HomeMy WebLinkAboutEX52-22 Miller (3126 Topsail Ave)December 5, 2022 Exemption Number – EX52-22
Ernest Miler
7418 Kirkwall Drive
North Chesterfield, VA 23235
RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES -
[G.S. 113-103(5)(B)(5) and [15A NCAC 7K.0103(a)]
PROJECT ADDRESS: 3126 Topsail Avenue, North Topsail Beach, Onslow County
AREA OF ENVIRONMENTAL CONCERN – Outstanding Resource Area
Dear Mr. Miller:
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a
minor development permit under the Coastal Area Management Act. After making a site inspection on December 2, 2022, I have
determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent
with your site drawing and materials list submitted on 12/2/22, and meets the conditions specified below. If your plans should
change and your project will no longer meet these conditions, please contact me before proceeding.
MAINTENANCE AND REPAIR – [G.S. 113-103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding
replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of
development under the conditions and in the circumstances set out in G.S. 113A-103(5)(b)(5). Individuals required to take such
measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work.
Structures may be repaired in a similar manner, size, and location as the original structure. No expansions or additions are
permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions.
1.The project consists of the repair of the single-family residence (1,080 square feet), as shown on the attached
drawing and materials list and the existing stairs which attach to the deck associated with the maintenance.
2.The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building
Code standards.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local
authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter
Sincerely,
Tina Martin, DCM Field Representative
NC Division of Coastal Management
400 Commerce Ave.
Morehead City, NC 28557
REMOH CONCEPTS LLC
Business Number C2021 166 16663
314 edgewater rd
wilmington
28411
910 7422798
910-7422798
remohconcepts@outlook.com
ESTIMATE
EST0141
DATE
10/04/2022
TOTAL
USD $78,438.00
TO
3126 topsoil
3126 topsoil ave
N topsoil beach
28460
7046140182
DESCRIPTION RATE QTY AMOUNT
DEMOLOTION
demo including all paneling on walls
bathrooms and kitchen cabinets
all interior doors
$2,500.00 1 $2,500.00
ROUGH IN AND ELECTRICAL FINAL FIXTURES INSTALL
this estimate is basis on similar houses price can be change if we fine more
issues or can be less I will be work whit the electrical
$5,500.00 1 $5,500.00
RUOGH IN AND PLUMING FINAL FIXTURES INSTALL
this estimate is basis on similar houses price can be change if we fine more
issues or can be less I will be work whit the plumber
$5,000.00 1 $5,000.00
NEW HVAC SISTEM
new unit, remove and install all new duct work , and grills .this estimate is basis
on similar houses price can be change if we fine more issues or can be less I
will bw work whit the HVAC .
$7,000.00 1 $7,000.00
NEW ROOF
remove and install new shingles this including any small repair we have to
addresses ( if we fine bigger problem on sheeding will be charge extra )
$7,500.00 1 $7,500.00
soffit and trusses repair
any rotten wood need to be change for the new roof
$1,700.00 1 $1,700.00
Page 1 of 3
DESCRIPTION RATE QTY AMOUNT
EXTERIOR PORCHS
discuss for this
$10,000.00 1 $10,000.00
INSTALL SHEEROCK
install about 120 Sheed of sheerock , mud and finished ready for paint
$6,680.00 1 $6,680.00
INTERIOR PAINT
interior paint incluinding ( Shervin Willians ) all materials .
ceiling
walls
doors and trim
$3,900.00 1 $3,900.00
BASEBOARD /TRIM/AND 1/4 ROUND
this item include materials and labor
$2,550.00 1 $2,550.00
KICHEN CABINETS SET
this can be change depending on cabinets layout
$3,500.00 1 $3,500.00
KICHEN CABINETS INSTALL
install all cabinets ,crown, baseboard ,microwave stove ,fridge etc
$900.00 1 $900.00
BAHTROON AT THE HALL
this is for the hall baht we can talk about the 2 bathroom for the master
$2,399.00 1 $2,399.00
VANATY AND TIOLET $800.00 1 $800.00
INTERIOR DOORS
this is for materials including doors and hardware
$1,650.00 1 $1,650.00
INTERIOR DOORS INSTALL
change all the interior doors and install ready to paint hinges and hardware
install too
$1,210.00 1 $1,210.00
APPLIANCES SET $3,500.00 1 $3,500.00
ELECTRICAL FINAL FIXTURES
lights ,fans , vanity light etc
$1,000.00 1 $1,000.00
PLUMING FINAL FIXTURES
water heater
toilets
faucets
sink etc
$700.00 1 $700.00
ENTRY DOORS
2 entry doors
$800.00 1 $800.00
Page 2 of 3
DESCRIPTION RATE QTY AMOUNT
ENTRY DOORS INSTALL $450.00 1 $450.00
DUMSTERS FEES $2,000.00 1 $2,000.00
FLOORS REFINISHED $2,200.00 1 $2,200.00
CONTINGENCY / CHANCE ORDERS $4,999.00 1 $4,999.00
SUBTOTAL $78,438.00
TAX (0%)$0.00
TOTAL USD $78,438.00
Page 3 of 3