Issued to Reginald H. Bishop, 513 Front Street Belhaven NC 27810
authorizing development in Beaufort County at Pantego Creek on Front Street
as requested in the pennittee's application dated 5/14/84 including
attached plats, 2,/plan view and X-section no date
This permit, issued on�V2:%Zggf -,is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these teens may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
(1) The bulkhead will not extend waterward more than three feet from the normal
water level at any point along its alignment. Representatives of the North
Carolina Office of Coastal Management and the Corps of Engineers are available
to stake the bulkhead alignment to prevent an unintentional violation of
this authority.
(2) All backfill material will be obtained from an upland source and confined
landward of the permitted bulkhead.
(3) The activity will be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction -rela-
ted discharge.
(4) If submergent cultural materials are encountered during construction, the
permittee will immediately notify the Regulatory Branch, Wilmington District,
U. S. Army Corps of Engineers, telephone (919) 343-4632 and the Office
of Coastal Management at 946-6481.
NOTE: The proposed project is certified under General Water Quality Certification
No. 1272 issued on November 10, 1978, for bulkhead construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval. .
All work must cease when the permit expires on
December 31. 1987
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
David W.Owens, Director
Office of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Pennittee
Reginal H. Bishop Permit #163-84
Page 2 of 2
ADDITIONAL CONDITIONS '
NOTE: In keeping with the provisions of GS 146-6(c) the State Property Office
of the Department of Administration has granted authorization to fill
State=owned submerged lands as described in this permit.
e
f
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P. O. Box 1890
WILMINGTON. NORTH CAROLINA 28402
July 19, 1984
IR REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC084-N-007-0256
Mr. John Parker
North Carolina Department of
Natural Resources and
Community Development
Office of Coastal Management
Post Office Box 27687
Raleigh, North Carolina 27611
Dear Mr. Parker:
P�
RECE-PvT-,D
9UL
fid -
Reference the application of Mr. Regina q
H. Biah for a
Department of the Army permit to construct and 1 a bulkhead
and repair a pier on Pantego Creek in Belhaven, Beaufort County,
North Carolina.
The Federal agencies have completed review of the proposal as
presented by the application and your field investigation report.
We recommend that the following conditions be included in the
State authorization:
1. The bulkhead will not be positioned farther than 5 feet
waterward from the normal water level (NWL) elevation contour
at any point along its alignment. Representatives of the
North Carolina Office of Coastal Management and the Corps of
Engineers are available to stake the bulkhead alignment to
prevent an unintentional violation of this authority.
2. All backfill material will be obtained from an upland
source and confined landward of the permitted bulkhead.
3. If submergent cultural materials are encountered during
construction, the permittee will immediately notify the
Regulatory Branch, Wilmington District, U. S. Army Corps of
Engineers, telephone (919) 343-4632.
goeationa or c01IM1610a I44y ba 4d'464084 to Mr, 410ye brown,
F41001n114 019) 1/11-hba2,
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
-Tyep STN[o
OFFICEOF
North Carolina Department of Natural COASTAL MANAGEMENT
Resources &Community DevpAl ment David Owens
,� Director
James B. Hunt, Jr., Governor dam��ppVWr Secretary Telephone 919733-2293
�uN 26 193
22 June 1984
Memo To: John Parker J i-� 1
From: David Gossett
Subject:_Application for State Permits
a H BBis o
Pantego Cree.K
Beaufort County
Field Services
P.O. Box 1507
Washington, NC 27889
(919) 946-6481
On 1 June 1984 this office received an application from Mr. Bishop for a CAMA
Major Development Permit to construct a bulkhead waterward of the NWL in
Pantego Creek.
As can be seen by the application, a portion of Mr. Bishop's proposed bulkhead
alignment is positioned an average of 16' beyond the NWL. It is my opinion
that this exceeds the amount of land lost to erosion in the past twelve months.
Because of this, I recorm>end that the subject permit be conditioned to read:
"The bulkhead will not extend waterward more than three feet from the normal
water level at any point along its alignment."
If you have any questions do not hesitate to contact me.
cc: Creston Pate
Steve Brown
P O. Box 27687 Raleigh, N. C. 27611-7687
An Ecual OooOrlunif v Affirmative Action Emolover
' er Ito
" North Carolina Department of Natural
Resources &Community Development
James B. Hunt, Jr., Governor Joseph W. Grimsley, Secretary
7 June 1984
Mr. John R. Parker, Jr.
Permits Coordinator
Office of Coastal Management
Raleigh, NC 27611
Dear Mr. Parker:
The attached copy of an application submitted by:
Reginald H. Bishop
Applicant's Name
Front Street Belhaven Beaufort County
Location of Project County
OFFICE OF
COASTAL MANAGEMENT
Kenneth D. Stewart
Director
for a State permit to perform excavation and/or fill
work in coastal North Carolina and for a CAMA major development
permit...
X for a CAMA major development permit (only) ...
has been reviewed by the Field Services Section and is being forwarded to
you along with a Field Investigation Report for further application
processing including circulation to State and Federal agencies having
interest and/or jurisdiction over the subject matter which might be
affected by the project.
The recommendation of this Section are X covered on the reverse side;
attached; will be forwarded later.
W Sincerely,
Preston P. Pate, C 1ef
Field Services Section
PPP:kh:1526
P. 0. Box 27687 Raleigh, N. C. 27611 7687
N
X (A) This agency interposes no objection to the proposed work.
(B) Dredge and/or Fill. This agency objects to the project
as proposed. The objection is based upon findings which
lead to the conclusion that there will be one or more
adverse effects as covered in G. S. 113-229 (e) 1-5.
(e) (1) ...that there will be significant
adverse effect of the proposed
dredging and filling on the use
of the water by the public;
(e) (2) ...that there will be significant
adverse effect on the value and
enjoyment.of the property of any
riparian owners;
(e) (3) ...that there will be significant
adverse effect on public health,
safety, and welfare;
(e) (4) ...that there will be significant
adverse effect on the conservation
of public and private water
supplies;
(e) (5) that there will be significant
adverse effect on wildlife or
fresh water, estuarine or marine
fisheries;
(C) CAMA Major Development. This agency objects to the
project as pro�The objection is based upon
findings which lead to the conclusion that a violation
would occur as covered in G.S. 113A-120 and/or 15
NCAC 7I. The following reference indicates the
specific citation by which objections have been
made.
(D) Agency findings relating to item(s) A and/or B
and/or C are hereby detailed.
NO CONDITIONS
(E) Comments are submitted that do not directly relate
to item B and/or C but are relevant to the public
interest. (These comments will be forwarded by the
Department of Natural Resources and Community Development
to appropriate State or Federal ag ncies).
4y� e - -
sighed
17_Zl
date
OFFICE OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
I
K
Applicant's name Reginald H. BishoA
Location of project site Beaufort County Town of Belhaven Front Street Pantego Creek
3. Investigation type: Dredge & Fill CAMA X
4. Investigative procedure: (A) Dates of site visit 6-6-84
(B) Was applicant present Yes
5. Processing procedure: Application received 6-1-84 Office Washington
6. Site description: (A) Local Land Use Plan Belhaven
Land classification from LUP Conservation
Development constraints identified in LUP The Belhaven Land Use
Plan indicates no development will occur in Public Trust Waters except those which are
water dependent. It states, however, that bulkheads are water dependent which is not tt
case.
(B) AEC(s) involved: Ocean Hazard Estuarine shoreline
Coastal wetlands Public trust waters X
Estuarine waters Other
(C) Water dependent: Yes No X Other
(D) Intended use: Public Private X Commercial
(E) Type of waste water treatment: Existing m/A
Planned N/A
(F) Type of structures: Existing Deteriorated bulkhead pier and riprap
Planned Bulkhead
(G) Estimated annual rate of erosion less than 1' Source OCM staff observation
7. Habitat description: AREA
(A) Vegetated wetlands: Dredged Filled Other
None
(B) Non -vegetated wetlands:
(C) Other:
Open water None + 600 sq.ft.
(D) Total area disturbed: + 600 sq.ft.
8. Project summary The applicant is proposing to construct 150' of new bulkhead to stabilize
his shoreline. Also proposed is the repair of a 93' long section of deteriorated bulk-
head and the repair of a pier.
Environmental setting
The applicant owns a 120' x 100' lot on Front Street in the Town of Belhaven. The
property is a vacant lot between the street and Pantego Creek. Along the west
side of the property i-s a + 93' long deteriorated wooden bulkhead which is in need
of repair. At the southwest corner of the property is a + 110' long deteriorated
pier which is also in need of repair. Located along the south side of the property
is riprap which has stabilized the property fairly well in regards to erosion.
Along + 75' of this area of shoreline the riprap is located near the normal water
level. Along the other 25' the normal water angles in a northeasterly direction
away from the riprap. In this area the riprap is low enough to allow water movement
throughout the area. This low riprap continues in aneasterly direction in front
of other properties. The riprap has stabilized the entire length of shoreline fairly
well. No significant erosion appears to be occurring.
Project proposal
The applicant is proposing the following:
(1) To repair the existing 93' of deteriorated bulkhead along the existing alignment.
(2) To repair the existing pier to its present length and width.
(3) To construct a wooden bulkhead along the southern shoreline. 75' of the bulkhead
will average 3' beyond NWL and will be located near the toe of the riprap. 25' of
the bulkhead will also be placed near the toe of the riprap, however, this portion
will average + 16' beyond the NWL and will be + 30' at the furthest point. After
completion of the bulkhead, the confined area will be backfilled.
Environmental impact
If the project is conducted as proposed, + 600 sq.ft. of open water area will be
filled. The creek bottom throughout the area to be filled is covered by riprap or
is composed of sand. No wetland vegetation will be excavated or filled.
David L. Gossett - Washington Office - 7 June 1984
Wa.ak •
APPLICATION
FOR
PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
Department of Administration State of North Carolina Department of the Army
(GS 146.12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington Distric
- (GS 113.229, 143.215.3(a)(1), 143-215.3(G), 113A-118 (33 CIF 209.320-3291
Please type or print and fill in all blanks. If information is not applicable, so Indicate by placing N/A in blank.
I. Applicant Information
A. Name
Last �tLf? Middie
B. Address
� S[reet�Or. < or Route ^7 or� Z�a3
City or Town State �r 16 Oc Zip Code Phone
II. Location of Prop d Project:
A. County ` (Lb--r
B. 1. City, town, community or landmark k�� qUe ►� . 1 7i C
2. Is proposed work within city limits? Ye� No
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
III. Description of Project
/
✓
A.
1. Maintenance of existing project 2. New work
B.
Purpose of excavation or fill A
1. Access channel length width
depth
2. Boat basin length width .
depth
3. Fill area length width
depth
4. Other length width
depth
C.
1. Bulkhead length 6 1 Average distance waterward of MHW (shoreline)
�� ( ;; 7 1 I 4,
2. Type of bulkhead construction (material) S A LT, T►e_n
1 eeQ
.,7 f .
D.
Excavated material (total for prti e't)
1. Cubic yards 2. Type of material
E.
Fill material to be placed below h HW (see also VI. A) •
4;�Ard4we�e
/
1. Cubic yards S i 8 2. Type of material
^ X n ,
IV. Land Type, Disposal Area, and Construction Equipment:
A.
Does the area to be excavated include any marshland, swamps or other wetland? Yes
AZ�o
B.
Does the disposal area include any marshland, swamps or other wetland?
Yes
No
C.
Disposal Area
EP l ks'i'a
1. Location
2. Do you
claim title to disposal area?
D.
Fill material source iffill isurbcUucket' .r.i we.7e.a a
fa4.�i
!' I
E.
How will excavated material he entrapped and erosion controlled? f ' �^�_?�1•ik
h «t
1 . 1 ype of equipment to he used lk A,2A !iV t'_euTr AnT v-c
G. Will marshland be crossed in transporting equipment to project site? If yes, explain
nR G.n 1
V. Intended Use of Project Area (Describe)
A. 1. Private ✓
2. Commercial
3. Housing Development or Industrial
4. Other
B. 1. Lot ske(s) / °� e' I On
2. kbutim of lots) above mean high water 4- Z s Q
3. Soil type and texturora%-Gamen
4. Type of building facilities or structures A 0 _
S. Sewage disposal and/or waste water treatment A. Existing Planned
B. Describe
S. Land Classification (circle one) EVELOPED TRANSITIONAL COMMUNITY' RURAL
CONSERVATI OTHER (See CAMA Local Land. Use Plan Synopsis)
VI. Pertaining to Fill and Water Quality: '
A. Does the proposed project involve the placement of fill materials below mean high water? Yes_No
B. 1. Will any runoff or discharge enter adjacent waters as yesult of project activity or planned use of the
area following project completion? Y s_No (_ _
1. Type of discharge
3. Location of diseharl
VII. Present rate of shoreline erosion (if known):
Vill. List permit numbers and Issue dates of previous Department of Army Corps of Engineers or State permits for
work In project area; if applicable:
IX. Length of time required to complete project: 62 d fF
X. In addition to the completed application form, the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the:owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his
B. Attach an accuraje work plat drawn to scale on 8% X I I" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113-229'(d))Enter date served
D. List names and complete addresses of the riparian landowners with property adjoining applicant's.
Such owners haveZ0 days in which to submit comment .tq agenjies listedlbelow.
Xi. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolinals approved coastal management program and will be conducted in a
manner consistent with such'program.
XII. Any permit issued pursuant to this application will allow only the development described in this appli•
cation and plat. Applicants should therefore describe in the;application and plat all anticipated devel.
opment activitiesyir(cluding construction, excavation, filling, and land clearing.
/
DATE
Applicant's Signs re _
DaF-92 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS
Rev- 1017A
.
Por-oNT 6T, 4-j. z
.1-3-o
P*OL.Z"o CV-naKC
dO®l9OOP �dC'J ����
IST 75�AN gvc,oId
3/ SeNLOFW&
_ 4.o
LM Sfive ►1�aip1�%�Te�i :TS�q. SCS
PJIS T, T.A4,k0'OL, 419161AS
NO
— N J4 4) 6.0
L c.
t+ i ,(!, r a• y reaY � 1 v �j b, t' a � .
1 P l MY )
�p�t�`�- t es�r e S ,r ' ► r y; SsA '�` ..
*� y !i l � ��i'{"i�, It 3�_ Jy r �'r�2'��+!'�� r�i f .: /5 � 4u# l A��6 rdit�• � it 3•
*.•k x "sA v . • .� � �Uy't•'' y .F �. ha {t � ��xx r •
Y t rY. , i �� • •rem 4 �Saa} ,•, y. �.
FY �a�° iiyyygg: s •• • t y r gyA+.►w -
I 'a 'rP S� f4,r.' SSt T ♦ iO••i• �F R w^_. .+ ♦•4 •�•.;
J �fx i� • r � � t.�
�tyt /_ .€rs� tr + ,J't O Va. `..11► d'�yr ... ��•I-{
Mn•'Y±'%r Ui� � l S � �
�;32 30� -
s' Beffia _
i
• _ tawgr Cowry PC
I sl° } * to °�: f • '� '�'
t ` • 1 "
��� YWW � 1... Y,• ; x 4 � 4 S
.,c g
Pt
4.1
� } � �r t \ \ .•. � � ! Al : 1. w l x A rrt r ru.: "*i`;➢ t ., by r,,^ gym:.-`....•y,
t� *\\ F "t
� eyo
,, I PUl1Q0
Li
;t.
rf '`
,; ...
67000D
i FEET —; P U 4V GO — — — C
R E
�t ail. "Std•T` a O' �'_. $tp' j "• r J
0i I Grumpy
rants. Pt (c)Lighto
_ i yy� cs! 1 J� ♦ V
A
F d " wwn
r.
��. � '1, tan " � , _. :+�k•. <<,'..
0 76zn0000FeEr'« 35,
76 3T30•'
Mapped by U. S. Coast. -and Geodetic Survey `
CJA�J ��J ....LL..Ln.! L.. •L.. P....I:.n:a.�l G.nmu
.,
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT. CORPS OF ENGINEERS
P. O. BOX 1690
WILMINGTON. NORTH CAROLINA 284OZ
June 13, 1984
Regulatory Branch
SUBJECT: File No. SAWC084-N-007-0256
Mr. Reginald H. Bishop
513 Front Street
Belhaven, North Carolina 27810
Dear Mr. Bishop:
On January 27, 1981, we issued general permit No. SAWCO80-N-
000-0291 (enclosed), which provides Federal authorization for
construction activities that receive authorization from the State
of North Carolina.
A review of your application received June 11, 1984, for a
Department of the Army permit to construct and backfill a bulkhead
on Pantego Creek in Belhaven, Beaufort County, North Carolina,
indicates it to be a candidate for Federal authorization under
this general permit. Accordingly, the administrative procesain>
of your applii^^ " ' be accomplished by the North Carolina
Office of Coastal Management. Comments from Federal review
agencies will be furnished to the State.
If your application must be withdrawn from this general
permit process for any reason, you will be notified and informed
of its further management in writing. If there are no unresolved
differences of State -Federal positions or policy, the final action
taken on your application by the State will result in your
receiving written notice from us that your application has been
successfully processed under our general permit. Only after
receiving such confirmation should you begin work.
Your application has been assigned No. SAWC084-N-007-0256 and
will be coordinated by Mr. Steve Brown, telephone (919) 343-4632.
He is available to address questions or comments you may have.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch