Loading...
HomeMy WebLinkAbout87-22 Anderson (Perry Farms)Permit Class Permit Number NEW 87-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to James & Lisa Anderson, 3260 Old Ferry Rd. SW, Supply, NC 28462 Authorizing development in Brunswick County at adj. to AIWW at parcel #232KE002 in Supply , as requested in the permittee’s application dated 3/4/22 (MP- 1) and 3/5/22 (MP-3, MP-4), including work plan drawings (3) Sheets 1-3 of 3, dated 4/24/22. This permit, issued on August 30, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on August 30, 2027 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DE Q and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Commercial Docking Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes a maximum of 1 formalized boat slip. (See attached sheets for Additional Conditions) James & Lisa Anderson Permit No. 87-22 Page 2 of 3 ADDITIONAL CONDITIONS 3) All portions of the authorized structure shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner’s area of riparian access. 4) No portion of the authorized docking facility shall extend past the “Limits of Structure” line as determined by the U.S. Army Corps of Engineers and depicted in the workplan drawings (Sheet 3 of 3). 5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 6) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Upland Development – Free Standing Deck 10) This permit authorizes only the proposed upland development, as depicted in the attached permit application, project narrative, and workplan drawings. Any other work or development proposed in an Area of Environmental Concern (AEC), including but not limited to the Coastal and Estuarine Shoreline AECs and located within the applicant’s property, shall require a review and authorization from the Division of Coastal Management prior to work commencing. 11) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. James & Lisa Anderson Permit No. 87-22 Page 3 of 3 ADDITIONAL CONDITIONS Sedimentation and Erosion Control 12) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 13) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 15) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 16) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any authorizations required from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 20220736. NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $400 was received by DCM for this project.