HomeMy WebLinkAbout154-75 Dennis, EdwardState of North Carolina
Department of Natural and Economic Resources
PERMIT Permit No.154-75
TO EXCAVATE AND/OR FILL
(Re: G. S. 113-229)
Issued to: Mr. Edward E. Dennis
P. O. Box 368 Bethel North Carolina 27812
Street Town -City State -Zip Code
This permit authorizes you to excavate and/or fill in Beaufort County, N. C.
at Pamlico River (Pamlico Beach, off SR 1730) as requested in your application
dated 7/18/75 & attached plat, no date , subject to the conditions set forth below.
(1) That the bulkhead must not exceed 15' from the mean water line.
(2) That all backfill material be obtained from a highland source and
confined behind the permitted bulkhead.
(3) That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside of the area of construction or constructio
related discharge (increases of 25 JTU's or less are not considered
significant).
(4) That all fill materials be landscaped and stabilized with vegetation
to reduce erosion.
THIS PERMIT WILL BE VOIDED AND WORK STOPPED IF THE ABOVE CONDITIONS AND THE
PLANS AND SPECIFICATIONS SUBMITTED AS PART OF THE APPLICATION (WHERE NOT IN
CONFLICT WITH THE CONDITIONS) ARE NOT FOLLOWED PRECISELY. PERSONS FOUND
GUILTY OF A VIOLATION UNDER G. S. 113-229 ARE SUBJECT TO A FINE OR IMPRISONMENT,
OR BOTH.
This permit, (as approved with conditions), may be objected to by the applicant or by
interested State agencies within twenty days of the date of issuance by giving written notice to the
issuing office. If the applicant does not submit an objection, this will be interpreted as an agreement of
compliance with all permit conditions.
This permit must be displayed along with a copy of the application and the project map in the
cab (or pilot -house) of the vehicle working on the project, or be easily accessible on site to Department
personnel when the project is inspected.
Notify: Permit Section, Division of Marine Fisheries, Box 27687, Raleigh, North Carolina,
27611 when the project is completed.
Any maintenance work or additional work on the project subsequent to the termination of
this permit requires permit renewal and/or modification.
This permit shall terminate on December 31, 1976
Issuing Date: October 13, 1975
Form D&F-g
Revised 10174
Signed by the authority of the Secretary of the
Department of Natural & Economic Resources
Edward G. Mc oy, Commissio'
Division of Marine Fisheries
W
Z
L
i
North Carolina Department of
Natural & Economic Resources
JAMES E. HOLSHOUSER, JR., GOVERNOR • JAMES E. HARRINGTON, SECRETARY
/3a /
Dafte
Mr. James T. Brown, Chief
Estuarine Studies Section
Division of Marine Fisheries
Box 769
Morehead City, North Carolina 28557
Dear Mr. Brown:
The attached copy of an
Applicant's Name
Location of Project
DIVISION OF
MARINE FISHERIES
EDWARD G. McCOY
DIRECTOR
BOX 27687. RALEIGH 27611
TELEPHONE 919 829 3767
Tc �
jwL 31'1975
C, DEPT.- WE8
alk FwiE?1E5
for a state permit to perform excavation and/or fill work in coastal North
Carolina is being circulated to State and Federal agencies having jurisdiction
over the subject matter which might be affected by the project.
Please indicate on the reverse side of this form your viewpoint on the
proposed work a d return to the Division of Marine Fisheries not later than
Sincerely,
L..Leo Tilley, Assist7t Director
Division of Marine Fisheries
LLT:dah
(Please use reverse side for comments and signature.)
CI(A) This agency interposes no objection to the proposed work.
❑ (B) This agency objects to the project as proposed. The objection is
based upon findings which lead to the conclusion that there will
be one
or more
adverse effects as covered in G. S. 113-229
(e) 1-5.
❑
(e)(1)
... that there will be significant adverse
effect
of the proposed dredging and filling on the
use of
the water by the public;
❑
(e)(2)
... that there will be significant adverse
effect
on the value and enjoyment of the property
of any
riparian owners;
❑
(e)(3)
... that there will be significant adverse
effect
on public health, safety, and welfare;
❑
(e)(4)
... that there will be significant adverse
effect
on the conservation of public and private water
supplies;
❑
(e)(5)
... that there will be significant adverse
effect
on wildlife or fresh water, estuarine or marine
fisheries.
❑ (C) Agency
findings
relating to Item(s) A and/or B are hereby
detailed.
❑
Detailed
comments continued on attached sheet.
No objections with the following conditions: (1) That the bulkhead must not exceed 15'
from the mean water line; (2) That all backfill material be obtained from a highland source
and confined behind theermitted bulkhead.
L
.... at any point along its alignment.
❑ (D) Comments are submitted that do not directly relate to item B but
are relevant to the public interest. (These comments will be for-
warded by the Department of Natural and Economic Resources to
appropriate State or Federal agencies.)
J. T. Brown
Signed
B-25-75
Date
STATE OF NORTH CAROLINA
DEPARTMENT OF NATURAL .AND ECONOMIC RESOURCES
Box 27897
J AMES E. HAP, RINGTON
SECRETARY
TELEPHONE
AREA CODE 919-929-4984
MEMORANDiM TO - Jim Brown
From Frank Yelverton
Subject App. for State permit - Edward E. Dennis -
Raleigh 27611
h STA)6s
p
� o
oy`* ,=A
JAMES E. HOLSHOUSER, I R.
GOVERNOR
Div. Marine Fisheries
P. 0. Box 769
Morehead City, NC 28557
August 25, 1975
7-18-75
Location - Beaufort County, near Pamlico Beach. Project site is located on the north
side of Pamlico River approximately 400' from the westward extent of SR 1730. The path
extending off SR 1730 leading to the project site is marked by a circle of signs with
two red birds on it. The applicant's house is a large "A" frame building with blue con-
crete block foundation.
Investigative process - App. rec. Raleigh 7-21-75; Morehead 7-31-75. Site investigated
with applicant, and revised plat received 8-21-75.
Environmental setting - Project site consists of a 150' wide lot along the north side
of 'Pamlico River. The lot is experiencing severe erosion. Numerous pines and gums have
recently been undermined and have collapsed into the river or fallen back on to the high
portion of the property. Many of these recently fallen trees still are covered with
green foliage. The 2-3' high bank at the site has eroded up to within 25-30' of the ap-
plicant's house. Many exposed roots are sticking out from the edge of the bank. The
property east of the applicant's lot is experiencing similar type of erosion, whereas
the property west of the site has been rip -rapped with a 10-15' wide border of football
size granite rock.
The interior portion of the applicant's property is primarily wooded within 50' of the
shoreline. The applicant's house is a large "A" frame structure two stories high. No
marsh or submergent vegetation was observed in the sandy river substrate.
Applicant stated to me on site that since he purchased the property in January of this
year, he has lost an average of 10' of shoreline, and a maximum of 15' of shoreline in
a badly washed out area along the west property line adjacent to the rock rip -rap border.
Project description - The.applicant proposes to place a 150' long wooden bulkhead at the
site. The proposed bulkhead is to be placed a maximum of 15' offshore.of the MWL line -
in the badly eroded area adjacent to the west property line. The remainder of the bulk-
head alignment is to average around 5-10' offshore of the MWL. The applicant and I
staked out this described alignment during our onsite meeting of 8-21-75. All proposed
backfill materials are to be trucked in from a highland borrow area. In addition to
the proposed bulkhead, the applicant proposes to construct a 50' long by 4' wide pier at
the site. The proposed pier is to extend southward into Pamlico River near the west pro-
perty line.
Environmental impact - If the project is completed as proposed, approximately 1500 sq.ft.
of water area is to be filled. However, the applicant states that he has lost this amount
or property since January of this year. From my observations, such an erosion rate in
this area is quite possible. The proposed bulkhead should adequately stabilize the shore-
line in this area.
Frank Yelverton
/r
.1
1M W J _
b G G' m
GYM v � G
�4L'� ,A E _ O-e-.A t ;3
t` z-- /CC
5c a
h
` APPLICATION FOR PERMI X OR FILL
State of North Carolina t ` Department of the Army
w._
Department of Natural and Economic Resources �� Corps of Engineers, Wilmington District
(Re: GS 113-229) JUL 21 95 (Re: River and Harbor Act of 1899)
Please type or print and fill in all blanks. If the information requested is not applicable, so
indicate by placing N/A in the blank. DIV. OF t'AARINT F1SHMIES
I. Applicant Information:
A. Name �6fntvi r, a —
Last F irs d e
B. Address
11. Location of P�roposedcProject:
A. County !e nr�A F 0 01� n
B. 1. City, town, community or landmark Y t'yyl I-1
2. Is proposed work within city limits? Yes No h/ o
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
PA ttit 1..1 Q- S r CA N Q
III. Description of Operation: p -
A. I. Maintenance of existing project 2. New work GiL—A
B. Purpose of excavation or fill
1. Access channel length width depth
2. Boat basin length width depth
3. Fill area t3� t.ALr- t'Oiength X S 0' width +S r depths i
4.Other X'L _ length _ SO'__width If deoth
C. 1. Bulkhead dimensions �U r
2. Type of bulkhead construction (material) IQ C. c, V
D. Excavated material (total for project)
1. Cubic yards 2. Type of material
E. Fill material to be placed below MHW (see also VI. A)
1. Cubic yards 2. Type of material
IV. Land Type, Excavated Material, and Construction Equipment:
A. Does the area to be excavated include any marshland? Yes _No
B. Does the disposal area include any marshland? Yes —No
C. Disposal area 1. Location
2. Do you claim title to disposal area?
D. Fill material source if fill is to be trucked in V E S
E. How will excavated material be entrapped
F. Type of equipment to be used D (•, lm e :F jz (^ E (S
G. Will marshland be crossed in transporting equipment to project site? (If yes, explain){ (�
V. Describe Intended Use of Project Area:
A.1.Private v [ it kFrC> 7:0 V'.e r/' vaJ/c N o� Rr& In To PL-le 1-iDvtSF
2. Commercial
3. Housing Development or Industrial
4. Otherei,' it U ' X 14 /
D& F-81
Rev. 3/74
v � 1
B1. Lot sizes) Leo i S 5Or k f c O I - -%w_
• 1
2. Elevation of lots) above mean high water
3. Soil type or texture 5 tn1N 0
4. Type of building facilities or structures DJ Q ^ i0
5. Method of sewage disposal or treatment
VI. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes No_ ..
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes —No ✓
2. Type of discharge tir C N C
3. Location of discharge n
VI I. Present rate of shoreline erosion (if known): C'j u
Vlll. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for
work in project area, if applicable:
IX. Length of time required for project activity:^L T '
X. In addition to the completed application form, the following items must be provided:
A. Attached a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land. (Note: Federal law requires the
applicant to be the owner or his designated agent).
B. Attach an accurate work plat drawn to scale on 8'/z" X 11" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G. S. 113-229 (g) (9) and (10)). Enter date served �+ 2 Y ? S
Such owners have 30 days in which to submit comments to agencies listed below.
D. List the names and complete addresses of the riparian landowners with property adjoining applicant's
tract.
DATE 7 ' F - ,7
Send one completed copy each to:
Permit Section
Division of Commercial & Sports Fisheries
Department of Natural & Economic Resources
P. O. Box 27687
Raleigh, North Carolina 27611
Ph. 919-829-3767
pplicant's Signature
District Engineer
Department of the Army
Wilmington District Corps of Engineers
P. O. Box 1890
Wilmington, North Carolina 28401
(Note: attach Corps cover letter)
Ph.919-763-9971 Ext.565
D& F-62
Rev. 3174
��MNM
/-rz' `+4
h1,
� i
wL=o
60 4r,<-
Gr> o v rn
/" = /mac '
5c a 1,A-.
14 13
1�- .. .: 10 .,`, l3 Ia ..
.r..:6 Heilq :t}14cac 151t SM']3 �'• 1ti `'13`^,.. �''
14
ns Sneterthwoif d aae 13
Pt I7
• ,6s:6.� •cW II
V L1
3 14 1
`•_% `, •, `'_i 1. 4 'FIR jsec 4M" 2" �Qk FI R 1511 "W RM/ i�3
1...p1' _
...R„2.64 :: t1 yfl ;s` 1_4# 1i IS
'Cousin Yt 11• 6y 65 „6>`y P\s
' "F1 G 4sec 121t 12M' 1 • 1 '4 21 17
10.' 4 1 `'` - - oJ' • 3 It 4sec' 5" 5, / j Currstuck Pt.
2
14 le ah ` 19
5 , ` ..2,. 17 ` li'. ors immon Pt. 5SOP .
13..:.:'..............2.....,
IS ,.... W
t; j , 1 3
IS I W 1 n 2 . 4 %1.. I6 13 •.9'•..
51 ` t6
A yl' �9:. PbE� :Bi
Is 17
5 ..
I 1 FI 4sec ISt14M"1"•.:
15 14t If1�, 'Adnma Pt'.....,,.. 1 14 16 17 sB 7 marsh
5
1 -: '..., •.......t Ifi
16. 14''
14 16 nm loos 9 15 ',� 10 •'•. Willow Pt.
. ,11 I Qk FI 291t 6M"PR" '
15 Ifi 16 Ra Rat 16 2
13 F1 4sec .15 D.!',? I 17 f 8:'
Qa 14 ......-..:' B I6
'•...2... .. ... s96 16
t7 16 17 SO 17 17 ..
i :', : L.s 13
I6 , `s 7 •.
w II I FI 4sec lblt d �:
f `....4 II.♦ 7,. ....� 1 e RHI4 17 13
..t. �.. I 4' H A
' .,di.. .. 17 18
,... i .............. {......
16 16
9 Fi •4sec •.., 5,,..•"\^, t R 9 ' I 20 24 s
South Cr (J!; ..�5 •12. �arr 4,H 10 ,_.L..i 2.... + 13 14 16 17
9 II oe 11 :,I,'1.•., 14„+ sat I7
�ai.: .. ..... 15 19 20
: 110 2 2
to!' r8'19
10 '. Soh. Oasa
i,.. 4 Gb ....... �.. :"Rye II Fi4}.Rac \5e17 , . ... f ... -- 1. 15 :} PA 17
l f
l� F7R /� dA Wii... 7a... ...........P.R._.....•"6 •.., 7 �"10 ^•,,_.,,...:, .... 19
j'lr"4.7_.. 1i�'c." 2 I I '•....
(:teak : °eli P 2�8 ♦.,3,; ....1......
. .
l� rlB9� Cr. ` °: t. I Fl •, : , . 2 ,L7 OBS' 3'...�'y.. S� 5 SM"4" IP 4sec 3M 1' ..... ......._......
ewer SP. '�. 14 t __\` @1 F1 ..
y � Pnlie�a �%�k
5 ....:...7 ., kF-1 Q,4........1......................•::•v... ..4 010'•. 3 _ `, ,:j),' ."R .. „cok P �.:64ntji. 3'.G t 2....................'3 r b••�i. 5..............
It 3
1 17
11 )'. , . Cw fed
:mesh;
RI aP /5 i ' '1 Di Gr PI. 4:&;' 3 0 1, 1'a.
51PA 3y Pno
,l `- •� 41t1y."O11 Cr. i as 6ia,! ...7'.. w•r 12
O 5 5
4 4 ? 7 marsh :2
Sod�cf4 ist �I Store Pt ,1 'i {: [ 6 •'4.+'6' 2•''�
3.11167 M1 oa r.y.
•YI 4
j t v� IAnm'Cr. ` . �1 oea Yaq� s ' 3.
+ "salt
i q
M1\
r•
C �
, ovi = o 1G
"kj
t
o
r2f�
f>; �fm
s. ice'
i `11j `�l '...��• �
F
Wnwa
_.r
1 I
t
1
i i
]Jr
,OmmERCIAI E, 5�
lie
ftoto
plid'� ,Qer1 n►_��
S-