HomeMy WebLinkAbout38-96 Letter of Refinement 1997 Woodard, WarrenState of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
27 March 1997
Mr. Warren Woodard
Route 2, Box 279-C
Columbia, North Carolina 27925
Dear Mr. Woodard:
/,If . ;
tiv
�EHN11
This letter of refinement is in reference to your 18 March 1997 correspondence addressing minor
changes in CAMA Major Permit No. 38-96. CAMA Major Permit No. 38-96 was issued to you for the
construction of a boat basin with boat ramp and docks, maintenance of an existing canal and dredging a new
entrance channel in Albemarle Sound onsite your property off SR 1219 near Columbia in Tyrrell County,
North Carolina. Your request to modify the aforementioned permit to allow the following items listed below
and depicted on your revised plats dated 18 March 1997 is hereby authorized.
1. Modify the permitted side to docking (for 25 to 30 vessels) to 13 - t3' by ±25,
finger piers with 3 mooring pilings between each for a total number of 26 slips.
2. Extend the permitted boat ramp landward by 25'.
3. Construct a bulkhead t2' below the normal water level at the fuel dock for a linear
distance of t 140.
Ail previous permit conditions including the 31 December 1999 expiration date still apply and remain
unchanged. Your modified plats dated 18 March 1997 will become a part of your permit and construction
should be accomplished accordingly.
Thank you for your time and cooperation in this matter. If you have any questions, please don't
hesitate to contact me or David Moye in the Washington Regional Office (919) 946-6481.
Sincerely,
Te E. Moore
District Manager 10 if
Division of Coastal M n
Washington Regional 1p �FcFX
cc: David Moye - Field Representative, DCM
Pr Pate - Assistant Director, DCM
Parker - Major Permits Coordinator, DCM
Raleigh Bland - US Army Corps of Engineers
1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716
An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%Post-consumer paper
March 18, 1996
Mr. David Moye
State of N.C. Dept.
Enviromental, Health &
Natural Resources
Dear Sir:
I am writing to you concerning my Permit Number 3896; to ask for
a variation in the configurations of the boat docks. I would like
to increase the size of the boat ramp to 50' X 15", and also add
another walkway on the south side. I would like to build a solid
dock on the north side loading and unloading boats and fueling
boats. This dock would be 4' wide with bulkhead underneath and a silt
fence attached to the timbers that are being used as bulkhead material.
Attached to this letter; you will find plans for the changes I am
proposing. Thanks for any consideration you can give me.
Sincerely,
Warren Woodard
WW/dc
ac.O�mArccE
. L.BElNi1LJ-E $ITE So VNO
SO LJ /V P W 0 0 W179
IZ w
Wk—fLP%tm
d,•
CVjSTING I?JG
�. rPEPrk v�G///lry /tl/tP
14101: l 4/,vE, �o/n/S Sil e f OF
We
33 '
a � 1
r ,SYO��E
-f?o �r•� v FPump
SffIGF /�So
TM,Vi !' '' o✓FILE
m oIII LZr
ox°° Tilr, z.260 4Q J. 'o
I BOA-7
1I1.11 uU ow/vEe _
2G TO N G?'ti. o : T.
ADJACE/r>•
a,wwex '
COL/1/ SNELL
-1. 2, o
n
0
q
e o 0
n
0 b a
0
�
2
w
•
0
,�Og11
h.
C
PRoPoseo a o
13OAT T
I 1 L
c o h
Q
0
f/lon.
39 6.o/ 7"0
1lD7;gc&4T• P40,06,x '
. v w r/ eX
Sfl EE-' J
WAgW-N !nloobAEO
P2ar`bSeO
.80Ar QAS/N•
ANb .
ACCESS. GNANNEL
•YYR.2ELL CO'. N, e ,
`00
UNL7.4Oin,; Dock
SInc Vlsw
40
L