Loading...
HomeMy WebLinkAbout112-96 Amended North Carolina State Ports Authority11. Permit Class AMENDED STATE OF NORTH=CAROLINA Department of Enviiommiht health & Natural Resources and . _ Coastal Resources Commission r jBF irm _ for, % ;t _ Major Developmenrin an -A Environmental Concern pursuant to NCG$ 113A-1'18,..L4w. Excavation and/or filling pursr'a—m to NCGS 113-229 Permit Number 112-96 Issued to North Carolina State Ports Authority, P. O. Box 9002, Wilmington, NC 28402 authorizing development in Carteret County at Newport River, north of Aviation Fuel Terminal --on-west.side-of-Radio-Is.—as-requested in-the-permittee s-application-dated 5/-13/-96-including attached-workplan-- -- drawings, 1 of 6 dated 5/5/96 and 2 of 6 through 6 of 6 dated 5/13/96. This permit, issued on 1�1' — li — q-6 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Mooring Field Construction and Use 1) Lash barges laden with hazardous or toxic materials will not be moored at the mooring field. 2) The permittee must install and maintain, at his expense, any signl lights, markings or signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on the buoys and moored barges. If not otherwise required by the U. S. Coast Guard, the buoys shall be lighted with a slow flashing white light. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the pemrit expires on December 31,1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Ar,Roger N. ScYiecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee N.C. State Ports Authority ADDITIONAL CONDITIONS Permit #112-96 Page 2 of 3 3) In order to preclude possible damage to area bridges and other facilities, the State Ports Authority must obtain written approval from the U. S. Coast Guard that an acceptable heavy weather protection and recovery plan has been developed for the fleeting area. Documentation of this approval must be provided to the Division of Coastal Management prior to initiation of construction of the mooring facilities. Any violation of or deviation from the plan approved by the U. S. Coast Guard will be considered a violation of this CAMA permit. General 4) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. 5) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored vessels. The permittee shall not hold the United States liable for any such damage. 6) This permit does not authorize the interference with any existing or proposed Federal Project. 7) The Federal Government does not assume any liability for: A. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or natural causes. B. Damages to the permitted project or uses thereof as a result of current or future Federal activities initiated on the public's behalf. C. Damages to other permitted or unpermitted activities or structures caused by the authorized activity. D. Design and construction deficiencies associated with the permitted work. E. Damage claims associated with any future modification, suspension, or revocation of this permit. 8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. Permit Class AMENDED STATE OF NORTH;CAROLINA Department of Envirorunat t 4LIdfi & Natural Resources and 771� A � f, R �+�' Major Development in an Area of Envtionmental Concern pursuant to NCGS 113A=118, ' ¢,- WA Excavation and/or filling pursuant to NCGS 113-229 Issued to North Carolina State Ports Authority, P. O. Box 9002, Wilmington, NC 28402 Permit Number 112-96 authorizing development in Carteret County at Newport River, north of Aviation Fuel Terminal on west side of Radio Is., as requested in the permittee's application dated 5/13/96 including attached workplan 1 of 6 dated 5/5/96 and 2 of 6 through 6 of 6 dated 5/13/96. This permit, issued on q —A — q-� , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Mooring Field Construction and Use 1) Lash barges laden with hazardous or toxic materials will not be moored at the mooring field. 2) The permittee must install and maintain, at his expense, any signl lights, markings or signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on the buoys and moored barges. If not otherwise required by the U. S. Coast Guard, the buoys shall be lighted with a slow flashing white light. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project,is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. \RogerN. Scliecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee r N.C. State Ports Authority ADDITIONAL CONDITIONS Permit #112-96 Page of 3) In order to preclude possible damage to area bridges and other facilities, the State Ports Authority must obtain written approval from the U. S. Coast Guard that an acceptable heavy weather protection and recovery plan has been developed for the fleeting area. Documentation of this approval must be provided to the Division of Coastal Management prior to initiation of construction of the mooring facilities. Any violation of or deviation from the plan approved by the U. S. Coast Guard will be considered a violation of this CAMA permit. General 4) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. 5) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored vessels. The permittee shall not hold the United States liable for any such damage. 6) This permit does not authorize the interference with any existing or proposed Federal Project. 7) The Federal Government does not assume any liability for: A. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or natural causes. B. Damages to the permitted project or uses thereof as a result of current or future Federal activities initiated on the public's behalf. C. Damages to other permitted or unpermitted activities or structures caused by the authorized activity. D. Design and construction deficiencies associated with the permitted work. E. Damage claims associated with any future modification, suspension, or revocation of this permit. 8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. N. C. State Ports Authority Permit #112-96 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The N. C. Division of Environmental Management has assigned the proposed project DEM Project No. 960535. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199603575. NOTE: The authorization of this mooring field in no way approves any upland development on Radio Island nor establishes any precedent for future development of the island. Permit Class AMENDED STATE OF NORTH CAROLINA Department of Envimnment,'Health & Natural Resources and . Coastal Resources Commission PtI3tIt for' R Major Development in an' a of Environmental Concern pursuant to NCGS 113A=118 = ' •, J(rar.. -• Excavation and/or filling pursuant to NCGS 113-229 Permit Number 112-96 Issued to North Carolina State Ports Authority, P. O. Box 9002, Wilmington, NC 28402 authorizing development in Carteret County at Newport River. north of Aviation Fuel Terminal on west side of Radio Is., as requested in the permittee's application dated 5/13/96 including attached workplan drawings, 1 of 6 dated 5/5/96 and 2 of 6 through 6 of 6 dated 5/13/96. This permit, issued on q - A - q , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Mooring Field Construction and Use 1) Lash barges laden with hazardous or toxic materials will not be moored at the mooring field. 2) The permittee must install and maintain, at his expense, any signl lights, markings or signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on the buoys and moored barges. If not otherwise required by the U. S. Coast Guard, the buoys shall be lighted with a slow flashing white light. (See attached sheet for Additional Conditions) This permitLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger N. Schecter, Direc Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee r. N.C. State Ports Authority ADDITIONAL CONDITIONS Permit 9112-96 Page 2 of 3 3) In order to preclude possible damage to area bridges and other facilities, the State Ports Authority must obtain written approval from the U. S. Coast Guard that an acceptable heavy weather protection and recovery plan has been developed for the fleeting area. Documentation of this approval must be provided to the Division of Coastal Management prior to initiation of construction of the mooring facilities. Any violation of or deviation from the plan approved by the U. S. Coast Guard will be considered a violation of this CAMA permit. General 4) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. 5) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored vessels. The permittee shall not hold the United States liable for any such damage. 6) This permit does not authorize the interference with any existing or proposed Federal Project. 7) The Federal Government does not assume any liability for: A. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or natural causes. B. Damages to the permitted project or uses thereof as a result of current or future Federal activities initiated on the public's behalf. C. Damages to other permitted or unpermitted activities or structures caused by the authorized activity. D. Design and construction deficiencies associated with the permitted work. E. Damage claims associated with any future modification, suspension, or revocation of this permit. 8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. N. C. State Ports Authority Permit #112-96 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The N. C. Division of Environmental Management has assigned the proposed project DEM Project No. 960535. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199603575. NOTE: The authorization of this mooring field in no way approves any upland development on Radio Island nor establishes any precedent for future development of the island. Perot Class AMENDED STATE OF NORTH CAROLINA Department of Environment Health & Natural Resources — and ,. Coastal Resources Commission R , wy,y _ ., for.:;.=::;.•. •J -` Major DevelopmenCih an Area.of Env_iFoiunental Concern pursuant to NCGS 113A418 � _ , tr r are " Excavation and/or filling pursuant to NCGS 113-229 Permit Number 112-96 Issued to North Carolina State Ports Authority, P. O. Box 9002, Wilmington, NC 28402 authorizing development in Carteret County at Newport River, north of Aviation Fuel Terminal on west side of Radio Is., as requested in the permittee's application dated 5113196 including attached workplan drawings, 1 of 6 dated 5/5/96 and 2 of 6 through 6 of 6 dated 5/13/96. This pemtit, issued on q — A — q , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Mooring Field Construction and Use 1) Lash barges laden with hazardous or toxic materials will not be moored at the mooring field. 2) The permittee must install and maintain, at his expense, any signl lights, markings or signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on the buoys and moored barges. If not otherwise required by the U. S. Coast Guard, the buoys shall be lighted with a slow flashing white light. (See attached sheet for Additional Conditions) This permiLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. — Roger N. Sc tecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee r N.C. State Ports Authority ADDITIONAL CONDITIONS Permit #112-96 Page 2 of 3 3) In order to preclude possible damage to area bridges and other facilities, the State Ports Authority must obtain written approval from the U. S. Coast Guard that an acceptable heavy weather protection and recovery plan has been developed for the fleeting area. Documentation of this approval must be provided to the Division of Coastal Management prior to initiation of construction of the mooring facilities. Any violation of or deviation from the plan approved by the U. S. Coast Guard will be considered a violation of this CAMA permit. General 4) No attempt will. be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. 5) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored vessels. The permittee shall not hold the United States liable for any such damage. 6) This permit does not authorize the interference with any existing or proposed Federal Project. 7) The Federal Government does not assume any liability for: A. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or natural causes. B. Damages to the permitted project or uses thereof as a result of current or future Federal activities initiated on the public's behalf. C. Damages to other permitted or unpermitted activities or structures caused by the authorized activity. D. Design and construction deficiencies associated with the permitted work. E. Damage claims associated with any future modification, suspension, or revocation of this permit. 8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. r N. C. State Ports Authority Permit 9112-96 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The N. C. Division of Environmental Management has assigned the proposed project DEM Project No. 960535. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199603575. NOTE: The authorization of this mooring field in no way approves any upland development on Radio Island nor establishes any precedent for future development of the island. Permit Class AMENDED STATE OYNORTH-CAROLINA Department of Environment, Health & Natural Resources and Coastal kesoiuces Commission R Mfor_x1,. Major Developmenrin an Area of Environmental Concern pursuant to NCGS 113A=118 '• , Excavation and/or filling pursuant to NCGS 113-229 Issued to North Carolina State Ports Authoritv, P. O. Box 9002, Wilmington, NC 28402 Permit Number 112-96 authorizing development in Carteret County at Newport River, north of Aviation Fuel Terminal on west side of Radio Is., as requested in the permince's application dated 5/13/96 including attached workplan drawings, 1 of 6 dated 5/5/96 and 2 of 6 through 6 of 6 dated 5/13/96. This permit, issued on q —!A — q is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Mooring Field Construction and Use 1) Lash barges laden with hazardous or toxic materials will not be moored at the mooring field. 2) The permittee must install and maintain, at his expense, any signl lights, markings or signals prescribed by the U. S. Coast Guard, through regulations or otherwise, on the buoys and moored barges. If not otherwise required by the U. S. Coast Guard, the buoys shall be lighted with a slow flashing white light. (See attached sheet for Additional Conditions) This permit_action maybe appealed by the perminee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the pemtit expires on December 31. 1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger N. ScYlecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee iy N.C. State Ports Authority Permit #112-96 Page 2 of 3 ADDITIONAL CONDITIONS 3) In order to preclude possible damage to area bridges and other facilities, the State Ports Authority must obtain written approval from the U. S. Coast Guard that an acceptable heavy weather protection and recovery plan has been developed for the fleeting area. Documentation of this approval must be provided to the Division of Coastal Management prior to initiation of construction of the mooring facilities. Any violation of or deviation from the plan approved by the U. S. Coast Guard will be considered a violation of this CAMA permit. ` General 4) No attempt will be made by the permittee to prevent the free and full use by the public of all navigable waters at or adjacent to the authorized work. 5) It is possible that the authorized structure may be damaged by wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored vessels. The permittee shall not hold the United States liable for any such damage. 6) This permit does not authorize the interference with any existing or proposed Federal Project. 7) The Federal Government does not assume any liability for: A. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or natural causes. B. Damages to the permitted project or uses thereof as a result of current or future Federal activities initiated on the public's behalf. C. Damages to other permitted or unpermitted activities or structures caused by the authorized activity. D. Design and construction deficiencies associated with the permitted work. E. Damage claims associated with any future modification, suspension, or revocation of this permit. 8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. N. C. State Ports Authority Permit #112-96 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The N. C. Division of Environmental Management has assigned the proposed project DEM Project No. 960535. NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID No. 199603575. NOTE: The authorization of this mooring field in no way approves any upland development on Radio Island nor establishes any precedent for future development of the island. NORTH CAROLINA PORTS JERREL J. FREEMAN, P.E. Senior Engineer October 8, 1996 Mr. John Parker Major Permits Processing Coordinator Division of Coastal Management PO Box 27687 Raleigh, NC 27611 Subject: North Carolina State Ports Authority(NCSPA) Morehead City Terminal Facility CAMA Permit Number 112-96 Mooring Field Construction and Use Dear Mr. Parker: On 9-4-96, the North Carolina State Ports Authority, Morehead City Terminal Facility was issued Permit #112-96 for the construction and use of a mooring field. The Permit's Additional Condition 3) requires, prior to construction, written approval from the U.S. Coast Guard accepting the NCSPA's inclusion of the fleeting area in its Hurricane Response Plan. Please find attached the U.S. Coast Guard's acceptance letter regarding the Morehead City Terminal's Hurricane Response Plan. Captain Rice's comments are presently being incorporated in the Terminal's plan by Morehead City Terminal staff. 4 n�K a t? -pa OCT 101996 NORTH CAROLINA STATE PORTS AUTHORITY P.O. Box 9002 • Wilmington, NC 28402 • Tel: (910) 3436227 • Fax: (910) 343-6289 .,r The North Carolina State Ports Authority feels Additional Comment 3) has been executed and shall now proceed with developing the construction project. If any additional information is needed, please contact me at (910) 343-6228. Sincerely, NORTH CAROLINA STATE PORTS AUTHORITY W--1eX- a,1A H. Layton Bedsole Jr. Manager of Environmental Affairs encl. cc: Chief Engineer Charles Jones, Division of Coastal Management Director, Morehead City Terminal Facility General Superintendent, Morehead City Terminal Facility Marine Engineer iJ, 5. Department pf TranspartHtfon Olcor 272 N. Front Street.at, Suite 500commandi iolnflPnl9(1345907MrnSaaety Orco hoo90 3-499 Y Toll Free:1-900-325-4955 United states Fax:. ,(910) 343-423 . mast Guard 16471" 2 October 1996, Mr. Doug Campen North Carolisxa State Ports Authority 0.0. Drawer 829 iYlorehead City, NC Dear Mr. Mr. Campen: 'Thank you for 't:he.opportunity,to review your Draft Hurricane Response ;Plan (207 revision II). I have no substantive objections to the policies and.procedures you. -have outlined in the plan. The following comments are recommended 'to be considered during. your next revision. Additional general comments have been made on the draft '•hurricane response plan, a copy of which is returned as enclosure (1). i. Diagrams/chartlets`which depict the mooring arrangements of the ±Pjash barge,, both at they bargee. fleeting area and at identified hurricane mooring, should be included. 2. Is Came:;: River Towing Company dedicated solely to the support of 'Lash baroes2 Pending potential non -availability, have alternate towing :companies been ,identifi.ed? If so, what is their response time and time irequirod to sacure the greatestnumber of barges to be at the facility :within the specified time? S z. Condition Three - CG requires specific information from ;vessels/'ba.rgc%s which intend on remaining in port, per page C-21-D-11 of :Captain of the Port (COTP) Wilmington!s Hurricane Plan. This info :should be included in your plan's Condition Three section. In addition, COTP Wilmington should be apprised of the type and quantity :of cargo on vessels/barges remaining in port. 4. Condition Two for Lash Barge Fleeting area - Include notifying the COTP tor Item 5. We hold a meeting of all.port users each spring prior to the beginning !of hurri„cane season. The purpose of the meeting is to ensure the currency of the COTP Wilmington plan. The closer agreement we have :with oi:r plans, the better we can. all respond -t:o a hurricane. !Please- contact LT Dave Brown at extension 108 of the number above if you have any qucstions regarding the COTP Wilmington hurricane plan. sin cerel . T. L. RICE .Captain, U.S. Coast Guard Encl.: (.l) NCSP Morehead City Draft Hurricane Response Plan (207 revision II) revision date 8/20/96 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 REPLY TO ATTENTION OF August 16, 1996 Regulatory Branch Action ID No. 199603575 and State Permit No. 112-96 NC State Ports Authority Post Office Box 9002 Wilmington, North Carolina 28402 Dear Sirs: Reference your application for a Department of the Army permit to place a "LASH" barge mooring field covering approximately 5.4 acres of non -vegetated shallow water in the Newport River,adjacent to Radio Island in the NC State Ports complex in Morehead City, Carteret County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. 198000291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field office, Regulatory Branch, telephone (910) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure RECFivEO AUG 2P r1996 Copies furnished (with plan): Chief, Source Data Unit NOAA/National Ocean Service 1315 East-West Hwy., RM 7316 Silver Spring, Maryland 20910-3282 Mr. John Dorney Division of Water Quality North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. Thomas Welborn, Chief Wetlands Regulatory Section - Region IV Wetlands, Oceans and Watersheds Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. John Parker /Division of Coastal Management / North Carolina Department of V Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Hefner U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries service Pivers Island Beaufort, North Carolina 28516 Mr. Charles Jones, District Manager Morehead City Regional Office North Carolina Division of Coastal Management 3441 Arendell Street Post Office Box 769 Morehead City, North Carolina 28557 - t `'�"4'�•: z es,r r ,r„ );:. _ ' St„tri:tm it .,.• d".'(`` v' a , A i `fit a BEAUFORT= MOREHEAD"," CITY AIRPORT I t I01 f• • r 6 � S€P n�t:�T Fq Y+ MQREHEAD CITY yh ' 7�0 {° t+4 " 4a ," UFORT. . • I v lF � � A O 7 NCsP x _ RRNIINA, R i�P��" ISLA D - r IaG M rJFl ,.r� rx n{3♦ l t f > t yn i r Pr Ix p+T 3 = ' q■ r t I' ry,Se)lSi �a1 �? ,}'Y>Zx;;�{✓Y�r 3MY'i"�'i sj°i yxs� 4 � r �� rl 3.. µ )_ t rl� i�sy -fe'y�y ww '1 -ii •b � Y1i Y' i C }fit _ 1,1.•d �3:�'ri"iS [It'�51fi3iEpy d �, .ii }j - T•I' t{ iT' V F ) Y S "t y �+ \'BSI' i - � � I ,< C�. ! ,�s••�� �,ti'Fsyxip ..,� 9 F 't k. Ji {'.!" K ,Y, Jr:l I YY i. �'v�r t✓ hK W ; Y'' �tio,lit;T✓ir ) � s � �r ENTsOFENGINEERING d+. t ,, � �t ��° . �M�". �" � z`� =t'"t ��>'•�'t �, �+ L :, � � x �� ` �:�.r �� x 1 f?R�4PD4Ep�,BA,9GE;�FI.EETING AREA. t 'f=iie:�i"r' S4 i+x a;<'J (w f rl >• 1f t ; S �VICINMAP,✓ ....:t.-),•nJ, 1 ,ra �IIW CAIIS .iY'.SiAL�.1J4 4.tfp^i"`"`3 'Y t'`" SHEET D 4oI NEWPORT RIVER I ` 177 o ' .71 t O r y A I }1� .• � 5 .� �ivnTT �ti� 3 a � %� � •i r�+ A .ti' t r�� t"ik)r �r{. ''4 �� xf �'tV thh S(.GfJ+zll>><�y �„ �l .0 P ✓v.. �_.. i e i f'yr�^v «� v � GC f'1r tea y'j.la 6p ti,M;t} ..e� 5 1 .., i k �$ �4 .. .f kPG� �. 'x '9��5 4' y 4 ; t. I'' i� i•14 f -.� r<��'a W�3 rc ff� lry, � I + o ti irC' +. a3 i t - , 2 �'•� c'�s+t«y '1 r2p `' `rdl�,,. i Mr✓'��t-rsrJ,a \ ' I"' -r - t � ., i � f:{.,c t w"c ?}>tAQ14l�•cJI.ANp ' f TLw `iji`a � a�-r � r¢i r.N f• , C7 I J,r r f 1 ' 'w q``f�i ai -r,.' I. y '}.rta t r. Z.11 ...v�t � iPEPAR,TIuJPNT;OF�ENGINEERING A,'FS.. 4dqr4 Lit1�JA 4r's«a .y � Y�7,91k , t `xa t M7y v5 , II at x5i ,,.. ".• t µ4 A +', 9 f 5\�!� xv .!taq.t. d.f.f....1 fF _it fY 4r fir „,S�(ti': j`P'TL' ROtaTP~�V'Qt}V;t;Y IIr OLrnAeR...G-.E. r F;LE'` ETNO SEP AREA Qlr .. QNs \+ Y 5t � ,}. � 3 1 A >' r .wl 3 t e'M4r < ✓3 P1 fE� ".': r ' "' it: y .r ���',C^��''tysft5�{ ,«,��.'{T, z,xi sar �µ :f 1 .t. ,AVIh71oN jFU0.'t'►EIjMINM. Y(r k 4 x . tr k.+six --• P aS'.'ds...:l-ff �, av nakm .. - P R Q- J G, `' t t QOCiVE SOUND I de r 5. rt•,t t f i fit `{ v 4 I i f ik a.�h Cpp �, 1y Mmf-�111• c .. k vt v.-".i 0 A +• l''• 5 r: te,._ .. G1 `Y; .:. fr r". f ^.! �)�. � 1 �I t- SNEET Y ff 6 f NE eoi q) 0_1 01 ANDREW,,'.�, I I MIDGETT AG ENT 1'.. 74 mt 4, V4, -gi #f NC$PA ...... Ti, i IJ1,11, o., A47 113P 01• P 71- Ir ow" M-77777 d LLJ"., vx lu MV, AVIATION FUEC,, JERY, I oi 77 , �mr r7 liEp �JOTE-,,':,'80U�kff(NGS�t,TAKEN�i FROM _SURVEY u act DAM AR AM b In 854 156 OFFSET � NCSPA NNOREW.' 41 r,7111" 7AGENT -' I T I , �ACSPA,,..' t 15"o F"T AVIATION 408 '32 9 2z H V7 740't , , TYPICAL"..BARGE 60, X 30' i } �r ��ti ;If ` � r r;fi'a'J i. i, •r a i Yi ,5 S i''.r "t f „, .'ll { i X' -t, Pr =il HJ, Y= v 1 .'a 6 ' _ 1 y Jrt. f � +r� •. ; _ `a k ~ `' =t SECTION ,8 8 v y�'jf i ,� I F3 r r { > tl ✓ ^ tF� e.v L H t'T� �F � } � , ,�,� tE } � d t• ; h 4. Y t '!-.� 8tr"�1 31� "'ls4 ('. � AREA LAR RL ' in' 71 LSmt 1 F' e A a 9.5' X ' T X 2' REINFORCED i CONCRETE BLOCK (TYP) TYPE MOORING 'BODY "r 4 '• ., (SEE SPECIFICATION SHEET) 45• • - � ,� J r tam z^ 90' OF ANCHOR CHAIN;(TYP) r .. 12.000 LB. SHIP (SEE SPECIFICATION SHEET) ANCHOR (TYP) PLAN (SEE SPECIFICATION SHEET) 45' OF ANCHOR CHAIN (TYP) WATER LINE (SEE SPECIFICATION SHEET)# ,�t VARIES pOTTOM 1 xr� k ARIL t 1 A tf vl1 y 3�54 h i l �• �� " wi �.:q� at t ., r !'^ 1 Y tc �t 'F � ; +d'uq•� t. J3.5,�'•�r���kY'���.�'nt�u-<�e0i F < ELEVATION x ,A Sµ, i„rltl<„vF"�EPARMNxTmOFti,ENG(NEERING �+. �►YF't �'� rit.ti�,�'. '",�' ve ,fit f` y�`, a�!tt ,n .Fh ��':t=-J �-<� ��5�#�`'�h,�t' 'J i. _�(,?!l.. 1.1,.. �Y.— t v �} xiilN� TIG�'AREA�� �N ..,�«a Ye .tea R ,. x'�n.i" r./a-w•elery 1 t.ti _ ��f. ,, u,i..w.r - s b�..' tFh�.,Yf a f n u..� k-..._ if pa State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director September 4, 1996 N. C. State Ports Authority P.O. Box 9002 Wilmington, NC 28402 Dear Sir: .AT4*A [DEHNR The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on.the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, John R. Parker, Jr. Major Permits Processing Coordinator JRP:jr/amw Enclosure P.O. Box 27687, FAX 919-733-1495 Raleigh, North Carolina 27611-7687 N%'*w'o-'CAn Equal Opportunity/Affirmative Actlon Employer Voice 919-733-2293 I�7! 50% recycled/l0% post -consumer paper Division of Coastal Management Application Processing Notes Applicant: S, IQ �, \\z _lz�, �, Deadline: Date/Time: Message: - - C1 NORTH CAROLI NA PORTS JERREL J. FREEMAN, P.E. Chief Engineer August 8, 1996 Mr. John Parker Major Permits Processing Coordinator Division of Coastal Management PO Box 27687 Raleigh, NC 27611 Subject: North Carolina State Ports Authority(NCSPA) Morehead City Terminal Facility CAMA Permit Number 112-96 Mooring Field Construction and Use Dear Mr. Parker: The North Carolina State Ports Authority is requesting an amendment to CAMA Permit Number 112-96. The spirit of the second NOTE on page one is understood, however the verbiage restricts the Port's import\export flexibility. On August 7, 1996, a meeting was held at the Morehead City, Division of Coastal Management's field office. Mr. Pate, Mr. Jones, and myself discussed this issue and the following amended wording was acceptable to all. 'LASH barges laden with hazardous or toxic materials will not be moored at the mooring field.• The NCSPA is requesting the second NOTE on page one of Permit Number 112-96 be amended to read as above. The NCSPA appreciates the Division's assistance in this matter, and if any additional information is needed please call me at (910)343-6228. Sincerely, NORTH CAROLINA STATE PORTS AUTHORITY H. Layton Bedsole Jr. Manager of Environmental Aff gG�lr�F cc: Director, Port of Morehead City MAHvj� 99� FNT NORTH CAROLINA STATE PORTS AUTHORITY P.O. Box 9002 • Wilmington, NC 28402 • Tel: (910) 343-622T • Fu (910) 343-6289