HomeMy WebLinkAbout109-97 Bluegreen Corp.Permit Class a Permit Number
NEW 109-97
STATE OF NORTH CAROLINA
Department of Environment, Health & Natural Resources
and
Coastal Resources Commission
ern�it AUG 2 6 1997
for U-1
X Major Development in an Area of Environmental Concern -------------
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bluegreen Corp., 3973 A Market Street, Wilmington, NC 28403
authorizing development in Beaufort County at Blounts Creek. Harbour Bay S/D, off SR 1115 near
Cotten Patch Landing , as requested in the pennittee's application dated5/19/97 including attached workplan
drawings, 1-4 of 6, all dated 5/19/97.
This pennit, issued on <� —,xcx —00 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
Docking_ Facility
1) This permit authorizes a maximum of ten boat slips.
NOTE: Any proposal to add one or more additional boat slips to the authorized 10 slip facility will
require that the docking facility be classified as a marina, and will therefore require a review
under the N.C. Environmental Policy Act (NCEPA).
2) The perimeter of the 10 slip docking area must be staked by a representative of the Division prior
to the initiation of construction.
attached sheets for Additional Conditions)
This permit action may be appealed by the pemrittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31.2000
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
C1_
Roger N. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bluegreen Corp.
ADDITIONAL CONDITIONS
Permit#109-97
Page 2 of 3
3) Construction on the 10 slip pier or boatramp may not begin until an on -site pre -construction
conference is held between the applicant, contractor and a representative of the Division of Coastal
Management. Contact a representative of the Division at (919) 946-6481 to initiate such a
conference.
4) The docking facility will display a sign showing the location of the nearest pumpout facility,
including other appropriate waste disposal information, at the entrance and exit from the main
pier(s).
NOTE: The permittee is encouraged to pursue the installation of a pumpout facility at the proposed
docking facility.
5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
6) This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, may become a permanent part of this docking facility without permit
modification. No non -water dependent uses of structures may be conducted on, in or over public
trust waters without permit modification.
7) The pier and associated structures shall have a minimum setback distance of 15 feet between any
parts of the structure and the adjacent property owner's riparian access corridor, which is determined
by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the water's edge.
8) No attempt will be made by the permittee to prevent the full and free use by the public of all
navigable waters at or adjacent to the authorized work.
9) The authorized structure and associated activity must not cause an unacceptable interference with
navigation.
NOTE: Permanent reflectors should be attached to the structure in order to make it more visible
during hours of darkness or inclement weather.
Bluegreen Corp. Permit #109-97
Page 3 of 3
ADDITIONAL CONDITIONS
Boatramp
10) The cement slab for the boatramp must be poured on an upland site and pushed into place once
hardened.
Upland Development
11) The Division of Water Quality approved this project under stormwater management rules of the
Environmental Management Commission on 8/8/97 (Permit No. SW970122). Any violation of
or deviation from the plan approved by the DWQ will be considered a violation of this CAMA
permit.
NOTE: Future development of the permittee's property, including individual home construction,
may require a modification of this permit. Contact a representative of the Division at
(9190) 946-6481 prior to the commencement of any such activity for this determination.
Sedimentation and Erosion Control
12) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain
erosion within thirty days of project completion.
General
13) No marsh grass may be excavated or filled.
14) No open water area may be excavated.
15) This permit does not eliminate the need to obtain any other permits, approvals or authorizations
that may be required.
NOTE: The permittee is encouraged to contact the Public Health Pest Management Section at
(919) 733-6407 to schedule a pre -construction conference to discuss mosquito control
measures.
NOTE: The N.C. Division of Water Quality authorized the proposed project under General Water
Quality Certification No. 3112 (Project No. 970551) which was issued on 7/22/97.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id.
No. 199601519.
Ta:MOREHERD
4qUCr19—' 97 TUE 15: 57 ID:
. .1 TEL NO:
PeamitCis$s
1NEW
X Major Den
Natural Resources
Concern
Uar1ltn Ntki ' r �A.19,tf ::%�.+:
% Excavation arwor dun jiiifsniiint Eo NCGS 113-229
PeamitNumber
109A7
Issued to,$l�grew Q•. 3973 A Market Street. Wihnmeton. NC 28403
authorizing development in Beaufort County at..Blounts Creek. Harbour Bay S/D. off SR 1 115 hear
Qg t i Patch I-Andlag , w requested is the pumiace's application daWd5/19/97 ineludmg attachedm oTkphn
dra d tus, 1-4 of 6, all dated 5119197.
lids permit, issued on is subject m compliance with the application (where consistent
with the permit), all applicable regulations. special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be mill and void.
1) This permit authorizes amaAmum of ten boat slips.
lYS2T$h: Any proposal to add one or more additional boat slips to the authorized 10 slip facility will
requite that the docking facility be classified as a marina, and will therefore require a review
under the N.C. Environmental Policy Act (NCEPA).
2) The perimeter of the 10 slip docking area must be staked by a representative of the Division prior
to the initiation of construction.
attached sheets for AddWopal
f ,Tbis perar urdon may be appealed by the permittee or
other qualified persons within twenty (20) days of the
ris$tting date. An appeal reghilrt s rYsulution prior to work
initiation or conlimrmx e, as the case may be.
t : M permit must be accessible en -site to Department
pt rsotutel when the project is inspected for compliance
'Any maintenance work or prglect modification not
:coveredlio midarrequi=fiuftrDepartmemalapproval.
'All work must cease when the pemnit expires on
j , December 31, 20QO
j`Lrissuingthispermit,the State ofNoah Carolina Agrees
at -your prgject is consistent with the North Carolina
tat MahagemeMProgtam.
i
Signed bytheautborityofthe Secretary of DEHM and the
Chairman of the Coastal Resources Commission,
RogerN, Schecter, Director
Division of Coastal Management
This permit and its conditions ate hereby accepted.
Signature of Permittee
MOREHEAD
-197 TUE 15:58 ID: .' ,' TEL NO,
p579 p02
Hlaegreen Corp. PerriUR04 97
Page 2 of 3
ADDITIONAL CONDITIONS
3) Construction on the 10 slip pier or boatramp tray not be& until an on -site pre -construction
conference is held between the applieam, contractor and a representative of the Division of Coastal
Management Contact a representative of the Division at (919) 946-6481 to initiate such a
conference.
4) The docking fa6lity will display a sign showing the location of the nearest pumpout facility,
including other appropriate waste disposal information, at the entrance and exit from the mama
pier(s)•
NDTE: The permittee is encouraged to pursue the installation of a pumpout facility at the proposed
docking facility,
5) No sewage, whether treated or unheatod, shall be discharged at any tune from any boats using the
docking facility. Any sewage discharge at the docking facility shall he considered a violation of this
permit for which the permitter is responsible. This probibition shall be applied and enforced
throughout the entire exiatence of the permitted structure.
6) This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, may become apermanemt part of this docking facility without permit
modification. No non -water dependent uses of structures may be- conducted on, in or over public
j trust waters without permit modification.
7) The pier and associated sttuctrres shall have a minimum setback distance of 15 feet between any
parts of the sttmetwe and the adjacent property owner's riparian access corridor, which is determined
by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the watees edge.
8) No attempt will be made by the permittee to prevent the full and free use by the public of all -
navigable waters at or adjacent to the authorized work.
9) The authorized structure and associated activity must not cause an unacceptable intcrference with
navigation.
NOTE, Permanent reflectors should be attached to the structure in order to make it more visible
during hours of darkness or inclement weather.
TO:MOREHEAD
f RUG-19-197 TUE 15:59 ID: ,' TEL NO: R579 P03
B104r en Corp. Permit 0109-97
Page 3 of 3
ADDITIONAL CONDITIONS
BoatrMg
10) The cement slab for the boatramp must be poured on an upland site and pushed into place once
hardened.
11) The Division of Water Quality approved this project under stomtwater management rules of the
Environmental Management Commission on 818M (Permit No. SW970122). Any violation of
or deviation from the plan approved by the DWQ will be considered a violation of this CAMA
permit_
1•
' NQTF; Future development of the permittee's property, including individual home construction,
may require a modification of this permit. Contact a representative of the Division at
(9190) 946-6481 prior to the commencement of any such activity for this determination.
f
I'
Sedimentation and Erosion Control
12) All disturbed areas sba11 be properly graded and provided aground cover sufficient to restrain
erosion within doirty days of project completion.
13) No amrsh grass may be excavated or filled.
14) No open water area may be excavated.
15) This permit does not eliminate the need to obtain any ather permits, approvals or authorizadorrs
{ that may be required.
F
! NOTE; The peunittee is encouraged to contact the Public Health Pest ]Management Section at
(919) 733-6407 to schedule a pre -construction conference to discuss mosquito control
t measures
F
i NOTE; The N.C. Division of Water Quality authorized the proposed project order General Water
Quality Certification No. 3112 (Project No. 970551) which was issued on 7122/97.
! NOTF• The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id.
i No.199601519.
APPLICATION TRANSMITTAL/PROCESSING RECORD
pplicant: Bluegreen Corporation
County: Beaufort v
•
�
ocation of Project: Qff SR 1115
adiarPnt
Rlnnntc Crepk na r fntta a + ti i
9
�—s
va
• ate Application Received Complete by
Field: 2 dune 1997
=
field Recommendation: Attached
X
To be Forwarded
onsistency Determination: Attached
To be Forwarded X
fielRepresentative: D. Gossett
d
District Office: Washington
District Manager Review:
B)
Date Application Received in Raleigh:
Fee Rec'd: $
Public Notice Rec'd:
End of Notice Date:
Adj. Rip. Prop Notices Rec'd:
Deed Rec'd:
Application Assigned to:
on
C)
75 Day Deadline:
150 Day Deadline:
Mail Out Date:
State Due Date:
Federal Due Date:
Fed. Comments Rec'd on
Permit Final Action: Issue
Deny
Draft on
D) I AGENCY
Coastal Management District Office
Division of Comm. Assistance
Land Quality Section
Div. of Env. Management
State Property Office
Div. of Archives 6 History
Div. of Env. Health
Div. of Highways
Wildlife Resources Commission
Div. of Water Resources
Div. of Marine Fisheries
DATE COMMENTS OBJECTIONS NOTES
RETURNED I YES I NO
J - • J .
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Bluegreen Corporation
2. LOCATION OF PROJECT SITE: Beaufort County, Harbour Bay Subdivision, off SR 1115,
adjacent Blounts Creek near Cotten Patch Landing
Photo Index - 1995: 97-1014, I-15 1989: 265-8, R-6 1984: No Photo
State Plane Coordinates - X: 2,605,200 Y: 612,800 Blounts Bay LL
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2 June 1997
Was Applicant Present - Yes
0
5. PROCESSING PROCEDURE: Application Received - 2 June 1997
Office - Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Beaufort County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: Public Trust Area
(C) Water Dependent: Yes
(D) Intended Use: Community boating facility (pier and boat ramp)
(E) Wastewater Treatment: Existing - One septic tank
Planned - Septic tanks _
(F) Type of Structures: Existing - Sales office, 2 piers, boat house, bulkhead
Planned - Single family dwellings, pier, boat ramp
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
nRFT)(;FT) FTT.T.F.T) OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
(C) Other
Open Water
±555 sq. ft.
Highground
±345 sq. ft.
(D) Total Area Disturbed: ±900 sq. ft. or 0.02 acres
(E) Primary Nursery Area: No
(F) Water Classification: SC Open: No
8. PROJECT SUMMARY: The applicant is proposing to construct a pier and boat ramp for the residents
of the Bay Harbour Subdivision.
BLUEGREEN CORPORATION
Beaufort County
The applicant owns a 166 acre tract of land off SR 1115 adjacent to Blounts Creek in Beaufort
County. The property has been divided into 97 lots for single family dwellings which average
approximately 1.5 acres each in size. The development has been named Bay Harbour. Located
on the property is a sales office along with two piers , boathouse, causeway and bulkhead. All of
these structures were permitted to the previous property owner, Mr. Paul Sorkoram. Under Mr.
Sorkoram's ownership the sales office was under construction and was to be used as a single
family dwelling for his family. Upon Mr. Sorkoram's death, the property was purchased by
Bluegreen Corporation for development. At this time roads have been placed throughout the
property and the 97 lots have been surveyed with 12 being sold. The entire tract of land is heavily
wooded and is vegetated predominately by various species of hardwoods. Considerable amounts
of wetlands are present throughout the property, which consist of both coastal wetlands (marsh);
and wooded swamps.
At this time the applicant is proposing to continue the selling of individual lots. Each lot will
be served by an individual septic tank and well. Also being proposed is the development of a
community boating facility which includes a 10 slip pier, boat ramp with launching pier, and a
gazebo. The proposed pier will extend 205 feet beyond the normal water line and will have a 85
foot long by 6 foot wide "T" platform at the waterward end. Extending from this platform will be
four (4) 25' long by 4' wide finger piers and three (3) mooring pilings. Also just landward of the
platform will be two (2) 25' long by 4' wide finger piers and two (2) mooring pilings.
Approximately 40 feet to the south of the proposed pier will be located a boat ramp. The ramp is
proposed to be constructed 60 feet in length, of which 37 feet will be beyond the normal water
line. The ramp will have a width of 15 feet. Adjacent to and to the south of the ramp will be a 60'
long by 6' wide launching pier. Approximately 48 feet of the pier will extend beyond the normal
water he. The last construction proposed at this time is a gazebo on highground to the south of
the ramp.
ENVIRONMENTAL IMPACTS
The following environmental impacts will occur if the project is conducted as proposed:
1) Approximately 555 square feet of creek bottom will be covered by the proposed
boat ramp.
2) Approximately 345 feet of highground will be disturbed in regards to the sloping
for the boat ramp.
3) Short term turbidity will occur during the construction of the piers and boat ramp.
4) No wetland vegetation will be excavated or filled.
David L. Gossett - Washington Regional Office - 10 June 1997
MEMORANDUM
TO: John Parker
FROM: David Gossett`°
THROUGH: Terry Moore
SUBJECT: Application for State Permits
Bluegreen Corporation/Bay Harbour Subdivision
Blounts Creek, Beaufort County, North Carolina
Enclosed is an application package that has been received from Bluegreen Corporation for
the development of the boating facilities at Bar Harbour Subdivision. The application has been
reviewed in regards to the regulations adopted by the CRC, specifically the general and specific
use standards in NCAC 7H, and has been found to be consistent. I recommend that the permit be
issued with the following conditions:
1) No construction can begin on the 10 slip pier or boatramp until a pre -construction
conference is held at the site between the applicant, contractor, and a representative
of the N.C. Division of Coastal Management.
2) The docking facility will display a sign showing the location of the nearest pumpout
facility, including other appropriate waste disposal information, at the entrance and
exit from the main pier(s).
3) No sewage, whether treated or untreated, shall be discharged at any time from boats
using the docking facility. Any sewage discharge at the docking facility shall be
considered a violation of this permit for which the permittee is responsible. This
prohibition shall be applied and enforced throughout the entire existence of the
permitted structure.
4) This permit authorizes only the docks, piers, and other structures and uses located in
or over the water that are expressly and specifically set forth in the permit
application. No other structures, whether floating or stationary, may become a
permanent part of this docking facility without permit modification. No non -water
dependent uses of structures may be conducted on, in, or over public trust waters
without permit modification.
5) The pier and associated structures shall have a minimum setback of 15 feet between
any parts of the structure and the adjacent property lines as extended perpendicular
to the channel into the water at the points where they intersect the shoreline.
6) The authorized structure and associated activity must not cause an unacceptable
- interference with navigation.
7) The perimeter of the 10 slip must be staked and the alignment approved by a
representative of the DCM prior to its construction.
8) No marsh grass will be excavated and/or filled.
If you have any questions do not hesitate to contact me.
T
Form DChI-M7-1
APPLICATION
(ro be completed by all applicants)
b. City, town, community or landmark
1. APPLICANT C-14 w vey
a. Landowner-
Name ALVZ6&SN �RPe¢hro�
Address 3973 A MIARKcr-ST-
City 01L^,,v67anl State VC -
Zip AF-403 Day Phone 9/0 03-0071
Fax `ilo1763- p11 S
b. Authorized Agent:
Name STgvS-MOie?fsOAJ
L,.4fvwb /t .4"4£wl V.-7-6Rau J 1�
Address Po. COX .2.S22-
City XJ11 "IMC-rMl State AJ-C-.
Zip .2r�/0.2 Day Phone 41c ySZ eeo 1
Fax 9(0-<a - 0060
c. Project name (if any) A4Y A1+,e8oe,&
Suds_ fwS(cn,j r+f;yNtrY 6olriNG-Fi+difTy
NOTE. Penrdf wilt be issued in fame of landownerf ), and/or
project fame.
2. LOCATION OF PROPOSED
PROJECT
a. County &+u -O,ar
c. Street address or seco ary road number
III
d. Is proposed work within city limits or planning
jurisdiction? Yes ✓ No
e. Name of body of water nearest project (e.g, river,
creek, sound, bay) SLOG U C2ssK
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
COMCrrrwe-ny,✓OF % SLfP CoMMVy,T-Y
80A7'f✓(.- PtCILIi //iCCu,()fyG.-.ti OJFi ?Af„7P
AA/6 6A-gsao. RinziTy r� ,rwvr Tau , S cF
Lars e✓ St/6,D/yLrfo.V.
b. Is the proposed activity maintenance of an existing
project, new work, or both? ,v£w LJokK
c. Will the project be for public, private or commercial
use? C`ornM£Cc(M AML,V(ry
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. FtcaL/TY is �raanfrc ivxl
.4-Mr"/tyrnk Lei osul-lr? t1se. crr MOAAb
/NN-Rf✓T- eb"rnawcriotJ MYr/sedS fa 69
vriLizrD . uSL
Form DChf-MP-1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 166 i4cRzS
b. Size of individual lot(s) 1•.5Aewrs Ave--.
c. Approximate elevation of tract above MHW or
NWL _e-2$ P&)L
d. Soil type(s) and texture(s) of tract
ALr4viS774- e0,4MYP/uC.SitM,)
e. Vegetation on tract _ LodtottY QNs "7-g2 Me
/?XD MAptE.. iur1X MYRicE ,*,gne eAw q-zzY
f. Man-made features now on tract _ caax_*.4
�RIVA-7c- N��+E R.a.FDS
g. What is the CAMA Land Use Plan land
classification of the site? Xanttdt the local laid =e plan.)
Conservation Transitional
Developed Community
Rural Other
h. How is the tractz9ned by local government?
N�
i. Is the proposed project consistent with the applicable
zoning? ✓ Yes No
(Attach zoning coiVilance cerrificate, if applicable)
Has a professional archaeological assessment been
done for the tract? Yes ✓ No
If yes, by whom? t'/4
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes ✓ No
h Are there wetlands on the site? —!:,-,,yes _ No
Coastal (marsh) Other 1/05(
If yes, has a delineation been conducted? YFr
(Attach docvmnuation, if available) APPRov£j dY CORPS
ye y svR vey uwAvA,r.�6tg,
in. Describe existing wastewater treatment facilities.
oN s/M tJw tPrrr�s sYsrsw r.� t'
£XtrTrt✓t--
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down' and residential discharges.) NO,vi-
o. Describe existing drinking water supply source.
'ON S177— tJrLL
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an g 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Form DCh1-MP-1
site. Include highway or secondary road (SR)
numbers, landmarks, and the like.
• A Stocmwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name STEv£u /}uDpsw 8 uc
Address 1377 cv7moj P+mo ez.
Phone C ca r l nvi G. 2 I
7t9 9YG -7G6/
Name 1-7.ArJ C2hTr_4 MiLLC
Address 16co corro.� YOA7-Vf
Phone CrlacowiNi PYJ.C. n7pl7
Name
Address
Phone
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
f Oif-9 `i
PAUL
2�.ri .
c2orsinlG-
26— 9S
104-UL
�k�
6�rulrA� kAmO doaTi�-sr-
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project"involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application: The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the /c? �k day of MAY , 19 97 .
Print Name 5T2.V7_. Njo2CtroN
Signature �iFSNr�
tmdow r or AWA ed Agew
Please indicate attachments pertaining to your proposed
project. .
MP-2
Excavation and Fill Information
_✓DCM
_✓ DCM MP-3
Upland Development
DCM MP-4
Structures Information
DCM MP-5
Bridges and Culverts
✓ DCM W-6
`
Marina Development(TNrwu%4 ,.,w- 1
NOTE. Please sign and dare each attachment in the
space provided at the bottom of each form.
-5 O� is
Q=
114 o p. 1 1 1
Form DCM-M2-2
e. Does the disposal area include any coastal wetlands
(marsh), SAVs or other wetlands?
Yes ✓ No
f. Does. the disposal incl de any area in the water?
Yes ✓ No
3. SHORELINE STABILIZATION 1✓/�
a. Type of shoreline stabilization
Bulkhead Riprap
b. Length
c. Average distance waterward of MHW or NWL
d. Maximum distance waterward of MHW or NWL
e. Shoreline erosion during preceding 12 months
(Source of in 0--horn)
f. Type of bulkhead or riprap material
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap
(2) Bulkhead back -fill
h. Type of fill material
i. Source of fill material
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
✓ Yes No
If yes,
(1) Amount of material to be placed in the
water /0.9 CoBIC y'c,ebs
(2) Dimensions of fill area zk'x IS'
(3) Purpose of fill ca.✓cerm c3on+,TR.+.aP
b. Will fill material be placed in, coastal wetlands
(marsh), SAVs or other wetlands?
Yes ✓ No _
If yes,
(1) Dimensions of fill area
(2) Purpose of fill !ZAL
5. GENERAL
a. How will excavated or fill material be kept on site
and erosion controlled? f}reAvkrrb AIA-raRrlt
7b Bi 'rAArA-h AF b 'rrcb c.) . 1�y 6 L. �VMrRiiYt
iJ coNckcT£.
b.= What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
c. Will wetlands be crassed in transporting equipment
to project site? _ Yes ✓ No
If yes, explain steps that will be taken to lessen
environmental impacts. �.A--
IKAY #Ae&cA
Applicant or Project Nam
'G��A 6rr)
Signature c
"r7797
Date
Revised 03195
Form DCM-MP-3
UPLAND
DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
a. Type and number of buildings, facilities, [nits or
structures proposed 97 LoTs r-mz .rlNr-i;
1=kr"/1y IiomE CoftcTRu�no✓rLa7-sAtrSove�
b. Number of lots or parcels 97
C. Density (give the number of residential units and the
units per acre) lie 7TWT?,+L uAll
.65 Chris ACR
d. Size of area to be graded, filled or disturbed
including roads, ditches, etc, t/6 Ac-P_ej
e. .If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been plimitted to the Division of Land
Resources? ✓ 'Yes No
If yes, date submitted A65 vrD 3ll,319 7
f. List the materials (such as marl, paver stone,
asphalt, or concrete) to be used for paved surfaces.
i✓140-
g. Give the percentage of the tract within 75 feet of
MHW or NWL, or within 575 feet in the case of an
Outstanding Resource Water, to be covered by
impervious and/or built -upon surfaces, such as
pavement, buildings, rooftops, or to be used for
vehicular driveways or parking. ±.3 "7<
h. Projects that require a CAMA Major Development
Permit may also require a Stormwater Certification.
Has a site development plan been submitted to the
Division of Environmental Management for review?
✓ Yes No
If yes, date submitted UAvKwbw.i
i. Describe proposed method of sewage disposal.
0I-�sri� wr567"� ner,Frwrc.•T
j. Have the facilities described in Item i. above
received state or local approval? Lars 54 _5� 56 57
(Anachapopnate� 'on) 6z� 63)6y 75, 91~�
DD 7 QYQL4vFear brf
k. Describe location and type of proposed discharges to
waters of the state (for example, surface runoff,
sanitary wastewater, industrial/commercial effluent,
"wash down" and residential discharges).
vo tNE-
1. Describe proposed drinking water supply source
(e.g. well, community, public system, etc.)
/.t/d/yaD✓i}L WELLS
in. Will water be impounded? _ Yes ✓ No
If yes, how many acres? /-I&
n. If the project is a oceanfront development, }hen
was the lot(s) platted and recorded?
/SAY /t/.4R6ov&
Applicant or Project Name
Signature
Date
Revised 03/95
Form DCM-MP4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and/or Pier(s)
(1) _ Commercial _✓Community _ Private
(2) Number - /
(3) Length .2o.s '
(4) Width 6'
e. Mooring buoys
(1) _ Commercial _Community
(2) Number .
(3) Description of buoy
(Color, inscription, size, anchor,
(5) Finger Piers ✓ Yes _No
(1) Number 6
(ii) Length 2-S' f.
(iii) Width °/'
(6) Platform(s) _Yes _ No FNW Ras? NL)
(i) Number /
(ii) Length 8'S'
(iii) Width 41
(7) Number of slips proposed / o g,
(8) Proximity of structure to adjacent riparian
property lines ISNAor4 rz&jE_ 3SSource S/DL
(9) Width of water body /Gm'
(10) Water depth at waterward end of pier at
MLW or NWL 1- v'NA/L
b. Boathouse (including covered lifts) N�4
(1) Commercial Private
(2) Length
(3) Width
c. Groin (e.g. wood, sheetpile, etc.) AIIA-
(1) Number
(2) Length(s)
51
Breakwater (e.g.
(1) Length
(2) Average
wetlands _
(3) Maximum
wetlands
wood, sheetpile, etc.) N/
distance from MHW, NWL or
distance beyond MHW, NWL or
_ Private
etc.)
(4) Width of water body
(5) Distance buoy(s) to be placed beyond
shoreline
Mooring structure (boatlift, mooring pilings, etc.)~
(1) _ Commercial _Community _ Private
(2) Number
(3) Length
(4) Width
Other (Give complete dercnpdon)
6o47 - 124W! P LA ✓k'14t,i/6'6£.e 60 X 6
`TO'FieoMNFAR.9fTRtPA,FUjNtiA/£. To c3£
l/SLD /-p2 T?MRo.PAkY T/E 4114vmZ Y !✓Ni.0
Gi4vK.4arr hNd 9z72i.-.,IC /Toarr
LAY #AASOd
Appriamt or Project Name
Stguature
s�9 9 7
Date,
Form DCM-MP-6
MARINA
DEVELOPMENT
(Required for the mooring of more than 10 vessels)
P%Lo PLstD FA{'/uTT� Ce&.TAji1J oNLY /O S4PS. 7711S Fk1R-M, /S /a/FVRMA7-/oh64L Ceay,
Attach this form to Joint Application for CAMA Major g. Tjpical boat length �5
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this h. Maximum boat length ?S
proposed project.
1. MARINA CHARACTERISTICS
a. Check below the type of marina proposed.
Commercial _ Public V Residential
b. Will the marina be open to the general public?
Yes ✓ No
c. If there is residential development associated with
the marina, how many units or lots are planned and
how many are currently developed?
2kS 97 Loll jo &E-da Lb. flour£.
�7rySTpu'.oN ISLAND RL/A/G-US£ .tc ,,tACrc oFFic£.
d. Check all of the types of services to be provided.
Full service, including travel lift and/or rail
Dockage, fuel, and marine supplies
✓ Dockage ("wet slips") only
Number of slips to
Dry storage
Number of boats
Boat ramp(s)
Other (describe)
e. Check below the proposed type of siting.
Land cut and access channel
Open water with dredging for basin and/or
channel
✓ Open water, no dredging required
Other (describe)
f. Describe the typical boats to be served (for example,
open runabout, charter boats, sail boats, mixed
types). f1/XZb SM.+11 PtTASvKT A043
Are any floating structures planned? No
If so, describe
2. MARINA OPERATIONS
a. Check each of the following sanitary facilities that
will be included in the proposed project.. AIJA
Office toilets
Toilets for patrons
Number
Location
Showers
Boat holding tank pumpout
Type and location
b. Describe treatment type and disposal location for all
sanitary wastewater. JAA-
C. Describe the disposal of solid waste, fish offal and
trash disposal. co rieacr— N.►ut.-oFr-
d. How will overboard discharge of sewage from boats
be controlled? co"rRAc7- LAmcwa r-
e. Give the location and number of "No Sewage
Discharge" signs proposed. oms ow PiLP-
Revised 03/95
Form DCM-MP-6
f. Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
sandblasting waste and petroleum products.
Qi PrerogmzD o., b.cgs .
o. Is the marina proposed within a primary or
secondary nursery area? Yes _wl� No
p. Is the marina proposed within an area open to
shellfish harvesting? Yes _v"� No
q. Give the location and number of 'Pumpout
Available' signs proposed. Nil
g. Where will residue from vessel maintenance be II
disposed of ? t'1 -
h. Give the number of channel markers and 'No
Wake' signs proposed. Noig—
Give the location of fuel -handling facilities, and
describe the safety measures planned to protect area
water quality.
j. Describe design measures that promote boat basin
flushing or circulation and that reduce water quality
impacts. Pig? DErIgAl /)air pvr-r,nPwr/t
uA-7-rR C//LCuLAnwv OR ovaurY
k. What will be the marina policy on overnight and
live -board dockage? Ngrry-rX +t.Lzwrb
1. Is the proposed marina located near any shellfish
leases? Yes _v"' No
If yes, give the naan and address of the leaseholder.
Na
m. If this project is an expansion of an existing marina,
what types of services are currently provided?
N�
n. How many slips are now available? AMP&
,6a y fldovK
Applicant or Project Name
Sig=ture
&/r9 s
Date
Reriaed M195
i
PROPOSED PROJECT
N COMMUNITY BOATING FACILITY
EXISTING HOUSE USED
�ITT�E CREEK AS SALES OFFICE
i
VI
i
i
BAY HARB UR SUBDIVISION
LOT 21
LOT 20
4 WETLAI
�1h
oC
I�
LINE
LOT 22
r.
i PILING a' 1 10 25' SLIPS
VOODEN PIER 1
- ✓���NE
f 2A0' i P x
� P`Q P
BOAT RAMP 60'xl5'
i
TO PAMLICO RIVER
/ - SCALE 1 "=100'
i LAUNCHING PIER 60'
NORMAL WATER LEVEL
COMMUNITY BOATING FACILITY
BLOUNTS CREEK
BEAUFORT COUNTY, NORTH CAROLINA
BLUEGREEN CORPORATION
SI19197SHEET I OF 6
EXISTING ROAD BED
PIER SIDE ELEVATION
(FACING NORTH)
240'
SCALE HOR. 1 "=40'
VERT. 1 "=20'
COMMUNITY BOATING FACILITY
BLOUNTS CREEK
BEAUFORT COUNTY, NORTH CAROLINA
BLUEGREEN CORPORATION
51/9►97SHEETzOFG
CREEK
BOAT RAMP CROSS SECTION
(FACING SOUTH)
CUT
BLOUNTS CREEK LAUNCHING PIER
KIWI
EXISTING ROAD BED
ACCESS
ETE RAMP
SCALE HOR. 1 "= 20'
VERT. 1 "= 10'
COMMUNITY BOATING FACILITY
BLOUNTS CREEK
BEAUFORT COUNTY, NORTH CAROLINA
BLUEGREEN CORPORATION
,1I/9197SHEET3 0F&
AN
SCALE 1'=600'
BAY HARBOUR SUBDIVISION
RIPARIAN CORRIDORS.
MINIMUM CORRIDOR WIDTH = 40'
LEVEL
COMMUNITY BOATING FACILITY
BLOUNTS CREEK
BEAUFORT COUNTY, NORTH CAROLINA
BLUEGREEN CORPORATION
S 1/9197SHEETA/ OFG
" o
USGS QUADMAP
s
.. Area
It-
�s•�s••; I /0
33 Gilead \ •`�' ��m�, `
Ephesus /) '
Chi • • ��. li/'
.°� idea B A Y
Piles /r r
�
Red Bug., ��-=2u, �'( , •.
P`
\� `Buekhorn �1 r--3o
Je,E ,P z •..� Cove . "'; n 0'
25\-�� SCALE 1 =20
�\tjLorigPt
\
Baas L,ftCli�*2233���
O l ���.,�'' _ / I' v (•'�• �. ,:ter'•:.
'11./)�j: U° \�^� _ 1 /?r'^�✓ .mil q edar�J' ;"'ry — / i� a• x` Ware
3Creek (�ry�
�/• ..N ` \ `Y 11 7' /' Pt eh •i
/;/Y
r r W SITE �— 6'erara \\1�5 d�•7 ( ,(�r
Jo' so �s1_I i ^; J '7, \,., `T"�1 �('/.al 1/•�' �1�^` _\�. (•Q�/ �V
/ e,�s, Pt
v ;Ziff
\ \ Jn u
COMMUNITY BOATING FACILITY
BLOUNTS CREEK
Jr BEAUFORT COUNTY, NORTH CAROLINA
p o 1115 V BLUEGREEN CORPORATION
5IJ9197SHEETSOF6 '
\ \ / fl /l !� 1 / ° / 1 • _, _ - / r7:0..:��u : .r all)
/
i i s 10 •�
yl'11111' � 1 '1'�11
1. loll
,
1 °Q,JNI Abb3.rMgy,
T'f-
ee . I.1�P 1 �` 5 1 V' QI, I•`� +1� J 'i' 11'I I '
iy) I,,�P��,';��� u, I
+'21 ���' II
Pq itI,
(jf�SJ
I V, Nirst� I G'� i N
s 1r C ��
Er
' ,u a , n Z Ob
OW70
mw0Uw
l` �A 7 W IT
l t y `� O_j J_
41
Im
pjuIf.
111;0''
j P> / �P 1,• 1 i `y , I ''I111 / ap, •e j '` ``1/
®• _Li_
41
r
All FI I
State of North Carolina
Department of Environment,
Health and Natural Resources / •
Division of Coastal Management _
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary ED E H N R
Roger N. Schecter, Director
MEMORANDUM
TO: Jim Mulligan
Deborah Sawyer
FROM: David Gossett 17�
DATE: 10 June 1997
SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit
Bluegreen Corporation
Beaufort County, North Carolina
Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was received
by me on 2 June 1997. I am considering this application complete, have acknowledged receipt,
and have begun processing.
If you have any questions do not hesitate to contact me.
1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975.3716
An Equal Opportunity Affirmative Action Employer 50%recycled/10% post -consumer paper