Loading...
HomeMy WebLinkAbout38-96 Letter of Refinement 1997 Woodard, WarrenState of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director 27 March 1997 Mr. Warren Woodard Route 2, Box 279-C Columbia, North Carolina 27925 Dear Mr. Woodard: /,If . ; tiv �EHN11 This letter of refinement is in reference to your 18 March 1997 correspondence addressing minor changes in CAMA Major Permit No. 38-96. CAMA Major Permit No. 38-96 was issued to you for the construction of a boat basin with boat ramp and docks, maintenance of an existing canal and dredging a new entrance channel in Albemarle Sound onsite your property off SR 1219 near Columbia in Tyrrell County, North Carolina. Your request to modify the aforementioned permit to allow the following items listed below and depicted on your revised plats dated 18 March 1997 is hereby authorized. 1. Modify the permitted side to docking (for 25 to 30 vessels) to 13 - t3' by ±25, finger piers with 3 mooring pilings between each for a total number of 26 slips. 2. Extend the permitted boat ramp landward by 25'. 3. Construct a bulkhead t2' below the normal water level at the fuel dock for a linear distance of t 140. Ail previous permit conditions including the 31 December 1999 expiration date still apply and remain unchanged. Your modified plats dated 18 March 1997 will become a part of your permit and construction should be accomplished accordingly. Thank you for your time and cooperation in this matter. If you have any questions, please don't hesitate to contact me or David Moye in the Washington Regional Office (919) 946-6481. Sincerely, Te E. Moore District Manager 10 if Division of Coastal M n Washington Regional 1p �FcFX cc: David Moye - Field Representative, DCM Pr Pate - Assistant Director, DCM Parker - Major Permits Coordinator, DCM Raleigh Bland - US Army Corps of Engineers 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%Post-consumer paper March 18, 1996 Mr. David Moye State of N.C. Dept. Enviromental, Health & Natural Resources Dear Sir: I am writing to you concerning my Permit Number 3896; to ask for a variation in the configurations of the boat docks. I would like to increase the size of the boat ramp to 50' X 15", and also add another walkway on the south side. I would like to build a solid dock on the north side loading and unloading boats and fueling boats. This dock would be 4' wide with bulkhead underneath and a silt fence attached to the timbers that are being used as bulkhead material. Attached to this letter; you will find plans for the changes I am proposing. Thanks for any consideration you can give me. Sincerely, Warren Woodard WW/dc ac.O�mArccE . L.BElNi1LJ-E $ITE So VNO SO LJ /V P W 0 0 W179 IZ w Wk—fLP%tm d,• CVjSTING I?JG �. rPEPrk v�G///lry /tl/tP 14101: l 4/,vE, �o/n/S Sil e f OF We 33 ' a � 1 r ,SYO��E -f?o �r•� v FPump SffIGF /�So TM,Vi !' '' o✓FILE m oIII LZr ox°° Tilr, z.260 4Q J. 'o I BOA-7 1I1.11 uU ow/vEe _ 2G TO N G?'ti. o : T. ADJACE/r>• a,wwex ' COL/1/ SNELL -1. 2, o n 0 q e o 0 n 0 b a 0 � 2 w • 0 ,�Og11 h. C PRoPoseo a o 13OAT T I 1 L c o h Q 0 f/lon. 39 6.o/ 7"0 1lD7;gc&4T• P40,06,x ' . v w r/ eX Sfl EE-' J WAgW-N !nloobAEO P2ar`bSeO .80Ar QAS/N• ANb . ACCESS. GNANNEL •YYR.2ELL CO'. N, e , `00 UNL7.4Oin,; Dock SInc Vlsw 40 L