Loading...
HomeMy WebLinkAbout4-76 Buckman, Jamestir T " r State of North Carolina Department of Natural and Economic Resources PERMIT Permit No. 4-76 TO EXCAVATE AND/OR FILL (Re: G. S. 113-229) Issued to: Mr. James F. Buckman 1126 N. Market Street Washington North Carolina 27889 Street Town -City State -Zip Code This permit authorizes you to excavate and/or fill in Beaufort County, N. C. at Pamlico River (N. side at Swan Point development) as requested in your application dated 10/10/75 & attached plat, no date , subject to the conditions set forth below. (1) That the bulkhead must not exceed 5' from the high water mark at any point along its alignment. (2) That all backfill material be obtained from a highland source and confine behind the permitted bulkhead. (3) That no excavated or fill materials be placed at any time in any marshes waters of the state except as stated in condition #1 of this permit. (4) That all fill be stabilized with vegetation to prevent its erosion intoadjacent rZ waters.(5) That the activity be conducted in such a manner as to prevent significantincreases in turbidity outside of the area of construction or constructionrelated discharge ( increases of 25 JTU's or less are not considered significant ). THIS PERMIT WILL BE VOIDED AND WORK STOPPED IF THE ABOVE CONDITIONS AND THE PLANS AND SPECIFICATIONS SUBMITTED AS PART OF THE APPLICATION (WHERE NOT IN CONFLICT WITH THE CONDITIONS) ARE NOT FOLLOWED PRECISELY. PERSONS FOUND GUILTY OF A VIOLATION UNDER G. S. 113-229 ARE SUBJECT TO A FINE OR IMPRISONMENT, OR BOTH. This permit, (as approved with conditions), may be objected to by the applicant or by interested State agencies within twenty days of the date of issuance by giving written notice to the issuing office. If the applicant does not submit an objection, this will be interpreted as an agreement of compliance with all permit conditions. This permit must be displayed along with a copy of the application and the project map in the cab (or pilot -house) of the vehicle working on the project, or be easily accessible on site to Department personnel when the project is inspected. Notify: Permit Section, Division of Marine Fisheries, Box 27687, Raleigh, North Carolina, 27611 when the project is completed. Any maintenance work or additional work on the project subsequent to the termination of this permit requires permit renewal and/or modification. This permit shall terminate on December 31, 1977 Issuing Date: January 12, 1976 Form D&F-g Revised 10/74 Signed by the authority of the Secretary of the Department of Natural & Economic Resources L.�.Z;M0 A a 1 Edward G. McCoy, Commissiorl— Division of Marine Fisheries NERNorth Carolina Department of Natural & Economic Resources JAMES E. HOLSHOUSER, JR., GOVERNOR • JAMES E. HARRINGTON, SECRETARY Mr. James T. Brown, Chief Estuarine Studies Section Division of Marine Fisheries Box 769 Morehead City, North Carolina 28557 Dear Mr. Brown: The attached copy of an application submitted by: James P. Buckman Applicant DIVISION OF MARINE FISHERIES EDWARD G. MtCOY DIRECTOR BOX 27M7, RAI SIGH 27611 TELEPHONE 919 829-3767 Pamlico River Beaufort County Location of Project County for a state permit to perform excavation and/or fill work in coastal North Carolina is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return to the Division of Marine Fisheries not later than ENTIRE FILE ATTACHED. (originated in dash. Field ofc. ) LLT:dah Sincerely, C' L. Leo Tilley, Assistant Director Division of Marine Fisheries (Please use reverse side for comments and signature.) E.. I (A) This agency interposes no objection to the proposed work. ❑ (B) This agency objects to the project as proposed. The objection is based upon findings which lead'to the conclusion that there will be one or more adverse effects as covered in G. S. 113-229 (e) 1-5.- ❑ (e)(1) ... that there, will be significant adverse effect.. of the proposed dredging and filling on the use of. the water by the public; ❑ (e)(2) that there will be significant adverse effect on the value and enjoyment of the property of any riparian owners; ❑ .(e)(3) ... that there will be significant adverse effect on public health, safety, and welfare; ❑ (e)(4) ... that there will be significant adverse effect on the conservation of public and private water supplies; ❑ (e)(5) ... that there will be significant adverse effect on wildlife or fresh water, estuarine or marine fisheries. ❑ (C) Agency findings relating to item(s) A and/or B are hereby detailed. ❑ Detailed comments continued on attached sheet. No objection with following conditions: (1) That the bulkhead must not exceed 5' from the inigh water mark at any point along its alignment; (2) That all backfill material be ob- tained from a highland source and confined behind the permitted bulkhead; (3) That no excavated or'fill materials be placed at any time in any marshes or waters of the state. .... except as stated in Condition No. 1 of this permit. ❑ (D) Comments are submitted that do not directly relate to item B but are relevant to the public interest. (These comments will be for- warded'by the Department of Natural and Economic Resources to appropriate State or Federal agencies.) J. T. Signed 10-15-75 Date NERNorth Carolina Department of Natural & Economic Resources JAMES E. HOLSHOUSER, JR., GOVERNOR • JAMES E. HARRINGTON, SECRETARY October 13, 1975 MEMO TO: Mr. James Brown FROM: Preston Pate SUBJECT: Application for State Permit James F. Buckman, October 10, 1975 Location - Beaufort County - Pamlico River NORTHEASTERN FIELD OFFICE BOX 1129, WASHINGTON 27889 TELEPHONE 919946e481 Investigative process - Met with applicant on site September 26, 1975; received application in Washington Field Office October 10, 1975 Environmental Setting - The project site is located on the north side of Pamlico River in Swan Point development which is approximately five (5) miles east of Washington. The applicant's lot is bordered on one side by Pamlico River and on one side by a boat canal serving the housing development. The river shore has a narrow sandy beach which has been stabilized with a series (5) of jetties. The canal bank is covered with weeds and is subjected to moderate erosion. No marsh grasses or submerged vegetation occur on either shoreline. The applicant's lot, 250' x 150', has an average elevation of four feet. The area below the house and boat canal was the site of spoil disposal when the canal was originally dug. Project description - The applicant proposes to construct a bulkhead 200' long to stabilize the canal bank and a 50' portion of the river shore. The bulkhead will begin at applicant's property line in the canal and end adjoining the first jetty nearest the mouth of the canal. The irregular shoreline requires building the bulkhead slightly below the normal high water mark in some places. The bulkhead will be back filled with old spoil material which was deposited on the applicant's lot when the canal was originally dug. Environmental impact - The project will destroy no marshgrass or submerged vegetation. By building the bulkhead below normal high water a small portion of sand bottom will be filled. Some short term turbidity could occur from the backfilling operation. Preston Pate APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL F, e State of North Carolina Department of the Army Department of Natural and Economic Resources Corps of Engineers, Wilmington District (Re: GS 113-229) (Re: River and Harbor Act of 1899) Please type or print and Fill in all blanks. If the information requested is not applicable, so indicate by placing N/A in the blank. Applican A. Name B. Addre 11. Location of Proposed Project: / A. County �i2u a for B. 1. City, town, community or landmark_ 2. Is proposed work within city limits? Yes h C. Creek, river, sound or b y upon which project is located or nearest named body of water to < . I Ill. Description of Operation: A. I. Maintenance of existing project 2. New work J B. Purpose of excavation or fill 1. Access channel length width depth 2. Boat basin length width depth 3. Fill area length 3 Qci width 3 depth 3 4.Other length width depth C- 1. Bulkhead dimensions a Od x y' , , , 2. Type of bulkhead construction (material) J /7` Tr eeri eor / i ,2c-r D. Excavated material (total for project) 1. Cubic yards /a 7 2. Type of material s er n c E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards /S 2. Type of material Sa n IV. Land Type, Excavated Material, and Construction Equipment: A. Does the area to be excavated include any marshland? Yes _No ✓ B. Does the disposal area include any marshland? Yes —No L-'— C. Disposal area 1. Location /V /t. 2. Do you claim title to disposal area? D. Fill material source if fill is to be trucked in E. F. Type of equipment to be used — 7 G. Will marshland be crossed in transporting equipment to project site? (If yes, explain) //o V. Describe Intended Use of Project�rea: / A. 1. Private Sf46 <// 72 SflOie✓/ ne O Oii vvw/ C �P.I fn id 2. Commercial 3. Housing Development or Industrial 4, Other D&F-B1 B. 1- Lot size(s) J 2. Elevation of lot(s) above mean high iD / 3 ' Z i A S< / 3. Soil type or texture Sri" 61 / 4. Type of building facilities or structures hio of O7 5. Method of sewage disposal or VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes ✓go_ B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes —No v-� 2. Type of discharge 3. Location of discharge VI1. Present rate of shoreline erosion (if known): ��ld VIII. List permit numbers and issue dates of previous apartment of Army Corps of Engineers or State permits for work in project area, if applicable: / IX. Length of time required for project activity: _ n 0 r42 wQP� s X. In addition to the completed application form, the ollowing items must be provided: A. Attached a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. (Note: Federal law requires the applicant to be the owner or his designated agent). B. Attach an accurate work plat drawn to scale on 8%z" X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent ri arian landowners by registe or certified mail or by publication (G. S. 113-229 (g) (9) and (10)). Enter date served o Such owners have 30 days in which to submit comments to agencies listed below. D. List the names and complete addresses of the riparian landowners with property adjoining applicant's tract- _ DA r. Send one completed copy each to: Permit Section Division of Marine Fisheries Department of Natural & Economic Resources P. O. Box 27687 Raleigh, North Carolina 27611 Ph. 919-829-3767 District Engineer Department of the Army Wilmington District Corps of Engineers P. O. Box 1890 Wilmington, North Carolina 28401 (Note: attach Corps cover letter) Ph.919-763-9971 Ext.565 D&F-B2 Rev. 3/74 \/ I Q ri t $ �s PJ V N �C v a vo \ �1 \ 4, 1 y M V ' d 2- rpr rLP 2 4 WASHINQTO PARK,�2 2a 3 JAI._ 24 31 BAY ITIA Cl" IT� W.G.WOL ha 33 I G 0 c 0 s MA �Aj 3 29N 9 S.a