HomeMy WebLinkAbout38-96 Minor Mod 1998 Woodard, WarrenPermit Class
MODIFICATION/N HNOR
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
hermit
X for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling.pursuant to NCGS 113-229
Permit Number
38-96
Issued to Warren Woodard, Route 2, Box 279-C, Columbia, NC 27925
authorizing development in Tyrrell County at Albemarle Sound near Columbia off of SR 1219
,as requested in the permittce's application dated letter dated 6/25/98 including attached
workplan drawing dated 6/25/98.
This permit, issued on \ O — Tl — '�\ J6 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) The Division has determined that the proposal to construct a riprap groin in lieu of the previously
authorized wooden structure would lead to an excessive amount of bottom disturbance (over 6,000
square feet assuming a structure height of 7 feet and a lrh:l slope) in a area determined by the NC
Division of Marine Fisheries to be a functional primary nursery area. Therefore, the request to utilize
riprap in place of a wooden structure for the groin is not authorized.
2) Within the existing canal, riprap may be used in lieu of wood for the purposed of shoreline
stabilization on the east side of the canal.
3) The riprap on the east side of the entrance canal shall not extend waterward more than three (3) feet
from the normal water line at any point along its alignment at the time of construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
DonnkD.Moffitt,Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Warren Woodard Permit #38-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) The height of the proposed riprap along the east side of the entrance canal shall not exceed six inches
above the adjacent wetland substrate.
5) The riprap material must be free from loose dirt or any pollutant. It must be of a size sufficient to
prevent its movement from the site by wave or current action.
6) The riprap material must consist of clean rock or masonry materials such as but not limited to
granite or broken concrete.
7) This minor modification must be attached to the original of Permit No. 38-96, which was issued
on 3/15/96, the minor modification of 9/10/97 and the letter of refinement of 4/27/98, and both
documents must be readily available on site when a Division representative inspects the project
for compliance. All conditions and stipulations of the active permit remain in force unless
altered herein.
NOTE: If the permittee wishes to continue to pursue authorization to construct a riprap groin,
submittal of the following items will be required:
a) Engineered design drawings of the proposed structure.
b) Justification that the riprap structure, as opposed to the currently
authorized wooden structure, is necessary based upon site specific
conditions, sound engineering and design principles.
.AL C'MA2LE-
S ITE SOUND
J iz,G
vlr/Nlry /%1,qP
nricrv/ u/vE, .xo.�/s siir�-2 of �
`\ vjOflAJ
coMRrNEP
�, IjfirlG rri
. JPort PicE �+� ?u 'Pm
... ems_._._..
boo
Permit Class
MODIFICATION/NIINOR
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
X for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling.pursuant to NCGS 113-229
Permit Number
38-96
Issued to Warren Woodard, Route 2, Box 279-C, Columbia, NC 27925
authorizing development in Tyrrell County at Albemarle Sound near Columbia off of SR 1219
as requested in the permittee's application d„ad letter dated 6/25/98 including attached
drawing dated 6/25/98.
This permit, issued on \ b — �A — '�\ 7 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) The Division has determined that the proposal to construct a riprap groin in lieu of the previously
authorized wooden structure would lead to an excessive amount of bottom disturbance (over 6,000
square feet assuming a structure height of 7 feet and a 1t/2:1 slope) in a area determined by the NC
Division of Marine Fisheries to be a functional primary nursery area. Therefore, the request to utilize
riprap in place of a wooden structure for the groin is not authorized.
2) Within the existing canal, riprap may be used in lieu of wood for the purposed of shoreline
stabilization on the east side of the canal.
3) The riprap on the east side of the entrance canal shall not extend waterward more than three (3) feet
from the normal water line at any point along its alignment at the time of construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Donn .Moffitt, Director
_Division of Coastal Management_
This permit and its conditions are hereby accepted.
Signature of Permittee
Warren Woodard Permit #38-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) The height of the proposed riprap along the east side of the entrance canal shall not exceed six inches
above the adjacent wetland substrate.
5) The riprap material must be free from loose dirt or any pollutant. It must be of a size sufficient to
prevent its movement from the site by wave or current action.
6) The riprap material must consist of clean rock or masonry materials such as but not limited to
granite or broken concrete.
7) This minor modification must be attached to the original of Permit No. 38-96, which was issued
on 3/15/96, the minor modification of 9/10/97 and the letter of refinement of 4/27/98, and both
documents must be readily available on site when a Division representative inspects the project
for compliance. All conditions and stipulations of the active permit remain in force unless
altered herein.
NOTE: If the permittee wishes to continue to pursue authorization to construct a riprap groin,
submittal of the following items will be required:
a) Engineered design drawings of the proposed structure.
b) Justification that the riprap structure, as opposed to the currently
authorized wooden structure, is necessary based upon site specific
conditions, sound engineering and design principles.
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF COASTAL MANAGEMENT
October 8, 1998
Mr. Warren Woodard
Route 2, Box 279-C
Columbia, NC 27925
Dear Sir
The enclosed pemilt constitutes authorizationunderthe Coastal AreaManagementAct, and where applicable,
the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is
retained by you and it must be available on site when the project is inspected for compliance. Please sign both the
original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
lfyou objedto the permit or any ofthe conditions, you may request a hearing pursuant to NCGS 113A-121.1
or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days ofthis
decision on your permit You should also be aware that if another qualified party submits a valid objection to the
issuance ofthis permitwithin twenty (20) days, the matter must be resolved priorto work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as
approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully
understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we request
that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise
concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at
any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally
important coastal resources.
Very sincerely,
John R Parker, Jr.
Major Permits Processing Coordinator
JRP.jr/amw
Enclosure
P.O. BOX 27687, RALEIGH, NC 27611-768712728 CAPITAL BLVO., RALEIGH, NC 27604
PHONE 919-733-2293 FAX 919-733-1495
AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLEO/10% POST -CONSUMER PAPER
Permit Class
MODIFICATION/1VIINOR STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermit
X for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling.pursuant to NCGS 113-229
PermitNumber
38-96
Issued to Warren Woodard, Route 2, Box 279-C, Columbia, NC 27925
authorizing development in Tyrrell County at Albemarle Sound near Columbia off of SR 1219
, as requested in the permittee's application dated letter dated 6/25/98 including attached
drawing dated 6/25/98.
This permit, issued on i O — zl — '�\ 7 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) The Division has determined that the proposal to construct a riprap groin in lieu of the previously
authorized wooden structure would lead to an excessive amount of bottom disturbance (over 6,000
square feet assuming a structure height of 7 feet and a lrh:l slope) in a area determined by the NC
Division of Marine Fisheries to be a functional primary nursery area. Therefore, the request to utilize
riprap in place of a wooden structure for the groin is not authorized.
2) Within the existing canal, riprap may be used in lieu of wood for the purposed. of shoreline
stabilization on the east side of the canal.
3) The riprap on the east side of the entrance canal shall not extend waterward more than three (3) feet
from the normal water line at any point along its alignment at the time of construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
�a Donn .Moffitt, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
0 .
Warren Woodard Permit #38-96
Page 2 of 2
ADDITIONAL CONDITIONS
4) The height of the proposed riprap along the east side of the entrance canal shall not exceed six inches
above the adjacent wetland substrate.
5) The riprap material must be free from loose dirt or any pollutant. It must be of a size sufficient to
prevent its movement from the site by wave or current action.
6) The riprap material must consist of clean rock or masonry materials such as but not limited to
granite or broken concrete.
7) This minor modification must be attached to the original of Permit No. 38-96, which was issued
on 3/15/96, the minor modification of 9110/97 and the letter of refinement of 4/27/98, and both
documents must be readily available on site when a Division representative inspects the project
for compliance. All conditions and stipulations of the active permit remain in force unless
altered herein.
NOTE: If the permittee wishes to continue to pursue authorization to construct a riprap groin,
submittal of the following items will be required:
a) Engineered design drawings of the proposed structure.
b) Justification that the riprap structure, as opposed to the currently
authorized wooden structure, is necessary based upon site specific
conditions, sound engineering and design principles.
Division of Coastal Management
Application Processing Notes
Applicant:
Deadline:
Date/Time: Message:
F
Division of Coastal Management
Application Processing Notes '7 9rl}
Applicant:
Deadline; rh,^w rYkd
Date/Time: Message:
base w,olh
CPI'e^' �o L
2g " C-7 ,1, -r2-1 slog r2 )
' C., I ted rn o yc tv c(. sc oss
a r 11 c<l/ &,ck
cI- EY-c+Y +'"oy� Q,"o( C7r.�, i CurnmCnA wrn
o yh .s c.t,l*f,urn S,j y c> +nl/CW:nf tuc f<
vn 9
2.1 slope an on/y p✓tz.:G
Wuocis-, C tr✓c tvR = i woo.ih
9n.k.•k
�Y-
`7-17'S f' 4—u.iw-. C0/7 Ce r/7 O✓tn. .v ho fk,
rr , l�/✓s i �Phc"15 /�
m,y jS; ova 5C ( 2joo 6on S,4s �
C,/led a i/gIUW. u-.)1 c,/i 6 /.
m o yt a� /�-d lj+ut
Gro✓lei 6e e.XCQSsi✓f. S�fc./'cwilcc �ll-�,
o.n f rec rnTtn�Wf.Hs
9-z1-9Sf Iw`}slo✓ s4 // G�c .s �n��i l�°NA✓ati
k 7 s l wo c v('f'oS-d #J 7%c ti1-no✓171-
°� d& Nam Recom^,
n J..r s4.y/�,
0
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
RECEIVEW[VISION OF COASTAL MANAGEMENT
JUL 0 81998
RW r i ��;`�u�O
TO:
John Parker y�
THROUGH:
Terry Moore '7e "
FROM:
David Moye b ""_
DATE:
7 July 1998
SUBJECT:
Modification of CAMA Permit No. 38-96
Mr. Warren Woodard has requested a modification to CAMA Permit No. 38-
96. The permit was originally issued for the excavation of a basin in the high ground,
maintenance excavation of an existing canal, excavation of an access channel in
Albemarle Sound, docks, and a boat ramp. The project site is off SR 1219 (Dewey's
Pier Road) near Columbia in Tyrrell County. The permit was modified on 10
September 1997 to include the following:
1. Construct a bulkhead around the perimeter of the new basin.
2. Construct a bulkhead on each side of the existing canal.
3. Construct wooden groins t 150' out into Albemarle Sound to
the edge of a natural slough on each side of the new access
channel.
Mr. Woodard is requesting to change the two groins as well as the canal
bulkhead from wood to riprap (see attached plat dated 25 June 1998). The base width
of the groins is proposed at 16' and will project 3' above the NWL. The existing
water depth at the end of the proposed groins is -6' so with a 2:1 slope and a F
exposure above the NWL, the base width of the riprap groin should be 14'. The riprap
on the east side of the entrance canal as proposed will follow the existing shoreline
contour. The $50 check to cover the cost of the permit modification has been
deposited into the Department account.
If a minor modification of Permit No.38-96 is authorize to include the changes
outlined above I suggest the following conditions be added to the existing permit;
1. The riprap on the east side of the entrance canal will not extend
waterward more than 3 feet from the normal water level at any
point along its alignment at the time of construction.
WASHINGTON OFFICE
949 WASHINGTON SQUARE MALL WASHINGTON, NC 27969
PHONE 919-946-6461 FA% 919-946-6061
AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER -50% RECYCLED/10% POST -CONSUMER PAPER
0 J,ub
LY
��i
,i
-
n
•�
�_ .:,1
-
:1
._ ..
;E2
. 3�
_-
�
��f
y
Warren Woodard memo
7 July 1998
Page Two
2. No fill material other than the riprap rock is authorized by this
modification.
3. The riprap material must consist of clean rock.
4. The base width of the proposed rock groins will not exceed 14'.
5. The height of the rock groins shall not exceed 1 foot above the normal
water level.
ATTACHMENTS
cc: Terry Moore - DCM
Joe
6—I-ee�
L c�.�
• .ALQC'MRlZC� � �
SITE SO VNO
oa W OOU�"D
\,j N'D
r
Sd IZIG
' � ••' ' v I G /Nlry mrrP
a«
..� Eyrrr
• l M/lY4/ uNE. so<IJS -Fr
z of
o � n � ` uJOflps
14
�. � ...-� -� ✓_ ^�--� 'v FBI L w
�ti•,. rPo[l. plr.E ��.c.Pum�.. SCAC.E l ;SO
lo0
r
41'
Division of Coastal Management
Application Processing Notes
Applicant: 1/�C4 rre w oWe I d
Deadline:
Date/Time: Message:
feyi r)t /" 17�
S M� I I Avc k d g V
Need m,nur hOcy, Swrn
IV.-t rec "t-d P"V=*— p0a ✓Y vo e
9
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF COASTAL MANAGEMENT
22 May 1998
Mr. Warren Woodard
Route 2, Box 27
Columbia, North Carolina 27925
Dear Mr. Woodard:
This letter m ergnce to your 22 May 1998 request to modify your CAMA
Major permit No. 8-96. a permit was originally issued for the construction of a
boat basin with boat d docks, maintenance of an existing canal and dredging
a new entrance channel in Albemarle Sound onsite your property off SR 1219 near
Columbia. You have requested to undertake maintenance excavation at the mouth of
the manmade canal using mats on the wetland section and trucking the material to the
high ground portion of your property. CAMA Major permit No. 38-96 was issued in
part to allow raintenance of the manmade canal to finished project depth of -6 feet
below the normal water level. As long as you comply with the conditions on your
existing permit you are already authorized to undertake the proposed work.
All conditions of your CAMA Major permit No. 38-96 remain unchanged and
in force including the 31 December 1999 expiration date. I appreciate your willingness
to cooperate with the rules and regulations of this Division. If I can provide additional
assistance, please call me at 252-946-6481 ext.276.
RECEIVED
JUN 01 1998
TM/dwm COASTAL MANAGEMENT
Sincerely,
'F
T y E. Moore
District Manager
Division of Coastal Management
Washington Regional Office
cc: David Moye - Field Representative, DCM
Charles Jones - Assistant Director, DCM
.mot n Parker - Major Permits Coordinator, DCM
Raleigh Bland - US Army Corps of Engineers
WASHINGTON OFFICE
943 WASHINGTON SQUARE MALL WASHINGTON, NC 27869
PHONE 919-946.6461 FAX 919-946-6061
AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER - 5096 RECYCLE01109e' POST -CONSUMER PAPER
i
r
,✓ ..
05/22/1998 10:04 9197965681
JONES HOMESTEAD LUMB
PAGE 01
��..Ct/�:•-�......� g.8t...-r� �q-f�e.,..�:.-rc--rr�"�e.:,.,�.e..�G:', �" ice....,,,
`la,LA
1 L�
05/22/1998 10:04 9197965681
• �+sor,K.—
JONES HOMESTEAD LUMB PAGE 02
A� 8jrMjg2[.<
ITT SOV.Y/o .
,:. ' l; p ra
fcrN/7r' InAo
s, � � ` „+�'��! !-;/NE, .SO/NS SIfLrEix Gr'.Y..•..._. Al/ i
T
V1 �` 5 t »- d FEu ..f ft/! Si1JR17C�
' U _ v lkb fl, lyfcE , Rum PS"ti r�
T , 2 6 49
Ito/ 7'0 ;, rGCU a:]f \ {aa7oc�irl /'l9oXI
owavE�
a•WrV t7C
P,J SHELL
i
• C e :. .a PRvpo56�
4
• q • ° h
4
• a i.
'T ,Bor f'Lov.
° .FROM IV. W.
V
4 9,y
°
��3 ° °° ! ;�.rnzrt�N tn10QElACO
° I P¢orrscn
60NY C!%!S/rY'
rJt caeN 9 r PAOP�',�7'Y ; RC�BTS GHAVHZL
- ricy/�O
vw,.It�ie f TMeXLL co, ,V,e.
ell" /9s-
t p.0
'
NCDENR
JAMES S. HUNT-R.
GOVERNOR
WAYNE MCDEVITT
SECRETARY
ROGER N. SCHECTER
DIRECTOR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF COASTAL MANAGEMEN-
27 April 1998
Columo,a, .... a 27925
Dear Mr. Woodard:
RECEIVED
APR 2 8 1998
COASTAL MANAGEMENT
This letter of refinement is in reference to your 24 April 1998 request to modify
your CAMA Major permit No. 38-96. The permit was originally issued for the
construction of a boat basin with boat ramp and docks, maintenance of an existing
canal and dredging a new entrance channel in Albemarle Sound onsite your property
off SR 1219 near Columbia. The permit also included fuel tanks and a marina store.
You have requested the addition of a 30' wide by 60' long crab buying station
adjacent the existing basin and a 15' wide dock extending 6' out into the basin. The
proposed structure will be located at the southeast corner of the basin. Your request
is hereby authorized. All conditions of your CAMA Major permit No. 38-96 remain
unchanged and in force including the 31 December 1999 expiration date. Your
modified plat dated 24 April 1998 illustrating the authorized change will become a part
of your permit and file and construction should be accomplished accordingly.
I appreciate your willingness to cooperate with the rules and regulations of this
Division. If I can provide additional assistance, please call me at 252-946-6481
ext.276.
Sincerely,
74,��vck-�
Terry E. Moore
District Manager
Division of Coastal Management
Washington Regional Office
cc: David Moye - Field Representative, DCM
Charles Jones - Assistant Director, DCM
,Jo6nParker - Major Permits Coordinator, DCM
Raleigh Bland - US Army Corps of Engineers
WASHINGTON OFFICE
943 WASHINGTON SQUARE MALL WASHINGTON
.NC 27889
PHONE 919-946-6481 FAX 919-946-6061
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50 o RECYCLED/10% POST -CONSUMER PAPER
L
...,q z
e-P g
,
�s '�LW —
�_ V
ALQC1nAJZLe-
S 17F SO UND _,;p
Soungv 4//// W o0b�-D
Y�/� wFr�_P%Ko
rpZ,prX /rlaP
•y
- /+,rt rcN r�,vE..TavvJs s//E61'2 of
¢ J N� • �000.
Z.
�E — `.1-'-,CCUG:SYOR_,qc"5
b
JPoct P/cE
� . o✓Frc.0
wr 000
94mP A.Tnt�J.rr
Zbho 70
A0.7AcFNYP.Car °
a,w,�ex
Coj•it4 SNCLL
.I
n
0
� e
¢
C 2
cL T 11
�Q
C Y
0
,L
h.
v
h
u
Q
,407',
FROM
y 3 C? ro
flD7fi cENY P,COPERYY
vwNE.0
2,+'S
3o'
IL
L
W V. -D. 0 T '
°
-hZo.
11 _
n
0
t
BFlK}IFAp
R
Stl Et7 J of
YJFlRICCN otoobA2o
pa.DfctrSE17
.8oR7- 6AS/1'1'
AN& .
ACCCfS CHANNEL
TYZL5LL CO'. N- C
U0
1412.6%1