HomeMy WebLinkAbout71-80 Dees, JuliusU^_4� 6
Permit Number
71-80
Issued to
Permit Class
NEW
STATE OF NORTHCA OLINA
Department of NafuTalppourpes and Cottl�unity Development -
°d RECEED
cofsta(tllour�es Cocrlj�slfs� IV
JUL 14 1980
for I. I..,, DIV. MAR. FISH.
® MaJ(ir bevalupntent `ae JSpta of Rnvironmental DRiDGE tt F.
Conbern�tutruant to GS 113A-118
® 11
Excavation an r'fliling pursuant to NCGS 113.229 �-/y
Mr. Julius G. Dees V
108 Dupont Circle Greenville NC 27834
authorbing development in Beaufort Co. at Pamlico River
as requested in the pennittee's application dated 5/l/80; including attached
Plat dated 4/29/80 subject to the conditions set forth below
(1) That no excavated material be placed at any time in any marsh or waters of the
state.
(2) That in order to protect water quality, runoff from the construction area must
not visibly increase the amount of suspended sediments in adjacent waters.
NOTE: Enforcement personnel will determine an increase as significant if
the measured level of suspended sediments is increased by 25 National
Turbidity Units.
NOTE: In issuing this permit, the State of North Carolina agrees that your project
is consistent with the approved North Carolina Coastal Management Program.
IF THE ABOVE CONDITIONS AND THE PLANS AND SPECIFICATIONS SUBMITTED AS PART OF THE APPLICATION
(WHERE NOT IN CONFLICT WITH THE CONDITIONS) ARE NOT FOLLOWED PRECISELY, THE PERMITTEE IS SUBJECT
TO A FINE, IMPRISONMENT, OR CIVIL ACTION AS PROVIDED IN G. S. 113A-126 AND G. S. 113.229 (K) AND (L).
This permit must be accessible, on site, to Department
personnel when the project is inspected.
This permit action may be objected to by the pennittee
or other qualified persons within twenty (20) days of the
issuing date. A valid appeal requires resolution prior to work
initiation or continuance, as the case may be. Signing this
form and proceeding with the work binds the applicant
to compliance with all permit conditions.
Any maintenance work or project modification not
covered here under requires further Departmental approval.
All work must cease when the permit expires.
Pernru expires on December 31. 1983.
Signed by the authority of the Secretary
E. Walton Jones, Deput retary
Signed by the authority of the Chairman
of the Cos Resourcerruissi vo
✓?�
Kenneth D. Stewart, Director
Office of Coastal Management
Iswhtg date _ June 30, 1980 ____
Signature o 'euuOW
OFFICE OF
North Carolina Department of Natural COASTAL MANAGEMENT
Kenneth D. Stewart
Resources &Community Development Director
'Do.,2�69.7.-iial�44I'27611
James B. Hunt, Jr., Governor Howard N. Lee, Secre�aryTn �¢jiphoge 9i'.'-i�3
16 May 1980 ' MAY 19 1980
Div. MAR. EmE
EDGE- 6 nLL MISt
Mr. Kenneth D. Stewart, Director
Office of Coastal Management
Raleigh, North Carolina 27611
Dear Mr. Stewart:
The attached copy of an application submitted by:
Julius Dees
Applicant's Name
Pamlico Beach Beaufort
Location of Project County
X for a State permit to perform excavation and/or fill work in
coastal North Carolina and for a CAMA major development
permit...
for a CAMA major development permit (only)...
... is being circulated to State and Federal agencies having jurisdiction
over the subject matter which might be affected by the project.
Please indicate on the reverse side of this form your viewpoint on
the proposed work and return it to me not later than
JRP:ap:812
Sincerely,
o R. ParkJr�
Pe it Coordinator
An Equal Opportunity Affirmative Acton Employer
X (A) This agency interposes no objection to the proposed work.
(B) Dredge and/or Fill. This agency objects to the project
as proposed. The objection is based upon findings which
lead to the conclusion that there will be one or more
adverse effects as covered in G. S. 113-229 (e) 1-5.
(e) (1) ...that there will be significant
adverse effect of the proposed
dredging and filling on the use
of the water by the public;
(e) (2) ...that there will be significant
adverse effect on the value and
enjoyment of the property of any
riparian owners;
(e) (3) ...that there will be'significant
adverse effect on public health,
safety, and welfare;
(e) (4) ...that there will be significant
adverse effect on the conservation
of public and private water
supplies;
(e) (5) that there will be significant
adverse effect on wildlife or
fresh water, estuarine or marine
fisheries;
(C) CAMA Major Development. This agency objects to the
project as proposed. The objection is based upon
findings which lead to the conclusion that a violation
would occur as covered in G.S. 113A-120 and/or.15
NCAC 7I. The following reference indicates the
specific citation by which objections have been
made.
(D) Agency findings relating to item(s) A and/or B
and/or C are hereby detailed.
1. That no excavated material be placed at any time in any marsh or waters
of the state.
(E) Comments are submitted that do not directly relate
to item B and/or C but are relevant to the public
interest. (These comments will be forwarded by the
Department of Natural Resources and Community Development
to appropriate State or Federal agencies).
signed
Field Services Section, OCM
P.O. Box 1129
Washington, N.C. 27889
16 May 1980
Memorandum To: Preston Pate
From: •David Gossett
Subject: Application for State Permit
Julius Dees
5/l/80
Location - Beaufort County - Adjacent to SR 1730 at Pamlico Beach on the Pamlico River.
Investigative process - Application received Washington.Office 5/2/80; met applicant
onsite 5/13/80.
Environmental setting - The applicant'sproperty is located on the Pamlico River. The
property consists of two adjacent lots.210' x 420' and 70' x 211' respectively. Located
on the property is a single family dwelling -with an existing septic tank sewage disposal
system. The elevation of the property is approximately 5' above the NwL. The applicant's
property is presently bulkheaded, although in the area of the proposed project the
bulkhead is deteriorated. There is no wetland vegetation present at the project site.
Project proposal - The applicant is proposing to remove a section of deteriorated
bulkhead and excavate into highground an access channel 12' long by 14' wide which will
terminate into a 35' long by 16' wide boat.bgsin. The access channel and basin will be
excavated to a depth of -5' MLW. The access channel and basin will be bulkheaded. All
spoil material will be disposed of on adjacent highground.
Environmental impact - If the project is conducted as proposed there should be no
significant impact upon the environment.' No wetland vegetation will be excavated or
filled. Some short term turbidity may exist -during project activity.
CAMA review - The area in which this project is located has been classified on the
Beaufort County Land Classification Map as being rural. The project has been reviewed
in regard to the goals and objectives of the Beaufort Lounty Land Use Plan, and has
been found to be consistent with the provisions of that document.
David Gossett
APPLICATION
FOR
PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
Department of Administration State of North Carolina Department of the Army
(GS 146-12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District
(GS 113-229, 143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329)
Plaw type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank.
1. Applicant Information Deed J
�d tone
A.
A
Name
L s[ First
708 Dupv UCe�te2e
'Middle
B.
Address
Street P. O Box or Route
yaeenville, N. C.
27834 756-6354
City or Town State
Zip Code Phone
11. Location of ProTsed Pr lee :
PAZ_
-
A.
aO'�h 1Of""'AT`-P
B.
1. City, town, community or landmark
2. Is proposed work within city limits? Yes —No X
C.
Creek, river, sound or bay upon which project is located or nearest named body of water to project
10=1.Lco Ri v em
Ill. Description of Project
A.
1. Maintenance of existing project 2. New work X
B.
Purpose of excavation or fill r Al
—5 n
1. Access channel length -72— width depth
,l —depth
—5 ALW
2. Boat basin length width
3. Fill area length width depth
4. Other length width depth
C.
1. Bulkhead length 700 + Average distance-waterward of M W (shoreline)
a
2. Type of bulkhead construction (material) 1�'�"O` �'t'��eA
D.
Excavated material (total for project) Sandy
1"
loam 40
1. Cubic yards 2. Type of material
E.
Fill material to be placed below MHW (see also VI. A)
1. Cubic yards none 2. Type of material
IV. Land Type, Disposal Area, and Construction Equipment:
A.
Does the area to be excavated include any marshland, swamps or other wetland? Yes
No X
B.
Does the disposal area include any marshland, swamps or other wetland? Yes
No X
C.
Disposal Area igh �� � y� �o be At tided omo.ty
1. Location—
PA
2. 2, Do you claim title to disposal area?
D.
Fill material source if fill is to be trucked in n1a
E.
How will excavated material be entrapped and erosion controlled? Naiu4_ a4't'n a'Aam Z777e&
F.
Type of equipment to be used _ bachAoe and d�e
G.
Will marshland be crossed in transporting equipment to project site? If yes, explain
rtO
D& F-B 1
Rev. 10/78
V. Intended Use of Project Area (Describe)
A. '. "rlvate— NiVa,7`e boafir[g �aciL:.iy
2. Commercial
3. Housing Development or Industrial
4. Other
B. 1. Lotsize(s) 270'X 420' and 70'x 217' (a4 deed maA A4)
2. Elevation of lot(s) above mean high water
5' +
3. Soil type and texture 4and; loam
4. Type of building facilities or structures 4utq,�e �om y nxeAiden.ce
5. Sewage disposal and/or wastewater treatment A. Existing X Planned
B. Describe dep#.LC .401h
6. Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' RURA
CONSERVATION OTHER (See CAMA Locr Land Use Plan Synopsis)
VI. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes —No X
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes —No X
2. Type of discharge rila
3. Location of discharge nl
VI I. Present rate of shoreline erosion (if known): unhnoun
VII I. List permit numbers and issue dates of prgvio a=ment of Army Corps of Engineers or State permits for
work in project area, if applicable: b'7 17�
IX. Length of time required to complete project: 1 Mea2
X. In addition to the completed application form, the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land.
B. Attach an accurate work plat drawn to scale on 8h X 11" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113-229 (d))Enter date served
D. List names and complete addresses of the riparian landowners with property adjoining applicant's.
Such owners ha v 30 days in -which to submit omments to encies listed "I w.
�odepA lefUeldorL, , oufe 2, ox 331, 1 ymou-ih, N. C.
e ii=. XoWie 2. DethaverL.
XI. Certification requirement: 1 certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolinals approved coastal management program and will be conducted in a
manner consistent with such program.
XII. Any permit issued pursuant to this application will allow only the development described in this appli-
cation and plat. Applicants should therefore describe in the application and plat all anticipated devel-
opment activities, including construction, excavation, filling, and land clearing.
DATE — 9 0
9)
Applicant's Signature
D&F-B2 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS
Rev. 10179
Vy��k;rd� Ne I� LT LS�.siti
'bI SwlJus
4-iH-, o
�54a4e N o al 17 3 a
111
T
N
a3rleS Davis
70'
Nc4e 1, till elevafci4s veToT ` c M H W
2. RII Scr�.Aivgs VAX gFe� e��vat�i,s arc e5 t �eS
3, 0t +c SC.&IC J
�rcQcse0. Q�IKI,ea,�
FY/Sfi�.µ`, &IKLeid Neali..p YtQ'�Y
bt Its p.i.,r, J 1
?IV, ItLO (lv cr
41TIM
Pcr 9
,!Ztfis5e,
-A
` Z
i
u
I