Loading...
HomeMy WebLinkAboutEX52-22 Miller (3126 Topsail Ave)December 5, 2022 Exemption Number – EX52-22 Ernest Miler 7418 Kirkwall Drive North Chesterfield, VA 23235 RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S. 113-103(5)(B)(5) and [15A NCAC 7K.0103(a)] PROJECT ADDRESS: 3126 Topsail Avenue, North Topsail Beach, Onslow County AREA OF ENVIRONMENTAL CONCERN – Outstanding Resource Area Dear Mr. Miller: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on December 2, 2022, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on 12/2/22, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR – [G.S. 113-103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development under the conditions and in the circumstances set out in G.S. 113A-103(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size, and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions. 1.The project consists of the repair of the single-family residence (1,080 square feet), as shown on the attached drawing and materials list and the existing stairs which attach to the deck associated with the maintenance. 2.The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter Sincerely, Tina Martin, DCM Field Representative NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 REMOH CONCEPTS LLC Business Number C2021 166 16663 314 edgewater rd wilmington 28411 910 7422798 910-7422798 remohconcepts@outlook.com ESTIMATE EST0141 DATE 10/04/2022 TOTAL USD $78,438.00 TO 3126 topsoil 3126 topsoil ave N topsoil beach 28460 7046140182 DESCRIPTION RATE QTY AMOUNT DEMOLOTION demo including all paneling on walls bathrooms and kitchen cabinets all interior doors $2,500.00 1 $2,500.00 ROUGH IN AND ELECTRICAL FINAL FIXTURES INSTALL this estimate is basis on similar houses price can be change if we fine more issues or can be less I will be work whit the electrical $5,500.00 1 $5,500.00 RUOGH IN AND PLUMING FINAL FIXTURES INSTALL this estimate is basis on similar houses price can be change if we fine more issues or can be less I will be work whit the plumber $5,000.00 1 $5,000.00 NEW HVAC SISTEM new unit, remove and install all new duct work , and grills .this estimate is basis on similar houses price can be change if we fine more issues or can be less I will bw work whit the HVAC . $7,000.00 1 $7,000.00 NEW ROOF remove and install new shingles this including any small repair we have to addresses ( if we fine bigger problem on sheeding will be charge extra ) $7,500.00 1 $7,500.00 soffit and trusses repair any rotten wood need to be change for the new roof $1,700.00 1 $1,700.00 Page 1 of 3 DESCRIPTION RATE QTY AMOUNT EXTERIOR PORCHS discuss for this $10,000.00 1 $10,000.00 INSTALL SHEEROCK install about 120 Sheed of sheerock , mud and finished ready for paint $6,680.00 1 $6,680.00 INTERIOR PAINT interior paint incluinding ( Shervin Willians ) all materials . ceiling walls doors and trim $3,900.00 1 $3,900.00 BASEBOARD /TRIM/AND 1/4 ROUND this item include materials and labor $2,550.00 1 $2,550.00 KICHEN CABINETS SET this can be change depending on cabinets layout $3,500.00 1 $3,500.00 KICHEN CABINETS INSTALL install all cabinets ,crown, baseboard ,microwave stove ,fridge etc $900.00 1 $900.00 BAHTROON AT THE HALL this is for the hall baht we can talk about the 2 bathroom for the master $2,399.00 1 $2,399.00 VANATY AND TIOLET $800.00 1 $800.00 INTERIOR DOORS this is for materials including doors and hardware $1,650.00 1 $1,650.00 INTERIOR DOORS INSTALL change all the interior doors and install ready to paint hinges and hardware install too $1,210.00 1 $1,210.00 APPLIANCES SET $3,500.00 1 $3,500.00 ELECTRICAL FINAL FIXTURES lights ,fans , vanity light etc $1,000.00 1 $1,000.00 PLUMING FINAL FIXTURES water heater toilets faucets sink etc $700.00 1 $700.00 ENTRY DOORS 2 entry doors $800.00 1 $800.00 Page 2 of 3 DESCRIPTION RATE QTY AMOUNT ENTRY DOORS INSTALL $450.00 1 $450.00 DUMSTERS FEES $2,000.00 1 $2,000.00 FLOORS REFINISHED $2,200.00 1 $2,200.00 CONTINGENCY / CHANCE ORDERS $4,999.00 1 $4,999.00 SUBTOTAL $78,438.00 TAX (0%)$0.00 TOTAL USD $78,438.00 Page 3 of 3