ad 9v20 nRl b00d-9I-1fir T. Earl Rhodes Major Permit 103-96 Subject: T. Earl Rhodes Major Permit 103-96 Date: Thu, 15 Jul 2004 14:24:37 -0400 From: Kelly Spivey <Kelly.Spivey@ncmail.net> To: Tere Barrett <Tere.Barrett@ncmail.net>, Kelly Spivey <Kelly.Spivey@ncmail.net> Tere Mr. and Mrs. Rhodes have not started the 60 foot extension of the jetties. I hope this helps in making the permit renewal decision. The check has already been deposited into the Departments account. Thanks Kelly I of 1 7/15/04 2:30 PM Re: (no subject) Subject: Re: (no subject) Date: Thu, 15 Jul 2004 15:14:03 -0400 From: Doug Huggett <Doug.Huggett@ncmail.net> Organization: NC DENR DCM To: Tere Barrett GTere.Barrett@ncmail.net> As you supposed, its not a mod, but is just a semi -simple renewal, so $100 is all that is needed. Tere Barrett wrote: > Hey. Talked to Kelly, and he said that no work had been done on the > T.Earl Rhodes project since the last renewal, and he will e-mail me > accordingly. He feels sure that he sent the check copy and Ms. Rhodes > request with his memo, but is sending me a copy. He collected 100.00, > but his memo asks for renewal and mod, which would cost 200.00. > However, is asking for a 5 year clause really a mod? He doesn't want to > ask her for more money, and I am not sure that is really a modification, > though his memo stated that it is. Whattaya think? t Doug Huggett <doug.huggett(ancmail.net> Major Permits and Consistency Coordinator Division of Coastal Management 1 of 1 7/19/04 9:55 AM