Loading...
HomeMy WebLinkAbout130-86 Minor Mod Crisp, OttisPermu Class r ^� Permit Number Minor Modification STATE OF NORTH CAROLINA 4/ 130-86 Department of Natural Community Development 7. A • OCT "� f� z, aMaj 1 in onmental : U U Con Excavatio j6 yfFr°fshaf(f to NCGS 113-229 Issuedto Ottis M. Crisp, Route 1, Box 596, Chocowinity, NC 27817 authorizing development in Beaufort County at Chocowinity Bay, Twin Lakes Camp- ground, off Whichards Beach Road as requested in the permittee's application dated 12/17/85 including attached plats. 4, plan view dated rec'd 9/22/87. pier detail and cross section dated 12/17/85 and location, p date. This permit, issued on d//� , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) The pier will be constructed in accordance with the attached project plans. (2) A minimum vertical clearance of 31 feet will be left between the bottom of the bridge and NWL to prevent blockage of navigation. (3) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction -related discharge. (4) A pumpout system will be installed to service boats with holding tanks, as noted by application and permit plat, sheet 2 of 3. (5) The marina shall prominently post and enforce a no sewage discharge policy for boats without holding tanks. (6) All floating structures, other than boats, used for habitation or commerce (as defined in 15 NCAC 7M.0602) shall be in conformance with local regulations for onshore sewage treatment. This permit action may be appealed by the pennittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. Ali work must cease when the permit expires on December 31. 1989 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. r� David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Otti s M.t Crisp ADDITIONAL CONDITIONS Permit #130-86 Page 2 of 2 (7) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. (8) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without transferring it to a third party. NOTE: This permit does not authorize any dredging or excavation around the proposed piers. Should this become necessary, a modification of this permit will be required. NOTE: This 10/87 modification authorizes the relocation of three piers within the basin and construction of a bridge over an adjacent canal. DEPARTMENT OF THE ARMY `? VlILSIINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402-189D October 20, 1987 IN REPLY REFER 0 Regulatory Branch SUBJECT: Pile No. SAWC086-N-007-0224 Mr. Ottis M. Crisp Route 1, Box 596 Chocowinity, North Carolina 27817 Dear Mr. Crisp: OCT 2 6 1987 I A r�ryr.rrr►�r���rrr �_ss Reference your proposed construction of four piers within an existing basin off Chocowinity Bay at your campground near Chocovinity, Beaufort County, North Carolina. By letter of July 22, 1986, after issuance of North Carolina Department of Natural Resources and Community Development permit No. 130-86, we informed you that the work was consistent with our general permit No. SAWC080-N-000-0291. Reference also your recent request to modify the permit to change the location of three of the permitted piers and to include construction of a bridge across the existing access canal. Through coordination with the North Carolina Division of Coastal Management, we have learned that the State permit was modified on October 8, 1987. Accordingly, we consider the proposed modification to be consistent with, and authorized by, the aforementioned general permit. It is understood that all conditions of the original permit remain applicable. Should you have questions, please contact Mr. Ken Jolly, Regulatory Branch, telephone (919) 343-4632. Sincerely, Charles W. Hollis Chief,Regulatory Branch Enclosure Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Survey, HOAA Attention: CAM04 439 West York Street Norfolk, Virginia 23510 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina Mr. David. Gossett Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina Mr. William Mills Water Quality Section Division of Environmental Management - North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. Beverly Etheridge, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Ms. L. K. (Mike) Gantt 28557 U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, *forth Carolina 27611-5039 Mr.� Randy Cheek National Marine Fisheries Service Habitat Conservation Division 27889 Pivers Island Beaufort, North Carolina 28516 r