Loading...
HomeMy WebLinkAbout81-22 DA BallouPermit Class NEW Permit Number 81-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Darious A Ballou, 303 Georgia Ave., Morehead City NC 28557 Authorizing development in Carteret County at adi to Peletier Creek at 303 Georgia Ave., in Morehead City , as requested in the peratittee's application dated 4/18/22, including attached workplan drawings (6) C1-C6 all dated 4/18/22. This permit, issued on August 8, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation rf these terms may be subject to tines, imprisonment or civu action; or may cause urc pcnurL w vo Hull MW V V,u. Docking Facility Reconfiguration 1) This permit authorizes only the demolition of the existing docking facility, and the construction of the docks, pier, boat port, boat lift and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No portion of the authorized docking facility shall extend more than one quarter of the width of the water body. Measurements to determine width of the water body shall be made from the normal high- water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on August 8, 2027 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of D> Q ano the cnau of the Coastal Resources Commission. f� Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Darious A Ballou ADDITIONAL CONDITIONS Permit No. 81-22 Page 2 of 3 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharged at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) The pennittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of three (3) formalized boat slips. 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the northeast adjacent property owner's area of riparian access. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 9) To reduce direct impacts to oyster resources, the permittee shall relocate all oysters falling within the footprint of pilings to an area immediately adjacent to the project area. Sedimentation and Erosion Control 10) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 11) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. USACE Conditions 12) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. General 13) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 14) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. Darious A Ballou ADDITIONAL CONDITIONS Permit No. 81-22 Page 3 of 3 15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2021-00897). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 2021-1524 v2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 515-5400 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project.