Loading...
HomeMy WebLinkAbout128-94 Butler Land & Timber Co.Permit Class - Permit Number NEW 128-94 STATE OF NORTH CAROLINA Department of Environment, Health & Natural Resources and Coastal Resources Commission ern�it L ' C 12 d 1994 for % Major Development in an Area of Environmental Concerg pursuant toNCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Butler Land & Timber Co., P. O. Box 390, Columbia NC 27925 authorizing development in Hyde County at Outfall Canal, off of Pamlico Sound adjacent SR1164 as requested in the permittee's application dated 7/20/94 including attached workplan drawings, sheets 1-3 of 3 dated 7/94. This permit, issued on OCTOBER 21 1994 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The center span of the bridge will have a minimum vertical clearance above the normal water line of 7' and a minimum navigable width of 10'. 2) The temporary placement or double -handling of excavated materials within waters or vegetated wetlands is not authorized. 3) In order to protect water quality, runoff from the construction area must not visibly increase the amount of suspended sediments in adjacent waters. NOTE: The perminee is advised that authorization may be required from the U. S. Coast Guard. The telephone number for the Bridge Section in Portsmouth, Virginia is 804/398-6227. This permit action may be appealed by the perrnittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work inidation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1997 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roge ct Scheer, Director Divtsion of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee p pIFF � T SEP 0 9 1994 MEMORANDUM TO: r David Moye OM: John Crew DATE: 31 August 1994 SUBJECT: Bridge Proposal over Outfall Canal to Butler Land Track, Hyde County This proposal to build a 16' by 95' bridge with 7' vertical clearance over the Outfall Canal comes under the auspices of the May 1992 CRC certified Hyde County Land Use Plan update. Apparently, estuarine waters, estuarine shoreline and public trust area AEC's are involved. Stated purpose of the bridge is to provide access for management, logging and protection. The county plan offers the following guidance on proposals of this nature. County policy, page IV-9, on Productive Forest Lands is: "Hyde County encourages and supports utilization of the Forest Best Management Practices Manual, 1989, N.C. Division of Forest Resources for all forestry operations." • County policy, page IV-9, on Marine resource areas notes the county supports the use standards for estuarine and public trust areas as defined in 15A NCAC 7H. The county's land classification map shows the landfall portion of the bridge predominately in the rural land class (although the 75' estuarine shoreline AEC will also be noted) while the canal itself is an AEC and by county definition, page V-2, is included in the conservation land class. The conservation class notes all uses permitted by 7H shall be permitted, and the rural class, page V-2, notes this class includes agriculture, forestry, and other uses that should be located in a relatively isolated and undeveloped area. My opinion is, if this proposal can be accomplished in accordance with AEC use and performance standards, it would not be inconsistent with the county's land classification system nor spirit of the narrative in the plan. cc:-16ston Pate John Parker LJ APPLICATION TRANSMITTAL/PROCESSING REFORDTL j �199�►A) Applicant: Butler Land and Timber Company ;CoventZ4/ Location of Project: On SR 1164 adjacent Outfall Canal nea_er Date Application Received Complete by Field: 22 August 1994 Field Recommendation: Attached X To be Forwarded Consistency Determination: Attached To be Forwarded X Field Representative: D. Moye District Office: Washington District Manager Review: �- B) Date Application Received in Raleigh: Fee Rec'd: Public Notice Rec'd: End of Notice Date: Adj. Rip. Prop Notices Rec'd: Deed Rec'd: Application Assigned to: on C) 75 Day Deadline: 150 Day Deadline: Mail Out Date: State Due Date: Federal Due Date: Fed. Comments Rec'd on Permit Final Action: Issue Deny Draft on D) AGENCY DATE COMMENTS RETURNED OBJECTIONS YES NO NOTES Coastal Management District Office Division of Comm. Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives & History Div. of Env. Health Div. of Highways Wildlife Resources Commission Div. of Water Resources Div. of Marine Fisheries DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Butler Land and Timber Company 2. LOCATION OF PROJECT SITE: Hyde County on SR 1164 adjacent Outfall Canal which connects into the Pamlico Sound near Swanquarter, North Carolina Photo Index - 1989: N/A 1984: N/A State Plane Coordinates - X: 2,853,200 Y: 612,400 New Holland Quad. (lower right corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8/24/94 Was Applicant Present - NO 5. PROCESSING PROCEDURE: Application Received - 8/22/94 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - Conservation (water, wetlands) Rural (land) (B) AEC(s) Involved: EW,PTA,ES (C) Water Dependent: YES (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing : None Planned - Bridge (G) Estimated Annual Rate of Erosion: 0 Source - Field Representative 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands t 1,520 W Canal bottom (C) Other ±128 ft2 ±800 W Highground (D) Total Area Disturbed: 0.06 acre (E) Primary Nursery Area: NO (F) Water Classification: SC Open: NO 8. PROJECT SUMMARY: The applicant proposes to construct a 16' wide by 95' long bridge over Outfall Canal to access his land from SR 1164 for the harvesting of timber. Project setting Butler Land and Timber Company's proposed bridge construction site is located on SR 1164 adjacent Outfall Canal which connects into the Pamlico Sound near Swanquarter, North Carolina. Several miles upstream of the project site Poole bridge crosses Outfall Canal. The Poole bridge is t 16' wide by ±90' long and has a navigable width of t 16' and a navigable height of t7'. Several miles downstream of the project site Gull Rock Game Lands bridge crosses Outfall Canal. The Game Lands bridge is t 16' wide by t 100' long and has 2 center sections for navigation which are ±10' wide and f7' high. On the east side of the canal at the proposed crossing, the area is vegetated with mixed hardwoods, vines, shrubs, and upland grasses. A dirt road is present on the east side at the proposed site and rums perpendicular to the canal. State road 1164 is adjacent Outfall Canal on the west side with a vegetated buffer approximately 20' wide at the proposed crossing. This area is vegetated with a dense stand of cane, several hardwoods, vines, and upland grasses. The bank is t5' high on both sides of the canal at the project site. Outfall Canal is classified as SC by the Environmental Management Commission. The canal is not a designated Primary Nursery Area and is closed to shellfishing. Project description The applicant proposes to construct a 16' wide by 95' long bridge at the project site crossing Outfall Canal. The proposed bridge will have a navigable height of 7' above the NWL and the navigable width between bents will be 9'. Rock riprap will be placed on the bank above the NWL at each end of the bridge to stabilize the area and to prevent erosion. A total of approximately 128 ft2 of highground will be removed from both sides of the canal where the bridge will intersect the bank. The resulting spoil will be spread out on the existing dirt road on the applicant's property. Anticipated impacts The project as proposed will result in localized turbidity associated with the placement of the bridge pilings. Approximately 1,520 ft2 of canal bottom will be shaded. The proposed height of the bridge and distance between bents will allow for continued navigation of the manmade canal. David W. Moye - Washington Office - 30 August 1994 MEMORANDUM TO: John Parker FROM: David Moye DATE: 30 August 1994 SUBJECT: Butler Land and Timber Company Permit Application The proposed project appears to be consistent with the rules found in Subchapter 7H concerning development in Estuarine Water, Estuarine Shoreline, and Public Trust Areas. In order to maintain consistent navigable opening size in relation to the existing downstream bridge I recommend that we condition the proposed bridge to at least 10' of navigable width at the center of the bridge. I recommend issuance of the permit and in addition to the standard conditions would suggest the following be included: Conditions 1. The center span of the bridge will have a minimum vertical clearance above the normal water line of 7' and a minimum navigable width of 10'. 2. The temporary placement or double handling of excavated materials within waters or vegetated wetlands is not authorized. 3. In order to protect water quality, runoff from the construction area must not visibly increase the amount of suspended sediments in adjacent waters. Specla9nng In: Forest Management SwAces Timber Sales Appraisals and inventories S9Ncumml Sm*es `The Forest Mom9ement Experts Timberlands Unlimited, Inc. Box 650, Windsor, N.C. 27983 July 15, 1994 Mr. Terry Moore Division of Coastal Management P. O. Box 1507 1424 Carolina Avenue Washington, NC 27889 Dear Mr. Moore: Reference is made to the attached permit application by Butler Land & Timber Company of Columbia, NC. Timberlands Unlimited, Inc., was employed by Butler to provide to the Division of Coastal Management the information needed for permit issuance. Attached is the following: 1. The Application 2. Property Deed (Book 94, page 138) 3. Location Map (Hyde County BSP - portion) 4. Aerial Photograph of area 5. Sketch of proposed bridge 6. Sketch of Gull Rock bridge 7. Sketch of Gregory Poole bridge 8. Site pictures (labeled). At the present time, no access is available to this tract. In the past, limited access was available over the Gull Rock bridge, but these gates now stay locked. An internal road system exists on the Butler/Coleman Tract that is serviced by a canal -side road from the Gull Rock bridge. Special note should be made of the Gull Rock and Gregory Poole bridge sketches that accompany this application. These are provided for comparative analysis purposes for the proposed bridge construction project. The proposed bridge conforms with the engineering design of the bridges already in place. Thank you for your consideration and courtesy in this matter. We wait your response and stand ready to provide any additional information required. Respectfully submitted: TBIBERLANDS UNLUMTED, INC. �Cl.,t11� David L. Jennette Timberlands Manager Tfthone: ar6ce: (919) 794.3642 POOL (919) 794-2254 DaNd L Jenneme PidOaM TlmbMMf Mw4w Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 must be completed, for all projects. 1 APPLICANT a. Name Butler Land & Timber Co. P. 0. Box 390 City Columbia State NC Zip 27925 Day phone (919) 796-3911 Landowner or Authorized agent b. Project name (if any) Coleman Tract Bridge c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR #1164 b. City, town, community, or landmark New Holland c. County Hyde d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project IOutfall Canal/Pamlico Sound 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Construct a bridge across the Outfall to access a 1159 acre tract of land on the east side. If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? New work c. Will the project be for community; private, or commercial use? d. Describe the planned use of the project. To access the tract of land for management purposes, logging and protection. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract 1199 arrnc b. Size of individual lot(s) c. Elevation of tract above mean sea level or National Geodetic Vertical Datum d. Soil type(s) and texture(s) of tract Hvde-Bavboro Assoc. - Loam e. Vegetation on tract loblolly pine. Rood pine Myrtle. bay and variety of vines f. Man-made features now on tract 4.9 mi 1 a s of road g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community XRural _Other h. How is the tract zoned by local government? i. How are adjacent waters classified? SC j. Hasa professional archaeological survey been carried out for the tract? no If so, by whom? 3/91 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or suucturesproposed 1 bridge b. Number of lots or parcels N/A c. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed — Me %w •Et small area at each end of bridge e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N/A h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? k. Describe existing treatment facilities. N/A L Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). surfare run -of m. Water supply source None n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floort N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp,',T`��' rock jetty) Fill placed in wetland or below MHW Upland fill areas Length Width Depth N/A b. Amount of material to be excavated from below water level in cubic yards N/A c. Type of material N/A . d. Does the area to be excavated include marshland, swamps, or other wetlands? No e. High ground excavation, in cubic yards less than 5 whir yarns 3/91 b. Amount of material to be excavated from below water level in cubic yards N/A c. Type of material N/A . d. Does the area to be excavated include marshland, swamps, or other wetlands? No e. High ground excavation, in cubic yards less than 5 whir yarns 3/91 f. Dimensions of spoil disposal area So' — ISesza tie. � a air z:G. w..d g. Location of spoil disposal area -Aisne �. r_,_ _ h. Do you claim title to the disposal area? rla �t 4 If not, attach a letter granting permission from the owner. - i. Will a disposal area be available for future maintenance? 4W;+- S-� If so, where? j. Does the disposal area include any marshland, swamps, or water areas? zQ e k. Will the fill material be placed below mean high . water? N/A 1. Amour of fill in cubic yards N/A m. Type of fill material N/A n. Source of fill material N/A o. Will fill material be placed on marsh or other wetlands? N/A p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? Yas — by silt fanra and rnrlr_ r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Draggling o drive piling s. Will wetlands be crossed in transporting equipment to project site? -1jo- If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead orriprap 1� Rov. W:U be reo c b. Average distance watetward of mean high water or normal waterlevel N/A c. Shoreline erosion during preceding 12 months, in feet urA d. Type of bulkhead material N/A e. Amount of fill, in cubic yards, to be placed below mean high water . N/A f. Type of fill material N/A ' 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county mad (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 3/91 Name Gull Rock Gamel_ands Address N. Wildlifa RagmirrPQ Cnm 512 Salisbury St.. Raleigh 97604 Name Rich Rro hers Address 146R Carnlinn Avanno Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None A check for $250 made payable to the Department of Environment, Health, and Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the a5..0. 19 't . X alka• i LandoWner or Authorized age 3/91 AERIAL PHOTOGRAPH BUTLER IAHI) AND TIMBER CO. COLEMAN TRACT LAKE [ANDINO TONNS11111 HYDE COUNTY, NC P.O. e.l650. Un—. KC F.O.be\6JO. WWar. a ]rvJJ N'sn glee (VIe)10a.Ma] 143N. (VW)1VI.]]51 of ' Sketch of ' -PropoSa� $r�d5a. Across OLLtfo.11 COvtia0.l to the, Lav\,&s of $vt\er Could 4 TMbe.r Co, Co1aw wr` Tract ` H.ydc, Co•....ry, KG S�r•.,geva 10�a 10' AppraacJa 94am:l:.a6.' w/ ROCK No F�\l or be r<.01•a:vaA. 7146 Y\ew Top V;ew t T Str:rctars Dl¢.nkintj Timberlands Unhmfted P.O. Boa 650., Windmv.lydaor. N.C. 47983 P&mm& ORkm (919) 794-3642 M19M (919) 794-2254 Al Sc 6_\c + i w.. = Zo Et. Wi &tlh.: 14' T S pas - Xx 8" Ct4.rr : All Presa►rt Yr aaFag — nrae��a cr Se.l}, ) M o—ft....a1s w.rry be o-�te.+a3 c)tesiq•a. w.\1 v.o} bt a\}a,reb. uila r RD¢d lix Ve P\o.<as -ll ScYY a{ S mtl� m a R P y i - ('7-I T3)- C rR LA -13v;a'A-0 Q G> r�i�� n c z�£2z 7 r- <� 2. fit m m m 'D r Z WIN L D Z c �ZU )c p r m G' (� O v m Q 'x m r r LP 6, m u n 0 -;bb) 1 G�^� C -4 o C rY»crit C v r s Z z w LOCATIONI of PROP EERTY: _.. , .. -.N. C. DEPARTMENT OF TRANSPORTATION County //✓ Access to Route No. S9 // 64 STREET AND DRIVEWAY ACCESS Miles N S E W -PERMIT APPLICATION Exact Distance 3•6' Feet ❑ PQ ❑ ❑ From the Intersection of Route No. SR 1165� - -and Route No. U3 2 to Toward 1NCAn ,EN d PROPERTY WILL BE USED FORT O .Special Commercial ❑ Regular Commercial PROPERTY; ❑ is PROPERTY IS LOCATED IN: PQ is not within Rural ❑ Urban AGREEMENT Residential/Subdivision vl Other Classification City Zoning Area. . I, the undersigned property owner, request access and permission to construct driveway(s) or street(s) on public right-of-way at the above location. I agree to construct and maintain driveway(s) or street entrance(s) in absolute conformance with the current "Policy on Street and Driveway Access to North Carolina Highways" as adopted by the North Carolina Department of Transportation. I agree that no signs or objects will be placed on or over the public right-of-way. I agree that the driveway(s) or street(s) will be constructed as shown on the sketch on (the reverse side) (the attached plans). I agree that driveway(s) orstreet(s) as used in this agreement include any approach tapers, storage lanes orspeed change lanes as deemed necessary. . I agree that if anyfuture improvements to the roadway become necessary, the portion of driveway(s) orstreet(s) located on public right-of-way will be considered the property of the North Carolina Department of Transportation, and I will not be entitled to reimbursement or have any claim for present expenditures for driveway or street construction. ; I agree that this permit becomes void if construction of driveway(s) or street(s) is not completed within the time specified by the "Policy on,Street and Driveway Access to North Carolina Highways". I agree to pay an -installation -fee for pipe installed bythe Division of Highways or pay a $50 inspection fee for installation by others. Make checks payable to NCDOT. The inspection fee will be reimbursed if application is denied. I agree to'construct and maintain the driveway(s) or street(s) in a safe manner so as not to interfere with or endanger the public travel. I agree to provide during construction proper signs, signal lights, (lagers and other warning devices for the protection of traffic in conformance with the current "Manual on Uniform Traffic Control Devices for Streets and Highways" and Amendments or Supplements thereto. Information as to the above rules and regulations may be obtained from the Division Engineer. I agree to indemnify and save harmless the North Carolina Department of Transportation from all damages and claims for damage that may arise by reason of this construction. I agree that the North Carolina Department of Transportation will assume no responsibility for any damages that may be caused to such facilities, within the highway right-of-way limits, in carrying out its construction. I agree to provide a Performance Bond in the amount specified by the Division of Highways for any construction proposed on the State Highway system. I AGREE TO NOTIFY THE DISTRICT ENGINEER WHEN THE PROPOSED WORK BEGINS AND WHEN IT IS COMPLETED. Pipe Inspection INSTALLATION BY: I I NCOOT ( ) OTHERS Entrance PipInstallationtfon S[ctory AMOUNT Width(sl Size `engthCssYas/No) RECEIVED 'v L9 COS Dollars S 1. SIGNATURE (MILE) 2. _ _ S INSPECTION BY NCOOT 3. _ S SIGNATURE PROPERTY OWNER NAME 3 ,. SIGNATURE ADDRESS • O -RIOT% 3Ei0 LtL"'IS_IK 2a rm Phone No. 746-?a_ APPLICANT NAME �w SIGNATURE wr ADDRESS a•x G%Q user tf�l,.c WITNESS NAME SIGNATURE ADDRESS ` WITNESS NAME SIGNATURE ADDRESS v 6- ZLq93 Phone No. ! -3Gft DATE DATE ID-I•00 rvv r c: auomrr rour uoples or Appacarlon ro Local District Engineer, N.C. Department or Transportation TEB 65-04 61-D3419 VSLL-V6L (616)'1461N ZV9C"V61 (616) oll 0 :1O4d RUE *7N'/OCpu1M'os, YO9'O'd pamwilun tpugja9Wlj •�arrs��v -►q }o•n ll•r+ ti.b1S7� . lax -s'd9 .8 A..f O1x01 �8 G.vr. 'd ruN-A Vld b •1 1 }•• � y� s l l ,?` :-44-?`M M1iy91d 2i X,p pooh - Va AA �s.n�q�o 1d/ � oa�v:nta -per••\:AoiS lv^•i •»va ) Malt\ dot Mal^ 9D)c .aN•1221. - O-D •a"p4-NA OD wao�w1 ,a-Vv,nl.aa\Ing �o S-puo-4 ^avl-4 of )rov,v-3 Avv)A-"o MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: David MoyebM DATE: 31 August 1994 SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit Butler Land and Timber Company Hyde County, North Carolina Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was received by me on 22 August 1994. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me.