HomeMy WebLinkAbout69-22 Tyrrell County Drainage CanalsPermit Class Permit Number NEW 69-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Tyrrell County, 155 LA Keiser Dr., Columbia, NC 27925 Authorizing development in Tyrrell County at w/i Bridgepath, Roughton B and North Boundary canals, off SR 1213, 1209 and North Road St., as requested in the permittee’s application dtd 3/1/22, including attached workplan drawings (14), G1 dtd 3/2/22 and G2, C1-C7, and EC1-EC5 all dtd March 2022. This permit, issued on July 1, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Excavation within Drainage Canals 1) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no excavation or filling shall be permitted within the North Boundary Canal between February 15 and June 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 2) No excavation shall take place outside of the area indicated on the workplan drawings. 3) Excavation shall not exceed -4.9 feet below the normal water level. In no case shall the depth of excavation exceed the depth of connecting waters. (See attached sheets for Additional Conditions) Tyrrell County Permit No. 69-22 Page 2 of 3 ADDITIONAL CONDITIONS 4) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 5) No excavated or fill material shall be placed at any time in any vegetated wetlands/marsh or surrounding waters outside of the alignment of the fill area indicated on the workplan drawing(s). 6) No excavation shall take place within 10 feet of any Coastal Wetlands. 7) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the National Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. Dredge Material Disposal 8) No dredge material shall be permanently placed within 30 feet of the normal water line. 9) If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed immediately upon completion of construction. 10) All excavated materials shall be confined above normal high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. The barriers shall be maintained and functional until the site is graded and stabilized. 11) The permittee and/or their contractor shall take all necessary precautions to ensure that the dredge material is properly contained during transport to the disposal site, and that all the proper coordination has taken place with the local or state governments to ensure that any damage to public streets caused by transport of the dredge material has been addressed. 12) The dredge material disposal area shall be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. Maintenance Excavation 13) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the area to be maintained, the area to be used for dredge material disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the dredge material disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee’s signature shown anew on the original plan. Tyrrell County Permit No. 69-22 Page 3 of 3 ADDITIONAL CONDITIONS Sedimentation and Erosion Control 14) An Erosion and Sedimentation Control Plan modification may be required for this project. If required, this plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Division of Energy, Mineral and Land Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889. 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 16) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 17) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 18) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 19) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2022-00445). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Water Quality Certification No.004961 and assigned the project DWR Project No. 2022-0510. NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $475 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.