Loading...
HomeMy WebLinkAbout8-96 Renewal 1999 Jarrett Bay Group LLCPermit Class Permit Number RENEWAL NhUNTENANCEE 5 STATE OF NORTH CAROLINA 8-96 Department of Environment and Natural Resources and Coastal Resources Commission - PfI_tt X for . Major Development in an Area of Environmental Concern pursuanttoNCGS113A-118 _ R Excavation and/or filling.pursuant to NCGS 113-229 Issued to Jarrett Bay Group, LLC, 530 Sensation Way, Beaufort, NC 28516 authorizing development in Carteret County ac . Core Creek (AIW W), N. of Eastman Creek, off of SR 1162 as requested in the permittee's applications letter dated 8/26/99. This permit, issued on / 0/s/c� y , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal must be attached to the original of Permit #8-96, which was. transferred into the name of the permittee on 4/17/98, and the major modification issued on 6/2/98 as well as all subsequent modifications and refinements. All documents must be readily available on site when Division personnel inspect the project for compliance. All conditions and stipulations of CAMA Major Permit 8-96, the major modification issued on 6/2/98 and all subsequent modifications and refinements remain in force under this renewal unless altered herein. (See attached sheet for Additional Conditions) This permit -action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on NEW wDBK -- DSCEmam 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. ��yh Dorffifi D.Moffitt Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee �orro.oKo.b*�or. > t. d r �13 1r { ♦ Nip � r t �i7� iyf � 1. � r a + . r �x e? RI 6)r 1rs 4 t1 ttc .—err i t �4> irNl Y `afro+F 1rr w'.rygy+ge §� ti iiw�>tY7% �5•x O rO+yl!ctlr3 l �" tNt i � Iv t r _.' � , 'f r/ "^ 0d4 . "^ ad yfkt �§,r Mi+jr� i tl. � b r/.��ptk ` r3 ^ art �Sl i��,txf i1SC ty 5' x `6t l'a y,.,i 'Ft1 �"; lOrJa t ti ti .......... Yr t .>< �, x ` �i7 �' Cl `.'( t �tr � f �+ +x@ Xe �r� ♦1 a � ', - rJ*F Yt 1"t+�4 %'(U• .7 y S � O r "'.: x.NJI O Ti'O LL �� FPr� rn 'bD •��� m x`!% 1riV k t a_I ,1 + -r t�tt'v;X4Ct+nr.��in IAMIr a 5 l - 5 ct`b N C rt SQyy1 �/,•a tK4 .'.--.fi�r N,; r! � xCq f'cd tiN4F N y'�. {frs7 x' tt iv. / r �GI"ty trots'�HY.kN l;�rftt Pr'O.t+ N9� §k t� 31{ iyu y, ri ,, -a0 NO r Nlr�1, lU-r.eeyt� i v.;� Y,fy if 4 +S i xs"t- r _ t fro+a .,ry Fa `s d�- N ,RI Nt Ft tf-`A 6 i t. r x - t ��rtx � i ir�7d � :b Wr,.cq�•O GJ �ya/yIU-` � Rr � •�. r�•'h 3 rtrf r jy', t � s:.� ., j al A O f t�. +! trd9 :t' •>) +y 05 Tt.� � t. 1 p+,ay bA �N";. r1 4i ri ' ikr 1 1 '� E /9Ss a i C ✓� Ct +✓ .' G=1 ; A` p .d r r.,, i4!'� 1 S, r V x F `'cy u d g 0 Si �U1 c2 W'dap s ra CNr.�x�r �,l UFt S'f kkr Poi Yk<{t} ti t.r ti. �4Z aY d i .. It r..,��� �ix��k,xFc7r� yQti ai.0 t � j�� Q s',. bra t, �' •"Irt r''{ t r ` - i V j lf' N yt<,.✓ „v v s / xf f r AAda C y r n+ �' ', t f'. l .5( Sa :,r �j r x? a.. c? .i-:.,;,1'r ✓' �..r., �"{ '.d � l .t - i �r, #� iritt � � i n:.r'�� ti. ?yr ✓!. �.� "?�%..�.'�,. � .. + ". R'.V. �'u 1�A,e':r�:. ..t.al . .93 �ii'.l:f ,'.�3?i ri .,"Y'C9 . sA., � r;:l k�' �f ,1` .�- .. 7 ... :t .. b},., .. Penn Klass ':PENANCE ENANCE5` STATE OF NORTH CAROLIl Department of Environment and Natural n and Coastal Resources C onimissiol fl or Major Development in an Area of ErMromnei 113A 110 anthonzi pursuant toMua X.. .. .. d/or NCGS.413229�i, Excavation an :�illiogpursuantto Jarrett Bay Gioup, LLC, 530 Sensation Way,* Beaufort, NC 28511 P­u'EI-4umber s rel — tin�l Carteret ''Cor&Cfeqk( -N. of E6tmah Creek, off of opmen County at ...... . .7777 a _tadcgfed in the mimifte's application This permit, issued on %01-rl C1 y, is subject to compliance with the application (where consistent witli the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be hull and void. - - -7 Tins renewal musti be attached to the original -of Permrt #8-96' which was transferred into the L' name of the permitteebri 4/17/98; and the major .'modification issued 6ii6/2J98-"-well as all subsequent modifications and iefiiierii6nts. All documents'intid-b-e-readily avi'Hlableon'site -' spect the project for c6inplian&` fd6iiditiohsafid'stip'ulati6nsof when Division'personnel in CAMA-Major-P&rmit 8-96, them' ajor'inodification issued 'on ' 6/2/98 and all subs644ent- modifications and refinements remain in force under this_,reiinie*al unless altered I herem. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiationorcontinuance, as the case may, be. This penfift must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered h6reunderrequires furtherDepartmental approval. All work must cease when the perm I it expires on NEW WORK -- DECEMBER 31. -2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Dorthl D-MoffittI)I—rector O Division of Coastal Management This permit and its conditions are hereby accepted Signature of Permittee A Jarrett Bay Group, LLC Permit #8-96 Page 2 of 2 f 3 ADDITIONAL CONDITIONS Maintenance Clause 2) The Division of Coastal Management shall be notified in writing at least two (2) weeks in Yr advance of any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site must be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. Peimiebass ., r _ PermrtNumber :. :- RENEWAL 8-96 = , —M UWTENANCE 5 STATE OF NORTH CAROLINA Department of Environment and Natural Resources - :and } Coastal Resources Commission -' i llllll for X Major Development in an Areabf Environmental Concern pursuantto_NCGSll3A-ll8-`6- -' - X1- _.-Excavation and/or fi Hng.pursuant to NCGS 113-229 Bay Gioup, LLC, 530 Sensation Way, Beaufort, NC 28516 - Issued to' .Jarrett authorizing development in, - Carteret County at . _ Core Creek (AI WV), N. of Eastman Creek, off of .. .. SR_1162 s '' letter dated 8/26/99 ` as requested in the permittee's applicatiorirleteg This permit, issued on I/S�y" y is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) T his renewal must be attached to the original of Petinit #8-96, which was transferred into the name'of the pemmttee on 4/17/98, and the major modification issued on 6/298 as well as -all :r subsequent modifications and refinements. All documents must be readily available on site when Division personnel inspect the project for compliance. All conditions and'stipulafions of CAMA Major Permit 8-96, the major modification issued on 6/2/98 and all subsequent modifications and refinements remain in force under this renewal unless altered here'm. (See attached sheet for. Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the ppeermit expires on NEW WORK -- DECEMSM 31, 2001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Dorffifi D.Moffrtt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Perminee !77 74 7 7 w7v. �- ? Jarrett Bay Group, LLC •Y_ _ :34 f ,tv Permit #8-96 Page 2 of 2 ; ADDITIONAL CONDITIONS Mamienance Clause i 6 cvj.iC 2) The Division of Coastal Management shall be notifie&in writing at least two (2) weeks in, advance of any maintenance work authorized by this permii,'and such notification shall include A. The number ofthe`origin al permit. B. A statement that no dimensional changes are proposed:. C. A copy of the original permit plans with cross -hatching indicating the area to be ' mamtained,.the area to be used for spoil disposal, and the estimated amount of material to be removed' The location,:design and holding capacity of the spoil disposal site must be a roved b a re representative of the Division ip to the initiation of an . maintenance PP Y P_,. . ,.P-_ Y dredging activities. D. The date of map revision and the permittee's.signature shownanew on the original plan. , SL• NORTH CAROLINA DEPARTMENT OF f ENVIRONMENT AND NATURAL RESOURCES ' DIVISION OF COASTAL MANAGEMENT October 5, 1999 Jarrett Bay Group, LLC 530 Sensation Way Beaufort, NC 28516 Dear Sir: . The enclosed permit constitutes authorization underthe Coastal AreaManagementAc4 aid where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copyto this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis decision on your permit_ You should also be aware that if another qualified party submits a valid objection to the issuance ofthis permit within twenty (20) days, the matter mustbe resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The projectplan is subject to those conditions appearing on the permitform. Otherwise, all work mustbe carried out in accordance with your application. Modifications, time extensions; and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, orproblem areas, you may contactDepartmentpersonnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, ovo,v s I� ggett Major Permits/Consistency Manager. DH/amw Enclosure P.O. BOX 27687, RALEIGH, NC 27611-7687 /2728 CAPITAL BLVD., RALEIGX, NC 27604 PHONE 919-733-2293 FAX 919-733-149S AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - SOq RECYCLED/1 O% POST -CONSUMER PAPER PermitClass Per_mitNumber ENANCE 5 "STATE OF NORTH CAROLINA = 8 9u Department of Environment and Natural Resources -. and a CoastahResources Commisston 3: '' T r Y t for r R Major Devel6pm8nt m a an An of Environmental Concern ' pursuant to NCGS 113A-118 _ R Excavation and/or fillingpun uant to NCGS.113-229 to Jaiiett Bay Group, LLC, 530 Sensation Way, Beaufort, NC 28516 IssuedCarteret. Core Cieek AI N. of Eastman Cree off of ` "authorizing developinent in County at' ( )e SR 1162 `' 'letter dafed 8/26/99. as requested in permittee s application' ` This permit, issued on y is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) , This renewal must be attached to the original of Permit #8-96, which wastransferred into the y { name -of the permittee'on`4/17M', and the major modification issued`on.'6/2/98 as well as •all subsequent modifications and refinements. All documents must be readily available on site when Division personnel inspect the.project for compliance. All conditions and stipulations of CAMA.Major Permit 8-96, the major modification issued on 6/2/98 and all subsequent modifications and refinements remain in force under this renewal unless altered harem. (See attached sheet for Additional Conditions) This permit_action may be appealed by the pemmittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires fuitherDepartmental approval. All work must cease when the mtit expires on NEw WORK -- )cgmBER 31. 001 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. vH „�0 ly �� Do D.Moffitt,Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee ('� rt fe-, { 'r`�tr .{¢s-1 n.t ..,,s. ,• ,V 2. - � r ., i ja; T'' �°°}R J aJ"r F'�a +v 4 _ _ Jarrett Bay Group, LLC fl, Permit 4 r Page-2 of,2 " t '" •^� ADDTTIONAL CONDITIONS R , �L i',r ♦�' ; },.._4'..-t A r s.�Q ry iu, ` r 41 .'x r.a tt r x�, 4A � e.r' ; t ''i f'4F '� a w a..V 1 i� rrz 5 � a{ ,Yi -' V 1 *ay�i ..._ it ✓ r E yvf n 's.3 C r V r - !e's "te% T' f r-'}--.,xa� rh x .. -•r t Maintenance Clause- .rF eN' Sf �ky 5{2 � },: � � Tsv £yT kj �, c' -NA � y � ks "�-ia Ts� Ff � ? •"h -° t. � j4y. Yr v4 -t S F Y rty 3y va"4+ t.'L .. Y4v'v Y 4 McDiviszon of Coastal Management shall be;notifiedln wnting.at least two (2) weeks ii rl 3 s °' advance of any maintenance work authorized by this penmt,' and such notification shall include A The number of the original permit #_ r B A statement that nq' dimensid'nal changes aze proposed f r�• u e ✓ y_ C. A copy of the orig'mal penriit plans with cross hatching uidicating the area to be �s<, t maintained, the areato be used for spoil disposal, and the estimated amount of material to 4 Fa be removed The 16cation, 'design and holding -capacity of the spoil'disposal site must- be i - . a reptesentative:of the'Division prior tothe. uutiahon of any mamtenano dredging activities, a D The date of map revision and the pennittee's signature shown anew on the original plan ir r 1 �iA F f \ 'S'X �, �'� 'r �- 'a„g6 � k, �• r it � ^ tx' iz r v F _ �\ x n p S is yr , �' '._,a• -z �-'t y ' f S - 4 ti 1 S t a Permit Class RENEWAL —M+rINTENANCE 5 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Issued to Vertu X fo Major Developmentof Environmental Concern pursuant to NCG 1 8 X Excavation and/or filiSrtg pWsuy, nt tkNCGS 113-229 Jarrett Bay Group, LLC, 530 authorizing development in SR 1162 NC 28516 Permit Number 8-96 RECEIVED OCT 2 0 1999 COASTALMANAGEMENT Carteret County az Core` C e k (AI W W), N. of Eastman Creek, off of ,as requested in the permittee's t pfiicatiprr.4,sled letter dated 8/26/99. This permit, issued on / 0/S// is subject(' cc with the application (where consistent with the permit), all applicable regulations, special conditions and no et forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal must be attached to the original of Permit #8-96, which was transferred into the name of the pemuttee on 4/17/98, and the major modification issued on 6/2/98 as well as all subsequent modifications and refinements. All documents must be readily available on site when Division personnel inspect the project for compliance. All conditions and stipulations of CAMA Major Permit 8-96, the major modification issued on 6/2/98 and all subsequent modifications and refinements remain in force under this renewal unless altered herein. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Deparnnental approval. All work must cease when the, a oit expires on NEW WORK -- nECE3BER 31. 20 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Dorffifi D.Moffitt,Director U Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Jarreff LLC ADDITIONAL CONDlY advance of any maintenance —A. The number ofthe original T) haj�' d B �","-'A'st'a'teift-'ent-thatiiodiifidh�ibin � �Ct ,ges.arg-,I) pose - I." . ar C - iiW 'it plans indicating IN* t b' A copy. of thd'ong permit a,n.s cro catmg the o e,". maintained the area to be used .for s os e estimated amount of material to ndesign d removed location, 6;holding:c of the sp bil disposal git&iriust be Approv"e'd by a re resentative of the.- ivisi ono o the initiationof any :'maintenancei� dre dgmg activities.' D. The. date ofmap'revisionand the permittee's.sign'a'lure shown'ainewoiithe original'plan. P6r'n'u*t #8-96'. lW" !,k State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor K Bill Holman, Secretary Division of Water Quality January 27, 2000 Mr. Randy Ramsey, President Whitewater Development Group, LLC 530 Sensation Weigh Road Beaufort, NC 28516 ioe, ! — V& a,� �7jL1 AND Subject: Permit No. SW8 980926 Modification Whitewater Subdivision Low Density Subdivision Stormwater Permit Carteret County Dear Mr. Ramsey: The Wilmington Regional Office received a complete modification to the Stormwater Management Permit Application for Whitewater Subdivision on December 22, 1999. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 980926, dated January 27, 2000, for the construction of the project Whitewater Subdivision. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Linda Lewis or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:\WQS\STORMWAT\PERI%gn980926.JAN cc: Ron Cullipher, P.E. Katrina Marshall, Carteret County Inspections A.C. Everette, NCDOT Division 2, District 2 Ter6 Barrett, DCM, Morehead City Wilmington Regional Office Central Files Linda Lewis 127 Cardinal Dr. Est, Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State Stormwater Management Systems Permit No.SW8 980926 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Whitewater Development Group, LLC Whitewater Subdivision Carteret County FOR THE construction, operation and maintenance ofa25%low density subdivision in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules ") and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for'Whitewater Subdivision. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS Each of the 26 lots is limited to a maximum built -upon area as listed on Attachment A, and as indicated on the approved plans. CAMA regulations may reduce the allowable built -upon area for those lots within the AEC. 2. The overall tract built -upon area percentage for the proj ect must be maintained at 25%, per the requirements of Section 1005 of the stormwater rules. Approved plans and specifications for projects covered by this permit are incorporated by reference and -are enforceable parts of the permit. 4. Projects covered by this permit will maintain a minimum 30 foot wide vegetative buffer between all impervious areas and surface waters. 5. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 6. No piping shall be allowed except: a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road. b. That minimum amount needed under driveways to provide access to lots. 2 State Stormwater Management Systems Permit No.SW8 980926 7. Direct discharges (ie., piping and ditches) to the Intracoastal Waterway are not allowed. All runoff must pass through a minimum 50' vegetated filter area prior to discharge. II. SCHEDULE OF COMPLIANCE 1. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b. Sediment removal. C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 4. Deed restrictions are incorporated into this permit by reference and must be recorded with the Office of the Register of Deeds prior to the sale of any lot. Recorded deed restrictions must include, as a minimum, the following statements related to stormwater management: a. "The allowable built -upon area per lot is * square feet, inclusive of that portion of the right-of-way between the front lot line and the edge of the pavement, structures, pavement, walkways of brick, stone, slate, but not including wood decking, or the water surface of swimming pools." b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the Division of Water Quality." C. "Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons." d. "Lots within CAMA's Area of Environmental Concern may have the permitted built -upon area reduced due to CAMA jurisdiction within the AEC." e. "Each lot will maintain a 30' wide vegetated buffer between all impervious areas and surface waters." f.. "Each lot will submit plans to the Division of Water Quality for approval prior to construction. The low density rules pertaining to Stormwater Management will apply." g. "No lot will be of such high density thaf stormwater runoff threatens water quality. Additional control measures suitable for class SA waters will be required for any lot determined to be of high density." It. "No direct discharges of runoff into surface waters is allowed. All lots will provide a minimum of 50' of vegetated filter area at the outlet of any channelized flow." 5. The permittee shall submit a copy of the recorded deed restrictions which includes items a-h in 44 above, within 30 days of the date of recording. *the permittee shall insert the correct BUA per the Attachment which lists the allowable lot built -upon area. State Stormwater Management Systems Permit No.SW8 980926 6. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. The permittee shall notify the Division of Water Quality of any mailing address changes within 30 days of moving. 8. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 9. Within 30 days of completion of the project, the Engineer/Owner/Developer/Permittee must certify in writing that the project's stormwater controls, and impervious surfaces have been constructed within substantial intent of the approved plans and specifications. Any deviation from the approved plans must be noted on the Certification. 10: The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. The following items will require amodification to the permit. Revised plans, specifications and calculations must be permitted prior to the permittee beginning construction on the modification: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 12. The Director may determine that other revisions to the project should require a modification to the permit. M. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A ofthe North Carolina Administrative Code, Subchapter2H.1000; and North Carolina General Statute 143-215.1 et. al. State Stormwater Management Systems PermitNO.SW8 980926 5. The permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be.submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. If any of those permits result in revisions to the plans, a permit modification must be submitted. The permittee grants permission to DENR Staff to enter the property during business hours for the purposes of inspecting the stormwater control system and it's components. Permit issued this the 27th day of January, 2000. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION f21�------------ �, Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 980926 t`s4i:nP. `_d+:+:�:ni(-c`�'�r"r.t�...a«:A�•�:x.:�dk'8,�'!:$r"4>'.'�:rOF.FICEitISE•1ONGYa"37..`.f'"ie'%,'�i-1S�.`ii[�:ir„�+..xi�sa-�i..�:v w`�.fYr,�::a�`'".e�^'4; Date Received Fee Paid Permit Number 9869Z(, Q4vlscri//02�2/l�9 ,� State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original Q: I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Whitewater'Development Group L.L.C. 2. Print Owner/Signing Official's name and title (person -legally responsible for facility and compliance): Randy Ramsey:- President 3. Mailing Address for person listed in item 2 above:. 530 Sensation Weigh City: Beaufort State: NC • Zip: 28516 Telephone Number:_ ( 252 1 728-2690 4. ' Project Name (s'ubdivision, facility, dr establishment name - should be consistent -with project name on plans, specifications, letters, operation and maintenance agreements, et`o<): Whitewater Subdivision (modifications to lots 7 and 11 only.)' S. Location of Project (street address): : 530 Sensation City: Beaufort, North Carolina County: Carteret 6. Directions to project (from nearest major intersection): From -the intersection of US Hwy. 70 & Hwy. 101` travel 6 1/2 miles North along N C 101 to NCSR 1162,.Steel Tank Rd. and take a left Take next left on N SR 1242 Sep -Weigh Rd., lots located approx. 1/2 mile. 7. Latitude: 34048'30"N Longitude: ' 76°40124"W of project 8. Contact person who can answer questions about the project: Name: Mason Cox Telephone Number. ( 2'92 l 728-2690 II. PERMIT INFORMATION: I. Specify whether project is (check one): New Renewal X Modification FormSWU-101 Version3.99 Pae61of4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the followirig iequired information by initialing in the space provided next to each item • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated -Vegetated buffers (where required) VII. AGENT AUTHORIZATION } I, If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Stroud. En¢ineerinR P.A. Mailing Address: 151-A Hwy 24 City: Morehead City State: NC Zip: 28557 Phone:f 252 ) 247-7479 Fax:( 252 1247-4098 VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information; item 2) Randy Ramsey certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required 11leed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Date: P r-t ' Form SWU-101 Version 3.99 Page:4:of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT Q, This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007. I. PROJECT INFORMATION Project Name : Whitewater Subdivision Contact Person: Mason Cox Phone Number. ( 252 ) 728-2690 Number of Lots: 26 Allowable Built Upon Area Per Lot*: see table 1 *If lot sizes are not uniform, attach a table indicating. the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. IL BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. For uniform lot sizes, complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean -High Water. Wetlands may be excluded when the development results in high density pockets:. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/L.ot - the computed allowable built upon area -for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. Form SWU-104 Rev 3.99 Page 1'of' 2 11 TABLE 1 WHITEWATER SUBDIVISION NOVEMBER 3, 1999 IMPERVIOUS ALLOTMENT DISTRIBUTION LOT# LOT SIZE IMPERVIOUS AREA ROAD 1.75 1 1.22 0.5 2 1.96 0.5 3 5.62 0.9 4 8.93 " 1 5 7.22 1.2 6 7.29 1.1 7 REV REV ROAD 0.55 7A 1.68 0.7 7B 1.28 0.5 7C 2.21 0.7 •-7D 5:21 0.8 7E 5.2 1.2 7F 3.98 0.8 7G 1.27 0.6 7H 1.21 0.7 71 1.21 0.7 7J 1.21 0.7 8 19.64 3 9 27.51 5 10 11.3 3.7 11, REV REV 11A 3.83 1.4 11B 5.58 2 12 1.21 0.8 13 1.38 0.8 14 1.55 0.8 15 1.38 0.8 16 2.2 1.2 TOTAL 132.28 34.4 D E C E I V E NOV 0 9 1999 FRGJ # fu O �MG140 RRETT BA � Builder SL Broker of Fine Sportfishing Boats May, 12000 Tere Barrett N.C. Department of Coastal Management Hestron Plaza 11, 151-B Hwy 24 Morehead City, NC 28557 RE: Dredge Maintance, Permit No. 8-96. Tere Barrett, Based on the renewal (issued 10/5/99) of our original permit (No.8-96), Jarrett Bay intends to maintenance dredge our existing high ground basin. No dimensional changes are proposed in the scope of work that vary from our existing permit. The existing basin depth and dimensions will confirm with previous site plans submitted to CAMA (and attached). We will utilize our existing spoil site to hold all material that is to be removed, of which the existing berm and spoil area must be maintained from within the spoil area (prior to dredging). This letter serves as written notification to the Division of Coastal Management, written two (2) weeks in advance of any maintenance work. Sincerely, Mason Cox Vice President of Operations 530 SENSATION WEIGH • BEAUFORT, NC 28516 • PHONE (252) 728-2690 • FAX (252) 728-2607 WEB SITE w .jarretrbay.com • E-MAIL jarrettbay@bmd.clis.com e NCDENR JAM ES B. HUNT JR.' GOVERNOR WAYNE MCDEVITT :. SECRETARY DONNA D. MOFFITT DIRECTOR t` NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAG MENT MEMORANDUM: TO: DOUG HUGGETT FROM: T. BARRETT ?b SUBJECT: RENEWAL REQUEST - CAMA MAJOR PERMIT - JARRETT BAY BOATWORKS, CARTERET COUNTY DATE: September 3, 1999 Please find enclosed a request from Mason Cox, acting on behalf of Jarrett Bay Boatworks, to renew State Permit #8-96. This permit was issued on June 02, 1998 for the construction of a boat manufacturing business. The permit authorized the construction of nine temporary slips, the excavation and enlarging of a basin, and the construction of the associated high ground facilities. The permit has been modified several times through the minor modification and renewal processes, for insignificant alterations such as bumper piles and catwalks. At this time, the construction is in process, and excavation finished. The applicant would like to renew the permit for a period of two years as allowed in T15A .07J .0404. As well, he would like additional time for the continuing maintenance excavation of the basin. As allowed in T15A .07J .0404(5), 1 would recommend a 10 year maintenance clause be allowed for excavation of the artificial basin. MOREHEAD CITY OFFICE HESTRON PLAZA II 151-B HIGHWAY 24 MOREHEAD CITY NC 28557 PHONE 252-808-2808 FAX 252-247-3330 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLED/10% POST -CONSUMER PAPER -.R.S:.... _ T_M .. 11 JARRETT BA •S A 1 Y Builder Sz Broker of Fine Sportfishing Boats August, 26 1999 Tere Barrett N.C. Department of Coastal Management Hestron Plaza 11, 151-B Hwy 24 Morehead City, NC 28557 Re: Renew CAMA Permit No. 8-96 Dear Tere, Based on our most recent phone conversation (8/25), This letter is a request to renew CAMA Permit No. 8-96. At present, we are still in the process of building our ships store, grading the parking lot, and finishing the associated boardwalks and piers. We will also require maintenance dredging of our existing high -ground basin over the next few years. Let me know if I need to supply any additional information, thank your for your assistance. Sincerely, Mason Cox Vice President 530 SENSATION WEIGH • BEAUFORT, NC 28516 • PHONE (252) 728-2690 • FAX (252) 728-2607 WEB SITE w jarrettbay.com • E-MAIL jarrettbay@bmd.clis.com iL nfEK/A�� .66 e— U Division of Coastal Management 5c4IAi-f-s,2 Application Processing Notes Applicant:Qi rr't�aYw�x�s Date/Time: Message: g/ 4/ 9 3 > -PR,,jr, — .A ux,),4F3 . ��r v ASS CAASI Vf1 F —r�tfE `NS (1)C1 TY OF 1)OI0C-, M Z YR -E),jE ✓.- Fb2 ALL �r-V%J . i- T/V11h1rFa fit£) '1N e"oJ 11Av1�( A9VL cF�7 a£p�lsr j�E�JEwa� iaa nnc t ar bt�LV ISSJi SyiL MA Ni, 2Frltrd� Y C4�-S-ED T.'v.AZZL) � ITT VO' G,E MAIL -.41 170 ZYR- a,£*'�"'� fJ✓i �.eutSSt f-elt- A^Ai MT. `1l1"1�55 �Ec F1 TWA NCDENR JAMES B. HUNT JR. GOVERNOR AYNE MC DEVITT i SECRETARY NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT MEMORANDUM: TO: DOUG HUGGETT FROM: T. BARRETT ?b SUBJECT: RENEWAL REQUEST - CAMA MAJOR PERMIT - JARRETT BAY BOATWORKS, CARTERET COUNTY DATE: September 3, 1999 Please find enclosed a request from Mason Cox, acting on behalf of Jarrett Bay Boatworks, to renew State Permit #8-96. This permit was issued on June 02, 1998 for the construction of a boat manufacturing business. The permit authorized the construction of nine temporary slips, the excavation and enlarging of a basin, and the construction of the associated high ground facilities. The permit has been modified several times through the minor modification and renewal processes, for insignificant alterations such as bumper piles and catwalks. At this time, the construction is in process, and excavation finished. The applicant would like to renew the permit for a period of two years as allowed in T15A .07J .0404. As well, he would like additional time for the continuing maintenance excavation of the basin. As allowed in T15A .07J .0404(5), 1 would recommend a 10 year maintenance clause be allowed for excavation of the artificial basin. SeCEQVED SEP 13 1999 COASTAL MANAGEMENT MOREHEAD CITY OFFICE HESTRON PLAZA II 151-B HIGHWAY 24 MOREHEAD CITY NC 28557 PHONE 252-808-280S FAX252-247-3330 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLED/10% POST -CONSUMER PAPER i 0 0 i D A A T •t) A D V G� Builder SL Broker of Fine Sportfishing Boats AU = - August, 26 1999 Tere Barrett N.C. Department of Coastal Management Hestron Plaza 11, 151-B Hwy 24 Morehead City, NC 28557 Re: Renew CAMA Permit No. 8-96 Dear Tere, Based on our most recent phone conversation (8/25), This letter is a request to renew CAMA Permit No. 8-96. At present, we are still in the process of building our ships store, grading the parking lot, and finishing the associated boardwalks and piers. We will also require maintenance dredging of our existing high -ground basin over the next few years. Let me know if I need to supply any additional information, thank your for your assistance. Sincerely, Vc Mason Cox Vice President 530 SENSATION WEIGH • BEAUFORT, NC 28516 • PHONE (252) 728-2690 • FAX (252) 728-2607 WEB SITE w Jarrettbay.com • E-MAIL jarrettbay@bmd.clis.com