Loading...
HomeMy WebLinkAbout80-22 Dean SpatholtPermit Class Permit Number NEW 80-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Dean Spatholt, 9229 Peakwood Dr. SW, Calabash, NC 28467 Authorizing development in Brunswick County at adj. to AIWW, at 9229 Peakwood Dr. SW in Calabash , as requested in the permittee’s application dated 9/13/21 (MP-1) and 2/2/22 (MP-4), including work plan drawings (2) Sheets 1-2 of 2 dated 8/11/21. This permit, issued on August 3, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2027 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DE Q and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Docking Facility Extension 1) This permit authorizes only the pier extension, relocation of two floating docks, boathouse, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit does not authorize any new formalized boat slips. The docking facility is authorized for no more than 2 formalized boat slips. (See attached sheets for Additional Conditions) Dean Spatholt Permit No. 80-22 Page 2 of 3 ADDITIONAL CONDITIONS 3) No portion of the permitted structure shall be located within 80 feet of the near bottom edge of the federally maintained AIWW channel. 4) No portion of the authorized docking facility shall extend more than one third of the width of the water body. Measurements to determine width of the water body shall be made from the normal high-water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. 5) Should the Western Lot be sold prior to the initiation of construction of the docking facility, the permittee shall obtain a written agreement from the new owner(s) waiving the minimum setback, and authorization to construct the portion of the docking facility within the property owner’s riparian setback, and submit it to the Division of Coastal Management prior to initiating construction of the docking facility. 6) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 7) The roof of the boathouse shall not be designed for second story use. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The authorized structures and associated activities shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure 12) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. Sedimentation and Erosion Control 13) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. Dean Spatholt Permit No. 80-22 Page 3 of 3 ADDITIONAL CONDITIONS 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 15) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 16) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 17) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any authorizations required from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 20220408. NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.