Loading...
HomeMy WebLinkAboutCBE11-44EX-DUNES II HOA. R n Joel Macon Mayor Lonnie Lashley Councilman Bob Lewis Councilman TOWN OF CAROLINA BEACH 1121 N. Lake Park Boulevard Carolina Beach, North Carolina 28428 910 458 2996 FAX 910 458 2997 08/16/11 Dunes II HOA 908 Carolina Beach Ave N Carolina Beach NC 28428 Pat Efird Mayor Pro Tem Dan Wilcox Councilman Timothy Owens Town Manager Exemption Number — CBE 11-44 RE: EXEMPTED PROJECT (MINOR) - MAINTENANCE AND REPAIR (15A NCAC 07K .0103) PROJECT ADDRESS — 908 Carolina Beach Ave N AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard To Whom It May Concern: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 8/16/2011, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on 8/12/2011, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCEAND REPAIR - (G S. 113-103(5) (B) (5) and 7X 0209) - Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50•9 of the physical value of the existing structure and the following sped conditions. 1. Replace bottom floor walls to breakaway walls. 2. Raise equipment platform to meet BFE. 3. The proposed work shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 4. No changes shall be made to the footprint. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. S' cere y, Jeremy Har PO Town of Carolina Beach 1121 North Lake Park Blvd. Carolina Beach, NC 28428 Cc: Shaun Simpson AUG 3 1 2011 DC�l WiLMINGTON, NC KZ12- je `c. ti So c�C—) Lz - 1 &e I Is /1 ' 11 1 c- -7-7 � f O ®T Xa- V� =� O / �• ®�J DCY1P+1 WILMINGTON, NC EXISTING GIRDER 5/8" DIAME THROUGH E EVER' 5/8" DI GALV TI BOLT AT E� m Al DCM WILMINGTON, Ni. TYPICAL SECTION OR 5/4 BOARD ATED DECK PT 2X6 HEADER BOTTOM/PLATFORM TO BE ABOVE BASE FLOOD ELEVATION �e �A CAROB OFESSlp� Q- y SEAL ` - 16573 _ P. 5111 PROPOSED A/C EQUIPMENT PLATFORM - DUNES 11 - CAROLINA BEACH JUNE 3, 2011 S1 Figure 13. Typical wood - framed breakaway wall construction (prescriptive method) Beam Permanent 2 x 4 nailer 4-inch widekout B ap Built-up +-- 24 /Exterior sheathing 2 N � 2x4 framing Table 1 a. Total required number of galvanized common nails (divided equally between top and bottom) for wood -framed breakawav wall configurations with 8-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 18 12 22 14 24 16 28 18 Table 1 b. Total required number of galvanized common nails (divided equally between top and bottom and PvPniv snacedl for wood -framed breakawav wall configurations with 10-foot pile spacing Breakaway Wall Height (feet) 6 7 i3 9 Nail Size 8d 10d 8d 10d 8d 10d �28d10d Nails Required 24 16 28 18 32 20 24 Table 1 c. Total required number of galvanized common nails (divided equally between top and bottom and Pvnnly snacadl for wood -framed breakawav wall configurations with 12-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 28 18 32 22 38 24 42 28 b.9 V ED AUG 3 1 2011 16 TECHNICAL BULLETIN 9 — AUGU����Q>�.®Ns NC Table 1 a. Total required number of galvanized common nails (divided equally between top and bottom) for wood -framed breakawav wall configurations with 8-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 18 12 22 14 24 16 28 18 Table 1 b. Total required number of galvanized common nails (divided equally between top and bottom and PvPniv snacedl for wood -framed breakawav wall configurations with 10-foot pile spacing Breakaway Wall Height (feet) 6 7 i3 9 Nail Size 8d 10d 8d 10d 8d 10d �28d10d Nails Required 24 16 28 18 32 20 24 Table 1 c. Total required number of galvanized common nails (divided equally between top and bottom and Pvnnly snacadl for wood -framed breakawav wall configurations with 12-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 28 18 32 22 38 24 42 28 b.9 V ED AUG 3 1 2011 16 TECHNICAL BULLETIN 9 — AUGU����Q>�.®Ns NC Table 1 b. Total required number of galvanized common nails (divided equally between top and bottom and PvPniv snacedl for wood -framed breakawav wall configurations with 10-foot pile spacing Breakaway Wall Height (feet) 6 7 i3 9 Nail Size 8d 10d 8d 10d 8d 10d �28d10d Nails Required 24 16 28 18 32 20 24 Table 1 c. Total required number of galvanized common nails (divided equally between top and bottom and Pvnnly snacadl for wood -framed breakawav wall configurations with 12-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 28 18 32 22 38 24 42 28 b.9 V ED AUG 3 1 2011 16 TECHNICAL BULLETIN 9 — AUGU����Q>�.®Ns NC Table 1 c. Total required number of galvanized common nails (divided equally between top and bottom and Pvnnly snacadl for wood -framed breakawav wall configurations with 12-foot pile spacing Breakaway Wall Height (feet) 6 7 8 9 Nail Size 8d 10d 8d 10d 8d 10d 8d 10d Nails Required 28 18 32 22 38 24 42 28 b.9 V ED AUG 3 1 2011 16 TECHNICAL BULLETIN 9 — AUGU����Q>�.®Ns NC b.9 V ED AUG 3 1 2011 16 TECHNICAL BULLETIN 9 — AUGU����Q>�.®Ns NC ^-14�vj `2 f LANDING CONTROLLER SLACK CABLE ROLLER BE 240v, 1PH SLACK CABLE GEARBOX MUST _ DISCONNECT SWITCH N-- -- MOUNTED w\SOUND"� BASE: MIN. (4) 1/2' FASTENERS, MIN. \ PULLOUT 10,000# NOTE: HOISTING MACHINE IS MOUNTED �- NOTEt FLOOR MUST TO (2) 4'-0'x8'-3/4' SUPPORT: PLYWOOD PLANKS, STATIC LOAD = 1,100 LBS, GLUED AND LAGGED IMPACT LOAD = 2,200 LBS. TO JOISTS THROUGH BOLT HOISTING MACHINE WHENEVER NOTE, 2'x12' PLANK PLUMB AND SQUARE POSSIBLE IF CAR S 8'H THEN ° IS SECURED WITH TWO 3/8'x5' MINIMUM OVERHEAD LAGS 2'-0' O.C. AT EDGES. OF 9' I NEEDED COUNTERB❑RE LAGS. 2ND TRAVEL FOR DOOR _ - SINGLE DRUM INTERLOCK STABALIZER - w/DOUCLE DRUM o 1ST - ---- - AUG 3 12011 6"PIT MINIMUM 46" HATCH _ DC-L 6 WILM INGTON, NC DWG VIEW PART NUMBER REV. DATE SECTION A —A 80205322 INCLIN COMPANY of .�.��� DRAWING TITLE DRAWING NO. — IN ATTIC TYPICAL PAGE: DRAWN BY: DWG. DATE JOB OR APP.# DEALER P.O. DWG. SCALE REV.LEVEL(1-3) 3/4 — — - LPO COMPOSITE RECORD FORM FOR EXEMPTIONS Revised02/02/08 LOCALITY - Carolina Beach FOR QUARTER - , 1st Year - 2011 Date: \0 t\\ d, Phone Number: w-71 Signature..._____ °i° U L a e: a = m Phone Number: a � m 1 _ F� o �0 L U) L -O to CU y--i i1 1 O C .2 CU L U RECEIVED LL U °' O E _' o DCIA WILMINGTON, NC o � N in �� w v 0 C T 1 1 2011 w`a '� °° U. U' N U N) U .� d N O c o m p E O Q 00 C O m Q' Q O c U C Q •U U O U (n E co K >, O > N d Q a)LLl Q a) W co 0 4 Q O O O '� O N U- O >, a c. o c a E File # Applicant Name Project Address 0 o o w H ¢ cn H U- CBE11-41 Anthony Seletti 718 Carolina Beach Ave N 7/5/2011 7/1/2011 7/5/2011 H RM SFR CBE11-42 NIGHTINGALE CORP 906 S Lake Park Blvd 7/19/2011 7/20/2011 7/20/2011 H RM SFR CBE11-43 Helen Vaughan 1416 Carolina Beach Ave N 7/25/2011 7/25/2011 7/25/2011 H RM SRF CBE11-44 Dunes II HOA 908 Carolina Beach Ave N 8/12/2011 8/16/2011 8/16/2011 H RM MRF CBE11-45 Ocean Harbor HOA 1404 Canal Dr 8/24/2011 8/24/2011 8/16/2011 H RM MFR CBE11-46 101 Seahorse 101 Seahorse 8/29/2011 8/26/2011 8/29/2011 H RM MFR CBE11-47 ELBERA LLC 901 -E Carolina Beach Ave N 9/1/2011 8/26/2011 9/1/2011 H RM SRF CBE11-48 Wayne Eudy 1303 Carolina Beach Ave S 9/19/2011 9/20/2011 9/20/2011 H RM SFR Exemptions. Log 2011 - 2012 Carolina Beach Page#1 Date Quarterly report received. 10-11-11 1st Quarter Permit No. Applicant's Name Project Location Date RO received Letter Date on Letter Date RO received App Date App. Filed AEC App Complete Appr. for Payment CBE11-41 Anthony Seletti 718 CB Ave N 7/8/11 7/5/11 x 7/5/11 OH Y Y CBE11-42 NIGHTINGALE CORF 906 S Lake Park Blvd 8/2/11 7/20/11 x 7/19/11 OH Y Y CBE11-43 Helen Vaughan 1416 CB Ave N 8/2/11 7/25/11 x 7/25/11 OH Y Y CBE11-44 Dunes If HOA 908 CB Ave N 8/31/11 8/16/11 x 8/12/11 OH Y Y CBE11-45 Ocean Harbor HOA 1404 Canal Dr 8/31/11 8/16/11 x 8/24/11 OH Y Y CBE11-46 101 Seahorse 101 Seahorse 8/31/11 8/29/11 x 8/29/11 OH Y Y CBE11-47 ELBERA LLC 901 -E CB Ave N 10/11/11 9/1/11 x 9/1/11 OH Y Y CBE11-48 Wayne Eudy 303 CB Ave S 9/22/11 9/20/11 x 9/19/11 OH Y Y REQUISTION FOR PAYMENT OF CAMA MINOR PERMIT PROGRAM IMPLEMENTATION AND ENFORCEMENT Local Government: V_-//04,13CAr Period Covered: X I" Quarter (July -Aug -Sept) FY: 2011-2012 2nd Quarter (Oct - Nov - Dec) 3rd Quarter (Jan - Feb - Mar) 4d' Quarter (Apr - May - Jun) Services Rendered: OH- ES = 3 Permits processed @ $55.00 each i $ (Cities and towns) OH ES = Permits processed @ $75.00 each $ (Counties) OH v2 ES c;L = T Final'Inspections @ $40.00 each $ OH </ ES = Exemptions investigated @ $25.00 each $ 0 OH ES = Violations resolved @ $100.00 each $ LPO Training (not to exceed $200.00) $ i 06 TOTAL AMOUNT REQUESTED UNDER THIS REQUISITION b , The above information is an accurate account of activities carried out by the local government staff during the period specified above. I approve for payment DCM Regional Representative Date: DATE RCVD IN WILMINGTON OFFICE: / 0 - / / — / / DATE SENT TO MOREHEAD CITY OFFICE: DATE PAID: