Loading...
HomeMy WebLinkAbout101-93 Bowen, WilliamPermit Class Permit Number NEW �3 101-93 STATE OF NORTH CAROLINA Department of Environment, Health & Natural Resources and Coastal Resources Commission Vrrmft Rnn ' Cf"s for % Major Development in an Area of Environmental CorEeM----------�_ ptusuanttoNCGS 113A-118 ~ R Excavation and/or filling pursuant to NCGS 113-229 Issued to William Harold Bowen, Route 1, Box 51, Pinetown, N. C. 27865 authorizing development in Beaufort Countyat Pungo River off SR1730 at Snake Island attached woranrawmg as requested in the permittee's application dated Inc u This permit, issued on September 8. 1993 . is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead Construction 1) The bulkhead will not extend waterward more than an average of 9'3" from the normal water line at the time of construction. The bulkhead alignment will be verified by a representative of this Division prior to any work. 2) The bulkhead must be constructed prior to any backfilling activities. 3) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 4) All backfill materials will be obtained from a highground source and confined landward of the permitted bulkhead. (See attached sheet for Additional Conditions) This permit action may be appealed by the pemrittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1996 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of bEHNR and the Chairman of the Coastal Resources Commission. o r N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee ♦ t Mr. William Harold Bowen Permit #101-93 Page 2 of 2 ADDITIONAL CONDITIONS 5) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 6) No vegetated wetlands will be excavated or filled. NOTE: The proposed work is authorized under General Water Quality Certification #2665 issued by the Division of Environmental Management on 1/21/92. Erosion and Sedimentation Control 7) A permanent ground cover sufficient to restrain erosion will be provided on all exposed areas within the shorter of 15 working or 60 calendar days after project completion. 8) Appropriate erosion and sedimentation control devices, measures, or structures will be used to prevent sediment from entering the adjacent wetlands/watercourses/property (e.g., silt fence, diversion swales/berms, sand fence, etc.). Operation and Maintenance 9) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he/she abandons the project without having the permit transferred to a third party. �1 APPLICATION TRANSMITTAL/PROCESSING RECORD l VV ) A) Applicant: William Harold Bowen County: Beaufort Location of Project: Off SR 1730 at Snake Island on Pungo River Date Application Received Complete by Field: 7 July 1993 Field Recommendation: Attached X To be Forwarded • Consistency Determination: Attached To be Forwarded X Field Representative: D. Moye 7 District Office: Washington District Manager Review: B) Date Application Received in Raleigh: Fee Rec'd: Public Notice Rec'd: End of Notice Date: Adj. Rip. Prop Notices Rec'd: Deed Rec'd: Application Assigned to: on C) 75 Day Deadline: 150 Day Deadline: Mail Out Date: State Due Date• a) Federal Due Date: Permit Final Action: Issue Fed. Comments Rec'd on Deny Draft on AGENCY DATE COMMENT'S RETURNED OBJECTIONS YES NO NOTES Coastal Management District Office Division of Comm. Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives 6 History Div. of Env. Health Div. of Highways r Wildlife Resources Commission i Div. of Water Resources UL 1 J 1,,y Div. of Marine Fisheries U LJ William Harold Bowen Beaufort County CONDITIONS (1) The bulkhead will not extend waterward more than an average of 9'3" from the normal water line at the time of construction and the bulkhead alignment will be verified by a representative of this Division prior to any work. (2) The bulkhead must be constructed prior to any backfilling activities. (3) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. (4) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. (5) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he/she abandons the project without having the permit transferred to a third party. •DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: William Harold Bowen 2. LOCATION OF PROJECT SITE: Off SR 1730 at Snake Island on Pungo'River in Beaufort County Photo Index - 1989: 2-84-10; K-14,L-14,L-15 1984: 78-1017; I-10 State Plane Coordinates - X: 2,719,800 Y: 613,800 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 03/10/93 07/08/93 Was Applicant Present - YES NO 5. PROCESSING PROCEDURE: Application Received - 07/07/93 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Rural (land) (B) AEC(s) Involved: EW,PTA,ES (C) Water Dependent: YES (D) Intended Use: Shoreline stabilization (E) Wastewater Treatment: Existing - NONE Planned - NONE (F) Type of Structures: Existing - NONE Planned - Bulkhead (G) Estimated Annual Rate of Erosion: 20' Source - Applicant 7. HABITAT DESCRIPTION: Conservation (water) [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands River bottom f 1,424.5 ft2 (C) Other (D) Total Area Disturbed: f 1,424.5 ft2 (E) Primary Nursery Area: NO (F) Water Classification: SA -NSW Open: YES 8. PROJECT SUMMARY: The applicant proposes to construct a t154' bulkhead an average of 9'3" waterward of the normal waterline. William Harold Bowen Beaufort County Project Setting The property is located off SR 1730 at Snake Island on the Pungo River in Beaufort .County, North Carolina. The site is a natural shoreline between existing bulkheads. The site is comprised of two lots which average ±25' in depth and end adjacent an access road. The project site is vegetated with several pines, upland grasses and herbaceous shrubs. The adjacent upstream (north) lot is developed and the existing wingwall runs ±40' before intersecting highground on the project site. The adjacent downstream (south) lot which Mr. Bowen also owns is developed and the existing wingwall runs t 100' before intersecting the highground on the project site. Pungo River is classified SA -NSW by the Environmental Management Commission. Project Description The applicant proposes to construct an approximately 154 foot long bulkhead an average of 9 feet 3 inches waterward of the NWL. The applicant proposes to fill the area between the new bulkhead and the existing shoreline with a sand/clay mix up to the elevation of the existing adjacent shoreline. The average water depth landward of the proposed bulkhead is f 1 foot and approximately 160 cubic yards of fill will be used. Anticipated Impacts The project as proposed would result in the filling of approximately 1,424.5 square feet of river bottom. The project will result in localized turbidity as a result of the construction of the bulkhead. The proposed bulkhead will stabilize approximately 154 fear of shoreline between existing bulkheads. David W. Moye - Washington Office - 8 July 1993 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1.4 and 8-9 must be completed for all projects. PPLICANT If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing proje work, or both? ne f j1 f c K.. A c. Will the project be for community, private, or a. Name I ,�li/)A1 %%� rold l G/�n% commeroialuse? --T�('I li Ya 42 Address city Ni iue 40WA) State Abr.kh (2Q/t.&4 d. Describe the planned use of the project F, /t Zig 2&,:L Dayphone,�-4V9 rro ! x t St 7 , icJ'' f Landowner or Authorized agent Jr� b. Project name (if any) liJ�n 4 LAND AND WATER 1. c. If the applicant is not the landowner, also give the CHARACTERISTICS owner's name and address. ' ., �l A a. Size of entire tract:�X 13 Cef 8 �J huh-) b. Size of individuallot(s),C_15' fSSA-� 2 LOCATION OF PROPOSED PROJECT �.� b. City, to unity. or 1 ark town c County. i30aa 40r4- d. Is proposed work within city limits or planning jurisdiction? A) to e. Name of body 9fwater nearest ject )Ilk/d d e r 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT c. Elevation of tract above mean sea level or Nation Geodetic Vertical Datum FPr{- ia.bcx d. Soil types and te�ture(s) of tract f1AJ Vegetation on tract PtUe Jr&&S r7ir c � TIYiS t f. Man-made features now on tract .4 /L)e- g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional —Developed Community _�f oral Other h. How is the tract ed by local government? i. How are adjacent waters cl sif ed? a. Describe all development activities you propose (for j, Hasa professional archaeo�l�o,�tco�al survey been example, building a home, tel arina, bulkhead, carried out for the tract? � If so, by whom? or pier). I� )1 k h;:w 3,91 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. L 9- Type and number of buildings, fa ' 'es, or strocturesproposed Nupiber of lots or parcels 4114 Density (Give the number of residential units and the units per acre.) Size of area to be graded or disturb ,// If the proposed project will disturb proposed project will disturb more than one than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to tr'sion of Land Resources? Give the percentage of the tact within 75 feet of mean high water to be covered by impermeable surfaces, such as pavemings, rooftops. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. 7 IL If applicable, has a stormwater management plan been submitted to the Division o ironmental Management? T, i. Describe proposed sewage disposal and/or waste water treatment facilities lin j- k. L 2 Have these facilities received state or local approval? Describe existing treatment facilities. w / A Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industri commercial effluent�t,,,"wash down"). lv )r Fi�O� !'LJrUGff= m. Water supply source li7` n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below KI Upland fill areas Length Width Depth �" . n ..?g"o N' WM b. Amount of mate!!!W low water level in cu c. Type of material d. Does the area to be excavated include marshland, swamps, or other wetlands? A) C. High ground excavation, jn,cuc yards 3N1 f. Dimensions of spoil disposal area g. Location of spoil disposal area It. Do you claim title to the disposal area? If not, attach a letter granting permission from owner. 1. W14 a disposal area be available for future, mail tenance? n If so, where? j. Does the disposal area include any marshland, swamps, or water areas? k. L m. n. o. c. Shoreline erosion during preceding 12 months, in feet_ 2 ci 622 d. Type of bulkhead material e. Amount of fill, in cublRards, to be placed below mean high water — ' f OO l2r!`rs L Type of fill material py� /-Pr��l `% 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: Will the fill material be placed Wow mean high A copy of the deed (with state application only) or other water? '�5 instrument under which the applicant claims title to the f ~3' affected property. If the applicant is not claiming to be Amount of fill in cubic yards the owner of said property, then forward a copy of the Type of fill material RA d AmY e �Ig✓ deed or other instrument under which the owner claims tie, plus written permission from the owner to carry out Source of fill material �t )�� 5---,theprojem Will fill material be placed on marsh or other wetlands? A.)n p. Dimensions of the and to be filled q. How will will excavated or fill material be kept on site material be kept on site and erosion contrplled? J l hva r what type of construction equipment will be used (for example, dragline, backhge orhydiaulic dredge )? s. Will wetlandsPnenvsirorimental led in transporting equipment to project site?If yes, explain steps that will be taken to lesimpacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. b. Average distance waterway of an ' water o L normal waterlevaA - - i— 11 aS 3/91 Name 41 'C'm r � Address aenif rizo JVC1 Name Address Je Name Address A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment , Health, and Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S.113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to'ionditions and restrictions containeI in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information relaied to this permit application and follow-up monitoring of project This is thq day of X Landowner or Authorized agent 4 W1 LIE N yF0 MR,?N° t3ti'1, 51�,0 � r UNFA _IVC. Ab II1Q__ ors UIRTER DEPTH NOTES_�V�1��N_RREF1: _ . •u - y�qa Ex►ST7NG 13L �P03ED-L'S0Vi�10 / .—FILL FIREA C PAMLIU) RIVER MIIPOSE 13UIKNEY►O FOR L.aZ 4 L. 5su 0� �61 "RajwJP gpOORE I-mus SURVEYED FOR. WI►l,1AV11 .ANI3 MOAO.IE litl GOXHI PINETOWIV NO 2.71365.. DUNE 10, 1993 H E H 0 R A N D U H To: Jim Mulligan Deborah Sawyer FROM: David Moye DATE: S July 1993 SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit William Harold Bowen Beaufort County, North Carolina Attached is an application for a CAMA Major and/or a Dredge & Fill Permit which was received by me on 7 July 1993. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me.