HomeMy WebLinkAbout130-86 Minor Mod Crisp, OttisPermu Class r ^� Permit Number
Minor Modification STATE OF NORTH CAROLINA 4/ 130-86
Department of Natural Community Development
7.
A •
OCT
"� f� z,
aMaj 1 in onmental : U U
Con
Excavatio j6 yfFr°fshaf(f to NCGS 113-229
Issuedto Ottis M. Crisp, Route 1, Box 596, Chocowinity, NC 27817
authorizing development in Beaufort County at Chocowinity Bay, Twin Lakes Camp-
ground, off Whichards Beach Road as requested in the permittee's application dated 12/17/85 including
attached plats. 4, plan view dated rec'd 9/22/87. pier detail and cross section dated
12/17/85 and location, p date.
This permit, issued on d//� , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
(1) The pier will be constructed in accordance with the attached project plans.
(2) A minimum vertical clearance of 31 feet will be left between the bottom
of the bridge and NWL to prevent blockage of navigation.
(3) The activity will be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction -related
discharge.
(4) A pumpout system will be installed to service boats with holding tanks,
as noted by application and permit plat, sheet 2 of 3.
(5) The marina shall prominently post and enforce a no sewage discharge policy
for boats without holding tanks.
(6) All floating structures, other than boats, used for habitation or commerce
(as defined in 15 NCAC 7M.0602) shall be in conformance with local regulations
for onshore sewage treatment.
This permit action may be appealed by the pennittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval.
Ali work must cease when the permit expires on
December 31. 1989
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
r�
David W. Owens, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Otti s M.t Crisp
ADDITIONAL CONDITIONS
Permit #130-86
Page 2 of 2
(7) No attempt will be made by the permittee to prevent the full and free use
by the public of all navigable waters at or adjacent to the authorized work.
(8) The permittee will maintain the authorized work in good condition and in
conformance with the terms and conditions of this permit. The permittee
is not relieved of this requirement if he abandons the permitted activity
without transferring it to a third party.
NOTE: This permit does not authorize any dredging or excavation around the
proposed piers. Should this become necessary, a modification of this
permit will be required.
NOTE: This 10/87 modification authorizes the relocation of three piers within
the basin and construction of a bridge over an adjacent canal.
DEPARTMENT OF THE ARMY
`? VlILSIINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON. NORTH CAROLINA 28402-189D
October 20, 1987
IN REPLY REFER 0
Regulatory Branch
SUBJECT: Pile No. SAWC086-N-007-0224
Mr. Ottis M. Crisp
Route 1, Box 596
Chocowinity, North Carolina 27817
Dear Mr. Crisp:
OCT 2 6 1987 I
A r�ryr.rrr►�r���rrr �_ss
Reference your proposed construction of four piers within
an existing basin off Chocowinity Bay at your campground near
Chocovinity, Beaufort County, North Carolina. By letter of
July 22, 1986, after issuance of North Carolina Department of
Natural Resources and Community Development permit No. 130-86,
we informed you that the work was consistent with our general
permit No. SAWC080-N-000-0291. Reference also your recent
request to modify the permit to change the location of three
of the permitted piers and to include construction of a bridge
across the existing access canal.
Through coordination with the North Carolina Division of
Coastal Management, we have learned that the State permit was
modified on October 8, 1987. Accordingly, we consider the
proposed modification to be consistent with, and authorized by,
the aforementioned general permit. It is understood that all
conditions of the original permit remain applicable.
Should you have questions, please contact Mr. Ken Jolly,
Regulatory Branch, telephone (919) 343-4632.
Sincerely,
Charles W. Hollis
Chief,Regulatory Branch
Enclosure
Copies Furnished with enclosure:
Director, Atlantic Marine Center
National Ocean Survey, HOAA
Attention: CAM04
439 West York Street
Norfolk, Virginia 23510
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611
Mr. Charles Jones
Morehead City Regional Office
North Carolina Division of
Coastal Management
Post Office Box 769
Morehead City, North Carolina
Mr. David. Gossett
Washington Regional Office
North Carolina Division of
Coastal Management
Post Office Box 1507
Washington, North Carolina
Mr. William Mills
Water Quality Section
Division of Environmental
Management -
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Ms. Beverly Etheridge, Chief
Wetlands Section
Region IV
Marine and Estuarine Branch
U.S. Environmental Protection Agency
345 Courtland Street
Atlanta, Georgia 30365
Ms. L. K. (Mike) Gantt
28557 U.S. Fish and Wildlife Service
Post Office Box 25039
Raleigh, *forth Carolina 27611-5039
Mr.� Randy Cheek
National Marine Fisheries Service
Habitat Conservation Division
27889 Pivers Island
Beaufort, North Carolina 28516